Registration | About | HOME                                OATI webOASISSM Production Node                                        



Documents

  • NAESB Home Page

  • Standards of Conduct
    2016 11 07 Transmission_Function_Employee_Position_Titles_and_Descriptions
    2017 06 01 Transmission Function Employee Job Titles and Descriptions
    GMP Affiliates Engaging Marketing Employees (2017 02 06)
    Job Transfers 02-27-15
    Shared Facilities
    Information Disclosures
    Potential Merger Partners
    Voluntary Consent
    Implementation Procedure
    Waivers
    Discount Posting
    GMP Discount Posting Informartion
    June 2016 Offer Price Issue
    Ongoing Offer Price Issue 08-08-2016
    Performance Metrics
    Performance Metrics
  • Local Study Process

  • Grants and Denials 2016
    Business Practices, Waivers, and Exemptions
    Schedule 20A
    Business Practices Amendments
    Business Practices Schedule 20A
  • Conditional Firm Service Sched. 20A

  • Creditworthiness
    Creditworthiness Amendment
  • Designation of Network Resources

  • Energy and Generation Imbalances
  • NAESB Business Practices

  • Planning Redispatch

  • Transmission Studies

  • ISO Business Practices and Business Practices Amendments

  • Schedule 21
    Business Practices Amendments
    Business Practices Schedule
    CEII Disclosure
    Credit worthiness
    Credit worthiness Amendment
    Conditional Firm Service
  • Designation of Network Resources

  • Energy and Generation Imbalances.
    Transmission System Information and Studies
    Planning Redispatch
    Transmission Planning
  • Transmission Planning Strawman

  • ISO New England Regional system Plans

  • ISO-NE Attachment K Regional System Plan – December 7, 2007 FERC Order 890A Compliance Filing

  • ISO-NE Attachment K Regional System Plan –August 13, 2008 FERC Order 890A Compliance Filing

  • ATC Information
    Schedule 20A
  • ATCID.

  • CBMID.

  • TRMID.

  • ATC Methodology Contact
  • Current Load Forecast Descriptive Satement

  • Postback Methodology

  • Load Forecast

  • Attachment C Methodology to Assess Available Transfer Capability

  • Mathematic Algorithms for calculation of ATC

  • Total Transfer Capability Data

  • Schedule 21
    ATCID
    CBMID
    TRMID
    ATC Methodology Contact ,
    Postback Methodology,
  • Attachment A Methodology to Assess Available Transfer Capability

  • Mathematic Algorithms for calculation of ATC
    Total Transfer Capability Data
    OASIS Related Information
    GMP Schedule 20-A Prices effective June 1, 2017
    OASIS Related Information
    Schedule 20-A GMP Prices effective June 1 2016
    GMP Transmission Information
  • GMP Transmission Information

  • Application for Firm and/or Non-Firm Point-To-Point Transmission Service

  • Service Agreement For the Resale, Reassignment or Transfer of L.T. Firm P.to P.
    Notice of Proposed Modifications to Schedule 20A
    Notice of Proposed Modifications to Schedule 20A
    Nov. 6 2009 Update and Cleanup Filing
    Reservation Timing Requirements
    Reservation Timing Requirements
    Transmission Outages
    Transmission Outages
    Available Capacity
    Available Capacity
    Company Web Site
  • Company Web Site

  • Request Validation: Error Comment Explanations
    Request Validation: Error Comment Explanations
    General Transmission Information
    Interconnection wide curtailment and interruption
  • NERC Transmission Loading Relief (TLR) Procedure

  • ISO-NE Transmission Operations - Short Term Outage Report - Long Term Transmission

  • ISO-NE Total Transfer Capability (TTC) Data

  • Methodology for Computing CBM and TRM
  • ISO-NE ATC Methodology for Phase I/II HVDC-FV

  • ISO-NE Transmission Information and Services for the Phase I/II HVDC-TF Intertie with HQ

  • Transmission System Studies
  • ISO-NE Transmission System Studies

  • Tariffs and Service Agreements
  • ISO-NE Transmission, Markets & Services Tariff

  • Interconnection Requests
  • ISO-NE Large Generator Interconnection Requests

  • GMP Generator Interconnection Request Queue
    Schedule 21 Forecast
    2015 Forecast Filing E-1 Document 1 of 3
    2015 Forecast Filing E-2 Document 2 of 3
    2015 Forecast Filing E-3 Document 3 of 3
    2016 Forecast Filing E-1 Document 1 of 3
    2016 Forecast Filing E-1 Final 12-14-15
    2016 Forecast Filing E-2 Document 2 of 3
    2016 Forecast Filing E-2 Final 12-14-15
    2016 Forecast Filing E-3 Document 3 of 3
    2016 Forecast Filing E-3 Final 12-14-15
    GMP FERC Form 1 2015
    Schedule 21-GMP 2017 Forecast E-1
    Schedule 21-GMP 2017 Forecast E-2
    Schedule 21-GMP 2017 Forecast E-3
    Schedule 21-GMP E-1 2017 Final 12-15-2016 Posting
    Schedule 21-GMP E-2 2017 Final 12-15-2016 Posting
    Schedule 21-GMP E-3 2017 Final 12-15-2016 Posting
    Schedule 21 Annual True-up
    2016 06 01 GMP AIF Letter and Attestation
    2016 10 30 GMP AIF Letter and Attestation
    GMP FERC Form 1 2015
    Schedule 21-GMP E-1 Actual 2015 Final
    Schedule 21-GMP E-1 Actual 2015 Final 10-30-16
    Schedule 21-GMP E-2 Actual 2015 Final
    Schedule 21-GMP E-3 Actual 2015 Final
    Schedule 21-GMP E-3 Actual 2015 Final 10-30-16
    Schedule_21-GMP_E-2_Actual_2015_Final 10-30-16
    GMP & CVPS OASIS Archive Information
    2016 True-up
    FERC Form 1 2016
    Schedule 21-GMP E-1 Actual 2016 6-1-17
    Schedule 21-GMP E-2 Actual 2016 6-1-16
    Schedule 21-GMP E-3 Actual 2016 6-1-16
    Notices
    2016 Posted Offerings Notice on 10-30-2015


    Welcome to GMP

    On June 27, 2012, GazMetro Limited Partnership acquired all of the issued and outstanding stock of Central Vermont Public Service Corporation. A merger among CVPS, and GazMetro subsidiary, Green Mountain Power Corporation was completed September 30, 2012.

    As of Oct. 1, 2012, all transmission reservations formerly made through the CVPS OASIS must now be made through GMP OASIS.

    If problems occur, which cannot be resolved on OASIS, call:

    Bill Ryan: 802-770-3261

    Sharon Lucia: 802-655-8425

    GMP Control Center: 802-770-3400

     

     

         


    ©2001-2010 OATI webOasisTM/SM - Open Access Technology International, Inc. All Rights Reserved.