AVAT Outages:
  LOLO-OXBOW 230     130458     AVAT     LOLO          AVA.SYS-LOLO(AVAT) 
  LOLO-AVA.SYS(AVAT)   
  340.0 
  400.0   
  450.0 
  400.0   
  0.0 
  0.0   
  2025-09-29 08:00 
  2025-09-29 08:00   
  2025-11-26 16:00 
  2025-11-26 16:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     AVAT     Line Rebuild     2025-01-14 12:34     AVAT53946      2025-07-29 10:52  
  LOLO-OXBOW 230     139424     AVAT     LOLO          AVA.SYS-LOLO(AVAT) 
  LOLO-AVA.SYS(AVAT)   
  450.0 
  400.0   
  450.0 
  400.0   
  0.0 
  0.0   
  2025-11-15 08:00 
  2025-11-15 08:00   
  2026-02-01 16:00 
  2026-02-01 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     AVAT     **IPCO Outage**T980 Rebuild Structures, Conductor, OPGW, Transfer Energized Shield Wire STR 1-STR-127.     2025-07-29 10:56     AVAT56757      2025-07-29 10:56  
AZPS Outages:
BEPW Outages:
  Summer 2025 Limit     63974     WACM     TOT-3 (BEPW)     TOT 3 BASIN (BEPW)     AU>LRS(BEPW) 
  KEOT>LRS(BEPW) 
  LRS>AU(BEPW) 
  LRS>KEOT(BEPW)   
  722.0     722.0     493.9 
  290.1 
  493.9 
  290.1   
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00   
  2025-11-01 10:00 
  2025-11-01 10:00 
  2025-11-01 10:00 
  2025-11-01 10:00   
  Active     Transmission     Planned      OnPath     BEPW,WACM     TOT-3 Summer 2025 Ratings of 1818 MW for system intact (Cell A1). Using Cell A2 with zero DC tie schedule the Limit will be 1534 MW and BEPWs share of transfer is 515 JK.     2025-06-02 08:47     WACM19584      2025-06-02 08:47  
  SGE-SGW     64220     BEPW     SGE>SGW          SGE>SGW(BEPW) 
  SGW>SGE(BEPW) 

  SGE>SGW(BEPW) 
  SGW>SGE(BEPW) 

  SGE>SGW(BEPW) 
  SGW>SGE(BEPW) 

  SGE>SGW(BEPW) 
  SGW>SGE(BEPW)   
  110.0 
  110.0 

  110.0 
  110.0 

  110.0 
  110.0 

  110.0 
  110.0   
  110.0 
  110.0 

  110.0 
  110.0 

  110.0 
  110.0 

  110.0 
  110.0   
  100.0 
  100.0 

  0.0 
  0.0 

  100.0 
  100.0 

  100.0 
  100.0   
  2025-06-26 15:00 
  2025-06-26 15:00 

  2025-06-26 17:00 
  2025-06-26 17:00 

  2025-06-26 17:48 
  2025-06-26 17:48 

  2025-06-27 16:00 
  2025-06-27 16:00   
  2025-06-26 17:00 
  2025-06-26 17:00 

  2025-06-26 17:48 
  2025-06-26 17:48 

  2025-06-27 16:00 
  2025-06-27 16:00 

  2025-09-18 16:00 
  2025-09-18 16:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     BEPW,WACM     SGE DC tie limited to 100 MW both directions     2025-06-26 14:35     BEPW19675      2025-06-26 17:48  
  DJ-LRS230     62803     BEPW     DJ-LRS230          DJ>LRS230(BEPW) 
  LRS230>DJ(BEPW)   
  0.0 
  0.0   
  223.0 
  227.0   
  0.0 
  0.0   
  2025-09-03 07:00 
  2025-09-03 07:00   
  2025-09-16 09:24 
  2025-09-16 09:24   
  Completed     Transmission     Planned      OnPath     BEPW,WACM     ICC-25-0507; INFO-25-1261     2025-02-04 18:33     BEPW19196      2025-09-16 09:23  
  System Conditions     62802     WACM     TOT-3 (BEPW)     TOT 3 BASIN (BEPW)     AU>LRS(BEPW) 
  KEOT>LRS(BEPW) 
  LRS>AU(BEPW) 
  LRS>KEOT(BEPW)   
  722.0     722.0     285.4 
  167.6 
  285.4 
  167.6   
  2025-09-03 07:00 
  2025-09-03 07:00 
  2025-09-03 07:00 
  2025-09-03 07:00   
  2025-09-16 10:00 
  2025-09-16 10:00 
  2025-09-16 10:00 
  2025-09-16 10:00   
  Completed     Transmission     Planned      OffPath     BEPW,WACM     TOT-3 to Series 9; ICC-25-0507; INFO-25-1261     2025-02-04 18:32     WACM19195      2025-09-16 09:22  
  LRS-KEOT 345     55540     BEPW     LRS>KEOT          KEOT>LRS(BEPW) 
  LRS>KEOT(BEPW)   
  323.0 
  323.0   
  323.0 
  323.0   
  0.0 
  0.0   
  2025-09-11 07:00 
  2025-09-11 07:00   
  2025-11-21 17:00 
  2025-11-21 17:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     BEPW,WACM     C-22-0096     2022-08-11 14:30     BEPW16706      2025-09-04 08:29  
  LRS-STY 345     58050     BEPW     TOT-3 (BASIN), LRS>STY 345          LRS>STY(BEPW) 
  STY>LRS(BEPW)   
  0.0 
  0.0   
  0.0 
  0.0   
  0.0 
  0.0   
  2025-09-11 07:00 
  2025-09-11 07:00   
  2025-11-21 15:00 
  2025-11-21 15:00   
  Cancelled     TRANSMISSION     FORCED      ONPATH     BEPW,WACM     Outage: C-22-0096     2023-05-03 23:52     BEPW17562      2023-06-21 12:23  
  System Conditions     58049     WACM     TOT-3 (BASIN)     TOT 3 BASIN (BEPW)     AU>LRS(BEPW) 
  KEOT>LRS(BEPW) 
  LRS>AU(BEPW) 
  LRS>KEOT(BEPW)   
  722.0     722.0     187.7 
  110.3 
  187.7 
  110.3   
  2025-09-11 07:00 
  2025-09-11 07:00 
  2025-09-11 07:00 
  2025-09-11 07:00   
  2025-11-25 15:00 
  2025-11-25 15:00 
  2025-11-25 15:00 
  2025-11-25 15:00   
  Cancelled     Transmission     Forced      OnPath     BEPW,WACM     C-22-0096; Series #3     2023-05-03 23:41     WACM17561      2023-06-21 12:23  
  System Conditions     55543     WACM     TOT-3 (BEPW)     TOT 3 BASIN (BEPW)     AU>LRS(BEPW) 
  KEOT>LRS(BEPW) 
  LRS>AU(BEPW) 
  LRS>KEOT(BEPW)   
  722.0     722.0     184.6 
  108.4 
  184.6 
  108.4   
  2025-09-11 14:00 
  2025-09-11 14:00 
  2025-09-11 14:00 
  2025-09-11 14:00   
  2025-11-21 17:00 
  2025-11-21 17:00 
  2025-11-21 17:00 
  2025-11-21 17:00   
  Cancelled     Transmission     Planned      OnPath     BEPW,WACM     C-22-0096; TOT-3 to Series 3     2022-08-11 14:34     WACM16707      2025-09-04 08:30  
  SGE-SGW     65012     BEPW     SGE>SGW          SGE>SGW(BEPW) 
  SGW>SGE(BEPW)   
  110.0 
  110.0   
  110.0 
  110.0   
  0.0 
  0.0   
  2025-09-16 08:00 
  2025-09-16 08:00   
  2025-09-16 15:00 
  2025-09-16 15:00   
  Cancelled     TRANSMISSION     FORCED      ONPATH     BEPW,WACM     Forced outage.      2025-09-16 07:15     BEPW20059      2025-09-16 07:47  
  SGW-SCSW     62916     BEPW     TOT-3 (BASIN), SGW-SCSW          SCSW>SGW(BEPW) 
  SGW>SCSW(BEPW)   
  96.0 
  111.0   
  0.0 
  0.0   
  0.0 
  0.0   
  2025-09-29 07:00 
  2025-09-29 07:00   
  2025-10-11 16:00 
  2025-10-11 16:00   
  Scheduled     Transmission     Planned      OnPath     BEPW     ICC-25-0357; TOT3 to Series 4.     2025-02-20 00:44     BEPW19259      2025-04-16 07:19  
  System Conditions     63560     WACM     TOT 3 BASIN (BEPW)     TOT 3 BASIN (BEPW)     AU>LRS(BEPW) 
  KEOT>LRS(BEPW) 
  LRS>AU(BEPW) 
  LRS>KEOT(BEPW)   
  722.0     722.0     204.1 
  119.9 
  204.1 
  119.9   
  2025-09-29 07:00 
  2025-09-29 07:00 
  2025-09-29 07:00 
  2025-09-29 07:00   
  2025-10-11 16:00 
  2025-10-11 16:00 
  2025-10-11 16:00 
  2025-10-11 16:00   
  Scheduled     Transmission     Planned      OffPath     BEPW,WACM     ICC-25-0357; INFO-25-1423; TOT-3 to Series 4     2025-04-16 07:10     WACM19459      2025-07-18 20:42  
  System Conditions     62912     WACM     TOT-3 BASIN (BEPW)          AU>LRS(BEPW) 
  LRS>AU(BEPW)   
  448.0 
  448.0   
  448.0 
  448.0   
  0.0 
  0.0   
  2025-09-29 08:00 
  2025-09-29 08:00   
  2025-10-11 17:00 
  2025-10-11 17:00   
  Cancelled     Transmission     Planned      OffPath     BEPW,WACM          2025-02-20 00:31     WACM19257      2025-04-16 06:43  
  SGE-SGW     65065     BEPW     SGE>SGW          SGE>SGW(BEPW) 
  SGW>SGE(BEPW)   
  110.0 
  110.0   
  110.0 
  110.0   
  0.0 
  0.0   
  2025-09-30 06:00 
  2025-09-30 06:00   
  2025-09-30 12:00 
  2025-09-30 12:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BEPW,WACM     INFO-25-2279     2025-09-22 18:44     BEPW20085      2025-09-22 18:44  
  System Conditions     64907     WACM     YT-South     YT-SOUTH     YTW>DJ(LAPT)      225.0     225.0     132.0      2025-10-07 07:00      2025-10-07 10:00      Scheduled     Transmission     Planned      OnPath     BEPW,LAPT,WACM     INFO_25-2158; Series 4     2025-09-04 23:58     WACM20004      2025-09-11 16:33  
  System Conditions     64763     WACM     TOT-3 (BEPW)     TOT 3 BASIN (BEPW)     AU>LRS(BEPW) 
  KEOT>LRS(BEPW) 
  LRS>AU(BEPW) 
  LRS>KEOT(BEPW)   
  722.0     722.0     208.5 
  122.5 
  208.5 
  122.5   
  2025-10-13 06:00 
  2025-10-13 06:00 
  2025-10-13 06:00 
  2025-10-13 06:00   
  2025-10-16 18:00 
  2025-10-16 18:00 
  2025-10-16 18:00 
  2025-10-16 18:00   
  Scheduled     Transmission     Planned      OnPath     BEPW,WACM     INFO-25-2080; C-25-1302; TOT-3 to series 5     2025-08-21 18:22     WACM19906      2025-08-21 18:22  
  DJ-LRS230     65054     BEPW     TOT-3 (BASIN), DJ-LRS230          DJ>LRS230(BEPW) 
  LRS230>DJ(BEPW)   
  223.0 
  227.0   
  223.0 
  227.0   
  0.0 
  0.0   
  2025-11-03 07:00 
  2025-11-03 07:00   
  2025-11-21 18:00 
  2025-11-21 18:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BEPW     INFO-25-2075     2025-09-20 19:47     BEPW20080      2025-09-20 19:47  
  System Conditions     65053     WACM     TOT-3 BASIN     TOT 3 BASIN (BEPW)     AU>LRS(BEPW) 
  KEOT>LRS(BEPW) 
  LRS>AU(BEPW) 
  LRS>KEOT(BEPW)   
  722.0     722.0     285.4 
  167.6 
  285.4 
  167.6   
  2025-11-03 07:00 
  2025-11-03 07:00 
  2025-11-03 07:00 
  2025-11-03 07:00   
  2025-11-21 18:00 
  2025-11-21 18:00 
  2025-11-21 18:00 
  2025-11-21 18:00   
  Scheduled     Transmission     Planned      OnPath     BEPW,CRCM,LAPT,WACM     INFO-25-2075; TOT3 Series 9     2025-09-20 19:45     WACM20079      2025-09-20 19:45  
  TOT-1A     64817     WACM     TOT-1A     TOT-1A     BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 
  CRG>SWR(CRCM) 
  SWR>CRG(CRCM) 
  SWR>VNL(CRCM) 
  VNL>FGE(CRCM) 
  VNL>SWR(CRCM)   
  395.0     395.0     240.5 
  240.5 
  129.5 
  129.5 
  129.5 
  222.0 
  129.5   
  2025-11-18 06:00 
  2025-11-18 06:00 
  2025-11-18 06:00 
  2025-11-18 06:00 
  2025-11-18 06:00 
  2025-11-18 06:00 
  2025-11-18 06:00   
  2025-11-20 15:00 
  2025-11-20 15:00 
  2025-11-20 15:00 
  2025-11-20 15:00 
  2025-11-20 15:00 
  2025-11-20 15:00 
  2025-11-20 15:00   
  Scheduled     Transmission     Planned      OffPath     BEPW,CRCM,LAPT,WACM     INFO-25-2086/2087     2025-08-28 03:35     WACM19944      2025-08-28 03:35  
  System Conditions     65048     WACM     TOT-3 BASIN     TOT 3 BASIN (BEPW)     AU>LRS(BEPW) 
  KEOT>LRS(BEPW) 
  LRS>AU(BEPW) 
  LRS>KEOT(BEPW)   
  722.0     722.0     193.4 
  113.6 
  193.4 
  113.6   
  2025-12-01 07:00 
  2025-12-01 07:00 
  2025-12-01 07:00 
  2025-12-01 07:00   
  2025-12-19 18:00 
  2025-12-19 18:00 
  2025-12-19 18:00 
  2025-12-19 18:00   
  Scheduled     Transmission     Planned      OnPath     BEPW,CRCM,LAPT,WACM     ICC-25-2236; TOT3 Series 15     2025-09-20 19:38     WACM20076      2025-09-20 19:38  
BHBE Outages:
  BHBE 002673.2     141338     BHBE     RCWest to RCEast = 0mw          RCWEST-RCEAST(BHBE)      200.0      200.0      0.0      2025-09-29 07:30      2025-09-29 10:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     BHBE     RCDC TIE LIMITED TO 0 E-W & 0 W-E - RCWEST-RCEAST (200)     2025-09-16 18:36     002673.2     2025-09-16 18:36  
  BHBE 002673.1     141339     BHBE     RCEast to RCWest = 0mw          RCEAST-RCWEST(BHBE)      200.0      200.0      0.0      2025-09-29 07:30      2025-09-29 10:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     BHBE     RCDC TIE LIMITED TO 0 E-W & 0 W-E - RCEAST-RCWEST (200)     2025-09-16 18:36     002673.1     2025-09-16 18:36  
  BHBE 002742.1     141368     BHBE     RCWest to RCEast = 100mw          RCWEST-RCEAST(BHBE)      200.0      200.0      100.0      2025-10-06 08:00      2025-10-16 10:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     BHBE     SOL Mitigation for Osage-Teckla 230 kV Line outage. RCEAST Limited to 100 MW W to E - RCWEST-RCEAST (100)     2025-09-23 11:36     002742.1     2025-09-23 11:36  
  BHBE 002245.1     141367     BHBE     OSAGE-TECKLA 230KV LINE          RC-WYODAK(BHBE) 
  WYODAK-RC(BHBE)   
  1784.0 
  1784.0   
  1784.0 
  1784.0   
  1063.0 
  1063.0   
  2025-10-06 08:30 
  2025-10-06 08:30   
  2025-10-16 09:00 
  2025-10-16 09:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     BHBE     TECKLA - OSAGE 230KV LINE OUTAGE - RC-WYODAK (721),WYODAK-RC (721)     2025-09-23 11:33     002245.1     2025-09-23 11:33  
  BHBE 002749.1     141375     BHBE     RCWest to RCEast = 100mw          RCWEST-RCEAST(BHBE)      200.0      200.0      100.0      2025-10-16 09:00      2025-10-16 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     BHBE     SOL Mitigation for Osage - Sagebrush 230 Line outage. RCEAST Tie limited to 100 MW W to E - RCWEST-RCEAST (100)     2025-09-23 13:51     002749.1     2025-09-23 13:51  
  BHBE 002274.1     141374     BHBE     OSAGE-SAGEBRUSH 230 KV LINE          RC-WYODAK(BHBE) 
  WYODAK-RC(BHBE)   
  1784.0 
  1784.0   
  1784.0 
  1784.0   
  1412.0 
  1412.0   
  2025-10-16 10:00 
  2025-10-16 10:00   
  2025-10-16 14:00 
  2025-10-16 14:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     BHBE     SAGEBRUSH - OSAGE 230KV LINE OUTAGE - RC-WYODAK (372),WYODAK-RC (372)     2025-09-23 13:50     002274.1     2025-09-23 13:50  
  BHBE 002071.1     141386     BHBE     WESTHILL-SOUTH RAPID 230 KV LINE          FALLRIVER-RC(BHBE) 
  RC-FALLRIVER(BHBE)   
  478.0 
  478.0   
  478.0 
  478.0   
  398.0 
  398.0   
  2025-10-20 08:00 
  2025-10-20 08:00   
  2025-10-21 08:30 
  2025-10-21 08:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     BHBE     WESTHILL-SOUTH RAPID 230KV LINE OUTAGE - RC-FALLRIVER (80),FALLRIVER-RC (80)     2025-09-24 15:44     002071.1     2025-09-24 15:45  
  BHBE 002758.1     141387     BHBE     RCWest to RCEast = 0mw; RCEast to RCWest = 100mw          RCEAST-RCWEST(BHBE) 
  RCWEST-RCEAST(BHBE)   
  200.0 
  200.0   
  200.0 
  200.0   
  100.0 
  0.0   
  2025-10-20 08:00 
  2025-10-20 08:00   
  2025-10-21 08:30 
  2025-10-21 08:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     BHBE     Mitigation for Westhill-South Rapid 230 kV Line Outage. RCEAST limited to 0 W to E and 100 E to W - RCWEST-RCEAST (200),RCEAST-RCWEST (100)     2025-09-24 15:49     002758.1     2025-09-24 15:49  
  BHBE 002784.1     141572     BHBE     RCWest to RCEast = 100mw          RCWEST-RCEAST(BHBE)      200.0      200.0      100.0      2025-10-21 08:00      2025-10-24 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     BHBE     Mitigation for Westhill-Fall River 230 kV Line outage. RCEAST Tie limited to 100 W to E. - RCWEST-RCEAST (100)     2025-09-26 17:33     002784.1     2025-09-26 17:33  
  BHBE 002541.1     141571     BHBE     WESTHILL-FALL RIVER 230KV LINE          FALLRIVER-RC(BHBE) 
  RC-FALLRIVER(BHBE)   
  478.0 
  478.0   
  478.0 
  478.0   
  0.0 
  0.0   
  2025-10-21 09:00 
  2025-10-21 09:00   
  2025-10-24 15:00 
  2025-10-24 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     BHBE     WESTHILL - FALL RIVER 230KV LINE OUTAGE - RC-FALLRIVER (478),FALLRIVER-RC (478)     2025-09-26 17:22     002541.1     2025-09-26 17:22  
  BHBE 002652.1     141383     BHBE     DONKEY CREEK-PUMPKIN BUTTES 230 KV LINE          WYODAK-RC(BHBE) 

  WYODAK-RC(BHBE)   
  1784.0 

  1784.0   
  1784.0 

  1784.0   
  1784.0 

  1784.0   
  2025-10-20 09:30 

  2025-11-03 08:00   
  2025-10-31 16:00 

  2025-11-06 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     BHBE     DONKEY CREEK - PUMPKN BUTTES 230KV LINE OUTAGE - WYODAK-RC (0)     2025-09-24 12:37     002652.1     2025-09-26 17:26  
BHCT Outages:
  BHCT 24-5817.1     139311     BHCT     PORTLAND-WEST STATION 115 KV LINE #1          BHCE-CCW(BHCT) 

  BHCE-CCW(BHCT)   
  323.0 

  323.0   
  323.0 

  323.0   
  323.0 

  323.0   
  2025-07-31 08:00 

  2025-07-31 08:14   
  2025-07-31 08:14 

  2025-12-31 16:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     BHCT     PORTLAND-WEST STATION 115 KV LINE #1 - BHCE-CCW (0)     2025-07-25 10:00     24-5817.1     2025-07-31 08:14  
  BHCT 001136.1     139904     BHCT     BOONE-LAJUNTA 115 KV LINE          BHCE-BOON(BHCT) 

  BHCE-BOON(BHCT)   
  198.0 

  198.0   
  198.0 

  198.0   
  198.0 

  198.0   
  2025-09-08 08:00 

  2025-09-29 08:00   
  2025-09-11 12:00 

  2025-10-02 12:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     BHCT     LA JUNTA SUB RTU REPLACEMENT ***TRANSMISSION*** - BHCE-BOON (0)     2025-08-15 11:06     001136.1     2025-08-26 14:33  
  BHCT 002611.1     141379     BHCT     READER-AIRPORT MEMORIAL 115 KV LINE          BHCE-READER(BHCT) 
  READER-BHCE(BHCT)   
  730.0 
  730.0   
  730.0 
  730.0   
  557.0 
  557.0   
  2025-10-13 07:00 
  2025-10-13 07:00   
  2025-10-13 16:00 
  2025-10-13 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     BHCT     AIRPORT MEMORIAL 115KV BREAKER 115-2 (OPEN END AIRPORT MEMORIAL - READER 115KV LINE) - BHCE-READER (173),READER-BHCE (173)     2025-09-23 16:05     002611.1     2025-09-23 16:05  
BPAT Outages:
  COI     2483     BPAT     COI Path Rating          AC_N>S(BPAT) 
  AC_S>N(BPAT) 

  AC_N>S(BPAT) 
  AC_S>N(BPAT) 

  AC_N>S(BPAT) 
  AC_S>N(BPAT) 

  AC_N>S(BPAT) 
  AC_S>N(BPAT) 

  AC_N>S(BPAT) 
  AC_S>N(BPAT) 

  AC_N>S(BPAT) 
  AC_S>N(BPAT) 

  AC_N>S(BPAT) 
  AC_S>N(BPAT)   
  4800.0 
  3675.0 

  4800.0 
  3675.0 

  4800.0 
  3675.0 

  4800.0 
  3675.0 

  4800.0 
  1400.0 

  4800.0 
  3675.0 

  4800.0 
  3675.0   
  2007-11-23 12:00 
  2007-11-23 12:00 

  2010-01-01 00:00 
  2010-01-01 00:00 

  2010-11-17 00:00 
  2010-11-17 00:00 

  2012-03-01 00:00 
  2012-03-01 00:00 

  2022-12-20 00:00 
  2022-12-20 00:00 

  2023-01-05 13:00 
  2023-01-05 13:00 

  2033-01-01 00:00 
  2033-01-01 00:00   
  2010-01-01 00:00 
  2010-01-01 00:00 

  2010-11-17 00:00 
  2010-11-17 00:00 

  2012-03-01 00:00 
  2012-03-01 00:00 

  2022-12-20 00:00 
  2022-12-20 00:00 

  2023-01-05 13:00 
  2023-01-05 13:00 

  2033-01-01 00:00 
  2033-01-01 00:00 

  2035-01-01 00:00 
  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Path Rating     2007-11-23 12:40     BPAT2116      2025-01-28 07:56  
  PDCI     2477     BPAT     PDCI_Path_Rating          DC_N>S(BPAT) 
  DC_S>N(BPAT) 

  DC_N>S(BPAT) 
  DC_S>N(BPAT) 

  DC_N>S(BPAT) 
  DC_S>N(BPAT) 

  DC_N>S(BPAT) 
  DC_S>N(BPAT) 

  DC_N>S(BPAT) 
  DC_S>N(BPAT) 

  DC_N>S(BPAT) 
  DC_S>N(BPAT) 

  DC_N>S(BPAT) 
  DC_S>N(BPAT)   
  2990.0 
  2084.0 

  2990.0 
  2084.0 

  2990.0 
  2084.0 

  3100.0 
  1904.0 

  3100.0 
  1904.0 

  3100.0 
  1904.0 

  3100.0 
  1904.0   
  2007-11-23 13:00 
  2007-11-23 13:00 

  2010-01-01 00:00 
  2010-01-01 00:00 

  2012-03-01 00:00 
  2012-03-01 00:00 

  2017-12-12 00:00 
  2017-12-12 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00 

  2028-01-01 00:00 
  2028-01-01 00:00 

  2033-01-01 00:00 
  2033-01-01 00:00   
  2010-01-01 00:00 
  2010-01-01 00:00 

  2012-03-01 00:00 
  2012-03-01 00:00 

  2017-12-12 00:00 
  2017-12-12 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00 

  2028-01-01 00:00 
  2028-01-01 00:00 

  2033-01-01 00:00 
  2033-01-01 00:00 

  2035-01-01 00:00 
  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Path Rating     2007-11-23 12:16     BPAT2114      2025-01-28 07:59  
  LAGR     2642     BPAT     LAGR_Path_Rating          LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT)   
  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0   
  2007-11-23 17:00 
  2007-11-23 17:00 

  2010-01-01 00:00 
  2010-01-01 00:00 

  2012-03-01 00:00 
  2012-03-01 00:00 

  2023-01-01 00:00 
  2023-01-01 00:00 

  2024-01-01 00:00 
  2024-01-01 00:00 

  2025-01-01 00:00 
  2025-01-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00 

  2028-01-01 00:00 
  2028-01-01 00:00 

  2033-01-01 00:00 
  2033-01-01 00:00   
  2010-01-01 00:00 
  2010-01-01 00:00 

  2012-03-01 00:00 
  2012-03-01 00:00 

  2023-01-01 00:00 
  2023-01-01 00:00 

  2024-01-01 00:00 
  2024-01-01 00:00 

  2025-01-01 00:00 
  2025-01-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00 

  2028-01-01 00:00 
  2028-01-01 00:00 

  2033-01-01 00:00 
  2033-01-01 00:00 

  2035-01-01 00:00 
  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Path Rating     2007-11-23 15:34     BPAT2145      2025-01-28 08:00  
  WOG     2798     BPAT     WOG_Path_Rating          WOGARR_E>W(BPAT) 

  WOGARR_E>W(BPAT) 

  WOGARR_E>W(BPAT) 

  WOGARR_E>W(BPAT) 

  WOGARR_E>W(BPAT) 

  WOGARR_E>W(BPAT) 

  WOGARR_E>W(BPAT) 

  WOGARR_E>W(BPAT)   
  2000.0 

  2000.0 

  2000.0 

  2200.0 

  2200.0 

  2200.0 

  2200.0 

  2200.0   
  2007-11-23 19:00 

  2010-01-01 00:00 

  2012-03-01 00:00 

  2019-08-15 00:00 

  2019-10-01 14:00 

  2019-10-09 10:00 

  2028-01-01 00:00 

  2033-01-01 00:00   
  2010-01-01 00:00 

  2012-03-01 00:00 

  2019-08-15 00:00 

  2019-10-01 14:00 

  2019-10-09 10:00 

  2028-01-01 00:00 

  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Path Rating     2007-11-23 18:09     BPAT2182      2025-01-28 08:07  
  WOG     2810     BPAT     WOG_Path_Rating_W-E          WOGARR_W>E(BPAT) 

  WOGARR_W>E(BPAT) 

  WOGARR_W>E(BPAT) 

  WOGARR_W>E(BPAT) 

  WOGARR_W>E(BPAT) 

  WOGARR_W>E(BPAT) 

  WOGARR_W>E(BPAT) 

  WOGARR_W>E(BPAT)   
  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0   
  2007-11-23 19:00 

  2009-08-21 08:00 

  2010-01-01 00:00 

  2012-03-01 00:00 

  2019-10-01 14:00 

  2019-10-09 10:00 

  2028-01-01 00:00 

  2033-01-01 00:00   
  2009-08-21 08:00 

  2010-01-01 00:00 

  2012-03-01 00:00 

  2019-10-01 14:00 

  2019-10-09 10:00 

  2028-01-01 00:00 

  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Path Rating     2007-11-23 18:53     BPAT2186      2025-01-28 08:08  
  RATS     2847     BPAT     RATS_Path_Rating          RATS_N>S(BPAT) 
  RATS_S>N(BPAT) 

  RATS_N>S(BPAT) 
  RATS_S>N(BPAT) 

  RATS_N>S(BPAT) 
  RATS_S>N(BPAT) 

  RATS_N>S(BPAT) 
  RATS_S>N(BPAT) 

  RATS_N>S(BPAT) 
  RATS_S>N(BPAT) 

  RATS_N>S(BPAT) 
  RATS_S>N(BPAT) 

  RATS_N>S(BPAT) 
  RATS_S>N(BPAT)   
  300.0 
  300.0 

  300.0 
  300.0 

  300.0 
  300.0 

  300.0 
  300.0 

  300.0 
  300.0 

  300.0 
  300.0 

  300.0 
  300.0   
  2007-11-28 00:00 
  2007-11-28 00:00 

  2010-01-01 00:00 
  2010-01-01 00:00 

  2012-03-01 00:00 
  2012-03-01 00:00 

  2023-01-01 00:00 
  2023-01-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00 

  2028-01-01 00:00 
  2028-01-01 00:00 

  2033-01-01 00:00 
  2033-01-01 00:00   
  2010-01-01 00:00 
  2010-01-01 00:00 

  2012-03-01 00:00 
  2012-03-01 00:00 

  2023-01-01 00:00 
  2023-01-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00 

  2028-01-01 00:00 
  2028-01-01 00:00 

  2033-01-01 00:00 
  2033-01-01 00:00 

  2035-01-01 00:00 
  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Path Rating     2007-11-26 09:09     BPAT2191      2025-01-28 08:04  
  WOH     48745     BPAT     WOH_Path Rating          WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT)   
  4250.0 

  4250.0 

  4250.0 

  4250.0 

  4250.0 

  4250.0 

  4250.0   
  2008-11-01 00:00 

  2010-01-01 00:00 

  2012-03-01 00:00 

  2019-10-01 14:00 

  2019-10-09 09:00 

  2028-01-01 00:00 

  2033-01-01 00:00   
  2010-01-01 00:00 

  2012-03-01 00:00 

  2019-10-01 14:00 

  2019-10-09 09:00 

  2028-01-01 00:00 

  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of Hatwai Path Rating     2008-10-08 15:30     BPAT7061      2025-01-28 08:08  
  JDW     152758     BPAT     JDW_Path_Limit          JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT)   
  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0   
  2011-03-15 09:00 

  2012-03-01 00:00 

  2023-01-01 00:00 

  2024-01-01 00:00 

  2025-01-01 00:00 

  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00   
  2012-03-01 00:00 

  2023-01-01 00:00 

  2024-01-01 00:00 

  2025-01-01 00:00 

  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Long term limit     2011-03-15 08:44     BPAT22259      2025-01-28 07:59  
  RCW     152760     BPAT     RCW_Path_Limit          ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT)   
  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0   
  2011-03-15 09:00 

  2012-03-01 00:00 

  2023-01-01 00:00 

  2024-01-01 00:00 

  2025-01-01 00:00 

  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00   
  2012-03-01 00:00 

  2023-01-01 00:00 

  2024-01-01 00:00 

  2025-01-01 00:00 

  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Long term limit     2011-03-15 08:46     BPAT22260      2025-01-28 08:05  
  14_Month     173144     BPAT     LAG_All_Lines_in_Service          LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT)   
  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0   
  2011-11-01 00:00 
  2011-11-01 00:00 

  2012-05-01 00:00 
  2012-05-01 00:00 

  2012-06-01 00:00 
  2012-06-01 00:00 

  2012-11-01 00:00 
  2012-11-01 00:00 

  2014-02-01 00:00 
  2014-02-01 00:00 

  2014-03-01 00:00 
  2014-03-01 00:00 

  2014-04-01 00:00 
  2014-04-01 00:00 

  2014-05-01 00:00 
  2014-05-01 00:00 

  2014-06-01 00:00 
  2014-06-01 00:00 

  2014-07-01 00:00 
  2014-07-01 00:00 

  2014-08-01 00:00 
  2014-08-01 00:00 

  2015-10-01 00:00 
  2015-10-01 00:00 

  2015-11-01 00:00 
  2015-11-01 00:00 

  2015-12-01 00:00 
  2015-12-01 00:00 

  2015-12-01 12:00 
  2015-12-01 12:00 

  2017-02-01 00:00 
  2017-02-01 00:00 

  2017-03-01 00:00 
  2017-03-01 00:00 

  2017-04-01 00:00 
  2017-04-01 00:00 

  2017-05-01 00:00 
  2017-05-01 00:00 

  2017-06-01 00:00 
  2017-06-01 00:00 

  2017-07-01 00:00 
  2017-07-01 00:00 

  2017-08-01 00:00 
  2017-08-01 00:00 

  2017-09-01 00:00 
  2017-09-01 00:00 

  2017-10-01 00:00 
  2017-10-01 00:00 

  2017-11-01 00:00 
  2017-11-01 00:00 

  2017-11-30 23:00 
  2017-11-30 23:00 

  2018-01-01 00:00 
  2018-01-01 00:00 

  2018-02-01 00:00 
  2018-02-01 00:00 

  2018-03-01 00:00 
  2018-03-01 00:00 

  2018-04-01 00:00 
  2018-04-01 00:00 

  2018-05-01 00:00 
  2018-05-01 00:00 

  2018-06-01 00:00 
  2018-06-01 00:00 

  2018-07-01 00:00 
  2018-07-01 00:00 

  2018-08-01 00:00 
  2018-08-01 00:00 

  2018-09-01 00:00 
  2018-09-01 00:00 

  2018-10-01 00:00 
  2018-10-01 00:00 

  2018-11-01 00:00 
  2018-11-01 00:00 

  2018-12-01 00:00 
  2018-12-01 00:00 

  2019-01-01 00:00 
  2019-01-01 00:00 

  2019-02-01 00:00 
  2019-02-01 00:00 

  2019-03-01 00:00 
  2019-03-01 00:00 

  2019-04-01 00:00 
  2019-04-01 00:00 

  2019-05-01 00:00 
  2019-05-01 00:00 

  2019-06-01 00:00 
  2019-06-01 00:00 

  2019-07-01 00:00 
  2019-07-01 00:00 

  2019-08-01 00:00 
  2019-08-01 00:00 

  2019-09-01 00:00 
  2019-09-01 00:00 

  2019-10-01 00:00 
  2019-10-01 00:00 

  2019-11-01 00:00 
  2019-11-01 00:00 

  2019-12-01 00:00 
  2019-12-01 00:00 

  2020-01-01 00:00 
  2020-01-01 00:00 

  2020-03-01 00:00 
  2020-03-01 00:00 

  2020-04-01 00:00 
  2020-04-01 00:00 

  2020-05-01 00:00 
  2020-05-01 00:00 

  2020-06-01 00:00 
  2020-06-01 00:00 

  2020-07-01 00:00 
  2020-07-01 00:00 

  2020-08-01 00:00 
  2020-08-01 00:00 

  2020-09-01 00:00 
  2020-09-01 00:00 

  2020-10-01 00:00 
  2020-10-01 00:00 

  2020-11-01 00:00 
  2020-11-01 00:00 

  2020-12-01 00:00 
  2020-12-01 00:00 

  2021-02-01 00:00 
  2021-02-01 00:00 

  2021-03-01 00:00 
  2021-03-01 00:00 

  2021-04-01 00:00 
  2021-04-01 00:00 

  2021-05-01 00:00 
  2021-05-01 00:00 

  2021-06-01 00:00 
  2021-06-01 00:00 

  2021-07-01 00:00 
  2021-07-01 00:00 

  2021-08-01 00:00 
  2021-08-01 00:00 

  2021-09-01 00:00 
  2021-09-01 00:00 

  2021-10-01 00:00 
  2021-10-01 00:00 

  2021-11-01 00:00 
  2021-11-01 00:00 

  2021-12-01 00:00 
  2021-12-01 00:00 

  2022-01-01 00:00 
  2022-01-01 00:00 

  2022-02-01 00:00 
  2022-02-01 00:00 

  2022-03-01 00:00 
  2022-03-01 00:00 

  2022-04-01 00:00 
  2022-04-01 00:00 

  2022-05-01 00:00 
  2022-05-01 00:00 

  2022-06-01 00:00 
  2022-06-01 00:00 

  2022-07-01 00:00 
  2022-07-01 00:00 

  2022-08-01 00:00 
  2022-08-01 00:00 

  2022-09-01 00:00 
  2022-09-01 00:00 

  2022-10-01 00:00 
  2022-10-01 00:00 

  2022-11-01 00:00 
  2022-11-01 00:00 

  2022-12-01 00:00 
  2022-12-01 00:00 

  2023-01-01 00:00 
  2023-01-01 00:00 

  2023-02-01 00:00 
  2023-02-01 00:00 

  2023-03-01 00:00 
  2023-03-01 00:00 

  2023-04-01 00:00 
  2023-04-01 00:00 

  2023-05-01 00:00 
  2023-05-01 00:00 

  2023-06-01 00:00 
  2023-06-01 00:00 

  2023-07-01 00:00 
  2023-07-01 00:00 

  2023-08-01 00:00 
  2023-08-01 00:00 

  2023-09-01 00:00 
  2023-09-01 00:00 

  2023-10-01 00:00 
  2023-10-01 00:00 

  2023-11-01 00:00 
  2023-11-01 00:00 

  2023-12-01 00:00 
  2023-12-01 00:00 

  2024-01-01 00:00 
  2024-01-01 00:00 

  2024-02-01 00:00 
  2024-02-01 00:00 

  2024-03-01 00:00 
  2024-03-01 00:00 

  2024-04-01 00:00 
  2024-04-01 00:00 

  2024-05-01 00:00 
  2024-05-01 00:00 

  2024-06-01 00:00 
  2024-06-01 00:00 

  2024-07-01 00:00 
  2024-07-01 00:00 

  2024-08-01 00:00 
  2024-08-01 00:00 

  2024-09-01 00:00 
  2024-09-01 00:00 

  2024-10-01 00:00 
  2024-10-01 00:00 

  2024-11-01 00:00 
  2024-11-01 00:00 

  2024-12-01 00:00 
  2024-12-01 00:00 

  2025-01-01 00:00 
  2025-01-01 00:00 

  2025-02-01 00:00 
  2025-02-01 00:00 

  2025-03-01 00:00 
  2025-03-01 00:00 

  2025-04-01 00:00 
  2025-04-01 00:00 

  2025-05-01 00:00 
  2025-05-01 00:00 

  2025-06-01 00:00 
  2025-06-01 00:00 

  2025-07-01 00:00 
  2025-07-01 00:00 

  2025-08-01 00:00 
  2025-08-01 00:00 

  2025-09-01 00:00 
  2025-09-01 00:00 

  2025-10-01 00:00 
  2025-10-01 00:00 

  2025-11-01 00:00 
  2025-11-01 00:00 

  2025-12-01 00:00 
  2025-12-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00 

  2026-02-01 00:00 
  2026-02-01 00:00 

  2026-03-01 00:00 
  2026-03-01 00:00 

  2026-04-01 00:00 
  2026-04-01 00:00 

  2026-05-01 00:00 
  2026-05-01 00:00 

  2026-06-01 00:00 
  2026-06-01 00:00 

  2026-07-01 00:00 
  2026-07-01 00:00 

  2026-08-01 00:00 
  2026-08-01 00:00 

  2026-09-01 00:00 
  2026-09-01 00:00 

  2026-10-01 00:00 
  2026-10-01 00:00 

  2026-11-01 00:00 
  2026-11-01 00:00 

  2026-12-01 00:00 
  2026-12-01 00:00   
  2012-05-01 00:00 
  2012-05-01 00:00 

  2012-06-01 00:00 
  2012-06-01 00:00 

  2012-11-01 00:00 
  2012-11-01 00:00 

  2014-02-01 00:00 
  2014-02-01 00:00 

  2014-03-01 00:00 
  2014-03-01 00:00 

  2014-04-01 00:00 
  2014-04-01 00:00 

  2014-05-01 00:00 
  2014-05-01 00:00 

  2014-06-01 00:00 
  2014-06-01 00:00 

  2014-07-01 00:00 
  2014-07-01 00:00 

  2014-08-01 00:00 
  2014-08-01 00:00 

  2015-10-01 00:00 
  2015-10-01 00:00 

  2015-11-01 00:00 
  2015-11-01 00:00 

  2015-12-01 00:00 
  2015-12-01 00:00 

  2015-12-01 12:00 
  2015-12-01 12:00 

  2017-02-01 00:00 
  2017-02-01 00:00 

  2017-03-01 00:00 
  2017-03-01 00:00 

  2017-04-01 00:00 
  2017-04-01 00:00 

  2017-05-01 00:00 
  2017-05-01 00:00 

  2017-06-01 00:00 
  2017-06-01 00:00 

  2017-07-01 00:00 
  2017-07-01 00:00 

  2017-08-01 00:00 
  2017-08-01 00:00 

  2017-09-01 00:00 
  2017-09-01 00:00 

  2017-10-01 00:00 
  2017-10-01 00:00 

  2017-11-01 00:00 
  2017-11-01 00:00 

  2017-11-30 23:00 
  2017-11-30 23:00 

  2018-01-01 00:00 
  2018-01-01 00:00 

  2018-02-01 00:00 
  2018-02-01 00:00 

  2018-03-01 00:00 
  2018-03-01 00:00 

  2018-04-01 00:00 
  2018-04-01 00:00 

  2018-05-01 00:00 
  2018-05-01 00:00 

  2018-06-01 00:00 
  2018-06-01 00:00 

  2018-07-01 00:00 
  2018-07-01 00:00 

  2018-08-01 00:00 
  2018-08-01 00:00 

  2018-09-01 00:00 
  2018-09-01 00:00 

  2018-10-01 00:00 
  2018-10-01 00:00 

  2018-11-01 00:00 
  2018-11-01 00:00 

  2018-12-01 00:00 
  2018-12-01 00:00 

  2019-01-01 00:00 
  2019-01-01 00:00 

  2019-02-01 00:00 
  2019-02-01 00:00 

  2019-03-01 00:00 
  2019-03-01 00:00 

  2019-04-01 00:00 
  2019-04-01 00:00 

  2019-05-01 00:00 
  2019-05-01 00:00 

  2019-06-01 00:00 
  2019-06-01 00:00 

  2019-07-01 00:00 
  2019-07-01 00:00 

  2019-08-01 00:00 
  2019-08-01 00:00 

  2019-09-01 00:00 
  2019-09-01 00:00 

  2019-10-01 00:00 
  2019-10-01 00:00 

  2019-11-01 00:00 
  2019-11-01 00:00 

  2019-12-01 00:00 
  2019-12-01 00:00 

  2020-01-01 00:00 
  2020-01-01 00:00 

  2020-03-01 00:00 
  2020-03-01 00:00 

  2020-04-01 00:00 
  2020-04-01 00:00 

  2020-05-01 00:00 
  2020-05-01 00:00 

  2020-06-01 00:00 
  2020-06-01 00:00 

  2020-07-01 00:00 
  2020-07-01 00:00 

  2020-08-01 00:00 
  2020-08-01 00:00 

  2020-09-01 00:00 
  2020-09-01 00:00 

  2020-10-01 00:00 
  2020-10-01 00:00 

  2020-11-01 00:00 
  2020-11-01 00:00 

  2020-12-01 00:00 
  2020-12-01 00:00 

  2021-02-01 00:00 
  2021-02-01 00:00 

  2021-03-01 00:00 
  2021-03-01 00:00 

  2021-04-01 00:00 
  2021-04-01 00:00 

  2021-05-01 00:00 
  2021-05-01 00:00 

  2021-06-01 00:00 
  2021-06-01 00:00 

  2021-07-01 00:00 
  2021-07-01 00:00 

  2021-08-01 00:00 
  2021-08-01 00:00 

  2021-09-01 00:00 
  2021-09-01 00:00 

  2021-10-01 00:00 
  2021-10-01 00:00 

  2021-11-01 00:00 
  2021-11-01 00:00 

  2021-12-01 00:00 
  2021-12-01 00:00 

  2022-01-01 00:00 
  2022-01-01 00:00 

  2022-02-01 00:00 
  2022-02-01 00:00 

  2022-03-01 00:00 
  2022-03-01 00:00 

  2022-04-01 00:00 
  2022-04-01 00:00 

  2022-05-01 00:00 
  2022-05-01 00:00 

  2022-06-01 00:00 
  2022-06-01 00:00 

  2022-07-01 00:00 
  2022-07-01 00:00 

  2022-08-01 00:00 
  2022-08-01 00:00 

  2022-09-01 00:00 
  2022-09-01 00:00 

  2022-10-01 00:00 
  2022-10-01 00:00 

  2022-11-01 00:00 
  2022-11-01 00:00 

  2022-12-01 00:00 
  2022-12-01 00:00 

  2023-01-01 00:00 
  2023-01-01 00:00 

  2023-02-01 00:00 
  2023-02-01 00:00 

  2023-03-01 00:00 
  2023-03-01 00:00 

  2023-04-01 00:00 
  2023-04-01 00:00 

  2023-05-01 00:00 
  2023-05-01 00:00 

  2023-06-01 00:00 
  2023-06-01 00:00 

  2023-07-01 00:00 
  2023-07-01 00:00 

  2023-08-01 00:00 
  2023-08-01 00:00 

  2023-09-01 00:00 
  2023-09-01 00:00 

  2023-10-01 00:00 
  2023-10-01 00:00 

  2023-11-01 00:00 
  2023-11-01 00:00 

  2023-12-01 00:00 
  2023-12-01 00:00 

  2024-01-01 00:00 
  2024-01-01 00:00 

  2024-02-01 00:00 
  2024-02-01 00:00 

  2024-03-01 00:00 
  2024-03-01 00:00 

  2024-04-01 00:00 
  2024-04-01 00:00 

  2024-05-01 00:00 
  2024-05-01 00:00 

  2024-06-01 00:00 
  2024-06-01 00:00 

  2024-07-01 00:00 
  2024-07-01 00:00 

  2024-08-01 00:00 
  2024-08-01 00:00 

  2024-09-01 00:00 
  2024-09-01 00:00 

  2024-10-01 00:00 
  2024-10-01 00:00 

  2024-11-01 00:00 
  2024-11-01 00:00 

  2024-12-01 00:00 
  2024-12-01 00:00 

  2025-01-01 00:00 
  2025-01-01 00:00 

  2025-02-01 00:00 
  2025-02-01 00:00 

  2025-03-01 00:00 
  2025-03-01 00:00 

  2025-04-01 00:00 
  2025-04-01 00:00 

  2025-05-01 00:00 
  2025-05-01 00:00 

  2025-06-01 00:00 
  2025-06-01 00:00 

  2025-07-01 00:00 
  2025-07-01 00:00 

  2025-08-01 00:00 
  2025-08-01 00:00 

  2025-09-01 00:00 
  2025-09-01 00:00 

  2025-10-01 00:00 
  2025-10-01 00:00 

  2025-11-01 00:00 
  2025-11-01 00:00 

  2025-12-01 00:00 
  2025-12-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00 

  2026-02-01 00:00 
  2026-02-01 00:00 

  2026-03-01 00:00 
  2026-03-01 00:00 

  2026-04-01 00:00 
  2026-04-01 00:00 

  2026-05-01 00:00 
  2026-05-01 00:00 

  2026-06-01 00:00 
  2026-06-01 00:00 

  2026-07-01 00:00 
  2026-07-01 00:00 

  2026-08-01 00:00 
  2026-08-01 00:00 

  2026-09-01 00:00 
  2026-09-01 00:00 

  2026-10-01 00:00 
  2026-10-01 00:00 

  2026-11-01 00:00 
  2026-11-01 00:00 

  2026-12-01 00:00 
  2026-12-01 00:00 

  2027-01-01 00:00 
  2027-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     LaGrande -All Lines in Service (Year Round)     2011-10-21 14:38     BPAT25449      2025-09-11 10:48  
  14_Month     173147     BPAT     RCW_All_Lines_in_Service          ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT)   
  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0   
  2011-11-01 00:00 

  2012-05-01 00:00 

  2012-11-01 00:00 

  2014-02-01 00:00 

  2014-03-01 00:00 

  2014-04-01 00:00 

  2014-05-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2015-10-01 00:00 

  2015-11-01 00:00 

  2015-12-01 00:00 

  2015-12-01 12:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2017-12-30 00:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00 

  2019-11-01 00:00 

  2019-12-01 00:00 

  2020-01-01 00:00 

  2020-03-01 00:00 

  2020-04-01 00:00 

  2020-05-01 00:00 

  2020-06-01 00:00 

  2020-07-01 00:00 

  2020-08-01 00:00 

  2020-09-01 00:00 

  2020-10-01 00:00 

  2020-11-01 00:00 

  2020-12-01 00:00 

  2021-02-01 00:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00 

  2026-10-01 00:00 

  2026-11-01 00:00 

  2026-12-01 00:00   
  2012-05-01 00:00 

  2012-11-01 00:00 

  2014-02-01 00:00 

  2014-03-01 00:00 

  2014-04-01 00:00 

  2014-05-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2015-10-01 00:00 

  2015-11-01 00:00 

  2015-12-01 00:00 

  2015-12-01 12:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2017-12-30 00:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00 

  2019-11-01 00:00 

  2019-12-01 00:00 

  2020-01-01 00:00 

  2020-03-01 00:00 

  2020-04-01 00:00 

  2020-05-01 00:00 

  2020-06-01 00:00 

  2020-07-01 00:00 

  2020-08-01 00:00 

  2020-09-01 00:00 

  2020-10-01 00:00 

  2020-11-01 00:00 

  2020-12-01 00:00 

  2021-02-01 00:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00 

  2026-10-01 00:00 

  2026-11-01 00:00 

  2026-12-01 00:00 

  2027-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Rock Creek - All Lines in Service (Year Round)     2011-10-21 14:39     BPAT25450      2025-09-11 10:42  
  14_Month     173150     BPAT     JDW_All_Lines_in_Service          JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT)   
  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0   
  2011-11-01 00:00 

  2012-05-01 00:00 

  2012-11-01 00:00 

  2014-02-01 00:00 

  2014-03-01 00:00 

  2014-04-01 00:00 

  2014-05-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2015-10-01 00:00 

  2015-11-01 00:00 

  2015-12-01 00:00 

  2015-12-01 12:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00 

  2019-11-01 00:00 

  2019-12-01 00:00 

  2020-01-01 00:00 

  2020-03-01 00:00 

  2020-04-01 00:00 

  2020-05-01 00:00 

  2020-06-01 00:00 

  2020-07-01 00:00 

  2020-08-01 00:00 

  2020-09-01 00:00 

  2020-10-01 00:00 

  2020-11-01 00:00 

  2020-12-01 00:00 

  2021-02-01 00:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-04-07 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00 

  2026-10-01 00:00 

  2026-11-01 00:00 

  2026-12-01 00:00   
  2012-05-01 00:00 

  2012-11-01 00:00 

  2014-02-01 00:00 

  2014-03-01 00:00 

  2014-04-01 00:00 

  2014-05-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2015-10-01 00:00 

  2015-11-01 00:00 

  2015-12-01 00:00 

  2015-12-01 12:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00 

  2019-11-01 00:00 

  2019-12-01 00:00 

  2020-01-01 00:00 

  2020-03-01 00:00 

  2020-04-01 00:00 

  2020-05-01 00:00 

  2020-06-01 00:00 

  2020-07-01 00:00 

  2020-08-01 00:00 

  2020-09-01 00:00 

  2020-10-01 00:00 

  2020-11-01 00:00 

  2020-12-01 00:00 

  2021-02-01 00:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-04-07 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00 

  2026-10-01 00:00 

  2026-11-01 00:00 

  2026-12-01 00:00 

  2027-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     John Day Wind - All Lines in Service (Year Round)     2011-10-21 14:41     BPAT25451      2025-09-11 10:42  
  WOCN     181812     BPAT     WOCN_LT          C-CASC_N(BPAT)      10000.0      2012-03-01 09:00      2032-01-01 00:00      Cancelled     TRANSMISSION     PLANNED      ONPATH     BPAT     WOCN long-term limit     2012-02-29 14:15     BPAT26934      2012-02-29 14:15  
  14_Month     185758     BPAT     WOM_All_Lines_in_Service          WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT)   
  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0   
  2012-04-01 00:00 

  2012-05-01 00:00 

  2012-06-01 00:00 

  2012-11-01 00:00 

  2013-03-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2015-10-01 00:00 

  2015-11-01 00:00 

  2015-12-01 00:00 

  2015-12-01 12:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00 

  2019-11-01 00:00 

  2019-12-01 00:00 

  2020-01-01 00:00 

  2020-03-01 00:00 

  2020-04-01 00:00 

  2020-05-01 00:00 

  2020-06-01 00:00 

  2020-07-01 00:00 

  2020-08-01 00:00 

  2020-09-01 00:00 

  2020-10-01 00:00 

  2020-11-01 00:00 

  2020-12-01 00:00 

  2021-02-01 00:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00 

  2026-10-01 00:00 

  2026-11-01 00:00 

  2026-12-01 00:00   
  2012-05-01 00:00 

  2012-06-01 00:00 

  2012-11-01 00:00 

  2013-03-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2015-10-01 00:00 

  2015-11-01 00:00 

  2015-12-01 00:00 

  2015-12-01 12:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00 

  2019-11-01 00:00 

  2019-12-01 00:00 

  2020-01-01 00:00 

  2020-03-01 00:00 

  2020-04-01 00:00 

  2020-05-01 00:00 

  2020-06-01 00:00 

  2020-07-01 00:00 

  2020-08-01 00:00 

  2020-09-01 00:00 

  2020-10-01 00:00 

  2020-11-01 00:00 

  2020-12-01 00:00 

  2021-02-01 00:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00 

  2026-10-01 00:00 

  2026-11-01 00:00 

  2026-12-01 00:00 

  2027-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of McNary - All Lines in Service (Year Round)     2012-03-29 12:34     BPAT27351      2025-09-11 10:52  
  14_Month     191688     BPAT     WOH_All_lines_in_service          WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT)   
  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0   
  2012-06-01 08:00 

  2012-11-01 00:00 

  2014-02-01 00:00 

  2014-03-01 00:00 

  2014-04-01 00:00 

  2014-05-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2015-10-01 00:00 

  2015-11-01 00:00 

  2015-12-01 00:00 

  2015-12-01 12:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00 

  2019-10-01 14:00 

  2019-10-09 09:00 

  2020-12-01 00:00 

  2021-02-01 00:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00 

  2026-10-01 00:00 

  2026-11-01 00:00 

  2026-12-01 00:00   
  2012-11-01 00:00 

  2014-02-01 00:00 

  2014-03-01 00:00 

  2014-04-01 00:00 

  2014-05-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2015-10-01 00:00 

  2015-11-01 00:00 

  2015-12-01 00:00 

  2015-12-01 12:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00 

  2019-10-01 14:00 

  2019-10-09 09:00 

  2020-12-01 00:00 

  2021-02-01 00:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00 

  2026-10-01 00:00 

  2026-11-01 00:00 

  2026-12-01 00:00 

  2027-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of Hatwai - All Lines in Service (Year Round)     2012-05-30 07:33     BPAT28676      2025-09-11 10:56  
  14_Month     203317     BPAT     SOB_All_Lines_in_Service          SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT)   
  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1260.0 

  1260.0 

  1260.0 

  1260.0 

  1260.0 

  1260.0 

  1260.0 

  1260.0 

  1260.0 

  1260.0 

  1260.0 

  1260.0 

  1260.0 

  1260.0 

  1260.0 

  1260.0 

  1260.0 

  1260.0   
  2012-11-01 09:00 

  2014-02-01 00:00 

  2014-03-01 00:00 

  2014-04-01 00:00 

  2014-05-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2014-09-01 00:00 

  2014-10-01 00:00 

  2014-11-01 00:00 

  2014-12-01 00:00 

  2015-01-01 00:00 

  2015-02-01 00:00 

  2015-03-01 00:00 

  2015-04-01 00:00 

  2015-05-01 00:00 

  2015-06-01 00:00 

  2015-07-01 00:00 

  2015-08-01 00:00 

  2015-09-01 00:00 

  2015-11-01 00:00 

  2015-12-01 00:00 

  2015-12-01 12:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00 

  2019-11-01 00:00 

  2019-12-01 00:00 

  2020-01-01 00:00 

  2020-03-01 00:00 

  2020-04-01 00:00 

  2020-05-01 00:00 

  2020-06-01 00:00 

  2020-07-01 00:00 

  2020-08-01 00:00 

  2020-09-01 00:00 

  2020-10-01 00:00 

  2020-11-01 00:00 

  2020-11-18 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00 

  2026-10-01 00:00 

  2026-11-01 00:00 

  2026-12-01 00:00   
  2014-02-01 00:00 

  2014-03-01 00:00 

  2014-04-01 00:00 

  2014-05-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2014-09-01 00:00 

  2014-10-01 00:00 

  2014-11-01 00:00 

  2014-12-01 00:00 

  2015-01-01 00:00 

  2015-02-01 00:00 

  2015-03-01 00:00 

  2015-04-01 00:00 

  2015-05-01 00:00 

  2015-06-01 00:00 

  2015-07-01 00:00 

  2015-08-01 00:00 

  2015-09-01 00:00 

  2015-11-01 00:00 

  2015-12-01 00:00 

  2015-12-01 12:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00 

  2019-11-01 00:00 

  2019-12-01 00:00 

  2020-01-01 00:00 

  2020-03-01 00:00 

  2020-04-01 00:00 

  2020-05-01 00:00 

  2020-06-01 00:00 

  2020-07-01 00:00 

  2020-08-01 00:00 

  2020-09-01 00:00 

  2020-10-01 00:00 

  2020-11-01 00:00 

  2020-11-18 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00 

  2026-10-01 00:00 

  2026-11-01 00:00 

  2026-12-01 00:00 

  2027-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     South of Boundary - All Lines in Service (Year Round)     2012-10-25 14:00     BPAT31256      2025-09-11 10:53  
  14_Month     210658     BPAT     WOJD_All_Lines_in_Service          WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT)   
  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0   
  2013-02-21 00:00 

  2013-03-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2015-08-27 09:00 

  2016-12-01 00:00 

  2017-01-01 00:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2020-08-01 00:00 

  2020-09-01 00:00 

  2020-10-01 00:00 

  2020-11-01 00:00 

  2020-12-01 00:00 

  2021-02-01 00:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00 

  2026-10-01 00:00 

  2026-11-01 00:00 

  2026-12-01 00:00   
  2013-03-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2015-08-27 09:00 

  2016-12-01 00:00 

  2017-01-01 00:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2020-08-01 00:00 

  2020-09-01 00:00 

  2020-10-01 00:00 

  2020-11-01 00:00 

  2020-12-01 00:00 

  2021-02-01 00:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00 

  2026-10-01 00:00 

  2026-11-01 00:00 

  2026-12-01 00:00 

  2027-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of John Day - All Lines in Service (Year Round)     2013-02-19 10:46     BPAT33076      2025-09-11 10:52  
  14_Month     215522     BPAT     WNAPM_All_lines_in_service          WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT)   
  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0   
  2013-06-04 00:00 

  2014-08-01 00:00 

  2015-08-27 14:00 

  2015-11-23 11:00 

  2016-03-24 11:00 

  2016-05-26 10:00 

  2016-06-24 15:00 

  2016-08-04 08:00 

  2016-08-26 13:00 

  2016-10-05 15:00 

  2016-11-07 14:00 

  2017-01-03 14:00 

  2017-03-03 14:00 

  2017-05-02 15:00 

  2017-06-28 14:00 

  2017-07-26 14:00 

  2017-08-28 14:00 

  2017-09-28 15:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00 

  2019-10-01 13:00 

  2019-10-09 10:00 

  2020-12-01 00:00 

  2021-02-01 00:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00 

  2026-10-01 00:00 

  2026-11-01 00:00 

  2026-12-01 00:00   
  2014-08-01 00:00 

  2015-08-27 14:00 

  2015-11-23 11:00 

  2016-03-24 11:00 

  2016-05-26 10:00 

  2016-06-24 15:00 

  2016-08-04 08:00 

  2016-08-26 13:00 

  2016-10-05 15:00 

  2016-11-07 14:00 

  2017-01-03 14:00 

  2017-03-03 14:00 

  2017-05-02 15:00 

  2017-06-28 14:00 

  2017-07-26 14:00 

  2017-08-28 14:00 

  2017-09-28 15:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00 

  2019-10-01 13:00 

  2019-10-09 10:00 

  2020-12-01 00:00 

  2021-02-01 00:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00 

  2026-10-01 00:00 

  2026-11-01 00:00 

  2026-12-01 00:00 

  2027-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Wanapum Injection - All Lines in Service (Year Round)     2013-05-31 09:59     BPAT34494      2025-09-11 10:54  
  SCSTER NOEL     241257     BPAT     SOC NOEL Long Term          N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT) 

  SCSTER_N>S(BPAT) 

  N_ECOL_S>N(BPAT) 

  N_ECOL_S>N(BPAT) 

  N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT) 

  N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT)   
  2800.0 
  1850.0 

  1880.0 

  2800.0 

  2800.0 

  2800.0 
  1880.0 

  2800.0 
  1880.0   
  2015-11-01 00:00 
  2015-11-01 00:00 

  2019-09-20 00:00 

  2025-01-01 00:00 

  2026-01-01 00:00 

  2028-01-01 00:00 
  2028-01-01 00:00 

  2033-01-01 00:00 
  2033-01-01 00:00   
  2025-01-01 00:00 
  2019-09-20 00:00 

  2028-01-01 00:00 

  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00 
  2033-01-01 00:00 

  2035-01-01 00:00 
  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     SCSTER & N_ECOL Long-term limit     2015-01-30 10:54     BPAT44295      2025-01-28 08:04  
  NOHANF     241268     BPAT     North of Hanford          NOHANF(BPAT) 

  NOHANF(BPAT) 

  NOHANF(BPAT) 

  NOHANF(BPAT) 

  NOHANF(BPAT)   
  4450.0 

  4450.0 

  4450.0 

  4450.0 

  4450.0   
  2015-11-01 00:00 

  2025-01-01 13:00 

  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00   
  2025-01-01 13:00 

  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     NOHANF Long-term limit     2015-01-30 11:06     BPAT44298      2025-01-28 08:02  
  WOMCNY     255118     BPAT     West of McNary LT Rating          WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT)   
  4500.0 

  4500.0 

  4500.0 

  4500.0   
  2015-11-02 00:00 

  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00   
  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of McNary Long-Term Limit.     2015-10-27 10:32     BPAT51473      2025-01-28 08:10  
  WOJD     255121     BPAT     West of John Day Long-Term Limit          WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT)   
  4300.0 

  4350.0 

  4350.0 

  4350.0   
  2015-11-02 00:00 

  2019-11-13 15:00 

  2028-01-01 00:00 

  2033-01-01 00:00   
  2019-11-13 15:00 

  2028-01-01 00:00 

  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of John Day Long Term Limit.     2015-10-27 10:35     BPAT51474      2025-01-28 08:10  
  WOSLATT     255124     BPAT     West of Slatt Path Rating          WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT)   
  4200.0 

  4200.0 

  4200.0 

  4200.0   
  2015-11-02 00:00 

  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00   
  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of Slatt Long-term Limit.     2015-10-27 10:37     BPAT51475      2025-01-28 08:11  
  RAVR_PAUL     255209     BPAT     Raver -Paul LT Rating          RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT)   
  1450.0 

  1450.0 

  1450.0 

  1450.0   
  2015-11-02 00:00 

  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00   
  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Raver-Paul Long-term Limit.     2015-10-27 14:00     BPAT51479      2025-01-28 08:04  
  SOALSN     255215     BPAT     South of Allston Path Rating          SOALSN(BPAT) 

  SOALSN(BPAT) 

  SOALSN(BPAT) 

  SOALSN(BPAT)   
  2950.0 

  3100.0 

  3200.0 

  3200.0   
  2015-11-02 00:00 

  2022-05-05 00:00 

  2023-08-29 00:00 

  2033-01-01 00:00   
  2022-05-05 00:00 

  2023-08-29 00:00 

  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     South of Allston Long-term Limit.     2015-10-27 14:05     BPAT51481      2025-01-28 08:06  
  W_LOMO     255224     BPAT     West of LOMO Path Rating          W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT)   
  4200.0 

  4200.0 

  4200.0 

  4200.0   
  2015-11-02 00:00 

  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00   
  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of Lower Monumental Long-term Limit.     2015-10-27 14:15     BPAT51482      2025-01-28 08:11  
  WOCS     255230     BPAT     West of Cascades South Path Rating          C-CASC_S(BPAT) 

  C-CASC_S(BPAT) 

  C-CASC_S(BPAT) 

  C-CASC_S(BPAT)   
  7500.0 

  7500.0 

  7500.0 

  7500.0   
  2015-11-02 00:00 

  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00   
  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of Cascades South Long-term Limit.     2015-10-27 14:21     BPAT51484      2025-01-28 07:58  
  14 MONTH     255188     BPAT     Northern Intertie ALIS          NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_WEST_N>S(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT)   
  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2850.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0   
  2015-11-04 00:00 
  2015-11-04 00:00 
  2015-11-04 00:00 
  2015-11-04 00:00 
  2015-11-04 00:00 
  2015-11-04 00:00 

  2017-02-01 00:00 
  2017-02-01 00:00 
  2017-02-01 00:00 
  2017-02-01 00:00 
  2017-02-01 00:00 
  2017-02-01 00:00 

  2017-03-01 00:00 
  2017-03-01 00:00 
  2017-03-01 00:00 
  2017-03-01 00:00 
  2017-03-01 00:00 
  2017-03-01 00:00 

  2017-04-01 00:00 
  2017-04-01 00:00 
  2017-04-01 00:00 
  2017-04-01 00:00 
  2017-04-01 00:00 
  2017-04-01 00:00 

  2017-05-01 00:00 
  2017-05-01 00:00 
  2017-05-01 00:00 
  2017-05-01 00:00 
  2017-05-01 00:00 
  2017-05-01 00:00 

  2017-06-01 00:00 
  2017-06-01 00:00 
  2017-06-01 00:00 
  2017-06-01 00:00 
  2017-06-01 00:00 
  2017-06-01 00:00 

  2017-07-01 00:00 
  2017-07-01 00:00 
  2017-07-01 00:00 
  2017-07-01 00:00 
  2017-07-01 00:00 
  2017-07-01 00:00 

  2017-08-01 00:00 
  2017-08-01 00:00 
  2017-08-01 00:00 
  2017-08-01 00:00 
  2017-08-01 00:00 
  2017-08-01 00:00 

  2017-09-01 00:00 
  2017-09-01 00:00 
  2017-09-01 00:00 
  2017-09-01 00:00 
  2017-09-01 00:00 
  2017-09-01 00:00 

  2017-10-01 00:00 
  2017-10-01 00:00 
  2017-10-01 00:00 
  2017-10-01 00:00 
  2017-10-01 00:00 
  2017-10-01 00:00 

  2017-11-01 00:00 
  2017-11-01 00:00 
  2017-11-01 00:00 
  2017-11-01 00:00 
  2017-11-01 00:00 
  2017-11-01 00:00 

  2017-11-30 23:00 
  2017-11-30 23:00 
  2017-11-30 23:00 
  2017-11-30 23:00 
  2017-11-30 23:00 
  2017-11-30 23:00 

  2017-12-31 23:00 
  2017-12-31 23:00 
  2017-12-31 23:00 
  2017-12-31 23:00 
  2017-12-31 23:00 
  2017-12-31 23:00 

  2018-01-01 00:00 
  2018-01-01 00:00 
  2018-01-01 00:00 
  2018-01-01 00:00 
  2018-01-01 00:00 
  2018-01-01 00:00 

  2018-02-01 00:00 
  2018-02-01 00:00 
  2018-02-01 00:00 
  2018-02-01 00:00 
  2018-02-01 00:00 
  2018-02-01 00:00 

  2018-03-01 00:00 
  2018-03-01 00:00 
  2018-03-01 00:00 
  2018-03-01 00:00 
  2018-03-01 00:00 
  2018-03-01 00:00 

  2018-04-01 00:00 
  2018-04-01 00:00 
  2018-04-01 00:00 
  2018-04-01 00:00 
  2018-04-01 00:00 
  2018-04-01 00:00 

  2018-05-01 00:00 
  2018-05-01 00:00 
  2018-05-01 00:00 
  2018-05-01 00:00 
  2018-05-01 00:00 
  2018-05-01 00:00 

  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 

  2018-07-01 00:00 
  2018-07-01 00:00 
  2018-07-01 00:00 
  2018-07-01 00:00 
  2018-07-01 00:00 
  2018-07-01 00:00 

  2018-08-01 00:00 
  2018-08-01 00:00 
  2018-08-01 00:00 
  2018-08-01 00:00 
  2018-08-01 00:00 
  2018-08-01 00:00 

  2018-10-01 00:00 
  2018-10-01 00:00 
  2018-10-01 00:00 
  2018-10-01 00:00 
  2018-10-01 00:00 
  2018-10-01 00:00 

  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 

  2019-11-01 00:00 
  2019-11-01 00:00 
  2019-11-01 00:00 
  2019-11-01 00:00 

  2019-12-01 00:00 
  2019-12-01 00:00 
  2019-12-01 00:00 
  2019-12-01 00:00 
  2019-12-01 00:00 
  2019-12-01 00:00 

  2020-01-01 00:00 
  2020-01-01 00:00 
  2020-01-01 00:00 
  2020-01-01 00:00 
  2020-01-01 00:00 
  2020-01-01 00:00 

  2020-03-01 00:00 
  2020-03-01 00:00 
  2020-03-01 00:00 
  2020-03-01 00:00 
  2020-03-01 00:00 
  2020-03-01 00:00 

  2020-04-01 00:00 
  2020-04-01 00:00 
  2020-04-01 00:00 
  2020-04-01 00:00 
  2020-04-01 00:00 
  2020-04-01 00:00 

  2020-05-01 00:00 
  2020-05-01 00:00 
  2020-05-01 00:00 
  2020-05-01 00:00 
  2020-05-01 00:00 
  2020-05-01 00:00 

  2020-06-01 00:00 
  2020-06-01 00:00 
  2020-06-01 00:00 
  2020-06-01 00:00 
  2020-06-01 00:00 
  2020-06-01 00:00 

  2020-07-01 00:00 
  2020-07-01 00:00 
  2020-07-01 00:00 
  2020-07-01 00:00 
  2020-07-01 00:00 
  2020-07-01 00:00 

  2020-08-01 00:00 
  2020-08-01 00:00 
  2020-08-01 00:00 
  2020-08-01 00:00 
  2020-08-01 00:00 
  2020-08-01 00:00 

  2020-09-01 00:00 
  2020-09-01 00:00 
  2020-09-01 00:00 
  2020-09-01 00:00 
  2020-09-01 00:00 
  2020-09-01 00:00 

  2020-10-01 00:00 
  2020-10-01 00:00 
  2020-10-01 00:00 
  2020-10-01 00:00 
  2020-10-01 00:00 
  2020-10-01 00:00 

  2020-11-01 00:00 
  2020-11-01 00:00 
  2020-11-01 00:00 
  2020-11-01 00:00 
  2020-11-01 00:00 
  2020-11-01 00:00 

  2020-12-01 00:00 
  2020-12-01 00:00 
  2020-12-01 00:00 
  2020-12-01 00:00 
  2020-12-01 00:00 
  2020-12-01 00:00 

  2021-02-01 00:00 
  2021-02-01 00:00 
  2021-02-01 00:00 
  2021-02-01 00:00 
  2021-02-01 00:00 
  2021-02-01 00:00 

  2021-03-01 00:00 
  2021-03-01 00:00 
  2021-03-01 00:00 
  2021-03-01 00:00 
  2021-03-01 00:00 
  2021-03-01 00:00 

  2021-04-01 00:00 
  2021-04-01 00:00 
  2021-04-01 00:00 
  2021-04-01 00:00 
  2021-04-01 00:00 
  2021-04-01 00:00 

  2021-05-01 00:00 
  2021-05-01 00:00 
  2021-05-01 00:00 
  2021-05-01 00:00 
  2021-05-01 00:00 
  2021-05-01 00:00 

  2021-06-01 00:00 
  2021-06-01 00:00 
  2021-06-01 00:00 
  2021-06-01 00:00 
  2021-06-01 00:00 
  2021-06-01 00:00 

  2021-07-01 00:00 
  2021-07-01 00:00 
  2021-07-01 00:00 
  2021-07-01 00:00 
  2021-07-01 00:00 
  2021-07-01 00:00 

  2021-08-01 00:00 
  2021-08-01 00:00 
  2021-08-01 00:00 
  2021-08-01 00:00 
  2021-08-01 00:00 
  2021-08-01 00:00 

  2021-09-01 00:00 
  2021-09-01 00:00 
  2021-09-01 00:00 
  2021-09-01 00:00 
  2021-09-01 00:00 
  2021-09-01 00:00 

  2021-10-01 00:00 
  2021-10-01 00:00 
  2021-10-01 00:00 
  2021-10-01 00:00 
  2021-10-01 00:00 
  2021-10-01 00:00 

  2021-11-01 00:00 
  2021-11-01 00:00 
  2021-11-01 00:00 
  2021-11-01 00:00 
  2021-11-01 00:00 
  2021-11-01 00:00 

  2021-12-01 00:00 
  2021-12-01 00:00 
  2021-12-01 00:00 
  2021-12-01 00:00 
  2021-12-01 00:00 
  2021-12-01 00:00 

  2022-01-01 00:00 
  2022-01-01 00:00 
  2022-01-01 00:00 
  2022-01-01 00:00 
  2022-01-01 00:00 
  2022-01-01 00:00 

  2022-02-01 00:00 
  2022-02-01 00:00 
  2022-02-01 00:00 
  2022-02-01 00:00 
  2022-02-01 00:00 
  2022-02-01 00:00 

  2022-03-01 00:00 
  2022-03-01 00:00 
  2022-03-01 00:00 
  2022-03-01 00:00 
  2022-03-01 00:00 
  2022-03-01 00:00 

  2022-04-01 00:00 
  2022-04-01 00:00 
  2022-04-01 00:00 
  2022-04-01 00:00 
  2022-04-01 00:00 
  2022-04-01 00:00 

  2022-05-01 00:00 
  2022-05-01 00:00 
  2022-05-01 00:00 
  2022-05-01 00:00 
  2022-05-01 00:00 
  2022-05-01 00:00 

  2022-06-01 00:00 
  2022-06-01 00:00 
  2022-06-01 00:00 
  2022-06-01 00:00 
  2022-06-01 00:00 
  2022-06-01 00:00 

  2022-07-01 00:00 
  2022-07-01 00:00 
  2022-07-01 00:00 
  2022-07-01 00:00 
  2022-07-01 00:00 
  2022-07-01 00:00 

  2022-08-01 00:00 
  2022-08-01 00:00 
  2022-08-01 00:00 
  2022-08-01 00:00 
  2022-08-01 00:00 
  2022-08-01 00:00 

  2022-09-01 00:00 
  2022-09-01 00:00 
  2022-09-01 00:00 
  2022-09-01 00:00 
  2022-09-01 00:00 
  2022-09-01 00:00 

  2022-10-01 00:00 
  2022-10-01 00:00 
  2022-10-01 00:00 
  2022-10-01 00:00 
  2022-10-01 00:00 
  2022-10-01 00:00 

  2022-11-01 00:00 
  2022-11-01 00:00 
  2022-11-01 00:00 
  2022-11-01 00:00 
  2022-11-01 00:00 
  2022-11-01 00:00 

  2022-12-01 00:00 
  2022-12-01 00:00 
  2022-12-01 00:00 
  2022-12-01 00:00 
  2022-12-01 00:00 
  2022-12-01 00:00 

  2023-01-01 00:00 
  2023-01-01 00:00 
  2023-01-01 00:00 
  2023-01-01 00:00 
  2023-01-01 00:00 
  2023-01-01 00:00 

  2023-02-01 00:00 
  2023-02-01 00:00 
  2023-02-01 00:00 
  2023-02-01 00:00 
  2023-02-01 00:00 
  2023-02-01 00:00 

  2023-03-01 00:00 
  2023-03-01 00:00 
  2023-03-01 00:00 
  2023-03-01 00:00 
  2023-03-01 00:00 
  2023-03-01 00:00 

  2023-04-01 00:00 
  2023-04-01 00:00 
  2023-04-01 00:00 
  2023-04-01 00:00 
  2023-04-01 00:00 
  2023-04-01 00:00 

  2023-05-01 00:00 
  2023-05-01 00:00 
  2023-05-01 00:00 
  2023-05-01 00:00 
  2023-05-01 00:00 
  2023-05-01 00:00 

  2023-06-01 00:00 
  2023-06-01 00:00 
  2023-06-01 00:00 
  2023-06-01 00:00 
  2023-06-01 00:00 
  2023-06-01 00:00 

  2023-07-01 00:00 
  2023-07-01 00:00 
  2023-07-01 00:00 
  2023-07-01 00:00 
  2023-07-01 00:00 
  2023-07-01 00:00 

  2023-08-01 00:00 
  2023-08-01 00:00 
  2023-08-01 00:00 
  2023-08-01 00:00 
  2023-08-01 00:00 
  2023-08-01 00:00 

  2023-09-01 00:00 
  2023-09-01 00:00 
  2023-09-01 00:00 
  2023-09-01 00:00 
  2023-09-01 00:00 
  2023-09-01 00:00 

  2023-10-01 00:00 
  2023-10-01 00:00 
  2023-10-01 00:00 
  2023-10-01 00:00 
  2023-10-01 00:00 
  2023-10-01 00:00 

  2023-11-01 00:00 
  2023-11-01 00:00 
  2023-11-01 00:00 
  2023-11-01 00:00 
  2023-11-01 00:00 
  2023-11-01 00:00 

  2023-12-01 00:00 
  2023-12-01 00:00 
  2023-12-01 00:00 
  2023-12-01 00:00 
  2023-12-01 00:00 
  2023-12-01 00:00 

  2024-01-01 00:00 
  2024-01-01 00:00 
  2024-01-01 00:00 
  2024-01-01 00:00 
  2024-01-01 00:00 
  2024-01-01 00:00 

  2024-02-01 00:00 
  2024-02-01 00:00 
  2024-02-01 00:00 
  2024-02-01 00:00 
  2024-02-01 00:00 
  2024-02-01 00:00 

  2024-03-01 00:00 
  2024-03-01 00:00 
  2024-03-01 00:00 
  2024-03-01 00:00 
  2024-03-01 00:00 
  2024-03-01 00:00 

  2024-04-01 00:00 
  2024-04-01 00:00 
  2024-04-01 00:00 
  2024-04-01 00:00 
  2024-04-01 00:00 
  2024-04-01 00:00 

  2024-05-01 00:00 
  2024-05-01 00:00 
  2024-05-01 00:00 
  2024-05-01 00:00 
  2024-05-01 00:00 
  2024-05-01 00:00 

  2024-06-01 00:00 
  2024-06-01 00:00 
  2024-06-01 00:00 
  2024-06-01 00:00 
  2024-06-01 00:00 
  2024-06-01 00:00 

  2024-07-01 00:00 
  2024-07-01 00:00 
  2024-07-01 00:00 
  2024-07-01 00:00 
  2024-07-01 00:00 
  2024-07-01 00:00 

  2024-08-01 00:00 
  2024-08-01 00:00 
  2024-08-01 00:00 
  2024-08-01 00:00 
  2024-08-01 00:00 
  2024-08-01 00:00 

  2024-09-01 00:00 
  2024-09-01 00:00 
  2024-09-01 00:00 
  2024-09-01 00:00 
  2024-09-01 00:00 
  2024-09-01 00:00 

  2024-10-01 00:00 
  2024-10-01 00:00 
  2024-10-01 00:00 
  2024-10-01 00:00 
  2024-10-01 00:00 
  2024-10-01 00:00 

  2024-11-01 00:00 
  2024-11-01 00:00 
  2024-11-01 00:00 
  2024-11-01 00:00 
  2024-11-01 00:00 
  2024-11-01 00:00 

  2024-12-01 00:00 
  2024-12-01 00:00 
  2024-12-01 00:00 
  2024-12-01 00:00 
  2024-12-01 00:00 
  2024-12-01 00:00 

  2025-01-01 00:00 
  2025-01-01 00:00 
  2025-01-01 00:00 
  2025-01-01 00:00 
  2025-01-01 00:00 
  2025-01-01 00:00 

  2025-02-01 00:00 
  2025-02-01 00:00 
  2025-02-01 00:00 
  2025-02-01 00:00 
  2025-02-01 00:00 
  2025-02-01 00:00 

  2025-03-01 00:00 
  2025-03-01 00:00 
  2025-03-01 00:00 
  2025-03-01 00:00 
  2025-03-01 00:00 
  2025-03-01 00:00 

  2025-04-01 00:00 
  2025-04-01 00:00 
  2025-04-01 00:00 
  2025-04-01 00:00 
  2025-04-01 00:00 
  2025-04-01 00:00 

  2025-05-01 00:00 
  2025-05-01 00:00 
  2025-05-01 00:00 
  2025-05-01 00:00 
  2025-05-01 00:00 
  2025-05-01 00:00 

  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 

  2025-07-01 00:00 
  2025-07-01 00:00 
  2025-07-01 00:00 
  2025-07-01 00:00 
  2025-07-01 00:00 
  2025-07-01 00:00 

  2025-08-01 00:00 
  2025-08-01 00:00 
  2025-08-01 00:00 
  2025-08-01 00:00 
  2025-08-01 00:00 
  2025-08-01 00:00 

  2025-09-01 00:00 
  2025-09-01 00:00 
  2025-09-01 00:00 
  2025-09-01 00:00 
  2025-09-01 00:00 
  2025-09-01 00:00 

  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 

  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 

  2025-12-01 00:00 
  2025-12-01 00:00 
  2025-12-01 00:00 
  2025-12-01 00:00 
  2025-12-01 00:00 
  2025-12-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00 
  2026-01-01 00:00 
  2026-01-01 00:00 
  2026-01-01 00:00 
  2026-01-01 00:00 

  2026-02-01 00:00 
  2026-02-01 00:00 
  2026-02-01 00:00 
  2026-02-01 00:00 
  2026-02-01 00:00 
  2026-02-01 00:00 

  2026-03-01 00:00 
  2026-03-01 00:00 
  2026-03-01 00:00 
  2026-03-01 00:00 
  2026-03-01 00:00 
  2026-03-01 00:00 

  2026-04-01 00:00 
  2026-04-01 00:00 
  2026-04-01 00:00 
  2026-04-01 00:00 
  2026-04-01 00:00 
  2026-04-01 00:00 

  2026-05-01 00:00 
  2026-05-01 00:00 
  2026-05-01 00:00 
  2026-05-01 00:00 
  2026-05-01 00:00 
  2026-05-01 00:00 

  2026-06-01 00:00 
  2026-06-01 00:00 
  2026-06-01 00:00 
  2026-06-01 00:00 
  2026-06-01 00:00 
  2026-06-01 00:00 

  2026-07-01 00:00 
  2026-07-01 00:00 
  2026-07-01 00:00 
  2026-07-01 00:00 
  2026-07-01 00:00 
  2026-07-01 00:00 

  2026-08-01 00:00 
  2026-08-01 00:00 
  2026-08-01 00:00 
  2026-08-01 00:00 
  2026-08-01 00:00 
  2026-08-01 00:00 

  2026-09-01 00:00 
  2026-09-01 00:00 
  2026-09-01 00:00 
  2026-09-01 00:00 
  2026-09-01 00:00 
  2026-09-01 00:00 

  2026-10-01 00:00 
  2026-10-01 00:00 
  2026-10-01 00:00 
  2026-10-01 00:00 
  2026-10-01 00:00 
  2026-10-01 00:00 

  2026-11-01 00:00 
  2026-11-01 00:00 
  2026-11-01 00:00 
  2026-11-01 00:00 
  2026-11-01 00:00 
  2026-11-01 00:00 

  2026-12-01 00:00 
  2026-12-01 00:00 
  2026-12-01 00:00 
  2026-12-01 00:00 
  2026-12-01 00:00 
  2026-12-01 00:00   
  2017-02-01 00:00 
  2017-02-01 00:00 
  2017-02-01 00:00 
  2017-02-01 00:00 
  2017-02-01 00:00 
  2017-02-01 00:00 

  2017-03-01 00:00 
  2017-03-01 00:00 
  2017-03-01 00:00 
  2017-03-01 00:00 
  2017-03-01 00:00 
  2017-03-01 00:00 

  2017-04-01 00:00 
  2017-04-01 00:00 
  2017-04-01 00:00 
  2017-04-01 00:00 
  2017-04-01 00:00 
  2017-04-01 00:00 

  2017-05-01 00:00 
  2017-05-01 00:00 
  2017-05-01 00:00 
  2017-05-01 00:00 
  2017-05-01 00:00 
  2017-05-01 00:00 

  2017-06-01 00:00 
  2017-06-01 00:00 
  2017-06-01 00:00 
  2017-06-01 00:00 
  2017-06-01 00:00 
  2017-06-01 00:00 

  2017-07-01 00:00 
  2017-07-01 00:00 
  2017-07-01 00:00 
  2017-07-01 00:00 
  2017-07-01 00:00 
  2017-07-01 00:00 

  2017-08-01 00:00 
  2017-08-01 00:00 
  2017-08-01 00:00 
  2017-08-01 00:00 
  2017-08-01 00:00 
  2017-08-01 00:00 

  2017-09-01 00:00 
  2017-09-01 00:00 
  2017-09-01 00:00 
  2017-09-01 00:00 
  2017-09-01 00:00 
  2017-09-01 00:00 

  2017-10-01 00:00 
  2017-10-01 00:00 
  2017-10-01 00:00 
  2017-10-01 00:00 
  2017-10-01 00:00 
  2017-10-01 00:00 

  2017-11-01 00:00 
  2017-11-01 00:00 
  2017-11-01 00:00 
  2017-11-01 00:00 
  2017-11-01 00:00 
  2017-11-01 00:00 

  2017-11-30 23:00 
  2017-11-30 23:00 
  2017-11-30 23:00 
  2017-11-30 23:00 
  2017-11-30 23:00 
  2017-11-30 23:00 

  2017-12-31 23:00 
  2017-12-31 23:00 
  2017-12-31 23:00 
  2017-12-31 23:00 
  2017-12-31 23:00 
  2017-12-31 23:00 

  2018-01-01 00:00 
  2018-01-01 00:00 
  2018-01-01 00:00 
  2018-01-01 00:00 
  2018-01-01 00:00 
  2018-01-01 00:00 

  2018-02-01 00:00 
  2018-02-01 00:00 
  2018-02-01 00:00 
  2018-02-01 00:00 
  2018-02-01 00:00 
  2018-02-01 00:00 

  2018-03-01 00:00 
  2018-03-01 00:00 
  2018-03-01 00:00 
  2018-03-01 00:00 
  2018-03-01 00:00 
  2018-03-01 00:00 

  2018-04-01 00:00 
  2018-04-01 00:00 
  2018-04-01 00:00 
  2018-04-01 00:00 
  2018-04-01 00:00 
  2018-04-01 00:00 

  2018-05-01 00:00 
  2018-05-01 00:00 
  2018-05-01 00:00 
  2018-05-01 00:00 
  2018-05-01 00:00 
  2018-05-01 00:00 

  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 

  2018-07-01 00:00 
  2018-07-01 00:00 
  2018-07-01 00:00 
  2018-07-01 00:00 
  2018-07-01 00:00 
  2018-07-01 00:00 

  2018-08-01 00:00 
  2018-08-01 00:00 
  2018-08-01 00:00 
  2018-08-01 00:00 
  2018-08-01 00:00 
  2018-08-01 00:00 

  2018-10-01 00:00 
  2018-10-01 00:00 
  2018-10-01 00:00 
  2018-10-01 00:00 
  2018-10-01 00:00 
  2018-10-01 00:00 

  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 

  2019-11-01 00:00 
  2019-11-01 00:00 
  2019-11-01 00:00 
  2019-12-01 00:00 
  2019-11-01 00:00 
  2019-12-01 00:00 

  2019-12-01 00:00 
  2019-12-01 00:00 
  2019-12-01 00:00 
  2019-12-01 00:00 

  2020-01-01 00:00 
  2020-01-01 00:00 
  2020-01-01 00:00 
  2020-01-01 00:00 
  2020-01-01 00:00 
  2020-01-01 00:00 

  2020-03-01 00:00 
  2020-03-01 00:00 
  2020-03-01 00:00 
  2020-03-01 00:00 
  2020-03-01 00:00 
  2020-03-01 00:00 

  2020-04-01 00:00 
  2020-04-01 00:00 
  2020-04-01 00:00 
  2020-04-01 00:00 
  2020-04-01 00:00 
  2020-04-01 00:00 

  2020-05-01 00:00 
  2020-05-01 00:00 
  2020-05-01 00:00 
  2020-05-01 00:00 
  2020-05-01 00:00 
  2020-05-01 00:00 

  2020-06-01 00:00 
  2020-06-01 00:00 
  2020-06-01 00:00 
  2020-06-01 00:00 
  2020-06-01 00:00 
  2020-06-01 00:00 

  2020-07-01 00:00 
  2020-07-01 00:00 
  2020-07-01 00:00 
  2020-07-01 00:00 
  2020-07-01 00:00 
  2020-07-01 00:00 

  2020-08-01 00:00 
  2020-08-01 00:00 
  2020-08-01 00:00 
  2020-08-01 00:00 
  2020-08-01 00:00 
  2020-08-01 00:00 

  2020-09-01 00:00 
  2020-09-01 00:00 
  2020-09-01 00:00 
  2020-09-01 00:00 
  2020-09-01 00:00 
  2020-09-01 00:00 

  2020-10-01 00:00 
  2020-10-01 00:00 
  2020-10-01 00:00 
  2020-10-01 00:00 
  2020-10-01 00:00 
  2020-10-01 00:00 

  2020-11-01 00:00 
  2020-11-01 00:00 
  2020-11-01 00:00 
  2020-11-01 00:00 
  2020-11-01 00:00 
  2020-11-01 00:00 

  2020-12-01 00:00 
  2020-12-01 00:00 
  2020-12-01 00:00 
  2020-12-01 00:00 
  2020-12-01 00:00 
  2020-12-01 00:00 

  2021-02-01 00:00 
  2021-02-01 00:00 
  2021-02-01 00:00 
  2021-02-01 00:00 
  2021-02-01 00:00 
  2021-02-01 00:00 

  2021-03-01 00:00 
  2021-03-01 00:00 
  2021-03-01 00:00 
  2021-03-01 00:00 
  2021-03-01 00:00 
  2021-03-01 00:00 

  2021-04-01 00:00 
  2021-04-01 00:00 
  2021-04-01 00:00 
  2021-04-01 00:00 
  2021-04-01 00:00 
  2021-04-01 00:00 

  2021-05-01 00:00 
  2021-05-01 00:00 
  2021-05-01 00:00 
  2021-05-01 00:00 
  2021-05-01 00:00 
  2021-05-01 00:00 

  2021-06-01 00:00 
  2021-06-01 00:00 
  2021-06-01 00:00 
  2021-06-01 00:00 
  2021-06-01 00:00 
  2021-06-01 00:00 

  2021-07-01 00:00 
  2021-07-01 00:00 
  2021-07-01 00:00 
  2021-07-01 00:00 
  2021-07-01 00:00 
  2021-07-01 00:00 

  2021-08-01 00:00 
  2021-08-01 00:00 
  2021-08-01 00:00 
  2021-08-01 00:00 
  2021-08-01 00:00 
  2021-08-01 00:00 

  2021-09-01 00:00 
  2021-09-01 00:00 
  2021-09-01 00:00 
  2021-09-01 00:00 
  2021-09-01 00:00 
  2021-09-01 00:00 

  2021-10-01 00:00 
  2021-10-01 00:00 
  2021-10-01 00:00 
  2021-10-01 00:00 
  2021-10-01 00:00 
  2021-10-01 00:00 

  2021-11-01 00:00 
  2021-11-01 00:00 
  2021-11-01 00:00 
  2021-11-01 00:00 
  2021-11-01 00:00 
  2021-11-01 00:00 

  2021-12-01 00:00 
  2021-12-01 00:00 
  2021-12-01 00:00 
  2021-12-01 00:00 
  2021-12-01 00:00 
  2021-12-01 00:00 

  2022-01-01 00:00 
  2022-01-01 00:00 
  2022-01-01 00:00 
  2022-01-01 00:00 
  2022-01-01 00:00 
  2022-01-01 00:00 

  2022-02-01 00:00 
  2022-02-01 00:00 
  2022-02-01 00:00 
  2022-02-01 00:00 
  2022-02-01 00:00 
  2022-02-01 00:00 

  2022-03-01 00:00 
  2022-03-01 00:00 
  2022-03-01 00:00 
  2022-03-01 00:00 
  2022-03-01 00:00 
  2022-03-01 00:00 

  2022-04-01 00:00 
  2022-04-01 00:00 
  2022-04-01 00:00 
  2022-04-01 00:00 
  2022-04-01 00:00 
  2022-04-01 00:00 

  2022-05-01 00:00 
  2022-05-01 00:00 
  2022-05-01 00:00 
  2022-05-01 00:00 
  2022-05-01 00:00 
  2022-05-01 00:00 

  2022-06-01 00:00 
  2022-06-01 00:00 
  2022-06-01 00:00 
  2022-06-01 00:00 
  2022-06-01 00:00 
  2022-06-01 00:00 

  2022-07-01 00:00 
  2022-07-01 00:00 
  2022-07-01 00:00 
  2022-07-01 00:00 
  2022-07-01 00:00 
  2022-07-01 00:00 

  2022-08-01 00:00 
  2022-08-01 00:00 
  2022-08-01 00:00 
  2022-08-01 00:00 
  2022-08-01 00:00 
  2022-08-01 00:00 

  2022-09-01 00:00 
  2022-09-01 00:00 
  2022-09-01 00:00 
  2022-09-01 00:00 
  2022-09-01 00:00 
  2022-09-01 00:00 

  2022-10-01 00:00 
  2022-10-01 00:00 
  2022-10-01 00:00 
  2022-10-01 00:00 
  2022-10-01 00:00 
  2022-10-01 00:00 

  2022-11-01 00:00 
  2022-11-01 00:00 
  2022-11-01 00:00 
  2022-11-01 00:00 
  2022-11-01 00:00 
  2022-11-01 00:00 

  2022-12-01 00:00 
  2022-12-01 00:00 
  2022-12-01 00:00 
  2022-12-01 00:00 
  2022-12-01 00:00 
  2022-12-01 00:00 

  2023-01-01 00:00 
  2023-01-01 00:00 
  2023-01-01 00:00 
  2023-01-01 00:00 
  2023-01-01 00:00 
  2023-01-01 00:00 

  2023-02-01 00:00 
  2023-02-01 00:00 
  2023-02-01 00:00 
  2023-02-01 00:00 
  2023-02-01 00:00 
  2023-02-01 00:00 

  2023-03-01 00:00 
  2023-03-01 00:00 
  2023-03-01 00:00 
  2023-03-01 00:00 
  2023-03-01 00:00 
  2023-03-01 00:00 

  2023-04-01 00:00 
  2023-04-01 00:00 
  2023-04-01 00:00 
  2023-04-01 00:00 
  2023-04-01 00:00 
  2023-04-01 00:00 

  2023-05-01 00:00 
  2023-05-01 00:00 
  2023-05-01 00:00 
  2023-05-01 00:00 
  2023-05-01 00:00 
  2023-05-01 00:00 

  2023-06-01 00:00 
  2023-06-01 00:00 
  2023-06-01 00:00 
  2023-06-01 00:00 
  2023-06-01 00:00 
  2023-06-01 00:00 

  2023-07-01 00:00 
  2023-07-01 00:00 
  2023-07-01 00:00 
  2023-07-01 00:00 
  2023-07-01 00:00 
  2023-07-01 00:00 

  2023-08-01 00:00 
  2023-08-01 00:00 
  2023-08-01 00:00 
  2023-08-01 00:00 
  2023-08-01 00:00 
  2023-08-01 00:00 

  2023-09-01 00:00 
  2023-09-01 00:00 
  2023-09-01 00:00 
  2023-09-01 00:00 
  2023-09-01 00:00 
  2023-09-01 00:00 

  2023-10-01 00:00 
  2023-10-01 00:00 
  2023-10-01 00:00 
  2023-10-01 00:00 
  2023-10-01 00:00 
  2023-10-01 00:00 

  2023-11-01 00:00 
  2023-11-01 00:00 
  2023-11-01 00:00 
  2023-11-01 00:00 
  2023-11-01 00:00 
  2023-11-01 00:00 

  2023-12-01 00:00 
  2023-12-01 00:00 
  2023-12-01 00:00 
  2023-12-01 00:00 
  2023-12-01 00:00 
  2023-12-01 00:00 

  2024-01-01 00:00 
  2024-01-01 00:00 
  2024-01-01 00:00 
  2024-01-01 00:00 
  2024-01-01 00:00 
  2024-01-01 00:00 

  2024-02-01 00:00 
  2024-02-01 00:00 
  2024-02-01 00:00 
  2024-02-01 00:00 
  2024-02-01 00:00 
  2024-02-01 00:00 

  2024-03-01 00:00 
  2024-03-01 00:00 
  2024-03-01 00:00 
  2024-03-01 00:00 
  2024-03-01 00:00 
  2024-03-01 00:00 

  2024-04-01 00:00 
  2024-04-01 00:00 
  2024-04-01 00:00 
  2024-04-01 00:00 
  2024-04-01 00:00 
  2024-04-01 00:00 

  2024-05-01 00:00 
  2024-05-01 00:00 
  2024-05-01 00:00 
  2024-05-01 00:00 
  2024-05-01 00:00 
  2024-05-01 00:00 

  2024-06-01 00:00 
  2024-06-01 00:00 
  2024-06-01 00:00 
  2024-06-01 00:00 
  2024-06-01 00:00 
  2024-06-01 00:00 

  2024-07-01 00:00 
  2024-07-01 00:00 
  2024-07-01 00:00 
  2024-07-01 00:00 
  2024-07-01 00:00 
  2024-07-01 00:00 

  2024-08-01 00:00 
  2024-08-01 00:00 
  2024-08-01 00:00 
  2024-08-01 00:00 
  2024-08-01 00:00 
  2024-08-01 00:00 

  2024-09-01 00:00 
  2024-09-01 00:00 
  2024-09-01 00:00 
  2024-09-01 00:00 
  2024-09-01 00:00 
  2024-09-01 00:00 

  2024-10-01 00:00 
  2024-10-01 00:00 
  2024-10-01 00:00 
  2024-10-01 00:00 
  2024-10-01 00:00 
  2024-10-01 00:00 

  2024-11-01 00:00 
  2024-11-01 00:00 
  2024-11-01 00:00 
  2024-11-01 00:00 
  2024-11-01 00:00 
  2024-11-01 00:00 

  2024-12-01 00:00 
  2024-12-01 00:00 
  2024-12-01 00:00 
  2024-12-01 00:00 
  2024-12-01 00:00 
  2024-12-01 00:00 

  2025-01-01 00:00 
  2025-01-01 00:00 
  2025-01-01 00:00 
  2025-01-01 00:00 
  2025-01-01 00:00 
  2025-01-01 00:00 

  2025-02-01 00:00 
  2025-02-01 00:00 
  2025-02-01 00:00 
  2025-02-01 00:00 
  2025-02-01 00:00 
  2025-02-01 00:00 

  2025-03-01 00:00 
  2025-03-01 00:00 
  2025-03-01 00:00 
  2025-03-01 00:00 
  2025-03-01 00:00 
  2025-03-01 00:00 

  2025-04-01 00:00 
  2025-04-01 00:00 
  2025-04-01 00:00 
  2025-04-01 00:00 
  2025-04-01 00:00 
  2025-04-01 00:00 

  2025-05-01 00:00 
  2025-05-01 00:00 
  2025-05-01 00:00 
  2025-05-01 00:00 
  2025-05-01 00:00 
  2025-05-01 00:00 

  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 

  2025-07-01 00:00 
  2025-07-01 00:00 
  2025-07-01 00:00 
  2025-07-01 00:00 
  2025-07-01 00:00 
  2025-07-01 00:00 

  2025-08-01 00:00 
  2025-08-01 00:00 
  2025-08-01 00:00 
  2025-08-01 00:00 
  2025-08-01 00:00 
  2025-08-01 00:00 

  2025-09-01 00:00 
  2025-09-01 00:00 
  2025-09-01 00:00 
  2025-09-01 00:00 
  2025-09-01 00:00 
  2025-09-01 00:00 

  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 

  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 

  2025-12-01 00:00 
  2025-12-01 00:00 
  2025-12-01 00:00 
  2025-12-01 00:00 
  2025-12-01 00:00 
  2025-12-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00 
  2026-01-01 00:00 
  2026-01-01 00:00 
  2026-01-01 00:00 
  2026-01-01 00:00 

  2026-02-01 00:00 
  2026-02-01 00:00 
  2026-02-01 00:00 
  2026-02-01 00:00 
  2026-02-01 00:00 
  2026-02-01 00:00 

  2026-03-01 00:00 
  2026-03-01 00:00 
  2026-03-01 00:00 
  2026-03-01 00:00 
  2026-03-01 00:00 
  2026-03-01 00:00 

  2026-04-01 00:00 
  2026-04-01 00:00 
  2026-04-01 00:00 
  2026-04-01 00:00 
  2026-04-01 00:00 
  2026-04-01 00:00 

  2026-05-01 00:00 
  2026-05-01 00:00 
  2026-05-01 00:00 
  2026-05-01 00:00 
  2026-05-01 00:00 
  2026-05-01 00:00 

  2026-06-01 00:00 
  2026-06-01 00:00 
  2026-06-01 00:00 
  2026-06-01 00:00 
  2026-06-01 00:00 
  2026-06-01 00:00 

  2026-07-01 00:00 
  2026-07-01 00:00 
  2026-07-01 00:00 
  2026-07-01 00:00 
  2026-07-01 00:00 
  2026-07-01 00:00 

  2026-08-01 00:00 
  2026-08-01 00:00 
  2026-08-01 00:00 
  2026-08-01 00:00 
  2026-08-01 00:00 
  2026-08-01 00:00 

  2026-09-01 00:00 
  2026-09-01 00:00 
  2026-09-01 00:00 
  2026-09-01 00:00 
  2026-09-01 00:00 
  2026-09-01 00:00 

  2026-10-01 00:00 
  2026-10-01 00:00 
  2026-10-01 00:00 
  2026-10-01 00:00 
  2026-10-01 00:00 
  2026-10-01 00:00 

  2026-11-01 00:00 
  2026-11-01 00:00 
  2026-11-01 00:00 
  2026-11-01 00:00 
  2026-11-01 00:00 
  2026-11-01 00:00 

  2026-12-01 00:00 
  2026-12-01 00:00 
  2026-12-01 00:00 
  2026-12-01 00:00 
  2026-12-01 00:00 
  2026-12-01 00:00 

  2027-01-01 00:00 
  2027-01-01 00:00 
  2027-01-01 00:00 
  2027-01-01 00:00 
  2027-01-01 00:00 
  2027-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Northern Intertie -All Lines in Service (Year Round)     2015-10-27 11:37     BPAT51477      2025-09-11 10:40  
  WOCN     255892     BPAT     West of Cascades North Path Rating          C-CASC_N(BPAT) 

  C-CASC_N(BPAT) 

  C-CASC_N(BPAT) 

  C-CASC_N(BPAT)   
  10700.0 

  10700.0 

  10700.0 

  10700.0   
  2015-11-10 00:00 

  2019-10-01 14:00 

  2028-01-01 00:00 

  2033-01-01 00:00   
  2019-10-01 14:00 

  2028-01-01 00:00 

  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of Cascades North Long-term Limit.     2015-11-09 10:26     BPAT51802      2025-01-28 07:57  
  14 MONTH     260712     BPAT     West of LOMO E>W All Lines in Service          W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT)   
  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0   
  2016-03-17 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00 

  2019-11-01 00:00 

  2019-12-01 00:00 

  2020-01-01 00:00 

  2020-03-01 00:00 

  2020-04-01 00:00 

  2020-05-01 00:00 

  2020-06-01 00:00 

  2020-07-01 00:00 

  2020-08-01 00:00 

  2020-09-01 00:00 

  2020-10-01 00:00 

  2020-11-01 00:00 

  2020-12-01 00:00 

  2021-02-01 00:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00 

  2026-10-01 00:00 

  2026-11-01 00:00 

  2026-12-01 00:00   
  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00 

  2019-11-01 00:00 

  2019-12-01 00:00 

  2020-01-01 00:00 

  2020-03-01 00:00 

  2020-04-01 00:00 

  2020-05-01 00:00 

  2020-06-01 00:00 

  2020-07-01 00:00 

  2020-08-01 00:00 

  2020-09-01 00:00 

  2020-10-01 00:00 

  2020-11-01 00:00 

  2020-12-01 00:00 

  2021-02-01 00:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00 

  2026-10-01 00:00 

  2026-11-01 00:00 

  2026-12-01 00:00 

  2027-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of LOMO - All Lines in Service (Year Round)     2016-03-16 13:36     BPAT53767      2025-09-11 10:55  
  14 MONTH     261306     BPAT     Columbia Injection ALIS          CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT)   
  1100.0 

  1100.0 

  1100.0 

  1100.0 

  1100.0 

  1100.0 

  1100.0 

  1100.0 

  1100.0 

  1100.0 

  1100.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0   
  2016-04-02 00:00 

  2016-05-26 10:00 

  2017-05-02 15:00 

  2017-06-05 10:00 

  2017-11-28 14:00 

  2017-12-20 12:00 

  2017-12-20 13:00 

  2018-02-28 17:00 

  2018-04-19 15:00 

  2018-05-14 11:00 

  2018-05-14 13:00 

  2018-06-01 00:00 

  2018-08-10 14:00 

  2019-10-01 00:00 

  2019-10-01 13:00 

  2019-10-09 10:00 

  2019-11-22 09:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00 

  2026-10-01 00:00 

  2026-11-01 00:00 

  2026-12-01 00:00   
  2016-05-26 10:00 

  2017-05-02 15:00 

  2017-06-05 10:00 

  2017-11-28 14:00 

  2017-12-20 12:00 

  2017-12-20 13:00 

  2018-02-28 17:00 

  2018-04-19 15:00 

  2018-05-14 11:00 

  2018-05-14 13:00 

  2018-06-01 00:00 

  2018-08-10 14:00 

  2019-10-01 00:00 

  2019-10-01 13:00 

  2019-10-09 10:00 

  2019-11-22 09:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00 

  2026-10-01 00:00 

  2026-11-01 00:00 

  2026-12-01 00:00 

  2027-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Columbia Injection All Lines in Service. (Year Round)     2016-04-01 14:58     BPAT53960      2025-09-11 10:54  
  14 MONTH     262981     BPAT     West of Slatt ALIS          WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT)   
  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0   
  2016-05-12 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2020-08-01 00:00 

  2020-09-01 00:00 

  2020-10-01 00:00 

  2020-11-01 00:00 

  2020-12-01 00:00 

  2021-02-01 00:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00 

  2026-10-01 00:00 

  2026-11-01 00:00 

  2026-12-01 00:00   
  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2020-08-01 00:00 

  2020-09-01 00:00 

  2020-10-01 00:00 

  2020-11-01 00:00 

  2020-12-01 00:00 

  2021-02-01 00:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00 

  2026-10-01 00:00 

  2026-11-01 00:00 

  2026-12-01 00:00 

  2027-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of Slatt - All Lines in Service (Year Round).     2016-05-11 12:16     BPAT54573      2025-09-11 10:55  
  NOJDAY     271567     BPAT     NJD_Path_Rating          NOJDAY(BPAT) 

  NOJDAY(BPAT)   
  8400.0 

  8400.0   
  2016-11-01 00:00 

  2026-01-01 00:00   
  2023-03-23 01:00 

  2023-03-23 01:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     NOJDAY Path Rating     2016-10-27 13:55     BPAT58592      2017-12-11 11:26  
  14 MONTH     279736     BPAT     RAVR PAUL          RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT)   
  1625.0 

  1640.0 

  1330.0 

  1800.0 

  1600.0 

  1630.0 

  1560.0 

  1560.0 

  1561.0 

  1528.0 

  1561.0 

  1561.0 

  1561.0 

  1561.0 

  1561.0 

  1561.0 

  1561.0 

  1463.0 

  1561.0 

  1555.0 

  1555.0 

  1555.0 

  1555.0 

  1555.0 

  1555.0 

  1555.0   
  2017-04-01 00:00 

  2017-07-01 00:00 

  2018-06-01 00:00 

  2019-06-01 00:00 

  2019-11-18 10:00 

  2020-06-01 00:00 

  2021-06-01 00:00 

  2022-05-11 00:00 

  2022-06-01 00:00 

  2023-06-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-11-01 00:00 

  2025-06-01 00:00 

  2026-06-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00 

  2026-10-01 00:00 

  2026-11-01 00:00 

  2026-12-01 00:00   
  2017-07-01 00:00 

  2018-06-01 00:00 

  2019-06-01 00:00 

  2019-11-18 10:00 

  2020-06-01 00:00 

  2021-06-01 00:00 

  2022-05-11 00:00 

  2022-06-01 00:00 

  2023-06-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-11-01 00:00 

  2025-06-01 00:00 

  2026-06-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00 

  2026-10-01 00:00 

  2026-11-01 00:00 

  2026-12-01 00:00 

  2027-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     RAVR_PAUL All Lines in Service.      2017-03-31 09:29     BPAT62912      2025-09-11 10:51  
  NI     306408     BPAT     NI          NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT)   
  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0   
  2018-10-31 00:00 
  2018-10-31 00:00 
  2018-10-31 00:00 
  2018-10-31 00:00 
  2018-10-31 00:00 
  2018-10-31 00:00   
  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     BPAT     NI Path Rating     2018-10-30 08:20     BPAT76509      2018-10-30 08:37  
  NI     306422     BPAT     NI          NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT)   
  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0   
  2018-10-31 00:00 
  2018-10-31 00:00 
  2018-10-31 00:00 
  2018-10-31 00:00 
  2018-10-31 00:00 
  2018-10-31 00:00   
  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     BPAT     NI Path Rating     2018-10-30 08:41     BPAT76511      2018-10-30 09:57  
  NI     306487     BPAT     NI          NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT)   
  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0   
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 

  2019-11-01 00:00 
  2019-11-01 00:00 
  2019-11-01 00:00 
  2019-11-01 00:00 
  2019-11-01 00:00 
  2019-11-01 00:00 

  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00 

  2033-01-01 00:00 
  2033-01-01 00:00 
  2033-01-01 00:00 
  2033-01-01 00:00 
  2033-01-01 00:00 
  2033-01-01 00:00   
  2019-11-01 00:00 
  2019-11-01 00:00 
  2019-11-01 00:00 
  2019-11-01 00:00 
  2019-11-01 00:00 
  2019-11-01 00:00 

  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00 

  2033-01-01 00:00 
  2033-01-01 00:00 
  2033-01-01 00:00 
  2033-01-01 00:00 
  2033-01-01 00:00 
  2033-01-01 00:00 

  2035-01-01 00:00 
  2035-01-01 00:00 
  2035-01-01 00:00 
  2035-01-01 00:00 
  2035-01-01 00:00 
  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     NI Path Rating     2018-10-31 08:51     BPAT76534      2025-01-28 08:01  
  NI     84603     BPAT     NI_Studied_Nomogram          NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT)   
  1571.0 
  1409.0 
  1571.0 
  1409.0 

  1571.0 
  1409.0 
  1571.0 
  1409.0 

  1571.0 
  1409.0 
  1571.0 
  1409.0   
  2019-12-01 00:00 
  2019-12-01 00:00 
  2019-12-01 00:00 
  2019-12-01 00:00 

  2024-01-01 00:00 
  2024-01-01 00:00 
  2024-01-01 00:00 
  2024-01-01 00:00 

  2025-01-01 00:00 
  2025-01-01 00:00 
  2025-01-01 00:00 
  2025-01-01 00:00   
  2024-01-01 00:00 
  2024-01-01 00:00 
  2024-01-01 00:00 
  2024-01-01 00:00 

  2025-01-01 00:00 
  2025-01-01 00:00 
  2025-01-01 00:00 
  2025-01-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00 
  2026-01-01 00:00 
  2026-01-01 00:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     BPAT     NI Studied Nomogram     2009-07-17 15:07     BPAT10813      2018-10-04 11:46  
  MI     323348     BPAT     MI_Path_TTC          MI_E>W(BPAT) 

  MI_E>W(BPAT) 

  MI_E>W(BPAT)   
  1930.0 

  1930.0 

  1930.0   
  2020-02-11 00:00 

  2029-01-01 00:00 

  2033-01-01 00:00   
  2029-01-01 00:00 

  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Townsend-Garrison (NWE path operator)     2020-02-10 07:57     BPAT84124      2025-01-28 08:00  
  COI PDCI     46533     BPAT     COI PDCI          AC_S>N(BPAT) 
  DC_S>N(BPAT) 

  AC_S>N(BPAT) 
  DC_S>N(BPAT)   
  2450.0 
  1904.0 

  2450.0 
  1904.0   
  2020-04-01 00:00 
  2020-04-01 00:00 

  2025-01-01 00:00 
  2025-01-01 00:00   
  2025-01-01 00:00 
  2025-01-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     BPAT     Studied Nomogram COI&PDCI SN     2008-09-22 10:44     BPAT6706      2019-01-28 09:16  
  SATSOP     333174     BPAT     SATSOP_Path_Limit          SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT)   
  650.0 

  680.0 

  680.0   
  2020-09-16 11:00 

  2024-11-13 00:00 

  2033-01-01 00:00   
  2024-11-13 00:00 

  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Long Term Limit     2020-09-16 10:49     BPAT89170      2025-01-28 08:05  
  14 MONTH     333180     BPAT     SATSOP_All_Lines_in_Service          SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT)   
  650.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0   
  2020-09-16 12:00 

  2021-11-09 00:00 

  2022-04-02 00:00 

  2022-11-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00 

  2026-10-01 00:00 

  2026-11-01 00:00 

  2026-12-01 00:00   
  2021-11-09 00:00 

  2022-04-02 00:00 

  2022-11-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00 

  2026-10-01 00:00 

  2026-11-01 00:00 

  2026-12-01 00:00 

  2027-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     SATSOP - All Lines in Service (Year Round)      2020-09-16 11:32     BPAT89172      2025-09-11 10:47  
  GRZN     366631     BPAT     GRZN          GRZN_N>S(BPAT)      4800.0      2023-05-17 00:00      2099-01-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     GRZN N>S Long-term Limit     2023-05-16 13:42     BPAT104227      2023-05-16 13:42  
  14 MONTH     367003     BPAT     GRZN          GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT)   
  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0   
  2023-06-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00 

  2026-10-01 00:00 

  2026-11-01 00:00 

  2026-12-01 00:00   
  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00 

  2026-10-01 00:00 

  2026-11-01 00:00 

  2026-12-01 00:00 

  2027-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     GRZN All Lines in Service     2023-05-22 08:09     BPAT104451      2025-09-11 10:56  
  SBNDRY     369914     BPAT     SBNDRY          SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT)   
  1350.0 

  1350.0   
  2023-08-22 00:00 

  2033-01-01 00:00   
  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     South of Boundary Long Term Limit     2023-08-21 11:12     BPAT105687      2025-01-28 08:06  
  CLMBIA     369916     BPAT     CLMBIA          CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT)   
  1010.0 

  1010.0   
  2023-08-22 00:00 

  2033-01-01 00:00   
  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Columbia Injection Long Term Limit     2023-08-21 11:14     BPAT105688      2025-01-28 07:58  
  WANAPM     369918     BPAT     WANAPM          WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT)   
  750.0 

  750.0   
  2023-08-22 00:00 

  2033-01-01 00:00   
  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Wanapum Injection Long Term Limit     2023-08-21 11:16     BPAT105689      2025-01-28 08:07  
  NOPE     372090     BPAT     NOPE S>N          NOPE_S>N(BPAT) 

  NOPE_S>N(BPAT)   
  2000.0 

  1400.0   
  2023-10-18 00:00 

  2023-12-01 12:00   
  2023-12-01 12:00 

  2099-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     NOPE S>N Long-Term Limit     2023-10-17 13:18     BPAT106649      2023-12-01 11:17  
  NI     374753     BPAT     NI          NI_TOTL_N>S(BPAT) 
  NI_WEST_N>S(BPAT) 

  NI_TOTL_N>S(BPAT) 
  NI_WEST_N>S(BPAT) 

  NI_TOTL_N>S(BPAT) 
  NI_WEST_N>S(BPAT)   
  2400.0 
  2000.0 

  2400.0 
  2000.0 

  2400.0 
  2000.0   
  2023-12-15 00:00 
  2023-12-15 00:00 

  2024-09-14 00:00 
  2024-09-14 00:00 

  2025-03-31 16:00 
  2025-03-31 16:00   
  2024-09-14 00:00 
  2024-09-14 00:00 

  2025-03-31 16:00 
  2025-03-31 16:00 

  2026-01-01 00:00 
  2026-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     BCH - CHAPMAN: 5CX1     2023-12-14 07:35     BPAT108183      2025-03-31 07:37  
  14 MONTH     376653     BPAT     SOA          SOALSN(BPAT) 

  SOALSN(BPAT) 

  SOALSN(BPAT) 

  SOALSN(BPAT) 

  SOALSN(BPAT) 

  SOALSN(BPAT) 

  SOALSN(BPAT) 

  SOALSN(BPAT) 

  SOALSN(BPAT)   
  3500.0 

  3500.0 

  3500.0 

  3009.0 

  3009.0 

  3009.0 

  3009.0 

  3009.0 

  3009.0   
  2024-02-14 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00 

  2026-10-01 00:00 

  2026-11-01 00:00 

  2026-12-01 00:00   
  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00 

  2026-10-01 00:00 

  2026-11-01 00:00 

  2026-12-01 00:00 

  2027-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     SOA - All lines in service MW limit reflects forecasted NW generation updates     2024-02-13 11:02     BPAT109109      2025-09-11 10:51  
  NI     388138     BPAT     NI          NI_EAST_S>N(BPAT)      200.0      2025-01-15 00:00      2026-01-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     BCH - VARIOUS EQUIPMENT     2025-01-14 12:54     BPAT114151      2025-01-14 12:54  
  WOCS     375932     BPAT     WOCS          C-CASC_S(BPAT)      5692.0      2025-04-01 00:00      2025-11-01 00:00      Cancelled     TRANSMISSION     PLANNED      ONPATH     BPAT     WOCS 2025 Spring/Summer Seasonal Limit     2024-01-19 11:21     BPAT108766      2024-01-19 11:22  
  14 MONTH     375935     BPAT     WOCS          C-CASC_S(BPAT)      6934.0      2025-06-01 00:00      2025-11-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     WOCS - 2025 Summer Seasonal Limit     2024-01-19 11:22     BPAT108767      2025-05-30 14:13  
  14 MONTH     378151     BPAT     NWACI PDCI RATS          AC_N>S(BPAT) 
  AC_S>N(BPAT) 
  DC_N>S(BPAT) 
  DC_S>N(BPAT) 
  RATS_N>S(BPAT) 
  RATS_S>N(BPAT)   
  4600.0 
  2800.0 
  3100.0 
  2084.0 
  300.0 
  200.0   
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00   
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     NWACI & PDCI & RATS 2025 SUMMER SEASONAL LIMITS     2024-03-27 11:15     BPAT109750      2025-04-24 14:59  
  14 MONTH     378158     BPAT     WOG          WOGARR_E>W(BPAT)      2200.0      2025-06-01 00:00      2025-11-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     WOG_E>W SUMMER 2025 Seasonal limit     2024-03-27 11:18     BPAT109751      2024-03-27 11:18  
  14 MONTH     378160     BPAT     WOG          WOGARR_W>E(BPAT)      1245.0      2025-06-01 00:00      2025-11-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     WOG_W>E SUMMER 2025 Seasonal limit     2024-03-27 11:20     BPAT109752      2024-03-27 11:20  
  14 MONTH     378173     BPAT     WOCN          C-CASC_N(BPAT)      8323.0      2025-06-01 00:00      2025-11-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     WOCN - SUMMER 2025 SEASONAL LIMIT     2024-03-27 11:28     BPAT109753      2025-03-14 08:10  
  14 MONTH     378176     BPAT     NOEL          N_ECOL_S>N(BPAT)      2288.0      2025-06-01 00:00      2025-11-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     NOEL - SUMMER 2025 SEASONAL LIMIT     2024-03-27 11:35     BPAT109754      2025-05-12 11:07  
  14 MONTH     378178     BPAT     SCSTER          SCSTER_N>S(BPAT)      1636.0      2025-06-01 00:00      2025-11-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     SCSTER - SUMMER 2025 SEASONAL LIMIT     2024-03-27 11:37     BPAT109755      2025-05-12 11:08  
  14 MONTH     378180     BPAT     NOHANF          NOHANF(BPAT) 
  NOHANF_S>N(BPAT)   
  4000.0 
  5000.0   
  2025-06-01 00:00 
  2025-06-01 00:00   
  2025-11-01 00:00 
  2025-11-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     NOHANF - SUMMER 2025 SEASONAL LIMIT     2024-03-27 11:41     BPAT109756      2024-05-13 11:58  
  14 MONTH     378184     BPAT     NOPE S>N          NOPE_S>N(BPAT)      1215.0      2025-06-01 00:00      2025-11-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     NOPE S>N - 2025 Summer Seasonal Limit     2024-03-27 11:44     BPAT109758      2025-05-30 09:01  
  PDCI     392215     BPAT     PDCI          DC_S>N(BPAT)      975.0      2025-06-01 00:00      2025-11-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     LADWP - PDCI SOUTH>NORTH SCHEDULING LIMIT     2025-05-22 10:03     BPAT115761      2025-05-22 10:03  
  NWACI     392745     BPAT     NWACI          AC_N>S(BPAT) 
  AC_S>N(BPAT) 

  AC_N>S(BPAT) 
  AC_S>N(BPAT)   
  3700.0 
  3575.0 

  4325.0 
  3575.0   
  2025-06-13 15:00 
  2025-06-13 15:00 

  2025-06-21 00:00 
  2025-06-21 00:00   
  2025-06-21 00:00 
  2025-06-21 00:00 

  2025-11-01 00:00 
  2025-11-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     PG&E - TABLE MOUNTAIN: ROUND MOUNTAIN 1 & 2 SERIES CAPS OOS     2025-06-04 14:41     BPAT115949      2025-06-20 09:21  
  NI     394906     BPAT     NI          NI_TOTL_S>N(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_TOTL_S>N(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_TOTL_S>N(BPAT) 
  NI_WEST_S>N(BPAT)   
  2000.0 
  2000.0 

  2000.0 
  2000.0 

  2000.0 
  2000.0   
  2025-09-01 07:00 
  2025-09-01 07:00 

  2025-09-12 18:00 
  2025-09-12 18:00 

  2025-09-27 18:00 
  2025-09-27 18:00   
  2025-09-12 18:00 
  2025-09-12 18:00 

  2025-09-27 18:00 
  2025-09-27 18:00 

  2025-10-10 18:00 
  2025-10-10 18:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - WAUTOMA-ROCK CREEK 1 500kV LINE (17037285 & 17037296)     2025-08-18 11:07     BPAT116787      2025-09-16 09:04  
  LAGR     393041     BPAT     LAGR          LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT)   
  50.0 
  50.0   
  2025-09-14 07:00 
  2025-09-14 07:00   
  2025-10-15 17:00 
  2025-10-15 17:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     BPAT     A PLANNED OUTAGE OF THE MCNARY-ROUNDUP NO 1 230KV LINE     2025-06-17 14:50     BPAT116076      2025-09-11 13:18  
  NOPE     395429     BPAT     NOPE          NOPE_S>N(BPAT)      1788.0      2025-09-15 08:00      2025-10-17 15:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - PEARL: 500/230kV BANK 1     2025-09-03 13:08     BPAT116963      2025-09-03 13:08  
  WOMCNY     395955     BPAT     WOMCNY          WOMCNY(BPAT)      4470.0      2025-09-15 09:00      2025-12-09 16:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - MCNARY: 500/230kV BANK 2     2025-09-15 09:07     BPAT117142      2025-09-15 09:07  
  SCSTER NOEL     395969     BPAT     SCSTER NOEL          N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT) 

  N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT)   
  1094.0 
  2236.0 

  1094.0 
  2236.0   
  2025-09-19 08:00 
  2025-09-19 08:00 

  2025-09-26 15:00 
  2025-09-26 15:00   
  2025-09-26 15:00 
  2025-09-26 15:00 

  2025-09-28 17:00 
  2025-09-28 17:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - RAVER-COVINGTON NO 1 500kV LINE, BPA - CUSTER 500/230kV TRANSFORMER 1 (STUDY 0605-ST25-R1)     2025-09-15 09:29     BPAT117144      2025-09-25 14:45  
  SCSTER NOEL     395974     BPAT     SCSTER NOEL          N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT)   
  1224.0 
  2283.0   
  2025-09-19 08:00 
  2025-09-19 08:00   
  2025-09-28 17:00 
  2025-09-28 17:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - RAVER-COVINGTON NO 1 500kV LINE (STUDY 0657-ST25-R1)     2025-09-15 09:33     BPAT117145      2025-09-18 13:55  
  NOHANF     395882     BPAT     NOHANF          NOHANF(BPAT) 
  NOHANF_S>N(BPAT)   
  4000.0 
  5000.0   
  2025-09-21 13:00 
  2025-09-21 13:00   
  2025-10-03 17:00 
  2025-10-03 17:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     USBR - Grand Coulee: PCBs 2192 and 2196, USBR: Grand Coulee-Schultz 1 500kV Line (17109690)     2025-09-12 14:40     BPAT117113      2025-09-19 08:46  
  NOHANF     395504     BPAT     NOHANF          NOHANF(BPAT) 
  NOHANF_S>N(BPAT)   
  3300.0 
  5000.0   
  2025-09-21 13:00 
  2025-09-21 13:00   
  2025-10-03 17:00 
  2025-10-03 17:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - GRAND COULEE: PCBs 2292 AND 2296, USBR - GRAND COULEE-SCHULTZ 1 500kV LINE (17109690)     2025-09-05 08:23     BPAT116994      2025-09-12 14:46  
  NOHANF     395179     BPAT     NOHANF          NOHANF(BPAT) 
  NOHANF_S>N(BPAT)   
  2600.0 
  5000.0   
  2025-09-21 13:00 
  2025-09-21 13:00   
  2025-09-27 18:00 
  2025-09-27 18:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - GRAND COULEE: PCBs 2292 & 2296, USBR - GRAND COULEE-SCHULTZ 1 500kV LINE, BPA - WAUTOMA-ROCK CREEK 1 500kV LINE     2025-08-26 08:40     BPAT116875      2025-09-12 14:46  
  NWACI PDCI     395373     BPAT     NWACI PDCI          AC_N>S(BPAT) 
  AC_S>N(BPAT) 
  DC_N>S(BPAT) 
  DC_S>N(BPAT)   
  4600.0 
  2800.0 
  3100.0 
  2084.0   
  2025-09-22 00:00 
  2025-09-22 00:00 
  2025-09-22 00:00 
  2025-09-22 00:00   
  2025-09-29 00:00 
  2025-09-29 00:00 
  2025-09-29 00:00 
  2025-09-29 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - VARIOUS EQUIPMENT (SOL NWACI S>N 3675)     2025-09-02 13:10     BPAT116942      2025-09-02 13:10  
  WOCN     395615     BPAT     WOCN          C-CASC_N(BPAT) 

  C-CASC_N(BPAT)   
  8057.0 

  8057.0   
  2025-09-22 00:00 

  2025-09-29 00:00   
  2025-09-29 00:00 

  2025-10-03 23:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - GRAND COULEE UNITS 19-24     2025-09-09 10:39     BPAT117041      2025-09-26 14:15  
  NWACI     396036     BPAT     NWACI          AC_N>S(BPAT) 
  AC_S>N(BPAT)   
  4275.0 
  3400.0   
  2025-09-22 06:00 
  2025-09-22 06:00   
  2025-10-02 18:00 
  2025-10-02 18:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     PG&E - TABLE MOUNTAIN: ROUND MOUNTAIN 1 & 2 SERIES CAP OOS, PG&E - VACA-TESLA 500kV LINE (18290985)     2025-09-17 11:20     BPAT117165      2025-09-17 11:20  
  WOCS     395507     BPAT     WOCS          C-CASC_S(BPAT)      6844.0      2025-09-24 08:00      2025-10-12 16:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     PGE - BETHEL-ROUND BUTTE 230kV LINE (17294060) (SOL 7011)     2025-09-05 08:56     BPAT116995      2025-09-05 08:56  
  WOCS     395509     BPAT     WOCS          C-CASC_S(BPAT)      6241.0      2025-09-26 07:00      2025-09-28 17:00      Cancelled     TRANSMISSION     PLANNED      ONPATH     BPAT     PGE - PEARL-SHERWOOD 1&2 230k LINE (18011078), PGE - BETHEL-ROUND BUTTE 230kV LINE (SOL 7208)     2025-09-05 09:00     BPAT116996      2025-09-18 14:54  
  NOPE     395500     BPAT     NOPE          NOPE_S>N(BPAT)      870.0      2025-09-26 07:00      2025-09-28 17:00      Cancelled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - PEARL: 500/230kV BANK 1, PGE - PEARL-SHERWOOD 1 & 2 230kV LINE     2025-09-05 08:17     BPAT116992      2025-09-18 14:53  
  NOHANF     395885     BPAT     NOHANF          NOHANF(BPAT) 
  NOHANF_S>N(BPAT)   
  3800.0 
  4600.0   
  2025-09-26 08:00 
  2025-09-26 08:00   
  2025-09-29 15:00 
  2025-09-29 15:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA: Grand Coulee: PCBs 2192 and 2196, BPA: Schultz-Echo Lake 1 500kV Line, BPA: Schultz-Raver 1 500kV Line, USBR: Grand Coulee-Schultz 1 500kV Line     2025-09-12 14:43     BPAT117114      2025-09-24 08:43  
  WOCN     395617     BPAT     WOCN          C-CASC_N(BPAT) 

  C-CASC_N(BPAT)   
  5638.0 

  5638.0   
  2025-09-26 08:00 

  2025-09-27 00:00   
  2025-09-27 00:00 

  2025-09-29 15:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - GRAND COULEE UNITS 19-24, BPA - SCHULTZ-ECHO LAKE NO 1 500kV LINE, BPA - SCHULTZ-RAVER NO 1 500kV LINE (SOL 7460)     2025-09-09 10:50     BPAT117042      2025-09-10 13:40  
  SCSTER NOEL     395665     BPAT     SCSTER NOEL          N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT) 

  N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT)   
  1245.0 
  1419.0 

  1245.0 
  1419.0   
  2025-09-26 08:00 
  2025-09-26 08:00 

  2025-09-28 15:00 
  2025-09-28 15:00   
  2025-09-28 15:00 
  2025-09-28 15:00 

  2025-09-29 15:00 
  2025-09-29 15:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - SCHULTZ-ECHO LAKE NO 1 500kV LINE, BPA - SCHULTZ-RAVER NO 1 500kV LINE (STUDY 0656-ST25-R0)     2025-09-09 15:49     BPAT117056      2025-09-11 11:14  
  SCSTER NOEL     395672     BPAT     SCSTER NOEL          N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT) 

  N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT)   
  291.0 
  967.0 

  291.0 
  967.0   
  2025-09-26 08:00 
  2025-09-26 08:00 

  2025-09-26 15:00 
  2025-09-26 15:00   
  2025-09-26 15:00 
  2025-09-26 15:00 

  2025-09-28 17:00 
  2025-09-28 17:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - RAVER-COVINGTON NO 1 500kV LINE, BPA - CUSTER 500/230kV BANK 1 INCLUDING STA SERV, BPA - SCHULTZ-ECHO LAKE NO 1 500kV LINE, BPA - SCHULTZ-RAVER NO 1 500kV LINE (STUDY 0655-ST25-R0)     2025-09-09 15:53     BPAT117057      2025-09-25 14:46  
  SCSTER NOEL     396217     BPAT     SCSTER NOEL          N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT)   
  618.0 
  2111.0   
  2025-09-26 08:00 
  2025-09-26 08:00   
  2025-09-28 17:00 
  2025-09-28 17:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - SCHULTZ-ECHO LAKE NO 1 500kV LINE, BPA - SCHULTZ-RAVER NO 1 500kV LINE, BPA - RAVER-COVINGTON 1 500kV LINE (STUDY 0721-ST25-R0)      2025-09-24 10:58     BPAT117243      2025-09-24 10:58  
  RT N. OUTAGE     396324     BPAT               NI_EAST_N>S(BPAT) 
  NI_TOTL_N>S(BPAT)   
  350.0 
  2350.0   
  2025-09-27 00:00 
  2025-09-27 00:00   
  2025-09-28 00:00 
  2025-09-28 00:00   
  Active     TRANSMISSION     FORCED      ONPATH     BPAT     Updated limits for 8/27/25     2025-09-26 19:17     BPAT117282      2025-09-26 19:17  
  RT N. OUTAGE     396330     BPAT               NI_EAST_N>S(BPAT)      350.0      2025-09-27 00:00      2025-09-27 01:00      Active     TRANSMISSION     FORCED      ONPATH     BPAT     Updated limits for 9/27/25     2025-09-26 19:34     BPAT117285      2025-09-26 19:34  
  RT N. OUTAGE     396333     BPAT               NI_EAST_N>S(BPAT)      350.0      2025-09-27 00:00      2025-09-28 00:00      Active     TRANSMISSION     FORCED      ONPATH     BPAT     Updated limits for 9/27/25     2025-09-26 19:43     BPAT117286      2025-09-26 19:43  
  SCSTER NOEL     396309     BPAT     SCSTER NOEL          N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT)   
  1556.0 
  2104.0   
  2025-09-28 00:00 
  2025-09-28 00:00   
  2025-09-29 15:00 
  2025-09-29 15:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - CUSTER: 500/230kV TRANSFORMER BANK 1, BPA - SCHULTZ-ECHO LAKE NO 1 500kV LINE, BPA - SCHULTZ-RAVER NO 1 500kV LINE (STUDY 0732-ST25-R0)     2025-09-26 10:34     BPAT117276      2025-09-26 10:34  
  SCSTER NOEL     395656     BPAT     SCSTER NOEL          N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT)   
  300.0 
  1310.0   
  2025-09-28 00:00 
  2025-09-28 00:00   
  2025-09-28 17:00 
  2025-09-28 17:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - Raver-Covington No 1 500KV Line, BPA - Schultz-Echo Lake No 1 500kV Line, BPA - Schultz-Raver No 1 500kV Line (STUDY 0659-ST25-R0)     2025-09-09 15:43     BPAT117053      2025-09-25 13:11  
  WOCN     396316     BPAT     WOCN          C-CASC_N(BPAT)      9309.0      2025-09-29 00:00      2025-10-06 00:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - VARIOUS EQUIMENT     2025-09-26 14:18     BPAT117278      2025-09-26 14:18  
  NWACI PDCI     395625     BPAT     NWACI PDCI          AC_N>S(BPAT) 
  AC_S>N(BPAT) 
  DC_N>S(BPAT) 
  DC_S>N(BPAT)   
  4600.0 
  2800.0 
  3100.0 
  2084.0   
  2025-09-29 00:00 
  2025-09-29 00:00 
  2025-09-29 00:00 
  2025-09-29 00:00   
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - VARIOUS EQUIPMENT (SOL NWACI S>N 3675)     2025-09-09 13:14     BPAT117047      2025-09-09 13:14  
  SCSTER NOEL     395748     BPAT     SCSTER NOEL          N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT)   
  2650.0 
  2324.0   
  2025-09-29 00:00 
  2025-09-29 00:00   
  2025-10-06 00:00 
  2025-10-06 00:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - VARIOUS EQUIPMENT (STUDY 0663-ST25-R0)     2025-09-11 08:15     BPAT117080      2025-09-11 08:15  
  MI     396305     BPAT     MI          MI_E>W(BPAT)      1750.0      2025-09-29 07:00      2025-10-05 16:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - GARRISON: 500/230kV TRANSFORMER 1     2025-09-26 10:31     BPAT117274      2025-09-26 10:31  
  WOG     396307     BPAT     WOG          WOGARR_E>W(BPAT)      1750.0      2025-09-29 07:00      2025-10-05 16:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - GARRISON: 500/230kV TRANSFORMER 1     2025-09-26 10:32     BPAT117275      2025-09-26 10:32  
  MI     395496     BPAT     MI          MI_E>W(BPAT)      1750.0      2025-09-29 07:00      2025-10-05 16:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - GARRISON: 500/230kV TRANSFORMER 1     2025-09-05 08:12     BPAT116990      2025-09-05 08:12  
  WOG     395498     BPAT     WOG          WOGARR_E>W(BPAT)      1750.0      2025-09-29 07:00      2025-10-05 16:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - GARRISON: 500/230kV TRANSFORMER 1     2025-09-05 08:14     BPAT116991      2025-09-05 08:14  
  CLMBIA     395511     BPAT     CLMBIA          CLMBIA_N>S(BPAT)      1175.0      2025-09-29 08:00      2025-10-24 17:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - SICKLER: 500/230kV TRANSFORMER 1 (17456856)     2025-09-05 11:34     BPAT116997      2025-09-05 11:34  
  CLMBIA     395513     BPAT     CLMBIA          CLMBIA_N>S(BPAT)      975.0      2025-09-29 08:00      2025-09-29 15:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - SICKLER: 500/230kV TRANSFORMER 1 (17456826), BPA - VANTAGE-COLUMIA 1 230kV LINE     2025-09-05 11:37     BPAT116998      2025-09-05 11:37  
  SCSTER NOEL     395751     BPAT     SCSTER NOEL          N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT)   
  2424.0 
  2494.0   
  2025-09-30 08:00 
  2025-09-30 08:00   
  2025-10-02 15:00 
  2025-10-02 15:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - TACOMA-COVINGTON NO 3 230kV LINEBPA - TACOMA-COVINGTON NO 4 230kV LINE INCL 230kV AUX BUS(STUDY 0665-ST25-R0)     2025-09-11 08:24     BPAT117081      2025-09-11 08:24  
  NWACI PDCI     395630     BPAT     NWACI PDCI          AC_N>S(BPAT) 
  AC_S>N(BPAT) 
  DC_N>S(BPAT) 
  DC_S>N(BPAT)   
  4800.0 
  2800.0 
  3100.0 
  2084.0   
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00   
  2025-10-06 00:00 
  2025-10-06 00:00 
  2025-10-06 00:00 
  2025-10-06 00:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - VARIOUS EQUIPMENT (SOL NWACI S>N 3675)     2025-09-09 13:16     BPAT117048      2025-09-11 14:23  
  NWACI     396225     BPAT     NWACI          AC_N>S(BPAT) 
  AC_S>N(BPAT)   
  3225.0 
  2400.0   
  2025-10-01 07:00 
  2025-10-01 07:00   
  2025-10-02 18:00 
  2025-10-02 18:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     PG&E - TABLE MOUNTAIN: ROUND MOUNTAIN 1 & 2 SERIES CAP OOS, PG&E - VACA-TESLA 500kV LINE (18290985), WAPA - OLINDA-TRACY 500kV LINE (15756962)     2025-09-24 12:11     BPAT117246      2025-09-24 12:11  
  NI     395997     BPAT     NI          NI_TOTL_S>N(BPAT) 
  NI_WEST_S>N(BPAT)   
  2000.0 
  2000.0   
  2025-10-01 08:00 
  2025-10-01 08:00   
  2025-10-15 15:00 
  2025-10-15 15:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - GRIZZLY-CAPTAIN JACK 1 500kV LINE (16903559)     2025-09-16 08:33     BPAT117154      2025-09-16 08:33  
  NWACI PDCI     395635     BPAT     NWACI PDCI          AC_N>S(BPAT) 
  AC_S>N(BPAT) 
  DC_N>S(BPAT) 
  DC_S>N(BPAT) 

  AC_N>S(BPAT) 
  AC_S>N(BPAT) 
  DC_N>S(BPAT) 
  DC_S>N(BPAT)   
  4330.0 
  2800.0 
  3100.0 
  2084.0 

  4330.0 
  2800.0 
  3100.0 
  2084.0   
  2025-10-01 08:00 
  2025-10-01 08:00 
  2025-10-01 08:00 
  2025-10-01 08:00 

  2025-10-06 00:00 
  2025-10-06 00:00 
  2025-10-06 00:00 
  2025-10-06 00:00   
  2025-10-06 00:00 
  2025-10-06 00:00 
  2025-10-06 00:00 
  2025-10-06 00:00 

  2025-10-15 15:00 
  2025-10-15 15:00 
  2025-10-15 15:00 
  2025-10-15 15:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - PONDEROSA-CAPTAIN JACK SECT OF GRIZ-CAPTAIN JACK NO 1 500kV LINE (SOL NWACI S>N 3675)     2025-09-09 13:20     BPAT117049      2025-09-11 14:24  
  NWACI     396228     BPAT     NWACI          AC_N>S(BPAT) 
  AC_S>N(BPAT)   
  3475.0 
  2925.0   
  2025-10-02 17:00 
  2025-10-02 17:00   
  2025-10-03 17:00 
  2025-10-03 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     PG&E - TABLE MOUNTAIN: ROUND MOUNTAIN 1 & 2 SERIES CAP OOS, PAC - MALIN: ROUND MTN 2 500kV SCAPs (18372078), WAPA - OLINDA-TRACY 500kV LINE (15756962)     2025-09-24 12:16     BPAT117247      2025-09-24 12:16  
  NOHANF     395888     BPAT     NOHANF          NOHANF(BPAT) 
  NOHANF_S>N(BPAT)   
  4000.0 
  5000.0   
  2025-10-03 00:00 
  2025-10-03 00:00   
  2025-10-06 00:00 
  2025-10-06 00:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA: Grand Coulee: PCBs 2292 and 2296     2025-09-12 14:44     BPAT117115      2025-09-12 14:44  
  SOALSN     395978     BPAT     SOALSN          SOALSN(BPAT)      3140.0      2025-10-03 07:00      2025-10-05 17:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - ROSS-ST JOHNS 1 230kV LINE, BPA - ROSS-RIVERGATE 1 230kV LINE, PGE - MCLOUGHLIN-PEARL-SHERWOOD 1 230kV LINE (17977782)     2025-09-15 11:21     BPAT117146      2025-09-15 11:21  
  NOPE     395785     BPAT     NOPE          NOPE_S>N(BPAT)      796.0      2025-10-03 07:00      2025-10-05 17:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - PEARL: 500/230kV BANK 1, PGE - MCLOUGHLIN-PEARL-SHERWOOD 1 230kV LINE     2025-09-11 11:28     BPAT117084      2025-09-15 10:15  
  WOCS     396099     BPAT     WOCS          C-CASC_S(BPAT)      5804.0      2025-10-03 07:00      2025-10-05 17:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     PGE - BETHEL-ROUND BUTTE 230kV LINE, PGE - MCLOUGHLIN-PEARL-SHERWOOD 1 230kV LINE (17977782) (SOL 7392)     2025-09-19 07:51     BPAT117188      2025-09-19 07:51  
  WOCN     396318     BPAT     WOCN          C-CASC_N(BPAT)      8649.0      2025-10-03 08:00      2025-10-04 15:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - TACOMA-RAVER 1 500kV LINE (16763788) (SOL 9317)     2025-09-26 14:19     BPAT117279      2025-09-26 14:19  
  SCSTER NOEL     395754     BPAT     SCSTER NOEL          N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT)   
  2646.0 
  2312.0   
  2025-10-03 08:00 
  2025-10-03 08:00   
  2025-10-04 15:00 
  2025-10-04 15:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - TACOMA-RAVER NO 1 500kV LINEBPA - TACOMA-COVINGTON NO 2 230kV LINE(STUDY 0664-ST25-R0)     2025-09-11 08:30     BPAT117082      2025-09-11 08:30  
  NWACI     396231     BPAT     NWACI          AC_N>S(BPAT) 
  AC_S>N(BPAT)   
  4450.0 
  3200.0   
  2025-10-03 17:00 
  2025-10-03 17:00   
  2025-10-31 16:00 
  2025-10-31 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     PG&E - TABLE MOUNTAIN: ROUND MOUNTAIN 1 & 2 SERIES CAP OOS, WAPA - OLINDA-TRACY 500kV LINE (15756962)     2025-09-24 12:19     BPAT117248      2025-09-24 12:19  
  NOHANF     396192     BPAT     NOHANF          NOHANF(BPAT) 
  NOHANF_S>N(BPAT)   
  4000.0 
  5000.0   
  2025-10-06 00:00 
  2025-10-06 00:00   
  2025-10-13 00:00 
  2025-10-13 00:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - GRAND COULEE: PCBs 2292 AND 2296     2025-09-23 12:57     BPAT117231      2025-09-23 12:57  
  SCSTER NOEL     396039     BPAT     SCSTER NOEL          N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT)   
  2650.0 
  2309.0   
  2025-10-06 00:00 
  2025-10-06 00:00   
  2025-10-13 00:00 
  2025-10-13 00:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - VARIOUS EQUIPMENT (STUDY 0697-ST25-R0)     2025-09-17 14:46     BPAT117166      2025-09-17 14:46  
  WOCN     396042     BPAT     WOCN          C-CASC_N(BPAT)      8317.0      2025-10-06 00:00      2025-10-13 00:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - VARIOUS EQUIPMENT (SOL 9310)     2025-09-17 15:47     BPAT117167      2025-09-18 09:05  
  RAVR_PAUL     396061     BPAT     RAVR PAUL          RAVR_PAUL(BPAT)      1419.0      2025-10-06 07:00      2025-10-17 17:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - CHEHALIS-COVINGTON 1 230kV LINE     2025-09-18 11:05     BPAT117175      2025-09-18 11:05  
  NOPE     396158     BPAT     NOPE          NOPE_S>N(BPAT)      1677.0      2025-10-06 07:00      2025-10-07 15:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - PEARL: 500/230kV BANK 1, PGE - KEELER-HORIZON 2 230kV LINE (18464027)     2025-09-22 09:58     BPAT117212      2025-09-22 09:58  
  WOCS     396154     BPAT     WOCS          C-CASC_S(BPAT)      6385.0      2025-10-06 08:00      2025-10-10 18:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     PGE - BETHEL-ROUND BUTTE 230kV LINE, BPA - BIG EDDY: 230kV MAIN BUS SECTION 1 (17361111)(SOL 7007)     2025-09-22 09:51     BPAT117210      2025-09-22 09:55  
  SBNDRY     396221     BPAT     SBNDRY          SBNDRY_N>S(BPAT)      1070.0      2025-10-06 08:00      2025-10-17 16:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BCH - BOUNDARY-NELWAY 1 230kV LINE (2L112)     2025-09-24 12:06     BPAT117244      2025-09-24 12:06  
  NI     396234     BPAT     NI          NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT)   
  0.0 
  0.0 
  2000.0 
  2500.0 
  2000.0 
  2500.0   
  2025-10-06 08:00 
  2025-10-06 08:00 
  2025-10-06 08:00 
  2025-10-06 08:00 
  2025-10-06 08:00 
  2025-10-06 08:00   
  2025-10-17 16:00 
  2025-10-17 16:00 
  2025-10-17 16:00 
  2025-10-17 16:00 
  2025-10-17 16:00 
  2025-10-17 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BCH - BOUNDARY-NELWAY 1 230kV LINE (17818170)     2025-09-24 12:22     BPAT117249      2025-09-24 12:22  
  SCSTER NOEL     395707     BPAT     SCSTER NOEL          N_ECOL_S>N(BPAT)      1960.0      2025-10-06 08:00      2025-10-07 15:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - MONROE: PCB 4519 ***ESTIMATE***     2025-09-10 13:39     BPAT117066      2025-09-10 13:39  
  W_LOMO     396070     BPAT     W_LOMO          W_LOMO_E>W(BPAT)      3700.0      2025-10-07 07:00      2025-10-07 16:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - LOWER MONUMENTAL-LITTLE GOOSE 1 500kV LINE     2025-09-18 14:12     BPAT117177      2025-09-18 14:12  
  WOG     396213     BPAT     WOG          WOGARR_E>W(BPAT)      2200.0      2025-10-07 07:00      2025-10-07 16:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - GARRISON: BROADVIEW 2 500kV LINE SERIES CAPS (17330744)     2025-09-24 08:41     BPAT117240      2025-09-24 08:41  
  SOALSN     396168     BPAT     SOALSN          SOALSN(BPAT)      3136.0      2025-10-07 07:00      2025-10-07 15:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - ROSS-ST JOHNS 1 230kV LINE, BPA - ROSS-RIVERGATE 1 230kV LINE, BPA - KEELER 230/115 BANK 1     2025-09-22 10:58     BPAT117217      2025-09-22 10:58  
  MI     396244     BPAT     MI          MI_E>W(BPAT)      1600.0      2025-10-08 08:00      2025-10-08 15:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - GARRISON-TAFT 1 500kV LINE     2025-09-24 12:27     BPAT117251      2025-09-24 12:27  
  WOG     396246     BPAT     WOG          WOGARR_E>W(BPAT)      1600.0      2025-10-08 08:00      2025-10-08 15:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - GARRISON-TAFT 1 500kV LINE     2025-09-24 12:29     BPAT117252      2025-09-24 12:29  
  NOPE     396160     BPAT     NOPE          NOPE_S>N(BPAT)      1805.0      2025-10-09 08:00      2025-10-09 15:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - PEARL: 500/230kV BANK 1, BPA - KEELER-ALLSTON 1 500kV LINE (16763816)     2025-09-22 10:15     BPAT117213      2025-09-22 10:15  
  SBNDRY     396223     BPAT     SBNDRY          SBNDRY_N>S(BPAT)      500.0      2025-10-09 08:00      2025-10-09 13:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BCH - BOUNDARY-NELWAY 1 230kV LINE (2L112), BPA - BOUNDARY: 230/115kV TRANSFORMER 1     2025-09-24 12:08     BPAT117245      2025-09-24 12:08  
  SOALSN     396166     BPAT     SOALSN          SOALSN(BPAT)      1414.0      2025-10-09 08:00      2025-10-09 15:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - ROSS-ST JOHNS 1 230kV LINE, BPA - ROSS-RIVERGATE 1 230kV LINE, BPA - KEELER-ALLSTON 1 500kV LINE     2025-09-22 10:55     BPAT117216      2025-09-22 10:55  
  SOALSN     396163     BPAT     SOALSN          SOALSN(BPAT)      3062.0      2025-10-10 07:00      2025-10-12 17:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - ROSS-ST JOHNS 1 230kV LINE, BPA - ROSS-RIVERGATE 1 230kV LINE, PGE - MCLOUGHLIN-PEARL-SHERWOOD 1 230kV LINE (17977782)     2025-09-22 10:32     BPAT117214      2025-09-22 10:32  
  WOCS     396173     BPAT     WOCS          C-CASC_S(BPAT)      5804.0      2025-10-10 07:00      2025-10-12 17:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     PGE - BETHEL-ROUND BUTTE 230kV LINE, PGE - MCLOUGHLIN-PEARL-SHERWOOD 1 230kV LINE (SOL 7392)     2025-09-22 12:17     BPAT117220      2025-09-22 12:17  
  WOCS     396156     BPAT     WOCS          C-CASC_S(BPAT)      5242.0      2025-10-10 07:00      2025-10-10 18:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     PGE - BETHEL-ROUND BUTTE 230kV LINE, BPA - BIG EDDY: 230kV MAIN BUS SECTION 1, PGE - MCLOUGHLIN-PEARL-SHERWOOD 1 230kV LINE (SOL 6888)     2025-09-22 09:53     BPAT117211      2025-09-22 09:53  
  NOPE     395787     BPAT     NOPE          NOPE_S>N(BPAT)      796.0      2025-10-10 07:00      2025-10-12 17:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - PEARL: 500/230kV BANK 1, PGE - MCLOUGHLIN-PEARL-SHERWOOD 1 230kV LINE     2025-09-11 11:30     BPAT117085      2025-09-22 10:16  
  NWACI PDCI     395710     BPAT     NWACI PDCI          AC_N>S(BPAT) 
  AC_S>N(BPAT) 
  DC_N>S(BPAT) 
  DC_S>N(BPAT)   
  2550.0 
  0.0 
  3100.0 
  2084.0   
  2025-10-10 08:00 
  2025-10-10 08:00 
  2025-10-10 08:00 
  2025-10-10 08:00   
  2025-10-14 15:00 
  2025-10-14 15:00 
  2025-10-14 15:00 
  2025-10-14 15:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - PONDEROSA-CAPTAIN JACK SECT OF GRIZ-CAPTAIN JACK NO 1 500kV LINE, PACW - MERIDIAN-KLAMATH COGEN 500kV LINE     2025-09-10 13:43     BPAT117067      2025-09-10 13:43  
  GRZN     395715     BPAT     GRZN          GRZN_N>S(BPAT)      4175.0      2025-10-10 08:00      2025-10-14 15:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     PAC - MERIDIAN-KLAMATH COGEN 500kV LINE     2025-09-10 13:45     BPAT117068      2025-09-10 13:45  
  NI     396241     BPAT     NI          NI_TOTL_S>N(BPAT) 
  NI_WEST_S>N(BPAT)   
  2000.0 
  2000.0   
  2025-10-10 08:00 
  2025-10-10 08:00   
  2025-10-14 14:00 
  2025-10-14 14:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     PAC - KLAMATH COGEN-MERIDIAN 1 500kV LINE (18647226)     2025-09-24 12:25     BPAT117250      2025-09-24 12:25  
  SCSTER NOEL     396252     BPAT     SCSTER NOEL          N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT)   
  2936.0 
  2545.0   
  2025-10-13 00:00 
  2025-10-13 00:00   
  2025-10-20 00:00 
  2025-10-20 00:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - VARIOUS EQUIPMENT (STUDY 0717-ST25-R0)     2025-09-24 14:57     BPAT117255      2025-09-24 14:57  
  WOCN     396271     BPAT     WOCN          C-CASC_N(BPAT)      9019.0      2025-10-13 00:00      2025-10-20 00:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - VARIOUS EQUIPMENT (SOL 9121)     2025-09-25 11:15     BPAT117263      2025-09-25 11:15  
  NOHANF     396312     BPAT     NOHANF          NOHANF(BPAT) 
  NOHANF_S>N(BPAT)   
  4000.0 
  5000.0   
  2025-10-13 00:00 
  2025-10-13 00:00   
  2025-10-20 00:00 
  2025-10-20 00:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - GRAND COULEE: PCBs 2292 AND 2296     2025-09-26 10:37     BPAT117277      2025-09-26 10:37  
  NWACI PDCI     395818     BPAT     NWACI PDCI          AC_N>S(BPAT) 
  AC_S>N(BPAT) 
  DC_N>S(BPAT) 
  DC_S>N(BPAT)   
  4800.0 
  2800.0 
  3100.0 
  2084.0   
  2025-10-13 00:00 
  2025-10-13 00:00 
  2025-10-13 00:00 
  2025-10-13 00:00   
  2025-10-20 00:00 
  2025-10-20 00:00 
  2025-10-20 00:00 
  2025-10-20 00:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - VARIOUS EQUIPMENT (SOL NWACI S>N 3675)     2025-09-11 14:28     BPAT117095      2025-09-11 14:28  
  SOALSN     396299     BPAT     SOALSN          SOALSN(BPAT)      2933.0      2025-10-14 05:00      2025-10-14 20:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - ROSS-ST JOHNS 1 230kV LINE, BPA - ROSS-RIVERGATE 1 230kV LINE, BPA - TROJAN-ALLSTON 1 & 2 230kV LINES     2025-09-26 08:33     BPAT117271      2025-09-26 08:33  
  SCSTER NOEL     396249     BPAT     SCSTER NOEL          N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT)   
  2716.0 
  1348.0   
  2025-10-14 06:00 
  2025-10-14 06:00   
  2025-10-17 17:00 
  2025-10-17 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - CHIEF JOSEPH-SNOHOMISH 3 & 4 345kV LINES (STUDY 0719-ST25-R1)     2025-09-24 14:54     BPAT117254      2025-09-24 14:54  
  WOCN     396273     BPAT     WOCN          C-CASC_N(BPAT)      6665.0      2025-10-14 06:00      2025-10-17 17:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - CHIEF JOSEPH-SNOHOMISH 3 & 4 345kV LINES (SOL 8868)     2025-09-25 11:29     BPAT117264      2025-09-25 11:29  
  WOCS     396301     BPAT     WOCS          C-CASC_S(BPAT)      5648.0      2025-10-15 08:00      2025-10-15 15:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - ASHE-MARION 2 500kV LINE, BPA - BUCKLEY-MARION 1 500kV LINE (SOL 6450)     2025-09-26 08:40     BPAT117272      2025-09-26 08:40  
  NWACI PDCI     395823     BPAT     NWACI PDCI          AC_N>S(BPAT) 
  AC_S>N(BPAT) 
  DC_N>S(BPAT) 
  DC_S>N(BPAT)   
  3077.0 
  1635.0 
  3100.0 
  2084.0   
  2025-10-15 08:00 
  2025-10-15 08:00 
  2025-10-15 08:00 
  2025-10-15 08:00   
  2025-10-15 15:00 
  2025-10-15 15:00 
  2025-10-15 15:00 
  2025-10-15 15:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA: Ponderosa-Captain Jack Sect of Griz-Cpjk, BPA: Ashe-Marion No 2 500kV Line, BPA: Buckley-Marion No 1 500kV Line (SOL NWACI S>N 3675)     2025-09-11 14:35     BPAT117096      2025-09-11 14:35  
  NWACI PDCI     395828     BPAT     NWACI PDCI          AC_N>S(BPAT) 
  AC_S>N(BPAT) 
  DC_N>S(BPAT) 
  DC_S>N(BPAT)   
  3252.0 
  1635.0 
  3100.0 
  2084.0   
  2025-10-15 08:00 
  2025-10-15 08:00 
  2025-10-15 08:00 
  2025-10-15 08:00   
  2025-10-15 09:00 
  2025-10-15 09:00 
  2025-10-15 09:00 
  2025-10-15 09:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA: Ponderosa-Captain Jack Sect of Griz-Cpjk, BPA: Ashe-Marion No 2 500kV Line, BPA: Buckley-Marion No 1 500kV Line, BPA: Slatt-Buckley and Buckley-Grizzly No 1 500kV Lines (SOL NWACI S>N 3675)     2025-09-11 14:37     BPAT117097      2025-09-11 14:37  
  GRZN     395802     BPAT     GRZN          GRZN_N>S(BPAT)      3200.0      2025-10-15 08:00      2025-10-15 15:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA: Ponderosa-Captain Jack Sect of Griz-Cpjk, BPA: Ashe-Marion No 2 500kV Line, BPA: Buckley-Marion No 1 500kV Line     2025-09-11 14:10     BPAT117091      2025-09-11 14:10  
  GRZN     395804     BPAT     GRZN          GRZN_N>S(BPAT)      1824.0      2025-10-15 08:00      2025-10-15 09:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA: Ponderosa-Captain Jack Sect of Griz-Cpjk, BPA: Ashe-Marion No 2 500kV Line, BPA: Buckley-Marion No 1 500kV Line, BPA: Slatt-Buckley No 1 and Buckley-Grizzly No 1 500kV Line     2025-09-11 14:12     BPAT117092      2025-09-11 14:12  
  GRZN     395806     BPAT     GRZN          GRZN_N>S(BPAT)      1824.0      2025-10-15 14:00      2025-10-15 15:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT      BPA: Ponderosa-Captain Jack Sect of Griz-Cpjk, BPA: Ashe-Marion No 2 500kV Line, BPA: Buckley-Marion No 1 500kV Line, BPA: Slatt-Buckley No 1 and Buckley-Grizzly No 1 500kV Line     2025-09-11 14:15     BPAT117093      2025-09-11 14:15  
  NWACI PDCI     395833     BPAT     NWACI PDCI          AC_N>S(BPAT) 
  AC_S>N(BPAT) 
  DC_N>S(BPAT) 
  DC_S>N(BPAT)   
  3252.0 
  1635.0 
  3100.0 
  2084.0   
  2025-10-15 14:00 
  2025-10-15 14:00 
  2025-10-15 14:00 
  2025-10-15 14:00   
  2025-10-15 15:00 
  2025-10-15 15:00 
  2025-10-15 15:00 
  2025-10-15 15:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA: Ponderosa-Captain Jack Sect of Griz-Cpjk, BPA: Ashe-Marion No 2 500kV Line, BPA: Buckley-Marion No 1 500kV Line, BPA: Slatt-Buckley and Buckley-Grizzly No 1 500kV Lines (SOL NWACI S>N 3675)     2025-09-11 14:39     BPAT117098      2025-09-11 14:39  
  NOPE     395789     BPAT     NOPE          NOPE_S>N(BPAT)      837.0      2025-10-17 07:00      2025-10-17 15:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - PEARL: 500/230kV BANK 1, PGE - MCLOUGHLIN-PEARL-SHERWOOD 1 230kV LINE     2025-09-11 11:32     BPAT117086      2025-09-11 11:32  
  NOPE     395791     BPAT     NOPE          NOPE_S>N(BPAT)      833.0      2025-10-17 07:00      2025-10-19 17:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     PGE - MCLOUGHLIN-PEARL-SHERWOOD 1 230kV LINE     2025-09-11 11:34     BPAT117087      2025-09-11 11:34  
  WOCS     396303     BPAT     WOCS          C-CASC_S(BPAT)      5648.0      2025-10-17 07:00      2025-10-17 15:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - JOHN DAY-MARION NO 1 500kV LINE, PGE - MCLOUGHLIN-PEARL-SHERWOOD 1 230kV LINE (SOL 6440)     2025-09-26 08:42     BPAT117273      2025-09-26 08:42  
  NOPE     396297     BPAT     NOPE          NOPE_S>N(BPAT)      796.0      2025-10-17 07:00      2025-10-17 15:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - PEARL: 500/230kV BANK 1, PGE - MCLOUGHLIN-PEARL-SHERWOOD 1 230kV LINE     2025-09-26 08:27     BPAT117270      2025-09-26 08:27  
  PDCI     393272     BPAT     PDCI          DC_N>S(BPAT) 
  DC_S>N(BPAT)   
  0.0 
  0.0   
  2025-10-18 03:00 
  2025-10-18 03:00   
  2025-11-08 21:00 
  2025-11-08 21:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     LADWP & BPA - Celilo-Sylmar Poles 3 & 4 1000kV DC Line     2025-06-24 15:08     BPAT116159      2025-06-24 15:08  
  LAGR     388421     BPAT     LAGR          LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT)   
  363.0 
  300.0   
  2025-10-21 08:00 
  2025-10-21 08:00   
  2025-10-21 16:00 
  2025-10-21 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     A PLANNED OUTAGE OF THE STARVATION RIDGE-HARNEY SECTION OF BRASADA-HARNEY NO 1 115kV LINE     2025-01-24 15:18     BPAT114250      2025-01-24 15:18  
  NOPE     395783     BPAT     NOPE          NOPE_S>N(BPAT)      861.0      2025-10-22 07:00      2025-11-20 17:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     PGE - PEARL-SHERWOOD 1&2 230kV LINES     2025-09-11 11:26     BPAT117083      2025-09-11 14:05  
  LAGR     388760     BPAT     LAGR          LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT)   
  363.0 
  300.0   
  2025-10-22 08:00 
  2025-10-22 08:00   
  2025-10-30 16:00 
  2025-10-30 16:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     BPAT     A PLANNED OUTAGE OF THE BEST LANE-RILEY SECTION OF BRASADA-HARNEY NO 1 115kV LINE     2025-02-03 15:42     BPAT114390      2025-05-13 11:25  
  LAGR     391939     BPAT     LAGR          LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT)   
  363.0 
  300.0   
  2025-10-22 08:00 
  2025-10-22 08:00   
  2025-10-30 16:00 
  2025-10-30 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     A PLANNED OUTAGE OF THE HAMPTON-BEST LANE SECTION OF THE BRASADA-HARNEY NO 1 115KV LINE     2025-05-13 11:27     BPAT115662      2025-05-13 11:28  
CLPT Outages:
  CLPT 001905.1     139344     CLPT     EAST BUSINESS PARK-CAMPSTOOL 115 KV LINE #2          ARH-ARH(CLPT) 

  ARH-ARH(CLPT)   
  400.0 

  400.0   
  400.0 

  400.0   
  400.0 

  400.0   
  2025-08-04 09:00 

  2025-08-25 08:44   
  2025-08-25 08:44 

  2026-04-30 18:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     CLPT     EAST BUSINESS PARK - CAMPSTOOL 115KV LINE #2 OUTAGE - ARH-ARH (0)     2025-07-25 13:31     001905.1     2025-08-25 11:45  
  CLPT 002141.2     141569     CLPT     SWEETGRASS-SOUTH CHEYENNE          ARH-ARH(CLPT)      400.0      400.0      400.0      2025-10-13 07:00      2025-10-16 18:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     CLPT     SWEETGRASS - SOUTH CHEYENNE 115KV LINE & SWEETGRASS - SOUTH CHEYENNE SOLAR 115KV LINE OUTAGES - ARH-ARH (0)     2025-09-26 16:45     002141.2     2025-09-26 16:46  
  CLPT 002141.1     141570     CLPT     SOUTH CHEYENNE SOLAR-SWEETGRASS 115          ARH-ARH(CLPT)      400.0      400.0      400.0      2025-10-13 07:00      2025-10-16 18:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     CLPT     SWEETGRASS - SOUTH CHEYENNE 115KV LINE & SWEETGRASS - SOUTH CHEYENNE SOLAR 115KV LINE OUTAGES - ARH-ARH (0)     2025-09-26 16:45     002141.1     2025-09-26 16:45  
CRCM Outages:
  Summer 2025 Limit     63973     WACM     TOT-1A     TOT-1A     BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 
  CRG>SWR(CRCM) 
  SWR>CRG(CRCM) 
  SWR>VNL(CRCM) 
  VNL>FGE(CRCM) 
  VNL>SWR(CRCM)   
  395.0     395.0     196.3 
  196.3 
  105.7 
  105.7 
  105.7 
  181.2 
  105.7   
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00   
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00   
  Active     Transmission     Planned      OnPath     CRCM,WACM     TOT-1A Summer Ratings- Maximum Seasonal TTC of 505 MW -JK     2025-06-02 08:42     WACM19583      2025-06-02 08:42  
  Summer 2025 Limit     63976     WACM     TOT-5     TOT-5     AU>CRG(CRCM) 
  BLUE>CRG(CRCM) 
  CCW>MIDW(CRCM) 
  CRG>AU(CRCM) 
  MIDW>CCW(CRCM)   
  750.0     750.0     456.8 
  21.8 
  246.5 
  456.8 
  246.5   
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00   
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00   
  Active     Transmission     Planned      OnPath     CRCM,WACM     TOT-5 Summer 2025 Rating for system intact is 1680 MW. CRCM Share is 725 MW. JK     2025-06-02 08:50     WACM19586      2025-06-02 08:50  
  System Conditions     64613     WACM     TOT-5     TOT-5     AU>CRG(CRCM) 
  BLUE>CRG(CRCM) 
  CCW>MIDW(CRCM) 
  CRG>AU(CRCM) 
  MIDW>CCW(CRCM)   
  750.0     750.0     472.5 
  22.5 
  255.0 
  472.5 
  255.0   
  2025-09-16 06:00 
  2025-09-16 06:00 
  2025-09-16 06:00 
  2025-09-16 06:00 
  2025-09-16 06:00   
  2025-09-16 15:00 
  2025-09-16 15:00 
  2025-09-16 15:00 
  2025-09-16 15:00 
  2025-09-16 15:00   
  Completed     Transmission     Planned      OffPath     CRCM,WACM     INFO-25-1965; TOT-5 to Series 38     2025-08-07 19:32     WACM19855      2025-08-07 19:34  
  System Conditions     64721     WACM     TOT-5     TOT-5     AU>CRG(CRCM) 
  BLUE>CRG(CRCM) 
  CCW>MIDW(CRCM) 
  CRG>AU(CRCM) 
  MIDW>CCW(CRCM)   
  750.0     750.0     472.5 
  22.5 
  255.0 
  472.5 
  255.0   
  2025-09-16 06:00 
  2025-09-16 06:00 
  2025-09-16 06:00 
  2025-09-16 06:00 
  2025-09-16 06:00   
  2025-09-16 15:00 
  2025-09-16 15:00 
  2025-09-16 15:00 
  2025-09-16 15:00 
  2025-09-16 15:00   
  Completed     Transmission     Planned      OffPath     CRCM,WACM     INFO-25-1906; TOT-5 to Series 38     2025-08-17 00:25     WACM19886      2025-08-17 00:25  
  System Conditions     64905     WACM     TOT-1A     TOT-1A     BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 
  CRG>SWR(CRCM) 
  SWR>CRG(CRCM) 
  SWR>VNL(CRCM) 
  VNL>FGE(CRCM) 
  VNL>SWR(CRCM)   
  395.0     395.0     185.3 
  185.3 
  99.8 
  99.8 
  99.8 
  171.0 
  99.8   
  2025-09-25 06:00 
  2025-09-25 06:00 
  2025-09-25 06:00 
  2025-09-25 06:00 
  2025-09-25 06:00 
  2025-09-25 06:00 
  2025-09-25 06:00   
  2025-09-25 13:00 
  2025-09-25 13:00 
  2025-09-25 13:00 
  2025-09-25 13:00 
  2025-09-25 13:00 
  2025-09-25 13:00 
  2025-09-25 13:00   
  Cancelled     Transmission     Planned      OffPath     CRCM,WACM     INFO-25-2161; Series 6     2025-09-04 23:50     WACM20002      2025-09-20 19:26  
  System Conditions     64385     WACM     TOT-1A     TOT-1A     BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 
  CRG>SWR(CRCM) 
  SWR>CRG(CRCM) 
  SWR>VNL(CRCM) 
  VNL>FGE(CRCM) 
  VNL>SWR(CRCM)   
  395.0     395.0     240.5 
  240.5 
  129.5 
  129.5 
  129.5 
  222.0 
  129.5   
  2025-09-29 04:00 
  2025-09-29 04:00 
  2025-09-29 04:00 
  2025-09-29 04:00 
  2025-09-29 04:00 
  2025-09-29 04:00 
  2025-09-29 04:00   
  2025-10-17 16:00 
  2025-10-17 16:00 
  2025-10-17 16:00 
  2025-10-17 16:00 
  2025-10-17 16:00 
  2025-10-17 16:00 
  2025-10-17 16:00   
  Scheduled     Transmission     Planned      OnPath     CRCM,WACM     INFO-25-1853; TOT-1A to Series 14     2025-07-23 16:56     WACM19752      2025-07-23 16:56  
  System Conditions     62911     WACM     TOT-3     TOT-3     ARH>AU(LAPT) 
  AU>ARH(LAPT) 
  AU>SCSW(LAPT) 
  SCSW>AU(LAPT)   
  509.0     509.0     233.1 
  233.1 
  136.9 
  136.9   
  2025-09-29 07:00 
  2025-09-29 07:00 
  2025-09-29 07:00 
  2025-09-29 07:00   
  2025-10-11 16:00 
  2025-10-11 16:00 
  2025-10-11 16:00 
  2025-10-11 16:00   
  Scheduled     Transmission     Planned      OffPath     CRCM,WACM     ICC-25-0357; INFO-25-1423; TOT-3 to Series 4.     2025-02-20 00:27     WACM19256      2025-07-18 20:42  
  System Conditions     64908     WACM     TOT-5     TOT-5     AU>CRG(CRCM) 
  BLUE>CRG(CRCM) 
  CCW>MIDW(CRCM) 
  CRG>AU(CRCM) 
  MIDW>CCW(CRCM)   
  750.0     750.0     472.5 
  22.5 
  255.0 
  472.5 
  255.0   
  2025-09-29 07:00 
  2025-09-29 07:00 
  2025-09-29 07:00 
  2025-09-29 07:00 
  2025-09-29 07:00   
  2025-10-10 15:00 
  2025-10-10 15:00 
  2025-10-10 15:00 
  2025-10-10 15:00 
  2025-10-10 15:00   
  Scheduled     Transmission     Planned      OffPath     CRCM,WACM     INFO-25-0637; Series 12     2025-09-05 00:03     WACM20005      2025-09-05 00:03  
  System Conditions     62900     WACM     TOT-5     TOT-5     AU>CRG(CRCM) 
  BLUE>CRG(CRCM) 
  CCW>MIDW(CRCM) 
  CRG>AU(CRCM) 
  MIDW>CCW(CRCM)   
  750.0     750.0     472.5 
  22.5 
  255.0 
  472.5 
  255.0   
  2025-09-29 08:00 
  2025-09-29 08:00 
  2025-09-29 08:00 
  2025-09-29 08:00 
  2025-09-29 08:00   
  2025-10-10 17:00 
  2025-10-10 17:00 
  2025-10-10 17:00 
  2025-10-10 17:00 
  2025-10-10 17:00   
  Scheduled     Transmission     Planned      OffPath     CRCM,WACM     INFO-25-0637; TOT5 to Series 12.     2025-02-19 21:14     WACM19249      2025-02-19 21:14  
  System Conditions     64614     WACM     TOT-5     TOT-5     AU>CRG(CRCM) 
  BLUE>CRG(CRCM) 
  CCW>MIDW(CRCM) 
  CRG>AU(CRCM) 
  MIDW>CCW(CRCM)   
  750.0     750.0     472.5 
  22.5 
  255.0 
  472.5 
  255.0   
  2025-10-08 10:00 
  2025-10-08 10:00 
  2025-10-08 10:00 
  2025-10-08 10:00 
  2025-10-08 10:00   
  2025-10-08 13:00 
  2025-10-08 13:00 
  2025-10-08 13:00 
  2025-10-08 13:00 
  2025-10-08 13:00   
  Scheduled     Transmission     Planned      OffPath     CRCM,WACM     INFO-25-1964; TOT-5 to Series 38     2025-08-07 19:41     WACM19856      2025-08-07 19:41  
  GLENCANYON2-PNPKWALC230     65059     CRCM     GLENCANYON2-PNPKWALC230          FLG>GLENCANYON2(CRCM) 
  FLG>PNPKWALC230(CRCM) 
  GLENCANYON2>FLG(CRCM) 
  PNPKWALC230>FLG(CRCM)   
  1494.0 
  1494.0 
  1494.0 
  1494.0   
  1494.0 
  1494.0 
  1494.0 
  1494.0   
  746.0 
  746.0 
  746.0 
  746.0   
  2025-10-20 07:00 
  2025-10-20 07:00 
  2025-10-20 07:00 
  2025-10-20 07:00   
  2025-10-31 14:00 
  2025-10-31 14:00 
  2025-10-31 14:00 
  2025-10-31 14:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     CRCM     INFO-25-2259     2025-09-22 18:30     CRCM20083      2025-09-22 18:30  
  System Conditions     64706     WACM     TOT-5     TOT-5     AU>CRG(CRCM) 
  BLUE>CRG(CRCM) 
  CCW>MIDW(CRCM) 
  CRG>AU(CRCM) 
  MIDW>CCW(CRCM)   
  750.0     750.0     472.5 
  22.5 
  255.0 
  472.5 
  255.0   
  2025-10-29 07:00 
  2025-10-29 07:00 
  2025-10-29 07:00 
  2025-10-29 07:00 
  2025-10-29 07:00   
  2025-11-03 16:00 
  2025-11-03 16:00 
  2025-11-03 16:00 
  2025-11-03 16:00 
  2025-11-03 16:00   
  Scheduled     Transmission     Planned      OffPath     CRCM,WACM     INFO-25-2030; TOT5 to Series 10.     2025-08-16 22:37     WACM19885      2025-08-18 18:45  
  System Conditions     65052     WACM     TOT-3     TOT-3     ARH>AU(LAPT) 
  AU>ARH(LAPT) 
  AU>SCSW(LAPT) 
  SCSW>AU(LAPT)   
  509.0     509.0     223.0 
  223.0 
  131.0 
  131.0   
  2025-11-03 07:00 
  2025-11-03 07:00 
  2025-11-03 07:00 
  2025-11-03 07:00   
  2025-11-21 16:00 
  2025-11-21 16:00 
  2025-11-21 16:00 
  2025-11-21 16:00   
  Scheduled     Transmission     Planned      OffPath     CRCM,WACM     INFO-25-2075; TOT3 Series 9     2025-09-20 19:44     WACM20078      2025-09-20 19:44  
  System Conditions     65053     WACM     TOT-3 BASIN     TOT 3 BASIN (BEPW)     AU>LRS(BEPW) 
  KEOT>LRS(BEPW) 
  LRS>AU(BEPW) 
  LRS>KEOT(BEPW)   
  722.0     722.0     285.4 
  167.6 
  285.4 
  167.6   
  2025-11-03 07:00 
  2025-11-03 07:00 
  2025-11-03 07:00 
  2025-11-03 07:00   
  2025-11-21 18:00 
  2025-11-21 18:00 
  2025-11-21 18:00 
  2025-11-21 18:00   
  Scheduled     Transmission     Planned      OnPath     BEPW,CRCM,LAPT,WACM     INFO-25-2075; TOT3 Series 9     2025-09-20 19:45     WACM20079      2025-09-20 19:45  
  System Conditions     64966     WACM     TOT-5     TOT-5     AU>CRG(CRCM) 
  BLUE>CRG(CRCM) 
  CCW>MIDW(CRCM) 
  CRG>AU(CRCM) 
  MIDW>CCW(CRCM)   
  750.0     750.0     472.5 
  22.5 
  255.0 
  472.5 
  255.0   
  2025-11-04 07:00 
  2025-11-04 07:00 
  2025-11-04 07:00 
  2025-11-04 07:00 
  2025-11-04 07:00   
  2025-11-04 11:00 
  2025-11-04 11:00 
  2025-11-04 11:00 
  2025-11-04 11:00 
  2025-11-04 11:00   
  Scheduled     Transmission     Planned      OffPath     CRCM,LAPT,WACM     INFO-25-2179. TOT-5 to series 38.     2025-09-09 17:18     WACM20034      2025-09-09 17:18  
  TOT-1A     64817     WACM     TOT-1A     TOT-1A     BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 
  CRG>SWR(CRCM) 
  SWR>CRG(CRCM) 
  SWR>VNL(CRCM) 
  VNL>FGE(CRCM) 
  VNL>SWR(CRCM)   
  395.0     395.0     240.5 
  240.5 
  129.5 
  129.5 
  129.5 
  222.0 
  129.5   
  2025-11-18 06:00 
  2025-11-18 06:00 
  2025-11-18 06:00 
  2025-11-18 06:00 
  2025-11-18 06:00 
  2025-11-18 06:00 
  2025-11-18 06:00   
  2025-11-20 15:00 
  2025-11-20 15:00 
  2025-11-20 15:00 
  2025-11-20 15:00 
  2025-11-20 15:00 
  2025-11-20 15:00 
  2025-11-20 15:00   
  Scheduled     Transmission     Planned      OffPath     BEPW,CRCM,LAPT,WACM     INFO-25-2086/2087     2025-08-28 03:35     WACM19944      2025-08-28 03:35  
CSU Outages:
DGT Outages:
EPE Outages:
  EDDY DC CONVERTER     364399     EPE     EDDY HVDC terminal          EDDY230-EDDY345(EPE) 
  EDDY345-EDDY230(EPE) 

  EDDY230-EDDY345(EPE) 
  EDDY345-EDDY230(EPE) 

  EDDY230-EDDY345(EPE) 
  EDDY345-EDDY230(EPE) 

  EDDY230-EDDY345(EPE) 
  EDDY345-EDDY230(EPE) 

  EDDY230-EDDY345(EPE) 
  EDDY345-EDDY230(EPE) 

  EDDY230-EDDY345(EPE) 
  EDDY345-EDDY230(EPE) 

  EDDY230-EDDY345(EPE) 
  EDDY345-EDDY230(EPE) 

  EDDY230-EDDY345(EPE) 
  EDDY345-EDDY230(EPE)   
  133.0 
  133.0 

  133.0 
  133.0 

  133.0 
  133.0 

  133.0 
  133.0 

  133.0 
  133.0 

  133.0 
  133.0 

  133.0 
  133.0 

  133.0 
  133.0   
  133.0 
  133.0 

  133.0 
  133.0 

  133.0 
  133.0 

  133.0 
  133.0 

  133.0 
  133.0 

  133.0 
  133.0 

  133.0 
  133.0 

  133.0 
  133.0   
  86.0 
  86.0 

  86.0 
  86.0 

  86.0 
  86.0 

  86.0 
  86.0 

  67.0 
  67.0 

  70.0 
  70.0 

  47.0 
  47.0 

  70.0 
  70.0   
  2022-08-01 00:00 
  2022-08-01 00:00 

  2022-12-31 23:59 
  2022-12-31 23:59 

  2023-12-31 23:59 
  2023-12-31 23:59 

  2025-01-01 00:00 
  2025-01-01 00:00 

  2025-07-09 00:00 
  2025-07-09 00:00 

  2025-07-09 12:00 
  2025-07-09 12:00 

  2025-07-14 20:00 
  2025-07-14 20:00 

  2025-07-15 18:00 
  2025-07-15 18:00   
  2022-12-31 23:59 
  2022-12-31 23:59 

  2023-12-31 23:59 
  2023-12-31 23:59 

  2025-01-01 00:00 
  2025-01-01 00:00 

  2025-07-09 00:00 
  2025-07-09 00:00 

  2025-07-09 12:00 
  2025-07-09 12:00 

  2025-07-14 20:00 
  2025-07-14 20:00 

  2025-07-15 18:00 
  2025-07-15 18:00 

  2026-01-01 00:00 
  2026-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     EPE     Reliability Constraints: EDDY Derate 105mw's; EPE - 70MW'S; PNM - 35MW'S     2022-06-01 14:23     EPE144221      2025-07-16 11:39  
  LUNA345-DIABLO345     555992     EPE               DIABLO345-LUNA345(EPE) 
  LUNA345-DIABLO345(EPE)   
  672.0 
  672.0   
  672.0 
  672.0   
  0.0 
  0.0   
  2025-10-04 03:00 
  2025-10-04 03:00   
  2025-10-04 11:00 
  2025-10-04 11:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     EPE     Replacing structures. SNMIC=520 (EPE=357, PNM=102, TSGT=61). EPIC=635.     2025-09-25 13:54     EPE204036      2025-09-26 12:33  
  LUNA345-AFTON345     516242     EPE               AFTON345-LUNA345(EPE) 
  LUNA345-AFTON345(EPE)   
  930.0 
  930.0   
  930.0 
  930.0   
  0.0 
  0.0   
  2025-10-06 08:00 
  2025-10-06 08:00   
  2025-11-22 16:00 
  2025-11-22 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     EPE     Line clearance needed to connect substation. SMNIC=566 (EPE=388, PNM=111, TSGT=67). EPIC=450.     2025-01-15 09:09     EPE190623      2025-05-07 10:37  
  CALIENTE345-PICANTE345     553923     EPE               CALIENTE345-PICANTE345(EPE) 
  PICANTE345-CALIENTE345(EPE)   
  295.0 
  295.0   
  295.0 
  295.0   
  0.0 
  0.0   
  2025-11-24 07:00 
  2025-11-24 07:00   
  2026-01-02 15:00 
  2026-01-02 15:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     EPE     Upgrading protective relays. SNMIC=612 (EPE=420, PNM=120, TSGT=72). EPIC=600.     2025-08-26 14:25     EPE203183      2025-08-26 14:25  
  EDDY DC CONVERTER     553895     EPE     EDDY HVDC Terminal          EDDY230-EDDY345(EPE) 
  EDDY345-EDDY230(EPE)   
  133.0 
  133.0   
  133.0 
  133.0   
  0.0 
  0.0   
  2025-12-01 07:00 
  2025-12-01 07:00   
  2025-12-12 13:00 
  2025-12-12 13:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     EPE     Maintenance.     2025-08-26 07:30     EPE203172      2025-08-26 07:30  
  ARROYO345-WM345     542592     EPE               ARROYO345-WM345(EPE) 
  WM345-ARROYO345(EPE)   
  197.0 
  400.0   
  197.0 
  400.0   
  0.0 
  0.0   
  2026-01-05 07:00 
  2026-01-05 07:00   
  2026-02-06 15:00 
  2026-02-06 15:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     EPE     Replacing Protective Relays. SNMIC=600 (EPE=412, PNM=118, TSGT=70). EPIC=600.     2025-06-05 10:23     EPE199284      2025-06-05 10:23  
IID Outages:
IPCO Outages:
  BORAHWEST     114472     IPCO     Burns Series Cap Bypass          BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO)   
  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0   
  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0   
  2250.0 

  2250.0 

  2250.0 

  2250.0 

  2250.0 

  2250.0 

  2250.0 

  2250.0 

  2510.0 

  2510.0 

  2510.0 

  2510.0 

  2510.0 

  2510.0 

  2510.0 

  2510.0 

  2510.0 

  2510.0 

  2510.0 

  2510.0 

  2510.0 

  2510.0 

  2510.0   
  2023-12-19 21:25 

  2023-12-20 17:00 

  2023-12-21 17:00 

  2023-12-26 23:59 

  2023-12-27 23:59 

  2024-01-05 23:59 

  2024-01-19 16:00 

  2024-02-02 16:00 

  2024-02-09 10:20 

  2024-03-01 16:00 

  2024-03-29 16:00 

  2024-04-30 16:00 

  2024-05-31 16:00 

  2024-06-28 16:00 

  2024-07-31 16:00 

  2024-12-31 16:00 

  2025-05-01 16:00 

  2025-06-01 01:00 

  2025-06-13 00:00 

  2025-07-01 00:00 

  2025-09-25 00:00 

  2025-10-31 00:00 

  2025-11-07 16:00   
  2023-12-20 17:00 

  2023-12-21 17:00 

  2023-12-26 23:59 

  2023-12-27 23:59 

  2024-01-05 23:59 

  2024-01-19 16:00 

  2024-02-02 16:00 

  2024-02-09 10:20 

  2024-03-01 16:00 

  2024-03-29 16:00 

  2024-04-30 16:00 

  2024-05-31 16:00 

  2024-06-28 16:00 

  2024-07-31 16:00 

  2024-12-31 16:00 

  2025-05-01 16:00 

  2025-06-01 01:00 

  2025-06-13 00:00 

  2025-07-01 00:00 

  2025-09-25 00:00 

  2025-10-31 00:00 

  2025-11-07 16:00 

  2025-11-18 16:00   
  Active     TRANSMISSION     FORCED      ONPATH     IPCO     BURNS SERIES CAPS FULL BYPASS     2023-12-19 21:28     IPCO48734      2025-09-08 12:27  
  BURNS SC FULL BYPASS     117113     IPCO     Burns Series Caps Full Bypass          IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-TOT75(IPCO) 

  IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-TOT75(IPCO) 

  IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-TOT75(IPCO) 

  IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 

  IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-TOT75(IPCO) 

  IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-TOT75(IPCO) 

  IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-TOT75(IPCO) 

  IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-TOT75(IPCO) 

  IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-TOT75(IPCO) 

  IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-TOT75(IPCO) 

  IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-TOT75(IPCO) 

  IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-TOT75(IPCO) 

  IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-TOT75(IPCO) 

  IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-TOT75(IPCO) 

  IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-TOT75(IPCO) 

  IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-TOT75(IPCO) 

  IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-TOT75(IPCO)   
  2230.0 
  1340.0 
  450.0 

  2230.0 
  1340.0 
  450.0 

  2230.0 
  1340.0 
  450.0 

  2190.0 
  1200.0 

  2190.0 
  1200.0 
  450.0 

  2190.0 
  1200.0 
  450.0 

  2190.0 
  1200.0 
  450.0 

  2190.0 
  1200.0 
  450.0 

  2230.0 
  1340.0 
  450.0 

  2230.0 
  1340.0 
  450.0 

  2190.0 
  1200.0 
  450.0 

  2190.0 
  1200.0 
  450.0 

  2190.0 
  1200.0 
  450.0 

  2190.0 
  1200.0 
  450.0 

  2190.0 
  1200.0 
  450.0 

  2230.0 
  1315.0 
  450.0 

  2230.0 
  1280.0 
  450.0   
  2230.0 
  1340.0 
  450.0 

  2230.0 
  1340.0 
  450.0 

  2190.0 
  1200.0 
  450.0 

  2190.0 
  1200.0 

  2190.0 
  1200.0 
  450.0 

  2190.0 
  1200.0 
  450.0 

  2190.0 
  1200.0 
  450.0 

  2230.0 
  1340.0 
  450.0 

  2230.0 
  1340.0 
  450.0 

  2190.0 
  1200.0 
  450.0 

  2190.0 
  1200.0 
  450.0 

  2190.0 
  1200.0 
  450.0 

  2190.0 
  1200.0 
  450.0 

  2190.0 
  1200.0 
  450.0 

  2190.0 
  1200.0 
  450.0 

  2230.0 
  1280.0 
  450.0 

  2230.0 
  1280.0 
  450.0   
  2230.0 
  1145.0 
  535.0 

  2230.0 
  1145.0 
  438.0 

  2230.0 
  1145.0 
  438.0 

  2145.0 
  1145.0 

  2145.0 
  1145.0 
  438.0 

  2145.0 
  1145.0 
  438.0 

  2145.0 
  1145.0 
  438.0 

  2145.0 
  1145.0 
  438.0 

  2230.0 
  1145.0 
  438.0 

  2230.0 
  1145.0 
  438.0 

  2230.0 
  1145.0 
  438.0 

  2230.0 
  1145.0 
  438.0 

  2230.0 
  1145.0 
  438.0 

  2230.0 
  1145.0 
  438.0 

  2145.0 
  1145.0 
  438.0 

  2145.0 
  1145.0 
  438.0 

  2145.0 
  1145.0 
  438.0   
  2024-02-09 10:05 
  2024-02-09 10:05 
  2024-02-09 10:05 

  2024-02-27 11:59 
  2024-02-27 11:59 
  2024-02-27 11:59 

  2024-03-29 16:00 
  2024-03-29 16:00 
  2024-03-29 16:00 

  2024-04-14 12:10 
  2024-04-14 12:10 

  2024-04-30 16:00 
  2024-04-30 16:00 
  2024-04-30 16:00 

  2024-05-31 16:00 
  2024-05-31 16:00 
  2024-05-31 16:00 

  2024-06-28 16:00 
  2024-06-28 16:00 
  2024-06-28 16:00 

  2024-07-31 16:00 
  2024-07-31 16:00 
  2024-07-31 16:00 

  2024-11-04 04:31 
  2024-11-04 04:31 
  2024-11-04 04:31 

  2024-12-31 16:00 
  2024-12-31 16:00 
  2024-12-31 16:00 

  2025-05-01 16:00 
  2025-05-01 16:00 
  2025-05-01 16:00 

  2025-06-01 01:00 
  2025-06-01 01:00 
  2025-06-01 01:00 

  2025-06-13 00:00 
  2025-06-13 00:00 
  2025-06-13 00:00 

  2025-07-01 00:00 
  2025-07-01 00:00 
  2025-07-01 00:00 

  2025-07-01 02:59 
  2025-07-01 02:59 
  2025-07-01 02:59 

  2025-10-31 00:00 
  2025-10-31 00:00 
  2025-10-31 00:00 

  2025-11-07 16:00 
  2025-11-07 16:00 
  2025-11-07 16:00   
  2024-02-27 11:59 
  2024-02-27 11:59 
  2024-02-27 11:59 

  2024-03-29 16:00 
  2024-03-29 16:00 
  2024-03-29 16:00 

  2024-04-14 12:10 
  2024-04-14 12:10 
  2024-04-30 16:00 

  2024-04-30 16:00 
  2024-04-30 16:00 

  2024-05-31 16:00 
  2024-05-31 16:00 
  2024-05-31 16:00 

  2024-06-28 16:00 
  2024-06-28 16:00 
  2024-06-28 16:00 

  2024-07-31 16:00 
  2024-07-31 16:00 
  2024-07-31 16:00 

  2024-11-04 04:31 
  2024-11-04 04:31 
  2024-11-04 04:31 

  2024-12-31 16:00 
  2024-12-31 16:00 
  2024-12-31 16:00 

  2025-05-01 16:00 
  2025-05-01 16:00 
  2025-05-01 16:00 

  2025-06-01 01:00 
  2025-06-01 01:00 
  2025-06-01 01:00 

  2025-06-13 00:00 
  2025-06-13 00:00 
  2025-06-13 00:00 

  2025-07-01 00:00 
  2025-07-01 00:00 
  2025-07-01 00:00 

  2025-07-01 02:59 
  2025-07-01 02:59 
  2025-07-01 02:59 

  2025-10-31 00:00 
  2025-10-31 00:00 
  2025-10-31 00:00 

  2025-11-07 16:00 
  2025-11-07 16:00 
  2025-11-07 16:00 

  2025-11-18 16:00 
  2025-11-18 16:00 
  2025-11-18 16:00   
  Active     TRANSMISSION     FORCED      ONPATH     IPCO     BURNS SERIES CAPS FULL BYPASS     2024-02-09 10:10     IPCO49502      2025-09-08 12:28  
  JBSNWEST     127814     IPCO     TMKL Series Cap C2          JBSN-POP(IPCO) 

  JBSN-POP(IPCO) 

  JBSN-POP(IPCO) 

  JBSN-POP(IPCO)   
  800.0 

  800.0 

  800.0 

  800.0   
  800.0 

  800.0 

  800.0 

  800.0   
  717.0 

  717.0 

  717.0 

  717.0   
  2024-09-23 14:48 

  2024-11-13 18:00 

  2025-01-06 17:00 

  2025-01-31 17:00   
  2024-11-13 18:00 

  2025-01-06 17:00 

  2025-01-31 17:00 

  2025-12-31 18:00   
  Active     TRANSMISSION     PLANNED      ONPATH     IPCO     Per Path 19 Operator (PAC) Request     2024-09-23 14:51     IPCO52468      2024-12-30 14:18  
  BORAHWEST     140881     IPCO     BURNS AND MPSN SERIES CAPS BYPASSED          BorahWest(IPCO)      2557.0      2557.0      2250.0      2025-09-22 06:00      2025-11-07 16:00      Active     TRANSMISSION     PLANNED      ONPATH     IPCO     BURNS AND MPSN SERIES CAPS BYPASSED     2025-09-03 13:31     IPCO57159      2025-09-03 13:31  
  BURNS SC FULL BYPASS     140892     IPCO     Burns Series Caps Full Bypass          IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-TOT75(IPCO)   
  2230.0 
  1200.0 
  450.0   
  2230.0 
  1315.0 
  450.0   
  2125.0 
  1145.0 
  438.0   
  2025-09-22 06:00 
  2025-09-22 06:00 
  2025-09-22 06:00   
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     IPCO     BURNS SERIES CAPS FULL BYPASS      2025-09-03 15:38     IPCO57166      2025-09-03 15:38  
  HMWY-MPSN     140947     IPCO     Midpoint - Hemingway, BURNS C506, HINE-WJDY          H500-TOT75(IPCO) 
  IDNW-NORTHWEST(IPCO) 
  IPCEIM-M500(IPCO) 
  M500-TOT75(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-IPCEIM(IPCO) 
  SMLK-TOT75(IPCO) 
  TOT75-H500(IPCO) 
  TOT75-M500(IPCO)   
  1050.0 
  2230.0 
  9999.0 
  700.0 
  1200.0 
  9999.0 
  450.0 
  760.0 
  410.0   
  1050.0 
  2230.0 
  9999.0 
  700.0 
  1315.0 
  9999.0 
  450.0 
  760.0 
  410.0   
  400.0 
  1175.0 
  0.0 
  0.0 
  805.0 
  327.0 
  327.0 
  440.0 
  0.0   
  2025-09-22 06:00 
  2025-09-22 06:00 
  2025-09-22 06:00 
  2025-09-22 06:00 
  2025-09-22 06:00 
  2025-09-22 06:00 
  2025-09-22 06:00 
  2025-09-22 06:00 
  2025-09-22 06:00   
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     IPCO     MPSN-HMWY, BURNS C506, HINE-WJDY, SUMMER SEASONAL     2025-09-04 08:25     IPCO57177      2025-09-04 09:20  
  BORAHWEST     141328     IPCO     Hemingway-Midpoint, Burns C506          BorahWest(IPCO)      2557.0      2557.0      1400.0      2025-09-22 06:00      2025-11-07 16:00      Active     TRANSMISSION     PLANNED      ONPATH     IPCO     MPSN-HMWY, BURNS C506 500KV SERIES CAPACITOR     2025-09-15 10:11     IPCO57367      2025-09-15 10:11  
  N. AMPS     141264     IPCO     Hot Springs-Placid Lake          AVAT.NWMT-NW-MT(IPCO) 
  BPAT.NWMT-NW-MT(IPCO) 
  NW-MT-AVAT.NWMT(IPCO) 
  NW-MT-BPAT.NWMT(IPCO)   
  296.0 
  170.0 
  184.0 
  125.0   
  296.0 
  170.0 
  184.0 
  125.0   
  0.0 
  0.0 
  0.0 
  0.0   
  2025-09-22 07:00 
  2025-09-22 07:00 
  2025-09-22 07:00 
  2025-09-22 07:00   
  2025-09-25 14:00 
  2025-09-25 14:00 
  2025-09-25 14:00 
  2025-09-25 14:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     IPCO     Outage Request #25-2455-TR      2025-09-10 12:46     IPCO57243      2025-09-10 12:46  
  IDAHO-NORTHWEST     139738     IPCO     Hines -WJDY          IDNW-NORTHWEST(IPCO) 
  LAGRANDE-OTECTAP(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  NPEAST-OBBLPR(IPCO) 
  OBBLPR-NPEAST(IPCO) 
  OTECTAP-LAGRANDE(IPCO)   
  2230.0 
  350.0 
  1200.0 
  431.0 
  431.0 
  413.0   
  2230.0 
  350.0 
  1280.0 
  470.0 
  470.0 
  413.0   
  2125.0 
  380.0 
  1145.0 
  380.0 
  380.0 
  380.0   
  2025-09-22 07:00 
  2025-09-22 07:00 
  2025-09-22 07:00 
  2025-09-22 07:00 
  2025-09-22 07:00 
  2025-09-22 07:00   
  2025-10-03 15:00 
  2025-10-03 15:00 
  2025-10-03 15:00 
  2025-10-03 15:00 
  2025-10-03 15:00 
  2025-10-03 15:00   
  Active     TRANSMISSION     PLANNED      ONPATH     IPCO     Path 14 Limit. HINES-WJDY     2025-08-07 14:47     IPCO56874      2025-08-07 14:47  
  CURTAILMENT     141376     IPCO     MIDPOINT-WEST Constraint          MPSN-MPWEST(IPCO)      9999.0      9999.0      9999.0      2025-09-23 13:02      2025-09-23 13:10      Completed     TRANSMISSION     FORCED      ONPATH     IPCO     MIDPOINT-WEST Constraint     2025-09-23 13:05     IPCO57407      2025-09-23 13:09  
  JBSNWEST     141381     IPCO     PPLS Series CAP #2          JBSN-POP(IPCO)      800.0      800.0      717.0      2025-09-23 16:00      2025-12-31 19:30      Active     TRANSMISSION     PLANNED      ONPATH     IPCO     Per Path 19 Operator (PAC) Request     2025-09-23 15:44     IPCO57410      2025-09-23 15:44  
  ANTS-MLCK     141369     IPCO     MLCK-ANTE ANTE-MLCK          ANTE-MLCK(IPCO) 
  BRDY-IPCEIM(IPCO) 
  IPCEIM-BRDY(IPCO) 
  MLCK-ANTE(IPCO)   
  184.0 
  9999.0 
  9999.0 
  296.0   
  184.0 
  9999.0 
  9999.0 
  296.0   
  0.0 
  0.0 
  0.0 
  0.0   
  2025-09-26 09:00 
  2025-09-26 09:00 
  2025-09-26 09:00 
  2025-09-26 09:00   
  2025-09-26 11:33 
  2025-09-26 11:33 
  2025-09-26 11:33 
  2025-09-26 11:33   
  Completed     TRANSMISSION     PLANNED      ONPATH     IPCO     Per Path 18 Operator (NWMT) Request     2025-09-23 11:33     IPCO57402      2025-09-26 11:32  
  N. AMPS     141269     IPCO     Hot Springs-Placid Lake          AVAT.NWMT-NW-MT(IPCO) 
  BPAT.NWMT-NW-MT(IPCO) 
  NW-MT-AVAT.NWMT(IPCO) 
  NW-MT-BPAT.NWMT(IPCO)   
  296.0 
  170.0 
  184.0 
  125.0   
  296.0 
  170.0 
  184.0 
  125.0   
  0.0 
  0.0 
  0.0 
  0.0   
  2025-09-29 07:00 
  2025-09-29 07:00 
  2025-09-29 07:00 
  2025-09-29 07:00   
  2025-10-02 14:00 
  2025-10-02 14:00 
  2025-10-02 14:00 
  2025-10-02 14:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     IPCO     Outage Request #25-2534-TR      2025-09-10 12:54     IPCO57244      2025-09-10 12:54  
  N. AMPS     141384     IPCO     BPA GARRISON 500-230KV TRANSFORMER 1          NW-MT-BPAT.NWMT(IPCO)      125.0      125.0      97.0      2025-09-29 07:00      2025-10-05 16:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     IPCO     Per Path 18 Operator (NWMT) Request - BPA GARRISON 500-230KV TRANSFORMER 1     2025-09-24 11:44     IPCO57413      2025-09-24 11:44  
  HMWY-MPSN     140959     IPCO     Midpoint - Hemingway, BURNS C506, HINE-WJDY          H500-TOT75(IPCO) 
  IDNW-NORTHWEST(IPCO) 
  IPCEIM-M500(IPCO) 
  M500-TOT75(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-IPCEIM(IPCO) 
  SMLK-TOT75(IPCO) 
  TOT75-H500(IPCO) 
  TOT75-M500(IPCO)   
  1050.0 
  2230.0 
  9999.0 
  700.0 
  1315.0 
  9999.0 
  450.0 
  760.0 
  410.0   
  1050.0 
  2230.0 
  9999.0 
  700.0 
  1315.0 
  9999.0 
  450.0 
  760.0 
  410.0   
  400.0 
  1375.0 
  0.0 
  0.0 
  1000.0 
  327.0 
  327.0 
  440.0 
  0.0   
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00   
  2025-10-03 15:00 
  2025-10-03 15:00 
  2025-10-03 15:00 
  2025-10-03 15:00 
  2025-10-03 15:00 
  2025-10-03 15:00 
  2025-10-03 15:00 
  2025-10-03 15:00 
  2025-10-03 15:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     IPCO     MPSN-HMWY, BURNS C506, HINE-WJDY, FALL SEASONAL     2025-09-04 08:36     IPCO57179      2025-09-04 09:25  
  HMWY-MPSN     140969     IPCO     Midpoint - Hemingway, BURNS C506          H500-TOT75(IPCO) 
  IDNW-NORTHWEST(IPCO) 
  IPCEIM-M500(IPCO) 
  M500-TOT75(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-IPCEIM(IPCO) 
  SMLK-TOT75(IPCO) 
  TOT75-H500(IPCO) 
  TOT75-M500(IPCO)   
  1050.0 
  2230.0 
  9999.0 
  700.0 
  1315.0 
  9999.0 
  450.0 
  760.0 
  410.0   
  1050.0 
  2230.0 
  9999.0 
  700.0 
  1280.0 
  9999.0 
  450.0 
  760.0 
  410.0   
  400.0 
  1415.0 
  0.0 
  0.0 
  1025.0 
  327.0 
  327.0 
  440.0 
  0.0   
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00   
  2025-11-07 16:00 
  2025-11-07 16:00 
  2025-11-07 16:00 
  2025-11-07 16:00 
  2025-11-07 16:00 
  2025-11-07 16:00 
  2025-11-07 16:00 
  2025-11-07 16:00 
  2025-11-07 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     IPCO     MPSN-HMWY, BURNS C506, FALL SEASONAL     2025-09-04 08:42     IPCO57180      2025-09-04 09:26  
  BURNS SC FULL BYPASS     140896     IPCO     Burns Series Caps Full Bypass          IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-TOT75(IPCO)   
  2230.0 
  1315.0 
  450.0   
  2230.0 
  1280.0 
  450.0   
  2125.0 
  1340.0 
  438.0   
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00   
  2025-11-07 16:00 
  2025-11-07 16:00 
  2025-11-07 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     IPCO     BURNS SERIES CAPS FULL BYPASS     2025-09-03 15:50     IPCO57167      2025-09-03 15:50  
  N. AMPS     141274     IPCO     Hot Springs-Placid Lake          AVAT.NWMT-NW-MT(IPCO) 
  BPAT.NWMT-NW-MT(IPCO) 
  NW-MT-AVAT.NWMT(IPCO) 
  NW-MT-BPAT.NWMT(IPCO)   
  296.0 
  170.0 
  184.0 
  125.0   
  296.0 
  170.0 
  184.0 
  125.0   
  0.0 
  0.0 
  0.0 
  0.0   
  2025-10-06 07:00 
  2025-10-06 07:00 
  2025-10-06 07:00 
  2025-10-06 07:00   
  2025-10-09 14:00 
  2025-10-09 14:00 
  2025-10-09 14:00 
  2025-10-09 14:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     IPCO     Outage Request #25-2534-TR      2025-09-10 13:01     IPCO57245      2025-09-10 13:01  
  HMWY-MPSN     140985     IPCO     Midpoint - Hemingway, BURNS C506, MAFT-SKPR 138KV          H500-TOT75(IPCO) 
  IDNW-NORTHWEST(IPCO) 
  IPCEIM-M500(IPCO) 
  M500-TOT75(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-IPCEIM(IPCO) 
  SMLK-TOT75(IPCO) 
  TOT75-H500(IPCO) 
  TOT75-M500(IPCO)   
  1050.0 
  2230.0 
  9999.0 
  700.0 
  1315.0 
  9999.0 
  450.0 
  760.0 
  410.0   
  1050.0 
  2230.0 
  9999.0 
  700.0 
  1315.0 
  9999.0 
  450.0 
  760.0 
  410.0   
  400.0 
  980.0 
  0.0 
  0.0 
  1025.0 
  327.0 
  327.0 
  440.0 
  0.0   
  2025-10-07 07:00 
  2025-10-07 07:00 
  2025-10-07 07:00 
  2025-10-07 07:00 
  2025-10-07 07:00 
  2025-10-07 07:00 
  2025-10-07 07:00 
  2025-10-07 07:00 
  2025-10-07 07:00   
  2025-10-08 17:00 
  2025-10-08 17:00 
  2025-10-08 17:00 
  2025-10-08 17:00 
  2025-10-08 17:00 
  2025-10-08 17:00 
  2025-10-08 17:00 
  2025-10-08 17:00 
  2025-10-08 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     IPCO     MPSN-HMWY, BURNS C506, MAFT-SKPR 138KV, FALL SEASONAL     2025-09-04 10:23     IPCO57184      2025-09-04 10:23  
  JBSNWEST     140789     IPCO     GOSHEN-THREE MILE KNOLL 345KV          JBSN-POP(IPCO)      800.0      800.0      650.0      2025-10-07 08:00      2025-10-08 14:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     IPCO     Per Path 19 Operator (PAC) Request     2025-08-29 14:04     IPCO57129      2025-09-10 12:11  
  MPSN-HMWY-SMLK     140997     IPCO     Midpoint-Hemingway-Summerlake          H500-TOT75(IPCO) 
  IDNW-NORTHWEST(IPCO) 
  IPCEIM-M500(IPCO) 
  M500-TOT75(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-IPCEIM(IPCO) 
  SMLK-TOT75(IPCO) 
  TOT75-H500(IPCO) 
  TOT75-M500(IPCO) 
  TOTOR-NORTHWEST(IPCO)   
  1050.0 
  2230.0 
  9999.0 
  700.0 
  1315.0 
  9999.0 
  450.0 
  760.0 
  410.0 
  545.0   
  1050.0 
  2230.0 
  9999.0 
  700.0 
  1315.0 
  9999.0 
  450.0 
  760.0 
  410.0 
  545.0   
  0.0 
  1015.0 
  0.0 
  0.0 
  660.0 
  0.0 
  0.0 
  0.0 
  0.0 
  400.0   
  2025-10-17 08:00 
  2025-10-17 08:00 
  2025-10-17 08:00 
  2025-10-17 08:00 
  2025-10-17 08:00 
  2025-10-17 08:00 
  2025-10-17 08:00 
  2025-10-17 08:00 
  2025-10-17 08:00 
  2025-10-17 08:00   
  2025-10-31 18:00 
  2025-10-31 18:00 
  2025-10-31 18:00 
  2025-10-31 18:00 
  2025-10-31 18:00 
  2025-10-31 18:00 
  2025-10-31 18:00 
  2025-10-31 18:00 
  2025-10-31 18:00 
  2025-10-31 18:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     IPCO     MPSN-HMWY, HMWY-SMLK     2025-09-04 10:30     IPCO57186      2025-09-04 10:30  
  MPSN-HMWY-SMLK     141008     IPCO     Midpoint - Hemingway - Summerlake, STRVRIDG-HARNEY          H500-TOT75(IPCO) 
  IDNW-NORTHWEST(IPCO) 
  IPCEIM-M500(IPCO) 
  M500-TOT75(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-IPCEIM(IPCO) 
  SMLK-TOT75(IPCO) 
  TOT75-H500(IPCO) 
  TOT75-M500(IPCO) 
  TOTOR-NORTHWEST(IPCO)   
  1050.0 
  2230.0 
  9999.0 
  700.0 
  1315.0 
  9999.0 
  450.0 
  760.0 
  410.0 
  545.0   
  1050.0 
  2230.0 
  9999.0 
  700.0 
  1315.0 
  9999.0 
  450.0 
  760.0 
  410.0 
  545.0   
  0.0 
  975.0 
  0.0 
  0.0 
  635.0 
  0.0 
  0.0 
  0.0 
  0.0 
  400.0   
  2025-10-21 08:00 
  2025-10-21 08:00 
  2025-10-21 08:00 
  2025-10-21 08:00 
  2025-10-21 08:00 
  2025-10-21 08:00 
  2025-10-21 08:00 
  2025-10-21 08:00 
  2025-10-21 08:00 
  2025-10-21 08:00   
  2025-10-21 16:00 
  2025-10-21 16:00 
  2025-10-21 16:00 
  2025-10-21 16:00 
  2025-10-21 16:00 
  2025-10-21 16:00 
  2025-10-21 16:00 
  2025-10-21 16:00 
  2025-10-21 16:00 
  2025-10-21 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     IPCO     MPSN-HMWY-SMLK, STRVRIDG-HARNEY 115kV     2025-09-04 11:16     IPCO57187      2025-09-04 11:16  
  MPSN-HMWY-SMLK     141019     IPCO     Midpoint-Hemingway-Summerlake, Hampton-BestLane          H500-TOT75(IPCO) 
  IDNW-NORTHWEST(IPCO) 
  IPCEIM-M500(IPCO) 
  M500-TOT75(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-IPCEIM(IPCO) 
  SMLK-TOT75(IPCO) 
  TOT75-H500(IPCO) 
  TOT75-M500(IPCO) 
  TOTOR-NORTHWEST(IPCO)   
  1050.0 
  2230.0 
  9999.0 
  700.0 
  1315.0 
  9999.0 
  450.0 
  760.0 
  410.0 
  545.0   
  1050.0 
  2230.0 
  9999.0 
  700.0 
  1315.0 
  9999.0 
  450.0 
  760.0 
  410.0 
  545.0   
  0.0 
  975.0 
  0.0 
  0.0 
  635.0 
  0.0 
  0.0 
  0.0 
  0.0 
  400.0   
  2025-10-22 09:00 
  2025-10-22 09:00 
  2025-10-22 09:00 
  2025-10-22 09:00 
  2025-10-22 09:00 
  2025-10-22 09:00 
  2025-10-22 09:00 
  2025-10-22 09:00 
  2025-10-22 09:00 
  2025-10-22 09:00   
  2025-10-30 17:00 
  2025-10-30 17:00 
  2025-10-30 17:00 
  2025-10-30 17:00 
  2025-10-30 17:00 
  2025-10-30 17:00 
  2025-10-30 17:00 
  2025-10-30 17:00 
  2025-10-30 17:00 
  2025-10-30 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     IPCO     MPSN-HMWY-SMLK, Hampton-Best Lane 115kV     2025-09-04 11:25     IPCO57188      2025-09-04 11:25  
  OBPR-LOLO     138824     IPCO     Oxbow - Lolo 230kV          IDNW-NORTHWEST(IPCO) 
  IPCEIM-LOLO(IPCO) 
  LOLO-IPCEIM(IPCO) 
  LOLO-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  NORTHWEST-LOLO(IPCO)   
  2230.0 
  9999.0 
  9999.0 
  400.0 
  1280.0 
  400.0   
  2230.0 
  9999.0 
  9999.0 
  450.0 
  1340.0 
  400.0   
  1925.0 
  0.0 
  0.0 
  0.0 
  930.0 
  0.0   
  2025-11-15 08:00 
  2025-11-15 08:00 
  2025-11-15 08:00 
  2025-11-15 08:00 
  2025-11-15 08:00 
  2025-11-15 08:00   
  2026-02-01 16:00 
  2026-02-01 16:00 
  2026-02-01 16:00 
  2026-02-01 16:00 
  2026-02-01 16:00 
  2026-02-01 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     IPCO     Oxbow - Lolo 230kV Out of Service     2025-07-16 11:15     IPCO56572      2025-07-16 11:15  
LAPT Outages:
  Summer 2025 Limit     63975     WACM     TOT-3 (LAPT)     TOT-3     ARH>AU(LAPT) 
  AU>ARH(LAPT) 
  AU>SCSW(LAPT) 
  SCSW>AU(LAPT)   
  509.0     509.0     321.3 
  321.3 
  188.7 
  188.7   
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00   
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00   
  Active     Transmission     Planned      OnPath     LAPT,WACM     TOT-3 Summer 2025 Ratings of 1818 MW for system intact (Cell A1). Using Cell A2 with zero DC tie schedule the Limit will be 1743 MW and LAPTs share of transfer is 510 MW. JK     2025-06-02 08:48     WACM19585      2025-06-02 08:48  
  System Conditions     64429     WACM     YT-South     YT-SOUTH     YTW>DJ(LAPT) 

  YTW>DJ(LAPT) 

  YTW>DJ(LAPT) 

  YTW>DJ(LAPT)   
  225.0     225.0     213.0 

  213.0 

  213.0 

  178.0   
  2025-07-14 09:00 

  2025-07-18 17:00 

  2025-08-20 17:00 

  2025-09-01 17:00   
  2025-07-18 17:00 

  2025-08-20 17:00 

  2025-09-01 17:00 

  2025-09-19 17:00   
  Completed     Transmission     Planned      OffPath     LAPT,WACM     C-25-1479, INFO 25-1824; YT-S to Series 8     2025-07-28 08:12     WACM19771      2025-09-01 16:50  
  System Conditions     65045     WACM     YT-South     YT-SOUTH     YTW>DJ(LAPT) 

  YTW>DJ(LAPT) 

  YTW>DJ(LAPT) 

  YTW>DJ(LAPT) 

  YTW>DJ(LAPT)   
  225.0     225.0     213.0 

  213.0 

  213.0 

  178.0 

  178.0   
  2025-07-14 09:00 

  2025-07-18 17:00 

  2025-08-20 17:00 

  2025-09-01 17:00 

  2025-09-19 17:00   
  2025-07-18 17:00 

  2025-08-20 17:00 

  2025-09-01 17:00 

  2025-09-19 17:00 

  2025-09-30 18:00   
  Active     Transmission     Planned      OffPath     LAPT,WACM     C-25-1479, INFO 25-1824; YT-S to Series 8     2025-09-20 00:44     WACM20073      2025-09-20 00:44  
  System Conditions     64864     WACM     TOT-4B     TOT-4B     DJ>YTW(LAPT)      230.0     230.0     243.0      2025-07-18 13:00      2025-10-15 16:00      Active     Transmission     Planned      OnPath     LAPT,WACM     ICC-25-1822; TOT-4B to curve 121     2025-09-03 03:24     WACM19977      2025-09-26 04:13  
  System Conditions     62801     WACM     TOT-3     TOT-3     ARH>AU(LAPT) 
  AU>ARH(LAPT) 
  AU>SCSW(LAPT) 
  SCSW>AU(LAPT)   
  509.0     509.0     223.0 
  223.0 
  131.0 
  131.0   
  2025-09-03 07:00 
  2025-09-03 07:00 
  2025-09-03 07:00 
  2025-09-03 07:00   
  2025-09-16 10:00 
  2025-09-16 10:00 
  2025-09-16 10:00 
  2025-09-16 10:00   
  Completed     Transmission     Planned      OffPath     LAPT,WACM     TOT-3 to Series 9; ICC-25-0507; INFO-25-1261     2025-02-04 18:31     WACM19194      2025-09-16 09:21  
  SCSE-SCSW     64924     LAPT     SCSE-SCSW          SCSE>SCSW(LAPT) 
  SCSW>SCSE(LAPT)   
  200.0 
  200.0   
  200.0 
  200.0   
  0.0 
  0.0   
  2025-09-08 07:00 
  2025-09-08 07:00   
  2025-10-10 15:00 
  2025-10-10 15:00   
  Active     TRANSMISSION     PLANNED      ONPATH     LAPT,WACM     INFO-25-2103 (TSO Desk: C-25-0518, BAL Desk: INFO-25-2104); Sidney DC tie unavailable     2025-09-05 23:05     LAPT20017      2025-09-05 23:05  
  System Conditions     53560     WACM     TOT-3     TOT-3     ARH>AU(LAPT) 
  AU>ARH(LAPT) 
  AU>SCSW(LAPT) 
  SCSW>AU(LAPT)   
  509.0     509.0     155.0 
  155.0 
  91.0 
  91.0   
  2025-09-11 07:00 
  2025-09-11 07:00 
  2025-09-11 07:00 
  2025-09-11 07:00   
  2025-11-21 17:00 
  2025-11-21 17:00 
  2025-11-21 17:00 
  2025-11-21 17:00   
  Cancelled     Transmission     Planned      OnPath     LAPT,WACM     C-22-0096: TOT-3 to Series 3     2021-12-02 03:02     WACM16016      2025-09-04 08:29  
  System Conditions     58048     WACM     TOT-3 (LAPT)     TOT-3     ARH>AU(LAPT) 
  AU>ARH(LAPT) 
  AU>SCSW(LAPT) 
  SCSW>AU(LAPT)   
  509.0     509.0     146.8 
  146.8 
  86.2 
  86.2   
  2025-09-11 07:00 
  2025-09-11 07:00 
  2025-09-11 07:00 
  2025-09-11 07:00   
  2025-11-21 15:00 
  2025-11-21 15:00 
  2025-11-21 15:00 
  2025-11-21 15:00   
  Cancelled     Transmission     Forced      OnPath     LAPT,WACM     C-22-0096; Series #3     2023-05-03 23:39     WACM17560      2023-06-21 12:22  
  System Conditions     64832     WACM     TOT-4B     TOT-4B     DJ>YTW(LAPT)      230.0     230.0     235.0      2025-09-15 06:00      2025-09-17 09:00      Completed     Transmission     Forced      OnPath     LAPT,WACM     INFO-25-1882; TOT-4B Curve 117     2025-08-29 16:38     WACM19954      2025-08-29 16:38  
  SCSE-SCSW     64909     LAPT     SCSE-SCSW          SCSE>SCSW(LAPT) 
  SCSW>SCSE(LAPT)   
  200.0 
  200.0   
  200.0 
  200.0   
  0.0 
  0.0   
  2025-09-15 09:00 
  2025-09-15 09:00   
  2025-09-15 13:00 
  2025-09-15 13:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     LAPT,WACM     INFO-25-2148; Sidney DC tie unavailable     2025-09-05 00:06     LAPT20006      2025-09-05 00:06  
  System Conditions     64964     WACM     TOT-4B     TOT-4B     DJ>YTW(LAPT)      230.0     230.0     233.0      2025-09-18 05:00      2025-09-18 17:00      Completed     Transmission     Planned      OnPath     LAPT,WACM     INFO-25-2172. TOT-4B to Series 107.     2025-09-09 17:05     WACM20032      2025-09-09 17:05  
  System Conditions     64617     WACM     YT-South     YT-SOUTH     YTW>DJ(LAPT)      225.0     225.0     212.0      2025-09-22 07:00      2025-09-22 16:00      Completed     Transmission     Planned      OffPath     LAPT,WACM     C-25-0594 / INFO-25-1960; YT-S to Series 11     2025-08-08 01:59     WACM19859      2025-09-11 17:35  
  System Conditions     64920     WACM     TOT-4B     TOT-4B     DJ>YTW(LAPT)      230.0     230.0     235.0      2025-09-22 10:00      2025-09-23 18:00      Terminated     Transmission     Planned      OnPath     LAPT,WACM     INFO-25-2166; Curve 117     2025-09-05 17:08     WACM20015      2025-09-23 17:45  
  System Conditions     64616     WACM     YT-South     YT-SOUTH     YTW>DJ(LAPT)      225.0     225.0     212.0      2025-09-23 07:00      2025-09-23 14:00      Terminated     Transmission     Planned      OffPath     LAPT,WACM     C-25-0595 / INFO-25-1961 ; YT-S to Series 11     2025-08-08 01:48     WACM19858      2025-09-23 13:48  
  System Conditions     65064     WACM     YT-South     YT-SOUTH     YTW>DJ(LAPT)      225.0     225.0     212.0      2025-09-24 07:00      2025-09-24 14:00      Terminated     Transmission     Planned      OffPath     LAPT,WACM     C-25-0594 / INFO-25-1960; YT-S to Series 11     2025-09-22 18:34     WACM20084      2025-09-24 13:38  
  System Conditions     64904     WACM     TOT-4B     TOT-4B     DJ>YTW(LAPT)      230.0     230.0     235.0      2025-09-25 05:00      2025-10-17 17:00      Active     Transmission     Planned      OnPath     LAPT,WACM     INFO-25-2162; Curve 117     2025-09-04 23:44     WACM20001      2025-09-04 23:44  
  System Conditions     64962     WACM     TOT-4B     TOT-4B     DJ>YTW(LAPT)      230.0     230.0     233.0      2025-09-25 07:00      2025-09-26 13:00      Terminated     Transmission     Planned      OnPath     LAPT,WACM     INFO-25-2171.TOT-4B to 107.     2025-09-09 16:58     WACM20030      2025-09-26 12:16  
  SCSE-SCSW     64366     LAPT     SCSE-SCSW          SCSE>SCSW(LAPT) 
  SCSW>SCSE(LAPT)   
  200.0 
  200.0   
  200.0 
  200.0   
  158.0 
  158.0   
  2025-09-29 07:00 
  2025-09-29 07:00   
  2025-10-11 16:00 
  2025-10-11 16:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     LAPT,WACM     INFO-25-1423     2025-07-21 18:07     LAPT19742      2025-07-21 18:08  
  SCSW-SGW     62913     LAPT     TOT-3 (LAPT), SCSW-SGW          SCSW>SGW(LAPT) 
  SGW>SCSW(LAPT)   
  187.0 
  100.0   
  0.0 
  0.0   
  0.0 
  0.0   
  2025-09-29 07:00 
  2025-09-29 07:00   
  2025-10-11 16:00 
  2025-10-11 16:00   
  Scheduled     Transmission     Planned      OnPath     LAPT     ICC-25-0357; TOT3 to Series 4.     2025-02-20 00:41     LAPT19258      2025-04-16 07:17  
  System Conditions     64344     WACM     TOT-3 (LAPT)     TOT-3     ARH>AU(LAPT) 
  AU>ARH(LAPT) 
  AU>SCSW(LAPT) 
  SCSW>AU(LAPT)   
  509.0     509.0     208.5 
  208.5 
  122.5 
  122.5   
  2025-09-29 07:00 
  2025-09-29 07:00 
  2025-09-29 07:00 
  2025-09-29 07:00   
  2025-10-11 16:00 
  2025-10-11 16:00 
  2025-10-11 16:00 
  2025-10-11 16:00   
  Cancelled     Transmission     Planned      OffPath     LAPT,WACM     INFO-25-1423; TOT-3 to Series 4     2025-07-18 20:37     WACM19728      2025-07-18 20:39  
  System Conditions     65046     WACM     TOT-1A     TOT-1A     BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 
  CRG>SWR(CRCM) 
  SWR>CRG(CRCM) 
  SWR>VNL(CRCM) 
  VNL>FGE(CRCM) 
  VNL>SWR(CRCM)   
  395.0     395.0     185.3 
  185.3 
  99.8 
  99.8 
  99.8 
  171.0 
  99.8   
  2025-10-01 07:00 
  2025-10-01 07:00 
  2025-10-01 07:00 
  2025-10-01 07:00 
  2025-10-01 07:00 
  2025-10-01 07:00 
  2025-10-01 07:00   
  2025-10-01 14:00 
  2025-10-01 14:00 
  2025-10-01 14:00 
  2025-10-01 14:00 
  2025-10-01 14:00 
  2025-10-01 14:00 
  2025-10-01 14:00   
  Scheduled     Transmission     Planned      OffPath     LAPT,WACM     INFO-25-2161; G-25-2160; TOT-1A to series 6     2025-09-20 19:24     WACM20074      2025-09-23 17:39  
  System Conditions     64906     WACM     TOT-4B     TOT-4B     DJ>YTW(LAPT)      230.0     230.0     230.0      2025-10-07 07:00      2025-10-07 10:00      Scheduled     Transmission     Forced      OnPath     LAPT,WACM     INFO-25-2158; Curve 110     2025-09-04 23:56     WACM20003      2025-09-11 16:26  
  System Conditions     64907     WACM     YT-South     YT-SOUTH     YTW>DJ(LAPT)      225.0     225.0     132.0      2025-10-07 07:00      2025-10-07 10:00      Scheduled     Transmission     Planned      OnPath     BEPW,LAPT,WACM     INFO_25-2158; Series 4     2025-09-04 23:58     WACM20004      2025-09-11 16:33  
  ARH-AU     64764     LAPT     TOT-3 (LAPT), ARH-AU          ARH>AU(LAPT) 
  AU>ARH(LAPT)   
  277.0 
  302.0   
  277.0 
  302.0   
  0.0 
  0.0   
  2025-10-13 06:00 
  2025-10-13 06:00   
  2025-10-16 18:00 
  2025-10-16 18:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     LAPT,WACM     INFO-25-2080; C-25-1302; TOT-3 to series 5     2025-08-21 18:28     LAPT19907      2025-08-21 18:28  
  System Conditions     64762     WACM     TOT-3 (LAPT)     TOT-3     ARH>AU(LAPT) 
  AU>ARH(LAPT) 
  AU>SCSW(LAPT) 
  SCSW>AU(LAPT)   
  509.0     509.0     163.2 
  163.2 
  95.8 
  95.8   
  2025-10-13 06:00 
  2025-10-13 06:00 
  2025-10-13 06:00 
  2025-10-13 06:00   
  2025-10-16 18:00 
  2025-10-16 18:00 
  2025-10-16 18:00 
  2025-10-16 18:00   
  Scheduled     Transmission     Planned      OnPath     LAPT,WACM     INFO-25-2080; C-25-1302; TOT-3 to series 5     2025-08-21 18:19     WACM19905      2025-08-21 18:19  
  System Conditions     63735     WACM     YT-South     YT-SOUTH     YTW>DJ(LAPT)      225.0     225.0     212.0      2025-10-14 07:00      2025-10-20 12:00      Scheduled     Transmission     Planned      OffPath     LAPT,WACM     C-25-1174 / INFO-25-1192; YT-S to Series 11.     2025-05-03 01:20     WACM19498      2025-05-03 01:31  
  BC-BSAN     65078     LAPT     BC-BSAN          BC>BSAN(LAPT) 
  BSAN>BC(LAPT)   
  109.0 
  109.0   
  109.0 
  109.0   
  0.0 
  0.0   
  2025-10-29 07:00 
  2025-10-29 07:00   
  2025-10-29 17:00 
  2025-10-29 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     LAPT,WACM     INFO-25-2281     2025-09-23 17:16     LAPT20088      2025-09-23 17:16  
  System Conditions     64615     WACM     YT-South     YT-SOUTH     YTW>DJ(LAPT)      225.0     225.0     212.0      2025-10-29 11:00      2025-10-31 15:00      Cancelled     Transmission     Planned      OffPath     LAPT,WACM     INFO-25-1191; YT-S to Series 11     2025-08-08 01:37     WACM19857      2025-08-08 01:41  
  System Conditions     65053     WACM     TOT-3 BASIN     TOT 3 BASIN (BEPW)     AU>LRS(BEPW) 
  KEOT>LRS(BEPW) 
  LRS>AU(BEPW) 
  LRS>KEOT(BEPW)   
  722.0     722.0     285.4 
  167.6 
  285.4 
  167.6   
  2025-11-03 07:00 
  2025-11-03 07:00 
  2025-11-03 07:00 
  2025-11-03 07:00   
  2025-11-21 18:00 
  2025-11-21 18:00 
  2025-11-21 18:00 
  2025-11-21 18:00   
  Scheduled     Transmission     Planned      OnPath     BEPW,CRCM,LAPT,WACM     INFO-25-2075; TOT3 Series 9     2025-09-20 19:45     WACM20079      2025-09-20 19:45  
  System Conditions     64966     WACM     TOT-5     TOT-5     AU>CRG(CRCM) 
  BLUE>CRG(CRCM) 
  CCW>MIDW(CRCM) 
  CRG>AU(CRCM) 
  MIDW>CCW(CRCM)   
  750.0     750.0     472.5 
  22.5 
  255.0 
  472.5 
  255.0   
  2025-11-04 07:00 
  2025-11-04 07:00 
  2025-11-04 07:00 
  2025-11-04 07:00 
  2025-11-04 07:00   
  2025-11-04 11:00 
  2025-11-04 11:00 
  2025-11-04 11:00 
  2025-11-04 11:00 
  2025-11-04 11:00   
  Scheduled     Transmission     Planned      OffPath     CRCM,LAPT,WACM     INFO-25-2179. TOT-5 to series 38.     2025-09-09 17:18     WACM20034      2025-09-09 17:18  
  TOT-1A     64817     WACM     TOT-1A     TOT-1A     BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 
  CRG>SWR(CRCM) 
  SWR>CRG(CRCM) 
  SWR>VNL(CRCM) 
  VNL>FGE(CRCM) 
  VNL>SWR(CRCM)   
  395.0     395.0     240.5 
  240.5 
  129.5 
  129.5 
  129.5 
  222.0 
  129.5   
  2025-11-18 06:00 
  2025-11-18 06:00 
  2025-11-18 06:00 
  2025-11-18 06:00 
  2025-11-18 06:00 
  2025-11-18 06:00 
  2025-11-18 06:00   
  2025-11-20 15:00 
  2025-11-20 15:00 
  2025-11-20 15:00 
  2025-11-20 15:00 
  2025-11-20 15:00 
  2025-11-20 15:00 
  2025-11-20 15:00   
  Scheduled     Transmission     Planned      OffPath     BEPW,CRCM,LAPT,WACM     INFO-25-2086/2087     2025-08-28 03:35     WACM19944      2025-08-28 03:35  
  System Conditions     64060     WACM     TOT-4B     TOT-4B     DJ>YTW(LAPT)      230.0     230.0     243.0      2025-11-19 07:00      2025-11-21 15:00      Scheduled     Transmission     Planned      OffPath     LAPT,WACM     TOT-4B to Curve 121; INFO-25-1557; ICC-25-1556     2025-06-11 17:57     WACM19617      2025-06-11 17:57  
LDWP Outages:
  MISC     139008     LDWP               PATH 41 (SYL Banks)(LDWP)      1600.0      1600.0      800.0      2024-11-14 08:00      2025-12-27 09:00      Active     TRANSMISSION     FORCED      ONPATH     LDWP     Path 41 limited due to SYL-SS BK-E forced outage     2024-11-14 08:05     LDWP52228      2025-03-03 14:43  
  NWOR     139077     LDWP               NWOR (E-W)(LDWP) 
  NWOR (W-E)(LDWP) 

  NWOR (E-W)(LDWP) 
  NWOR (W-E)(LDWP)   
  0.0 
  0.0 

  0.0 
  0.0   
  0.0 
  0.0 

  0.0 
  0.0   
  2578.0 
  2648.0 

  2578.0 
  2648.0   
  2024-12-04 00:00 
  2024-12-04 00:00 

  2026-04-01 15:00 
  2026-04-01 15:00   
  2026-04-01 15:00 
  2026-04-01 15:00 

  2026-04-08 18:00 
  2026-04-08 18:00   
  Active     TRANSMISSION     PLANNED      ONPATH     LDWP     NWOR 2024/12/03 08:31 MCCULLOUGH-VICTORVILLE LINE 1 SERIES COMPENSATION OUT. FS PER INTERCHANGE DESK.      2024-12-03 07:45     LDWP52244      2024-12-03 08:36  
  PDCI (PATH 65)     139239     LDWP               PNDC (N-S)(LDWP) 
  PNDC (S-N)(LDWP)   
  3100.0 
  1125.0   
  3100.0 
  975.0   
  0.0 
  0.0   
  2025-01-02 06:00 
  2025-01-02 06:00   
  2025-12-02 07:00 
  2025-12-02 07:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     LDWP     PNDC 2024/12/19 14:56 OUTAGE ID: 83318 SYLMAR CS / TRANSMISSION PATROL: CELILO-SYLMAR POLE 4 500KV DC LINE (-OFF-) [ISOLATION SWITCHING ON SYL-KEN 1 FOR RIN-TAR 1 & 2 RECONDUCTORING PROJECT]. FS      2024-12-19 15:17     LDWP52281      2024-12-19 15:18  
  VIC-LA     139356     LDWP               LA-VIC(LDWP) 
  VIC-LA(LDWP)   
  4500.0 
  4500.0   
  4300.0 
  4300.0   
  2800.0 
  2800.0   
  2025-01-26 08:00 
  2025-01-26 08:00   
  2025-12-26 09:00 
  2025-12-26 09:00   
  Cancelled     TRANSMISSION     FORCED      ONPATH     LDWP     VIC-LA 2024/12/27 12:33 OUTAGE ID: 79358 PATROL / RS-E / ESC: ADELANTO-TOLUCA 500-KV LINE 1 / BANK G / BANK H (-OUT/CLEARED-); [CBS & DISCS OPEN]; {VIC-LA & PDCI DE-RATES}[PATROL TO PERFORM LINE MAINTENANCE & ESC TO INSTALL LINE DROPS FOR FUTURE SURGE ARRESTORS] {CONTINUOUS OUTAGE}. FS -6072     2024-12-27 14:39     LDWP52316      2024-12-27 14:42  
  NWOR     137938     LDWP               NWOR (E-W)(LDWP)      2592.0      3067.0      2592.0      2025-02-07 15:00      2026-01-01 00:00      Cancelled     TRANSMISSION     PLANNED      ONPATH     LDWP     Enter default values. F.S.      2024-05-29 13:31     LDWP51932      2024-05-29 13:33  
  NWOR     137941     LDWP               NWOR (E-W)(LDWP)      2592.0      3067.0      2592.0      2025-02-07 15:00      2026-01-01 00:00      Cancelled     TRANSMISSION     PLANNED      ONPATH     LDWP     Enter default values. F.S.      2024-05-29 13:42     LDWP51933      2024-05-29 13:42  
  NWOR     140231     LDWP               NWOR (E-W)(LDWP) 
  NWOR (W-E)(LDWP)   
  0.0 
  0.0   
  0.0 
  0.0   
  2565.0 
  2635.0   
  2025-02-07 19:00 
  2025-02-07 19:00   
  2026-04-01 15:00 
  2026-04-01 15:00   
  Active     TRANSMISSION     PLANNED      ONPATH     LDWP     NWOR 2024/12/03 08:00 MCCULLOUGH-VICTORVILLE LINE 1 SERIES COMPENSATION OUT AND LINE 2 SERIES COMPENSATION OUT. FS PER INTERCHANGE DESK.     2025-02-07 19:10     LDWP52494      2025-02-07 19:10  
  NWOR     137935     LDWP               NWOR (W-E)(LDWP)      2662.0      2662.0      2662.0      2025-02-07 20:00      2031-01-01 00:00      Cancelled     TRANSMISSION     PLANNED      ONPATH     LDWP     Enter Default values. F.S.      2024-05-29 13:22     LDWP51931      2024-05-29 13:25  
  INT-DC (PATH 27)     141708     LDWP               INT DC (NE-SW)(LDWP) 
  INT DC (SW-NE)(LDWP)   
  2400.0 
  1400.0   
  2400.0 
  1400.0   
  1250.0 
  1250.0   
  2025-06-11 20:00 
  2025-06-11 20:00   
  2027-01-01 00:00 
  2027-01-01 00:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     LDWP     1 unit INT-DC value - AP     2025-05-16 10:32     LDWP52933      2025-06-11 18:33  
  MISC     142739     LDWP               AIR-LA(LDWP) 
  LA-AIR(LDWP)   
  360.0 
  360.0   
  360.0 
  360.0   
  210.0 
  210.0   
  2025-09-27 06:00 
  2025-09-27 06:00   
  2025-09-27 12:00 
  2025-09-27 12:00   
  Cancelled     TRANSMISSION     FORCED      ONPATH     LDWP     LA-AIR 2025/09/15 08:42 OUTAGE ID 89271 AIRWAY RS: 230-KV BUS 1 / BANK# 2 / STATION SERVICE #2 / AIRWAY-KELLOGG 69-KV LINE 2 (-OUT OK TO(IC)-); [INCLUDES CB'S ON 230-KV BUS 1) {CB'S ONLY OPENED AT KELLOGG}; [AIRWAY-RS STATION WASH DE-ENERGIZED]. FS.      2025-09-15 09:34     LDWP53208      2025-09-26 18:01  
  MISC     142721     LDWP               AIR-LA(LDWP) 
  LA-AIR(LDWP)   
  360.0 
  360.0   
  360.0 
  360.0   
  210.0 
  210.0   
  2025-09-27 11:00 
  2025-09-27 11:00   
  2025-09-27 16:00 
  2025-09-27 16:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     LDWP     LA-AIR 2025/09/13 13:52 OUTAGE 89248 AIRWAY RS: 230-KV BUS 2 / BANK# 1 / STATION SERVICE # 1 / AIRWAY-KELLOGG 69-KV LINE 1 (-OUT / OK TO (IC)-) [INCLUDING 230-KV BUS 2 CBS]; {AWY-RS STATION WASH DE-ENERGIZED}. AH     2025-09-15 06:49     LDWP53202      2025-09-26 18:02  
  MISC     142724     LDWP               AIR-LA(LDWP) 
  LA-AIR(LDWP)   
  360.0 
  360.0   
  360.0 
  360.0   
  210.0 
  210.0   
  2025-09-27 16:00 
  2025-09-27 16:00   
  2025-09-27 18:00 
  2025-09-27 18:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     LDWP     LA-AIR 2025/09/13 13:48 OUTAGE 89249 AIRWAY RS: BANK# 3 / AIRWAY-KELLOGG 69-KV LINE 3 (-OUT/ OK TO-); [CB'S ONLY AT KLG-SUB ONLY] [INCLUDING CB'S AT AWY-RS]; {AWY-RS STATION WASH DE-ENERGIZED}. AH     2025-09-15 06:52     LDWP53203      2025-09-26 18:03  
  INT-DC (PATH 27)     142893     LDWP               INT DC (NE-SW)(LDWP) 
  INT DC (SW-NE)(LDWP)   
  2400.0 
  1400.0   
  2400.0 
  1400.0   
  1700.0 
  1400.0   
  2025-09-27 16:00 
  2025-09-27 16:00   
  2025-09-29 09:00 
  2025-09-29 09:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     LDWP     INT DC 2025/09/26 11:31 OUTAGE ID 89643 INTERMOUNTAIN-DC (PATH 27) LIMIT 1700-MW NE TO SW / 1400-MW SW TO NE DUE TO INT-GS ONE COAL UNIT ONLINE AND 1 GAS UNIT ONLINE IN BI-POLE CONFIGURATION. FS.      2025-09-26 13:27     LDWP53241      2025-09-26 19:53  
  MISC     142746     LDWP               ADL-MKP(LDWP) 
  MKP-ADL(LDWP)   
  1291.0 
  1291.0   
  1291.0 
  1291.0   
  0.0 
  0.0   
  2025-10-03 17:00 
  2025-10-03 17:00   
  2025-10-03 18:00 
  2025-10-03 18:00   
  Scheduled     TRANSMISSION     FORCED      ONPATH     LDWP     MKT-ADL 2025/09/15 11:29 OUTAGE ID 88876 ADELANTO SS: MARKETPLACE-ADELANTO 1 500KV LINE (-OUT/CBS ONLY OPEN-) [RESTORATION SWITCHING FOR MKP-ADL 1 500KV LINE REACTOR AT ADL-SS] {PATH 46 DE-RATE}. FS.      2025-09-15 11:35     LDWP53209      2025-09-15 11:35  
  IPP NET IMPORTS     142780     LDWP               IPP NET IMPORTS(LDWP)      558.0      558.0      507.0      2025-10-13 09:00      2025-10-17 19:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     LDWP     IPP NET IMPORTS 2025/09/16 13:00 OUTAGE 89337 PACE/ PINTO SUB: HUNTINGTON-PINTO 345-KV LINE 1 SERIES CAPS [OUT/CLEARED] ROUTINE MAINTENANCE {OUTAGE REQUEST #25-17957} ***IPP NET IMPORT DE-RATE*****LINE REMAINS IN**. AH     2025-09-16 13:21     LDWP53214      2025-09-16 13:21  
MATL Outages:
  FULL OUTAGE     26440     MATL               AESO-WWA(MATL) 
  NWMT-WWA(MATL) 
  WWA-AESO(MATL) 
  WWA-NWMT(MATL)   
  300.0 
  295.0 
  295.0 
  300.0   
  300.0 
  295.0 
  295.0 
  300.0   
  0.0 
  0.0 
  0.0 
  0.0   
  2025-09-22 06:00 
  2025-09-22 06:00 
  2025-09-22 06:00 
  2025-09-22 06:00   
  2025-09-28 16:00 
  2025-09-28 16:00 
  2025-09-28 16:00 
  2025-09-28 16:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     MATL     Full Outage     2025-09-11 01:37     MATL20492      2025-09-11 02:22  
  RADIAL SOUTHBOUND OUTAGE     26506     MATL               AESO-WWA(MATL) 
  NWMT-WWA(MATL) 
  WWA-AESO(MATL) 
  WWA-NWMT(MATL)   
  300.0 
  295.0 
  295.0 
  300.0   
  300.0 
  295.0 
  295.0 
  300.0   
  0.0 
  189.0 
  0.0 
  189.0   
  2025-09-26 18:20 
  2025-09-26 18:20 
  2025-09-26 18:20 
  2025-09-26 18:20   
  2025-09-28 16:00 
  2025-09-28 16:00 
  2025-09-28 16:00 
  2025-09-28 16:00   
  Active     TRANSMISSION     PLANNED      ONPATH     MATL     Radial Southbound Outage     2025-09-26 18:14     MATL20533      2025-09-26 18:14  
NEVP Outages:
  MEAD KT2A 500/230 kv     503214     NEVP     Path 81          MD230-MD500(NEVP) 
  MD500-MD230(NEVP) 

  MD230-MD500(NEVP) 
  MD500-MD230(NEVP)   
  1500.0 
  1500.0 

  1500.0 
  1500.0   
  1500.0 
  1500.0 

  1500.0 
  1500.0   
  0.0 
  0.0 

  0.0 
  0.0   
  2024-09-16 07:45 
  2024-09-16 07:45 

  2024-12-31 23:00 
  2024-12-31 23:00   
  2024-12-31 23:00 
  2024-12-31 23:00 

  2025-12-31 17:00 
  2025-12-31 17:00   
  Active     TRANSMISSION     FORCED      ONPATH     NEVP     Mead KT2A 500/230 kV Transformer OOS     2024-09-16 07:48     NEVP185991      2024-12-18 07:35  
  CLARK E-BASIC     554449     NEVP               MD230-NVES1(NEVP) 
  NVES1-MD230(NEVP) 

  MD230-NVES1(NEVP) 
  NVES1-MD230(NEVP)   
  3408.0 
  3408.0 

  3408.0 
  3408.0   
  3408.0 
  3408.0 

  3408.0 
  3408.0   
  3077.0 
  3077.0 

  3077.0 
  3077.0   
  2025-09-02 06:30 
  2025-09-02 06:30 

  2025-09-02 13:00 
  2025-09-02 13:00   
  2025-09-02 13:00 
  2025-09-02 13:00 

  2025-10-01 00:00 
  2025-10-01 00:00   
  Active     TRANSMISSION     FORCED      ONPATH     NEVP     PATH 81 CLARK E-BASIC 230 KV LINE DE-RATE     2025-09-02 06:26     NEVP203382      2025-09-02 07:49  
  MARBLE 619     555540     NEVP     PATH24          MARBLE60-WEST.NVEN(NEVP) 
  WEST.NVEN-MARBLE60(NEVP)   
  18.0 
  18.0   
  18.0 
  18.0   
  0.0 
  0.0   
  2025-09-15 17:20 
  2025-09-15 17:20   
  2025-09-29 18:00 
  2025-09-29 18:00   
  Active     TRANSMISSION     FORCED      ONPATH     NEVP     LINE OOS     2025-09-15 17:26     NEVP203799      2025-09-15 17:26  
  DRUM-SUMMIT #1     555797     NEVP     PATH 24          NIE-NORTHSYS(NEVP) 
  SUMMIT120-WEST.NVEN(NEVP) 
  WEST.NVEN-SUMMIT120(NEVP)   
  1275.0 
  72.0 
  72.0   
  1275.0 
  72.0 
  72.0   
  1275.0 
  72.0 
  72.0   
  2025-09-22 07:29 
  2025-09-22 07:29 
  2025-09-22 07:29   
  2025-09-27 08:00 
  2025-09-27 08:00 
  2025-09-27 08:00   
  Completed     TRANSMISSION     FORCED      ONPATH     NEVP     LINE OOS      2025-09-22 07:30     NEVP203919      2025-09-22 07:30  
  MARBLE 619     555668     NEVP     PATH 24          MARBLE60-WEST.NVEN(NEVP) 
  WEST.NVEN-MARBLE60(NEVP) 

  MARBLE60-WEST.NVEN(NEVP) 
  WEST.NVEN-MARBLE60(NEVP)   
  18.0 
  18.0 

  18.0 
  18.0   
  18.0 
  18.0 

  18.0 
  18.0   
  0.0 
  0.0 

  0.0 
  0.0   
  2025-09-23 09:00 
  2025-09-23 09:00 

  2025-09-23 15:00 
  2025-09-23 15:00   
  2025-09-23 15:00 
  2025-09-23 15:00 

  2025-09-25 15:00 
  2025-09-25 15:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     NEVP     iTOA #25-04784 - Marble tie OOS.     2025-09-18 13:58     NEVP203847      2025-09-22 17:20  
  CRY500-MC500     556008     NEVP     PATH 81          CRY500-MC500(NEVP) 
  MC500-CRY500(NEVP) 
  NVES1-SIE(NEVP) 
  SIE-NVES1(NEVP)   
  628.0 
  628.0 
  3163.0 
  2710.0   
  628.0 
  628.0 
  3163.0 
  2710.0   
  0.0 
  0.0 
  3360.0 
  3894.0   
  2025-09-25 17:35 
  2025-09-25 17:35 
  2025-09-25 17:35 
  2025-09-25 17:35   
  2025-09-25 18:16 
  2025-09-25 18:16 
  2025-09-25 18:16 
  2025-09-25 18:16   
  Completed     TRANSMISSION     FORCED      ONPATH     NEVP     PATH 81 CRYSTAL-MCCULLOUGH 500 KV LINE DERATE     2025-09-25 17:41     NEVP204042      2025-09-25 18:15  
  NAVAJO-CRYSTAL 500 KV     556021     NEVP     NAVAJO-CRYSTAL 500 KV          CRY500-NA500(NEVP) 
  NA500-CRY500(NEVP) 

  CRY500-NA500(NEVP) 
  NA500-CRY500(NEVP)   
  533.0 
  533.0 

  533.0 
  533.0   
  533.0 
  533.0 

  533.0 
  533.0   
  453.0 
  453.0 

  453.0 
  453.0   
  2025-09-25 19:10 
  2025-09-25 19:10 

  2025-09-26 12:00 
  2025-09-26 12:00   
  2025-09-26 12:00 
  2025-09-26 12:00 

  2025-09-26 13:45 
  2025-09-26 13:45   
  Terminated     TRANSMISSION     FORCED      ONPATH     NEVP     NAVAJO-CRYSTAL 500 KV LINE DERATE     2025-09-25 19:17     NEVP204046      2025-09-26 13:48  
  OSCEOLA-BLACK ROCK 2301     555673     NEVP     PATH 32          EAST.NVEN-GON.PAV(NEVP) 
  GON.PAV-EAST.NVEN(NEVP)   
  291.0 
  291.0   
  291.0 
  291.0   
  0.0 
  0.0   
  2025-09-29 07:00 
  2025-09-29 07:00   
  2025-09-30 16:00 
  2025-09-30 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     NEVP     iTOA #25-04842 - 2301 LINE OOS for PACE WORK.     2025-09-18 14:13     NEVP203848      2025-09-18 14:13  
  TRUCKEE-SUMMIT 607     555985     NEVP     PATH 24          SUMMIT120-WEST.NVEN(NEVP) 
  WEST.NVEN-SUMMIT120(NEVP)   
  72.0 
  72.0   
  72.0 
  72.0   
  72.0 
  72.0   
  2025-09-30 06:00 
  2025-09-30 06:00   
  2025-10-03 16:00 
  2025-10-03 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     NEVP     iTOA #25-03182 - NVE to carry 5-8 MW PGE stranded load.     2025-09-25 11:22     NEVP204034      2025-09-25 11:22  
  PAVANT-SIGURD 230KV     556036     NEVP     PATH 32          EAST.NVEN-GON.PAV(NEVP) 
  GON.PAV-EAST.NVEN(NEVP)   
  291.0 
  470.0   
  291.0 
  470.0   
  0.0 
  0.0   
  2025-10-01 06:00 
  2025-10-01 06:00   
  2025-10-03 16:00 
  2025-10-03 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     NEVP     iTOA #25-04844 - LINE OOS. NVE to carry PACE stranded load.     2025-09-26 09:52     NEVP204054      2025-09-26 09:52  
  CRY-NAV 500     555213     NEVP     CRY-NAV 500 OOS          CRY500-NA500(NEVP) 
  NA500-CRY500(NEVP)   
  533.0 
  533.0   
  533.0 
  533.0   
  0.0 
  0.0   
  2025-10-13 08:00 
  2025-10-13 08:00   
  2025-11-05 15:00 
  2025-11-05 15:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     NEVP     CRY-NAV 500 OOS:     2025-09-11 13:24     NEVP203661      2025-09-11 13:24  
  CRY-NAV 500 Series Cap     555216     NEVP     CRY-NAV 500 Series Cap OOS          CRY500-NA500(NEVP) 
  NA500-CRY500(NEVP)   
  533.0 
  533.0   
  533.0 
  533.0   
  366.0 
  366.0   
  2025-11-05 15:00 
  2025-11-05 15:00   
  2025-11-30 16:00 
  2025-11-30 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     NEVP     CRY-NAV 500 Series Cap @ Crystal OOS     2025-09-11 13:27     NEVP203662      2025-09-11 13:27  
NWMT Outages:
  230KV CROSSOVER-YTP     13603     NWMT     230 CROSSOVER YTP          CROSSOVER-MTSE(NWMT) 
  MTSE-CROSSOVER(NWMT) 
  MTSE-NWMT.SYSTEM(NWMT) 
  NWMT.SYSTEM-MTSE(NWMT)   
  478.0 
  450.0 
  600.0 
  600.0   
  478.0 
  450.0 
  600.0 
  600.0   
  178.0 
  150.0 
  178.0 
  550.0   
  2025-02-28 23:00 
  2025-02-28 23:00 
  2025-02-28 23:00 
  2025-02-28 23:00   
  2026-12-31 23:00 
  2026-12-31 23:00 
  2026-12-31 23:00 
  2026-12-31 23:00   
  Active     TRANSMISSION     FORCED      ONPATH     NWMT     230 CROSSOVER YTP     2025-02-05 13:34     NWMT3043      2025-02-05 13:34  
  Path 1     14439     NWMT     MATL          GTFALLSNWMT-MATL.NWMT(NWMT) 
  MATL.NWMT-GTFALLSNWMT(NWMT)   
  325.0 
  300.0   
  325.0 
  300.0   
  189.0 
  189.0   
  2025-09-19 06:00 
  2025-09-19 06:00   
  2025-09-28 16:00 
  2025-09-28 16:00   
  Active     TRANSMISSION     FORCED      ONPATH     NWMT     MATL Radial Southbound     2025-09-17 08:57     NWMT3231      2025-09-17 08:57  
  25-2796-TR     14477     NWMT     115kV Dutton Pump-Great Falls 230          GLWND1-GTFALLSNWMT(NWMT) 
  GTFALLSNWMT-GLWND1(NWMT)   
  130.0 
  100.0   
  130.0 
  100.0   
  0.0 
  0.0   
  2025-09-29 06:00 
  2025-09-29 06:00   
  2025-09-29 16:00 
  2025-09-29 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     NWMT     NWMT Work.     2025-09-25 09:58     NWMT3241      2025-09-25 09:58  
  HOT SPRINGS-PLACID LAKE     14400     NWMT     HOT SPRINGS-PLACID LAKE          AVAT.NWMT-NW-MT(NWMT) 
  MLCK-NW-MT(NWMT) 
  NW-MT-AVAT.NWMT(NWMT) 
  NW-MT-MLCK(NWMT)   
  0.0 
  184.0 
  382.0 
  250.0   
  382.0 
  184.0 
  382.0 
  250.0   
  132.0 
  0.0 
  132.0 
  0.0   
  2025-09-29 07:00 
  2025-09-29 07:00 
  2025-09-29 07:00 
  2025-09-29 07:00   
  2025-10-02 14:00 
  2025-10-02 14:00 
  2025-10-02 14:00 
  2025-10-02 14:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     NWMT     NWE REQUEST FOR WORK     2025-09-04 11:59     NWMT3226      2025-09-04 11:59  
  GARRISON 500-230KV BANK     14464     NWMT     Garrison Bank          NW-MT-BPAT.NWMT(NWMT) 
  NWMT.SYSTEM-TOWNSEND(NWMT)   
  492.0 
  469.0   
  492.0 
  469.0   
  381.0 
  458.0   
  2025-09-29 07:00 
  2025-09-29 07:00   
  2025-10-05 16:00 
  2025-10-05 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     NWMT     BPA Outage.     2025-09-24 10:49     NWMT3235      2025-09-24 10:49  
  25-2556-TR     14467     NWMT     100kV Broadview-Fish Creek          GTFALLSNWMT-MATL.NWMT(NWMT)      325.0      325.0      50.0      2025-09-29 15:00      2025-09-29 19:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     NWMT     NWMT Work.     2025-09-24 11:29     NWMT3236      2025-09-24 11:29  
  25-2556-TR     14469     NWMT     Broadview-Fish Creek          GTFALLSNWMT-MATL.NWMT(NWMT)      325.0      325.0      50.0      2025-09-30 15:00      2025-09-30 19:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     NWMT     NWMT Work.     2025-09-24 11:31     NWMT3237      2025-09-24 11:31  
  25-2556-TR     14471     NWMT     Broadview-Fish Creek          GTFALLSNWMT-MATL.NWMT(NWMT)      325.0      325.0      50.0      2025-10-01 15:00      2025-10-01 19:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     NWMT     NWMT Work.     2025-09-24 11:32     NWMT3238      2025-09-24 11:32  
  25-2556-TR     14473     NWMT     Broadview-Fish Creek           GTFALLSNWMT-MATL.NWMT(NWMT)      325.0      325.0      50.0      2025-10-02 15:00      2025-10-02 19:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     NWMT     NWMT Work.     2025-09-24 11:33     NWMT3239      2025-09-24 11:33  
  25-2556-TR     14475     NWMT     Broadview-Fish Creek          GTFALLSNWMT-MATL.NWMT(NWMT)      325.0      325.0      50.0      2025-10-03 15:00      2025-10-03 16:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     NWMT     NWMT Work.     2025-09-24 11:35     NWMT3240      2025-09-24 11:35  
  HOT SPRINGS-PLACID LAKE     14405     NWMT     HOT SPRINGS-PLACID LAKE          AVAT.NWMT-NW-MT(NWMT) 
  MLCK-NW-MT(NWMT) 
  NW-MT-AVAT.NWMT(NWMT) 
  NW-MT-MLCK(NWMT)   
  382.0 
  184.0 
  382.0 
  250.0   
  382.0 
  184.0 
  382.0 
  250.0   
  132.0 
  0.0 
  132.0 
  0.0   
  2025-10-06 07:00 
  2025-10-06 07:00 
  2025-10-06 07:00 
  2025-10-06 07:00   
  2025-10-09 14:00 
  2025-10-09 14:00 
  2025-10-09 14:00 
  2025-10-09 14:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     NWMT     NWE REQUEST FOR WORK     2025-09-04 12:01     NWMT3227      2025-09-04 12:01  
PGE Outages:
  BETHEL-ROUND BUTTE 230KV     210686     PGE     Bethel-Round Butte 230kV          GRIZZLY-COB(PGE) 
  PGE-GRIZZLY(PGE)   
  150.0 
  150.0   
  150.0 
  150.0   
  0.0 
  0.0   
  2025-09-24 08:00 
  2025-09-24 08:00   
  2025-10-12 16:00 
  2025-10-12 16:00   
  Active     TRANSMISSION     PLANNED      ONPATH     PGE     Reduction of TTC on COI by path operator: PGE and BPAT     2025-01-27 11:45     PGE69383      2025-01-27 11:45  
  COLSTRIP TRANS PROJECT     224378     PGE     BPA Garrison 500-230kV Bank          BROADVIEW-TOWNSEND(PGE) 
  COLSTRIP-BROADVIEW(PGE) 
  COLSTRIP-TOWNSEND(PGE)   
  312.0 
  307.0 
  307.0   
  312.0 
  307.0 
  307.0   
  242.0 
  242.0 
  242.0   
  2025-09-29 07:00 
  2025-09-29 07:00 
  2025-09-29 07:00   
  2025-10-05 16:00 
  2025-10-05 16:00 
  2025-10-05 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     PGE     Reduction of TTC on CTP by path operator: NWMT     2025-09-24 13:47     PGE72090      2025-09-24 13:47  
PNM Outages:
  BW230 IMP/EXP RESTRICTION     482892     PNM     BW345-BW230          BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW345-BW230(PNM) 

  BW345-BW230(PNM) 

  BW345-BW230(PNM) 

  BW345-BW230(PNM) 

  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM)   
  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0   
  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0   
  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0   
  2024-06-21 16:00 
  2024-06-21 16:00 

  2024-06-21 17:00 
  2024-06-21 17:00 

  2024-06-21 18:00 
  2024-06-21 18:00 

  2024-06-21 19:00 
  2024-06-21 19:00 

  2024-06-21 20:00 
  2024-06-21 20:00 

  2024-06-21 21:00 
  2024-06-21 21:00 

  2024-06-21 22:00 
  2024-06-21 22:00 

  2024-06-21 23:00 
  2024-06-21 23:00 

  2024-06-22 12:00 
  2024-06-22 12:00 

  2024-06-22 13:00 
  2024-06-22 13:00 

  2024-06-22 14:00 
  2024-06-22 14:00 

  2024-06-22 15:00 
  2024-06-22 15:00 

  2024-06-22 16:00 
  2024-06-22 16:00 

  2024-06-22 17:00 
  2024-06-22 17:00 

  2024-06-22 18:00 
  2024-06-22 18:00 

  2024-06-22 19:00 
  2024-06-22 19:00 

  2024-06-22 20:00 
  2024-06-22 20:00 

  2024-06-22 21:00 
  2024-06-22 21:00 

  2024-06-22 22:00 
  2024-06-22 22:00 

  2024-06-22 23:00 
  2024-06-22 23:00 

  2024-06-23 12:00 
  2024-06-23 12:00 

  2024-06-23 13:00 
  2024-06-23 13:00 

  2024-06-23 14:00 
  2024-06-23 14:00 

  2024-06-23 15:00 
  2024-06-23 15:00 

  2024-06-23 16:00 
  2024-06-23 16:00 

  2024-06-23 17:00 
  2024-06-23 17:00 

  2024-06-23 18:00 
  2024-06-23 18:00 

  2024-06-23 19:00 
  2024-06-23 19:00 

  2024-06-23 20:00 
  2024-06-23 20:00 

  2024-06-23 21:00 
  2024-06-23 21:00 

  2024-06-23 22:00 
  2024-06-23 22:00 

  2024-06-23 23:00 
  2024-06-23 23:00 

  2024-06-24 08:00 

  2024-06-24 12:00 
  2024-06-24 12:00 

  2024-06-24 13:00 
  2024-06-24 13:00 

  2024-06-24 14:00 
  2024-06-24 14:00 

  2024-06-24 15:00 
  2024-06-24 15:00 

  2024-06-24 16:00 
  2024-06-24 16:00 

  2024-06-24 17:00 
  2024-06-24 17:00 

  2024-06-24 18:00 
  2024-06-24 18:00 

  2024-06-24 19:00 
  2024-06-24 19:00 

  2024-06-24 20:00 
  2024-06-24 20:00 

  2024-06-24 21:00 
  2024-06-24 21:00 

  2024-06-24 22:00 
  2024-06-24 22:00 

  2024-06-24 23:00 
  2024-06-24 23:00 

  2024-06-25 07:00 

  2024-06-25 08:00 

  2024-06-25 09:00 

  2024-06-25 10:00 

  2024-06-25 11:00 

  2024-06-25 12:00 
  2024-06-25 12:00 

  2024-06-25 13:00 
  2024-06-25 13:00 

  2024-06-25 14:00 
  2024-06-25 14:00 

  2024-06-25 15:00 

  2024-06-25 16:00 

  2024-06-25 17:00 

  2024-06-25 18:00 

  2024-06-25 19:00 

  2024-06-25 20:00 

  2024-06-25 21:00 

  2024-06-25 22:00 

  2024-06-25 23:00 

  2024-06-26 12:00 

  2024-06-26 13:00 

  2024-06-26 14:00 

  2024-06-26 15:00 

  2024-06-26 16:00 

  2024-06-26 17:00 

  2024-06-26 18:00 

  2024-06-26 19:00 

  2024-06-26 20:00 

  2024-06-26 21:00 

  2024-06-26 22:00 

  2024-06-26 23:00 

  2024-06-27 05:00 

  2024-06-27 06:00 

  2024-06-27 07:00 

  2024-06-27 08:00 

  2024-06-27 09:00 

  2024-06-27 10:00 

  2024-06-27 11:00 

  2024-06-27 12:00 

  2024-06-27 13:00 

  2024-06-27 14:00 

  2024-07-26 17:00 
  2024-07-26 17:00 

  2024-07-27 08:43 
  2024-07-27 08:43 

  2024-11-30 17:00 
  2024-11-30 17:00 

  2025-07-01 17:00 
  2025-07-01 17:00 

  2025-12-31 17:00 
  2025-12-31 17:00   
  2024-06-21 17:00 
  2024-06-21 17:00 

  2024-06-21 18:00 
  2024-06-21 18:00 

  2024-06-21 19:00 
  2024-06-21 19:00 

  2024-06-21 20:00 
  2024-06-21 20:00 

  2024-06-21 21:00 
  2024-06-21 21:00 

  2024-06-21 22:00 
  2024-06-21 22:00 

  2024-06-21 23:00 
  2024-06-21 23:00 

  2024-06-22 12:00 
  2024-06-22 12:00 

  2024-06-22 13:00 
  2024-06-22 13:00 

  2024-06-22 14:00 
  2024-06-22 14:00 

  2024-06-22 15:00 
  2024-06-22 15:00 

  2024-06-22 16:00 
  2024-06-22 16:00 

  2024-06-22 17:00 
  2024-06-22 17:00 

  2024-06-22 18:00 
  2024-06-22 18:00 

  2024-06-22 19:00 
  2024-06-22 19:00 

  2024-06-22 20:00 
  2024-06-22 20:00 

  2024-06-22 21:00 
  2024-06-22 21:00 

  2024-06-22 22:00 
  2024-06-22 22:00 

  2024-06-22 23:00 
  2024-06-22 23:00 

  2024-06-23 12:00 
  2024-06-23 12:00 

  2024-06-23 13:00 
  2024-06-23 13:00 

  2024-06-23 14:00 
  2024-06-23 14:00 

  2024-06-23 15:00 
  2024-06-23 15:00 

  2024-06-23 16:00 
  2024-06-23 16:00 

  2024-06-23 17:00 
  2024-06-23 17:00 

  2024-06-23 18:00 
  2024-06-23 18:00 

  2024-06-23 19:00 
  2024-06-23 19:00 

  2024-06-23 20:00 
  2024-06-23 20:00 

  2024-06-23 21:00 
  2024-06-23 21:00 

  2024-06-23 22:00 
  2024-06-23 22:00 

  2024-06-23 23:00 
  2024-06-23 23:00 

  2024-06-24 08:00 
  2024-06-24 12:00 

  2024-06-24 12:00 

  2024-06-24 13:00 
  2024-06-24 13:00 

  2024-06-24 14:00 
  2024-06-24 14:00 

  2024-06-24 15:00 
  2024-06-24 15:00 

  2024-06-24 16:00 
  2024-06-24 16:00 

  2024-06-24 17:00 
  2024-06-24 17:00 

  2024-06-24 18:00 
  2024-06-24 18:00 

  2024-06-24 19:00 
  2024-06-24 19:00 

  2024-06-24 20:00 
  2024-06-24 20:00 

  2024-06-24 21:00 
  2024-06-24 21:00 

  2024-06-24 22:00 
  2024-06-24 22:00 

  2024-06-24 23:00 
  2024-06-24 23:00 

  2024-06-25 12:00 
  2024-06-25 07:00 

  2024-06-25 08:00 

  2024-06-25 09:00 

  2024-06-25 10:00 

  2024-06-25 11:00 

  2024-06-25 12:00 

  2024-06-25 13:00 
  2024-06-25 13:00 

  2024-06-25 14:00 
  2024-06-25 14:00 

  2024-06-25 15:00 
  2024-07-26 17:00 

  2024-06-25 16:00 

  2024-06-25 17:00 

  2024-06-25 18:00 

  2024-06-25 19:00 

  2024-06-25 20:00 

  2024-06-25 21:00 

  2024-06-25 22:00 

  2024-06-25 23:00 

  2024-06-26 12:00 

  2024-06-26 13:00 

  2024-06-26 14:00 

  2024-06-26 15:00 

  2024-06-26 16:00 

  2024-06-26 17:00 

  2024-06-26 18:00 

  2024-06-26 19:00 

  2024-06-26 20:00 

  2024-06-26 21:00 

  2024-06-26 22:00 

  2024-06-26 23:00 

  2024-06-27 05:00 

  2024-06-27 06:00 

  2024-06-27 07:00 

  2024-06-27 08:00 

  2024-06-27 09:00 

  2024-06-27 10:00 

  2024-06-27 11:00 

  2024-06-27 12:00 

  2024-06-27 13:00 

  2024-06-27 14:00 

  2024-07-26 17:00 

  2024-07-27 08:43 
  2024-07-27 08:43 

  2024-11-30 17:00 
  2024-11-30 17:00 

  2025-07-01 17:00 
  2025-07-01 17:00 

  2025-12-31 17:00 
  2025-12-31 17:00 

  2027-12-31 17:00 
  2027-12-31 17:00   
  Active     TRANSMISSION     FORCED      ONPATH     PNM     HVDC OOS until further notice      2024-06-21 11:48     PNM181501      2025-09-16 08:42  
  NOMO PATH48 REDUCTION     536909     PNM     Rio Puerco - Pintado 245kv Series Comp          ABQ-FOURCORNE345(PNM) 
  ABQ-PINTADO345(PNM) 
  FOURCORNE345-ABQ(PNM) 
  FOURCORNE345-PINTADO345(PNM) 
  PINTADO345-ABQ(PNM) 
  PINTADO345-FOURCORNE345(PNM) 

  ABQ-FOURCORNE345(PNM) 
  ABQ-PINTADO345(PNM) 
  FOURCORNE345-ABQ(PNM) 
  FOURCORNE345-PINTADO345(PNM) 
  PINTADO345-ABQ(PNM) 
  PINTADO345-FOURCORNE345(PNM) 

  ABQ-FOURCORNE345(PNM) 
  ABQ-PINTADO345(PNM) 
  FOURCORNE345-ABQ(PNM) 
  FOURCORNE345-PINTADO345(PNM) 
  PINTADO345-ABQ(PNM) 
  PINTADO345-FOURCORNE345(PNM) 

  ABQ-FOURCORNE345(PNM) 
  ABQ-PINTADO345(PNM) 
  FOURCORNE345-ABQ(PNM) 
  FOURCORNE345-PINTADO345(PNM) 
  PINTADO345-ABQ(PNM) 
  PINTADO345-FOURCORNE345(PNM) 

  ABQ-FOURCORNE345(PNM) 
  ABQ-PINTADO345(PNM) 
  FOURCORNE345-ABQ(PNM) 
  FOURCORNE345-PINTADO345(PNM) 
  PINTADO345-ABQ(PNM) 
  PINTADO345-FOURCORNE345(PNM)   
  1901.0 
  1900.0 
  1100.0 
  1100.0 
  1100.0 
  1901.0 

  1901.0 
  1900.0 
  1100.0 
  1100.0 
  1100.0 
  1901.0 

  1901.0 
  1900.0 
  1100.0 
  1100.0 
  1100.0 
  1901.0 

  1901.0 
  1900.0 
  1100.0 
  1100.0 
  1100.0 
  1901.0 

  1901.0 
  1900.0 
  1100.0 
  1100.0 
  1100.0 
  1901.0   
  1901.0 
  1900.0 
  1100.0 
  1100.0 
  1100.0 
  1901.0 

  1901.0 
  1900.0 
  1100.0 
  1100.0 
  1100.0 
  1901.0 

  1901.0 
  1900.0 
  1100.0 
  1100.0 
  1100.0 
  1901.0 

  1901.0 
  1900.0 
  1100.0 
  1100.0 
  1100.0 
  1901.0 

  1901.0 
  1900.0 
  1100.0 
  1100.0 
  1100.0 
  1901.0   
  550.0 
  550.0 
  550.0 
  550.0 
  550.0 
  550.0 

  550.0 
  550.0 
  550.0 
  550.0 
  550.0 
  550.0 

  1150.0 
  1150.0 
  1150.0 
  1150.0 
  1150.0 
  1150.0 

  1150.0 
  1150.0 
  1150.0 
  1150.0 
  1150.0 
  1150.0 

  1150.0 
  1150.0 
  1150.0 
  1150.0 
  1150.0 
  1150.0   
  2025-05-07 09:00 
  2025-05-07 09:00 
  2025-05-07 09:00 
  2025-05-07 09:00 
  2025-05-07 09:00 
  2025-05-07 09:00 

  2025-05-07 10:00 
  2025-05-07 10:00 
  2025-05-07 10:00 
  2025-05-07 10:00 
  2025-05-07 10:00 
  2025-05-07 10:00 

  2025-05-28 07:49 
  2025-05-28 07:49 
  2025-05-28 07:49 
  2025-05-28 07:49 
  2025-05-28 07:49 
  2025-05-28 07:49 

  2025-08-01 10:00 
  2025-08-01 10:00 
  2025-08-01 10:00 
  2025-08-01 10:00 
  2025-08-01 10:00 
  2025-08-01 10:00 

  2025-09-01 10:00 
  2025-09-01 10:00 
  2025-09-01 10:00 
  2025-09-01 10:00 
  2025-09-01 10:00 
  2025-09-01 10:00   
  2025-05-07 10:00 
  2025-05-07 10:00 
  2025-05-07 10:00 
  2025-05-07 10:00 
  2025-05-07 10:00 
  2025-05-07 10:00 

  2025-05-28 07:49 
  2025-05-28 07:49 
  2025-05-28 07:49 
  2025-05-28 07:49 
  2025-05-28 07:49 
  2025-05-28 07:49 

  2025-08-01 10:00 
  2025-08-01 10:00 
  2025-08-01 10:00 
  2025-08-01 10:00 
  2025-08-01 10:00 
  2025-08-01 10:00 

  2025-09-01 10:00 
  2025-09-01 10:00 
  2025-09-01 10:00 
  2025-09-01 10:00 
  2025-09-01 10:00 
  2025-09-01 10:00 

  2025-10-01 10:00 
  2025-10-01 10:00 
  2025-10-01 10:00 
  2025-10-01 10:00 
  2025-10-01 10:00 
  2025-10-01 10:00   
  Active     TRANSMISSION     FORCED      ONPATH     PNM     NOMO Path48 NNMI Line Reduction due to NOMO Path48 NNMI Line Reduction due to: Rio Puerco - Pintado 245kv Series Comp bypassed.     2025-05-07 08:34     PNM197474      2025-08-11 08:54  
  EDDY DC CONVERTER OUTAGE     549554     PNM     EDDY DC Converter          AMRAD345-EDDY230(PNM) 
  EDDY230-AMRAD345(PNM) 

  AMRAD345-EDDY230(PNM) 
  EDDY230-AMRAD345(PNM) 

  AMRAD345-EDDY230(PNM) 
  EDDY230-AMRAD345(PNM) 

  AMRAD345-EDDY230(PNM) 
  EDDY230-AMRAD345(PNM) 

  AMRAD345-EDDY230(PNM) 
  EDDY230-AMRAD345(PNM)   
  67.0 
  67.0 

  67.0 
  67.0 

  67.0 
  67.0 

  67.0 
  67.0 

  67.0 
  67.0   
  67.0 
  67.0 

  67.0 
  67.0 

  67.0 
  67.0 

  67.0 
  67.0 

  67.0 
  67.0   
  35.0 
  35.0 

  0.0 
  0.0 

  35.0 
  35.0 

  35.0 
  35.0 

  35.0 
  35.0   
  2025-07-29 07:00 
  2025-07-29 07:00 

  2025-08-14 02:28 
  2025-08-14 02:28 

  2025-08-14 02:59 
  2025-08-14 02:59 

  2025-08-14 03:01 
  2025-08-14 03:01 

  2025-08-18 10:19 
  2025-08-18 10:19   
  2025-08-14 02:28 
  2025-08-14 02:28 

  2025-08-14 02:59 
  2025-08-14 02:59 

  2025-08-14 03:01 
  2025-08-14 03:01 

  2025-08-18 10:19 
  2025-08-18 10:19 

  2026-01-01 00:01 
  2026-01-01 00:01   
  Active     TRANSMISSION     FORCED      ONPATH     PNM     Reliability Constraints:     2025-07-29 07:08     PNM201767      2025-08-18 10:18  
  EDDY DC CONVERTER OUTAGE     554155     PNM               AMRAD345-EDDY230(PNM) 
  EDDY230-AMRAD345(PNM) 

  AMRAD345-EDDY230(PNM) 
  EDDY230-AMRAD345(PNM) 

  AMRAD345-EDDY230(PNM) 
  EDDY230-AMRAD345(PNM)   
  67.0 
  67.0 

  67.0 
  67.0 

  67.0 
  67.0   
  67.0 
  67.0 

  67.0 
  67.0 

  67.0 
  67.0   
  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0   
  2025-08-28 17:45 
  2025-08-28 17:45 

  2025-08-28 21:00 
  2025-08-28 21:00 

  2025-08-29 18:00 
  2025-08-29 18:00   
  2025-08-28 21:00 
  2025-08-28 21:00 

  2025-08-29 18:00 
  2025-08-29 18:00 

  2025-09-02 14:12 
  2025-09-02 14:12   
  Completed     TRANSMISSION     FORCED      ONPATH     PNM     HVDC Tripped off line, ETR = 1800hrs 8/29/25     2025-08-28 17:43     PNM203267      2025-09-02 14:12  
  BLACKWATER SYNCHRO OOS     554158     PNM     BW345-TAIBAN          BW230-BW345(PNM) 
  BW345-BW230(PNM) 
  BW345-TAIBAN(PNM) 
  TAIBAN-BW345(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 
  BW345-TAIBAN(PNM) 
  TAIBAN-BW345(PNM)   
  200.0 
  200.0 
  572.0 
  202.0 

  200.0 
  200.0 
  572.0 
  202.0   
  200.0 
  200.0 
  572.0 
  202.0 

  200.0 
  200.0 
  572.0 
  202.0   
  17.0 
  17.0 
  297.0 
  17.0 

  17.0 
  17.0 
  297.0 
  17.0   
  2025-08-28 18:00 
  2025-08-28 18:00 
  2025-08-28 18:00 
  2025-08-28 18:00 

  2025-08-29 19:00 
  2025-08-29 19:00 
  2025-08-29 19:00 
  2025-08-29 19:00   
  2025-08-29 19:00 
  2025-08-29 19:00 
  2025-08-29 19:00 
  2025-08-29 19:00 

  2025-08-30 09:59 
  2025-08-30 09:59 
  2025-08-30 09:59 
  2025-08-30 09:59   
  Completed     TRANSMISSION     PLANNED      ONPATH     PNM     BW345-TAIBAN CURTAILMENT DUE TO BLACKWATER SYNCRONOUS CONDENSER PLANNED OOS     2025-08-28 18:00     PNM203268      2025-08-30 09:59  
  EASTERN NM CORRIDOR     553469     PNM     Eastern NM Corridor          ABQ-CLINECRNR345(PNM) 
  CLINECRNR345-ABQ(PNM) 

  ABQ-CLINECRNR345(PNM) 
  CLINECRNR345-ABQ(PNM) 

  ABQ-CLINECRNR345(PNM) 
  CLINECRNR345-ABQ(PNM) 

  ABQ-CLINECRNR345(PNM) 
  CLINECRNR345-ABQ(PNM)   
  235.0 
  2307.0 

  235.0 
  2307.0 

  235.0 
  2307.0 

  235.0 
  2307.0   
  235.0 
  2307.0 

  235.0 
  2307.0 

  235.0 
  2307.0 

  235.0 
  2307.0   
  235.0 
  1507.0 

  235.0 
  1400.0 

  235.0 
  1507.0 

  235.0 
  1507.0   
  2025-09-02 00:00 
  2025-09-02 00:00 

  2025-09-03 10:50 
  2025-09-03 10:50 

  2025-09-03 11:31 
  2025-09-03 11:31 

  2025-10-01 00:00 
  2025-10-01 00:00   
  2025-09-03 10:50 
  2025-09-03 10:50 

  2025-09-03 11:31 
  2025-09-03 11:31 

  2025-10-01 00:00 
  2025-10-01 00:00 

  2025-10-02 00:00 
  2025-10-02 00:00   
  Active     TRANSMISSION     FORCED      ONPATH     PNM     DUE TO Western Spirit – Pajarito 345kV Line OOS Total Eastern NM Wind Corridor derated to 1507 MW imports in ABQ. Outage modified due to transmission contingencies.      2025-08-22 07:32     PNM203028      2025-09-22 08:40  
  WESTSPRTS345-ABQ     508086     PNM     WESTSPRTS345-ABQ          ABQ-WESTSPRTS345(PNM) 
  WESTSPRTS345-ABQ(PNM)   
  235.0 
  800.0   
  235.0 
  800.0   
  0.0 
  0.0   
  2025-09-02 00:00 
  2025-09-02 00:00   
  2025-10-01 00:00 
  2025-10-01 00:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     PNM     WESTSPRTS345-ABQ LIMITATION DUE TO Western Spirit – Pajarito 345kV Line OOS      2024-10-21 11:35     PNM187449      2025-08-22 07:18  
  NOMO PATH48 REDUCTION     552060     PNM               HERNANDEZ115-NORTON115(PNM)      70.0      70.0      0.0      2025-10-14 08:00      2025-10-16 16:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     PNM     NOMO Path48 NNMI Line Reduction due to NH (Norton - Hernandez) 115kV Line OOS - ICLSS Upgrade (Norton Terminal)     2025-08-13 10:53     PNM202553      2025-08-13 10:53  
  FOURCORNE345-230 XFMR     554989     PNM     FOURCORNE345-230 #4 XFMER          FOURCORNE230-FOURCORNE345(PNM) 
  FOURCORNE345-FOURCORNE230(PNM)   
  157.0 
  157.0   
  157.0 
  157.0   
  0.0 
  0.0   
  2025-10-15 07:00 
  2025-10-15 07:00   
  2025-10-15 18:00 
  2025-10-15 18:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     PNM     FC345-230 XFMER OUTAGE     2025-09-09 09:01     PNM203593      2025-09-09 09:01  
  NOMO PATH48 REDUCTION     555600     PNM     CZ Line SC          ABQ-FOURCORNE345(PNM) 
  ABQ-SJ345(PNM) 
  FOURCORNE345-ABQ(PNM) 
  SJ345-ABQ(PNM)   
  1901.0 
  1901.0 
  1100.0 
  2018.0   
  1901.0 
  1901.0 
  1100.0 
  2018.0   
  1150.0 
  1900.0 
  1150.0 
  2018.0   
  2025-10-27 08:00 
  2025-10-27 08:00 
  2025-10-27 08:00 
  2025-10-27 08:00   
  2025-10-31 16:00 
  2025-10-31 16:00 
  2025-10-31 16:00 
  2025-10-31 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     PNM     PNM is planning on taking the Rio Puerco – Cabezon (CZ) 345 kV Line Series Comp out of service for maintenance during the dates and times noted below.     2025-09-17 07:17     PNM203827      2025-09-24 10:00  
  WESTWING500-WESTWING230     554897     PNM     Westwing500-Westwing230          WESTWING230-WESTWING500(PNM) 
  WESTWING500-WESTING230(PNM)   
  134.0 
  134.0   
  134.0 
  134.0   
  134.0 
  134.0   
  2025-11-04 09:00 
  2025-11-04 09:00   
  2025-11-06 17:00 
  2025-11-06 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     PNM     Westwing500-Westwing230 reductions. Westwing 500/230kv T-1 Transformer will be removed from service. PNM No reduction at this time     2025-09-08 07:04     PNM203559      2025-09-08 07:04  
  HIDALGO345-HIDALGO115     535022     PNM     Hidalgo345-Hidalgo115 T1X          HIDALGO115-HIDALGO345(PNM) 
  HIDALGO345-HIDALGO115(PNM) 

  HIDALGO115-HIDALGO345(PNM) 
  HIDALGO345-HIDALGO115(PNM)   
  448.0 
  448.0 

  448.0 
  448.0   
  448.0 
  448.0 

  448.0 
  448.0   
  100.0 
  100.0 

  100.0 
  100.0   
  2025-11-10 08:00 
  2025-11-10 08:00 

  2025-11-14 16:00 
  2025-11-14 16:00   
  2025-11-14 16:00 
  2025-11-14 16:00 

  2025-11-21 16:00 
  2025-11-21 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     PNM     Hidalgo345-Hidalgo115 line reduction due to: Hidalgo 345/115kV T1 Transformer OOS - Maintenance/Testing     2025-04-24 08:19     PNM196816      2025-09-03 09:32  
  EDDY DC CONVERTER OUTAGE     553905     PNM     EDDY DC Converter          AMRAD345-EDDY230(PNM) 
  EDDY230-AMRAD345(PNM)   
  67.0 
  67.0   
  67.0 
  67.0   
  0.0 
  0.0   
  2025-12-01 07:00 
  2025-12-01 07:00   
  2025-12-12 13:00 
  2025-12-12 13:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     PNM     Outage due to EPE Maintenance     2025-08-26 09:07     PNM203176      2025-08-26 09:07  
  NOMO PATH48 REDUCTION     547346     PNM     EP (West Mesa - Arroyo) 345kv Line          FOURCORNER345-WM345(PNM) 
  WM345-FOURCORNE345(PNM)   
  2018.0 
  1901.0   
  2018.0 
  1901.0   
  2018.0 
  1901.0   
  2026-01-05 07:00 
  2026-01-05 07:00   
  2026-02-06 15:00 
  2026-02-06 15:00   
  Scheduled     TRANSMISSION     FORCED      ONPATH     PNM     NOMO Path48 NNMI Line Reduction due to (WM345-Arroyo- EP Line) outage. Replacing Protective Relays. SNMIC=600 (EPE=412, PNM=118, TSGT=70). EPIC=600.      2025-07-10 12:29     PNM200957      2025-07-10 12:29  
  TEST OUTAGE     549107     PNM     Test          ABQ-SJ345(PNM) 
  SJ345-ABQ(PNM)   
  1901.0 
  2018.0   
  1901.0 
  2018.0   
  1901.0 
  2018.0   
  2026-07-24 08:00 
  2026-07-24 08:00   
  2026-07-24 09:00 
  2026-07-24 09:00   
  Cancelled     TRANSMISSION     FORCED      ONPATH     PNM     Use this outage template for any outage or derate on the ABQ-CBZN-SJ345 Line. Path will be affected in both directions.If line OOS then enter ZERO in both directions.If derating enter the same desired value in both directions.     2025-07-24 09:05     PNM201584      2025-07-24 09:11  
PPW Outages:
  PPW 171983     10361     PPW     Riverton: 230 kV Cap Bank S/C 472               0.0      0.0      0.0      2021-02-18 09:03      2025-12-23 17:00      ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Riverton: 230 kV Cap Bank S/C 472:     2022-11-14 00:32     75797     2025-06-30 15:01  
  PPW 175805     9275     PPW     Hemingway-Summer Lake 500 kV line (Path 75 Schedule Limitation)          H500-SMLK(PPW) 

  H500-SMLK(PPW)   
  1500.0 

  1500.0   
  1500.0 

  1500.0   
  1386.0 

  1386.0   
  2021-06-02 12:00 

  2024-12-04 12:00   
  2024-12-04 12:00 

  2025-12-31 12:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Hemingway-Summer Lake 500 kV line (Path 75 Schedule Limitation)..:Path Restriction Notes: Path 75 Westbound = 1386.:     2021-12-21 14:06     80760     2024-12-04 08:04  
  PPW 24-00488     15058     PPW     Burns: Series Cap Segment #1 & 2,Burns: MO 11D10 BYPASS,Burns: BURNSBNW 11D555 GND SW,Burns: BURNSBN          BORA-M500(PPW) 
  PACW-SMLK(PPW) 
  SMLK-H500(PPW) 

  BORA-M500(PPW) 
  PACW-SMLK(PPW) 
  SMLK-H500(PPW) 

  BORA-M500(PPW) 
  PACW-SMLK(PPW) 
  SMLK-H500(PPW)   
  1090.0 
  550.0 
  100.0 

  1090.0 
  550.0 
  100.0 

  1090.0 
  550.0 
  100.0   
  1090.0 
  550.0 
  100.0 

  1090.0 
  550.0 
  100.0 

  1090.0 
  550.0 
  100.0   
  1090.0 
  550.0 
  100.0 

  1070.0 
  535.0 
  96.0 

  1070.0 
  535.0 
  96.0   
  2024-01-09 03:48 
  2024-01-09 03:48 
  2024-01-09 03:48 

  2024-01-09 03:48 
  2024-01-09 03:48 
  2024-01-09 03:48 

  2025-11-07 16:00 
  2025-11-07 16:00 
  2025-11-07 16:00   
  2024-01-09 03:48 
  2024-01-09 03:48 
  2024-01-09 03:48 

  2025-11-07 16:00 
  2025-11-07 16:00 
  2025-11-07 16:00 

  2025-11-18 16:00 
  2025-11-18 16:00 
  2025-11-18 16:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Investigating a possible failure of relay voltage sensing component.:Path 75 limited to 507 (Midpoint Series Caps bypassed for maint). SMLK-H500 = 96; BORA-M500 = 959;:     2024-01-03 10:34     138306     2025-09-08 12:00  
  PPW 24-06062     16750     PPW     Path 25 Schedule Limitation (Cascade 115 kV Tie)          CRAGVIEW-PACW(PPW) 

  CRAGVIEW-PACW(PPW)   
  108.0 

  108.0   
  108.0 

  108.0   
  0.0 

  0.0   
  2024-04-09 00:00 

  2024-04-09 02:35   
  2024-04-09 02:35 

  2026-04-09 00:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:CRAGVIEW-PACW TTC = 0 PER PLANNING.:CRAGVIEW-PACW = 0 INDEFINITELY:     2024-04-09 09:34     143888     2025-04-07 18:15  
  PPW 24-06351     18270     PPW     Threemile Knoll: TIE CB 335,Threemile Knoll: CB 335 W Bus Disc,Threemile Knoll: SWITCH 356A               0.0      0.0      0.0      2024-04-12 22:23      2025-12-31 17:00      ACTIVE     TRANSMISSION     FORCED      ONPATH     PPW     continuous:***Commissioning Required*** Investigate failure of CB 335. :     2025-08-15 14:08     144180     2025-08-15 14:08  
  PPW 24-15751     17530     PPW     Threemile Knoll: Series Cap C2,Threemile Knoll: Series Cap C1          JBSN-JB345(PPW) 
  NUT-PATHC(PPW) 
  PATHC-NUT(PPW) 

  NUT-PATHC(PPW) 

  NUT-PATHC(PPW) 

  JBSN-JB345(PPW) 
  PATHC-NUT(PPW)   
  1600.0 
  0.0 
  1600.0 

  1172.0 

  1060.0 

  1600.0 
  1600.0   
  1600.0 
  0.0 
  1600.0 

  1172.0 

  1060.0 

  1600.0 
  1600.0   
  1417.0 
  0.0 
  1600.0 

  1172.0 

  1060.0 

  1433.0 
  1480.0   
  2024-09-18 00:30 
  2024-09-18 00:30 
  2024-09-18 00:30 

  2024-11-01 00:00 

  2025-04-01 00:00 

  2025-06-09 19:09 
  2025-06-09 19:09   
  2025-06-09 19:09 
  2024-11-01 00:00 
  2025-06-09 19:09 

  2025-04-01 00:00 

  2025-06-09 19:09 

  2025-12-31 17:30 
  2025-12-31 17:30   
  ACTIVE     TRANSMISSION     FORCED      ONPATH     PPW     continuous:Computer/controller for Series caps needs to be repaired/replaced. Tech support needed from Hitachi.:JBSN-JB345 = 2150. PacifiCorp = 1433. IPCo = 717   2024-11-30 22:07     153619     2025-06-09 19:12  
  PPW 24-16609     18322     PPW     Oquirrh-Terminal #1 345 kV line               0.0      0.0      0.0      2024-10-25 07:52      2025-10-03 00:00      ACTIVE     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Relocate the Oquirrh-Terminal #1 345 kV line:No impact under normal conditions.:     2025-09-05 14:37     154477     2025-09-12 09:03  
  PPW 25-02017     17629     PPW     Crag View-PG&E Cascade section of the PG&E Cascade-Weed Junction 115 kV line          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  75.0   
  45.0 
  75.0   
  45.0 
  75.0   
  2025-06-30 06:00 
  2025-06-30 06:00   
  2025-10-31 17:00 
  2025-10-31 17:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Line reconductoring. Replacing structures.:CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0. CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0.:     2025-01-28 13:43     161094     2025-06-09 11:17  
  PPW 25-03418     17689     PPW     Crag View-PG&E Cascade section of the PG&E Cascade-Weed Junction 115 kV line          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  80.0   
  45.0 
  80.0   
  45.0 
  80.0   
  2025-06-30 07:00 
  2025-06-30 07:00   
  2025-10-31 17:00 
  2025-10-31 17:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Reconductor between structures.:CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0.:     2025-02-18 12:38     162500     2025-05-27 09:55  
  PPW 25-10324     17986     PPW     Crag View-PG&E Cascade section of the PG&E Cascade-Weed Junction 115 kV line          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW) 

  CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  75.0 

  45.0 
  75.0   
  45.0 
  75.0 

  45.0 
  75.0   
  45.0 
  75.0 

  0.0 
  0.0   
  2025-06-30 07:00 
  2025-06-30 07:00 

  2025-06-30 07:17 
  2025-06-30 07:17   
  2025-06-30 07:17 
  2025-06-30 07:17 

  2025-10-31 17:00 
  2025-10-31 17:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Line reconductoring. Replacing structures.:CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0. CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0.:     2025-06-10 10:10     169449     2025-06-30 07:18  
  PPW 25-13375     18179     PPW     Cold Springs: XFMR 1 T-3169,Cold Springs: CS 1W27,Cold Springs: CB 3W120,Cold Springs-Hermiston 69 k               0.0      0.0      0.0      2025-07-17 07:44      2025-10-01 09:00      ACTIVE     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Replace T-3169, CB 3W120, SW 3W119:Umatilla, Hermiston & Hinkle will be radial from BPA McNary. Network Load Service Arrangements may be required. With Cold Springs XFMR #1 out of service, Echo Wind Generation will be tied to BPA McNary. Orchard Wind restricted to 8.5MW maximum output.   2025-07-15 13:11     172511     2025-09-25 09:21  
  PPW 25-09461     18355     PPW     Mustang: BK 1(T3780),Mustang: CAP 4,Mustang: CAP 5,Mustang: CB 1H8013,Mustang: CB 1H8015,Mustang: MO               0.0      0.0      0.0      2025-07-18 12:36      2025-11-19 07:00      ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install Caps #4, #5, VTs #9, #10, #11 & #12, SWs 1H8018, 1H8014, 1H8012, 1H8016/1H8017, CBs 1H8015, 1H8013:     2025-09-18 09:31     168568     2025-09-18 09:33  
  PPW 25-13805     18193     PPW     Jim Bridger-Mustang 230 kV line,Mustang-WAPA Spence 230 kV line,Jim Bridger: SWITCH 1H744          JBSN-WYOCENTRAL(PPW) 
  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-JBSN(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  600.0 
  631.0 
  249.0 
  600.0 
  574.0 
  0.0 
  574.0   
  600.0 
  631.0 
  249.0 
  600.0 
  574.0 
  0.0 
  574.0   
  400.0 
  631.0 
  243.0 
  400.0 
  287.0 
  0.0 
  287.0   
  2025-07-18 13:20 
  2025-07-18 13:20 
  2025-07-18 13:20 
  2025-07-18 13:20 
  2025-07-18 13:20 
  2025-07-18 13:20 
  2025-07-18 13:20   
  2025-11-15 17:00 
  2025-11-15 17:00 
  2025-11-15 17:00 
  2025-11-15 17:00 
  2025-11-15 17:00 
  2025-11-15 17:00 
  2025-11-15 17:00   
  ACTIVE     TRANSMISSION     FORCED      ONPATH     PPW     continuous:Fix Jim Bridger SW 1H744 Broken Blade :AW/4B Curve 121. WAPAEAST-WAPANORTH = 243. WYOCENTRAL-WYOEAST=287. TOT4B-WYONORTH = 631. TOT 4B = 874.   2025-07-18 13:26     172941     2025-09-24 11:31  
  PPW 25-11020     18170     PPW     Dixonville: 115 kV Bus Differential Relay,Dixonville: CB 2U4          HYDROGEN-PACW(PPW) 

  HYDROGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  2025-08-04 09:00 

  2025-08-12 12:00   
  2025-08-12 12:00 

  2025-10-17 16:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Remove and replace 115 kV Bus Differential Relay Scheme:     2025-07-11 10:59     170145     2025-08-11 09:28  
  PPW 25-15397     18243     PPW     Gadsby: Gadsby Unit 1 GSU XFMR 1,Gadsby: Gadsby Unit 1 GSU XFMR 2          THERMALGEN-PACE(PPW) 

  THERMALGEN-PACE(PPW) 

  THERMALGEN-PACE(PPW)   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  0.0 

  0.0   
  2025-08-12 06:00 

  2025-08-12 06:36 

  2025-09-12 17:00   
  2025-08-12 06:36 

  2025-09-12 17:00 

  2025-10-01 17:00   
  ACTIVE     TRANSMISSION     OPPORTUNITY      ONPATH     PPW     continuous:Fire system scaffold setup and work.:Gadsby Unit #1 unavailable.:     2025-08-05 14:27     174536     2025-09-19 13:03  
  PPW 25-03627     18235     PPW     Prospect Central: T-3069,70,71,Prospect Central: Sw 2R264,Prospect Central: SW 3R105,Prospect Centra          HYDROGEN-PACW(PPW) 

  HYDROGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  0.0 

  0.0   
  2025-08-18 08:57 

  2025-09-25 15:00   
  2025-09-25 15:00 

  2025-10-03 00:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Remove existing XFMR relays and add new SEL-387E relay panel.:Prospect Hydro Project generation restricted to 14 MW.:     2025-08-04 09:39     162709     2025-09-22 15:44  
  PPW 25-13407     18188     PPW     BPA, Yale: Yale Runback SPS          HYDROGEN-PACW(PPW) 

  HYDROGEN-PACW(PPW) 

  HYDROGEN-PACW(PPW)   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  0.0   
  2025-08-25 08:00 

  2025-08-26 08:00 

  2025-08-26 10:57   
  2025-08-26 08:00 

  2025-08-26 10:57 

  2025-10-02 15:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Yale Runback RAS Relays Out of Service:Yale and Merwin total output limited to 175MW maximum.   2025-07-18 09:19     172543     2025-08-26 10:57  
  PPW 25-15687     18251     PPW     Yale: 115/13 kV Bank #1 - T365880, 1, 2               0.0      0.0      0.0      2025-09-15 06:04      2025-09-25 18:00      Completed     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Annual maintenance and runner welding. Penstock and scroll case DEWATERED.:     2025-08-08 08:54     174828     2025-09-15 06:04  
  PPW 25-11976     18051     PPW     Merwin-Yale 115 kV line,Merwin: CB 2P26,Merwin: CB 2P27,Merwin: 2P500 GND SW,Yale: SW 2P508          HYDROGEN-PACW(PPW) 

  HYDROGEN-PACW(PPW) 

  HYDROGEN-PACW(PPW)   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  0.0   
  2025-09-02 06:00 

  2025-09-15 06:00 

  2025-09-15 06:25   
  2025-09-12 17:30 

  2025-09-15 06:25 

  2025-09-27 17:30   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace structures and switches:Yale units 1 and 2 unavailable.:     2025-07-08 14:35     171108     2025-09-25 13:57  
  PPW 25-08524     18212     PPW     Aeolus-Clover 500 kV line,Aeolus: 500 kV South Bus          AEOLUS-CLOVER(PPW) 
  CLOVER-AEOLUS(PPW) 

  AEOLUS-CLOVER(PPW) 
  CLOVER-AEOLUS(PPW)   
  1394.0 
  1000.0 

  1394.0 
  1000.0   
  1394.0 
  1000.0 

  1394.0 
  1000.0   
  0.0 
  0.0 

  0.0 
  0.0   
  2025-09-15 06:59 
  2025-09-15 06:59 

  2025-09-23 15:30 
  2025-09-23 15:30   
  2025-09-23 15:30 
  2025-09-23 15:30 

  2025-09-23 15:55 
  2025-09-23 15:55   
  COMPLETED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Switch work/reactor work/Station service/Remove shoo fly at Aeolus, Little Snake, Coyote, Clover:AEOLUS-CLOVER=0; CLOVER-AEOLUS=0.:     2025-07-30 11:41     167630     2025-09-23 15:55  
  PPW 25-13898     18213     PPW     Little Snake: SW 11B4,Little Snake: Reactor #1 116.1 MVAR,Aeolus-Clover 500 kV line,Clover: SW 11B11          AEOLUS-CLOVER(PPW) 
  CLOVER-AEOLUS(PPW) 

  AEOLUS-CLOVER(PPW) 
  CLOVER-AEOLUS(PPW)   
  1394.0 
  1000.0 

  1394.0 
  1000.0   
  1394.0 
  1000.0 

  1394.0 
  1000.0   
  1394.0 
  1000.0 

  0.0 
  0.0   
  2025-09-15 07:00 
  2025-09-15 07:00 

  2025-10-02 09:00 
  2025-10-02 09:00   
  2025-10-02 09:00 
  2025-10-02 09:00 

  2025-10-02 09:30 
  2025-10-02 09:30   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Warranty work to replace oil valve on Little Snake reactor #1:CLOVER-AEOLUS and AEOLUS-CLOVER=0 DURING SWITCHING ONLY.:     2025-07-30 14:31     173034     2025-09-10 11:41  
  PPW 25-17454     18303     PPW     Burns: Series Cap Segment #1 & 2,Burns: SW 11D10          BORA-M500(PPW) 
  SMLK-H500(PPW)   
  1090.0 
  100.0   
  1090.0 
  100.0   
  1070.0 
  96.0   
  2025-09-22 06:00 
  2025-09-22 06:00   
  2025-11-07 16:00 
  2025-11-07 16:00   
  Active     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Bypass capacitors to keep IPCO 138kV system within system operating limits.:JBSN-JB345 = 2100. PacifiCorp = 1400. IPCo = 700;   2025-08-28 12:33     176613     2025-08-28 12:34  
  PPW 26-00002     17627     PPW     IPC Midpoint-Hemingway 500 kV line,IPCo Midpoint: 500/345 kV Bank T-501          BORA-M500(PPW) 
  H500-M500(PPW) 
  M500-H500(PPW) 
  PACW-NTLOAD(PPW) 

  BORA-M500(PPW) 
  H500-M500(PPW) 
  M500-H500(PPW) 
  PACW-NTLOAD(PPW) 

  H500-M500(PPW) 
  M500-H500(PPW) 
  PACW-NTLOAD(PPW)   
  1090.0 
  800.0 
  1090.0 
  9999.0 

  1090.0 
  800.0 
  1090.0 
  9999.0 

  800.0 
  1090.0 
  9999.0   
  1090.0 
  800.0 
  1090.0 
  9999.0 

  1090.0 
  800.0 
  1090.0 
  9999.0 

  800.0 
  1090.0 
  9999.0   
  1090.0 
  800.0 
  1090.0 
  9999.0 

  596.0 
  350.0 
  350.0 
  0.0 

  800.0 
  1090.0 
  9999.0   
  2025-09-22 06:00 
  2025-09-22 06:00 
  2025-09-22 06:00 
  2025-09-22 06:00 

  2025-09-22 06:03 
  2025-09-22 06:03 
  2025-09-22 06:03 
  2025-09-22 06:03 

  2026-02-23 08:00 
  2026-02-23 08:00 
  2026-02-23 08:00   
  2025-09-22 06:03 
  2025-09-22 06:03 
  2025-09-22 06:03 
  2025-09-22 06:03 

  2025-11-07 16:00 
  2025-11-07 16:00 
  2025-11-07 16:00 
  2025-11-07 16:00 

  2026-05-29 15:00 
  2026-05-29 15:00 
  2026-05-29 15:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:This outage is for relocating the existing Midpoint T501 345kV/500kV transformer to a new 345kV station bay.:M500-H500 & H500-M500= 350.   2025-01-28 09:16     161059     2025-09-22 06:04  
  PPW 25-18917     18348     PPW     Scheduling Limitation: Path 18 Schedule Limitation (ID-MT AMPS)          ANTE-MLCK(PPW) 
  AVAT.NWMT-NW-MT(PPW) 
  BPAT.NWMT-NW-MT(PPW) 
  MLCK-ANTE(PPW) 
  NW-MT-AVAT.NWMT(PPW) 
  NW-MT-BPAT.NWMT(PPW) 

  ANTE-MLCK(PPW) 
  AVAT.NWMT-NW-MT(PPW) 
  BPAT.NWMT-NW-MT(PPW) 
  MLCK-ANTE(PPW) 
  NW-MT-AVAT.NWMT(PPW) 
  NW-MT-BPAT.NWMT(PPW) 

  ANTE-MLCK(PPW) 
  AVAT.NWMT-NW-MT(PPW) 
  BPAT.NWMT-NW-MT(PPW) 
  MLCK-ANTE(PPW) 
  NW-MT-AVAT.NWMT(PPW) 
  NW-MT-BPAT.NWMT(PPW)   
  66.0 
  90.0 
  90.0 
  90.0 
  90.0 
  45.0 

  66.0 
  90.0 
  90.0 
  90.0 
  90.0 
  45.0 

  66.0 
  90.0 
  90.0 
  90.0 
  90.0 
  45.0   
  66.0 
  90.0 
  90.0 
  90.0 
  90.0 
  45.0 

  66.0 
  90.0 
  90.0 
  90.0 
  90.0 
  45.0 

  66.0 
  90.0 
  90.0 
  90.0 
  90.0 
  45.0   
  0.0 
  0.0 
  0.0 
  0.0 
  0.0 
  0.0 

  0.0 
  0.0 
  0.0 
  0.0 
  0.0 
  0.0 

  66.0 
  90.0 
  90.0 
  90.0 
  90.0 
  45.0   
  2025-09-22 07:00 
  2025-09-22 07:00 
  2025-09-22 07:00 
  2025-09-22 07:00 
  2025-09-22 07:00 
  2025-09-22 07:00 

  2025-09-22 08:00 
  2025-09-22 08:00 
  2025-09-22 08:00 
  2025-09-22 08:00 
  2025-09-22 08:00 
  2025-09-22 08:00 

  2025-09-25 14:00 
  2025-09-25 14:00 
  2025-09-25 14:00 
  2025-09-25 14:00 
  2025-09-25 14:00 
  2025-09-25 14:00   
  2025-09-22 08:00 
  2025-09-22 08:00 
  2025-09-22 08:00 
  2025-09-22 08:00 
  2025-09-22 08:00 
  2025-09-22 08:00 

  2025-09-25 14:00 
  2025-09-25 14:00 
  2025-09-25 14:00 
  2025-09-25 14:00 
  2025-09-25 14:00 
  2025-09-25 14:00 

  2025-09-25 15:00 
  2025-09-25 15:00 
  2025-09-25 15:00 
  2025-09-25 15:00 
  2025-09-25 15:00 
  2025-09-25 15:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:TBD:AVAT.NWMT-NW-MT = 0 NW-MT-AVAT.NWMT = 0 NW-MT-BPAT.NWMT = 0 BPAT.NWMT-NW-MT = 0 MLCK-ANTE = 0 ANTE-MLCK = 0:     2025-09-15 13:57     178083     2025-09-22 06:03  
  PPW 25-16620     18361     PPW     Marengo #1: MV Cable Circuit #1,Marengo #1: 34 kV Main Bus,Marengo #1: MV Cable Circuit #2,Marengo #          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-09-22 07:00      2025-09-24 17:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Bird Guard on 34.5kV side of Marengo 1. Terminal clearance will be issued instead of clearance (with assumption that crew will establish full clearance with help from Wind Site Supervisor):Marengo #1, circuit 1 unavailable (26 MW). Marengo #1, circuit 2 unavailable (16 MW). Marengo #1, circuit 3 unavailable. Marengo #1, circuit 4 unavailable. Marengo #1, circuit 5 unavailable. Marengo #1, circuit 6 unavailable.:     2025-09-18 12:07     175771     2025-09-22 18:20  
  PPW 25-17766     18362     PPW     Lemolo 1: 115/12 kV T3032          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-09-22 07:27      2025-09-26 17:30      COMPLETED     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Lemolo 1 GSU Maintenace and remove and replace TPU Relay:Load from Lemolo 1 will be unavailable to serve transmission load (Generation Islanded).:     2025-09-18 12:56     176928     2025-09-25 18:12  
  PPW 25-09915     18364     PPW     BPA Albany-Santiam 230 kV line,BPA Santiam: 230/69 kV Bank T3155,BPA Santiam: CS A538               0.0      0.0      0.0      2025-09-22 07:49      2025-09-25 15:00      Completed     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replacing damaged steel structure on 230kV line.:     2025-09-22 07:50     169027     2025-09-22 07:50  
  PPW 25-14736     18230     PPW     Black Rock-Osceola 230 kV line               0.0      0.0      0.0      2025-09-22 08:30      2025-09-23 17:00      Completed     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Changing Wingarms between Blackrock and State Line     2025-08-01 11:11     173874     2025-09-22 07:28  
  PPW 25-19515     18365     PPW     Sigurd: CB 133               0.0      0.0      0.0      2025-09-22 08:38      2025-09-25 17:00      CANCELLED     TRANSMISSION     FORCED      ONPATH     PPW     continuous:Sigurd CB 133 has a compressor failure. Will need new motor and compressor, currently has low air.   2025-09-22 08:40     178682     2025-09-22 09:23  
  PPW 25-18857     18346     PPW     Upalco-Emma Park 138 kV line          PACE-NTLOAD(PPW) 
  PACE-VNL(PPW) 
  VNL-PACE(PPW) 

  PACE-NTLOAD(PPW) 
  PACE-VNL(PPW) 
  VNL-PACE(PPW)   
  9999.0 
  140.0 
  138.0 

  9999.0 
  140.0 
  138.0   
  9999.0 
  140.0 
  138.0 

  9999.0 
  140.0 
  138.0   
  9999.0 
  140.0 
  138.0 

  0.0 
  0.0 
  0.0   
  2025-09-22 08:00 
  2025-09-22 08:00 
  2025-09-22 08:00 

  2025-09-22 08:56 
  2025-09-22 08:56 
  2025-09-22 08:56   
  2025-09-22 08:56 
  2025-09-22 08:56 
  2025-09-22 08:56 

  2025-09-26 14:00 
  2025-09-26 14:00 
  2025-09-26 14:00   
  Completed     TRANSMISSION     URGENT      ONPATH     PPW     continuous:A-condition structure replacements:PACE-VNL = 0. VNL-PACE = Ashley load. Network Load Service Arrangements may be required for Ashley. Impact to TOT-1A & CRSP Schedules. Bonanza West (Path 33) = 645.:     2025-09-15 12:24     178023     2025-09-22 08:56  
  PPW 25-11200     18335     PPW     Loafer-Spanish Fork Wind section of the Santaquin-Spanish Fork 46kV line          WINDGEN-PACE(PPW)      9999.0      9999.0      9999.0      2025-09-23 08:00      2025-09-23 14:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:B-condition str replacements:     2025-09-11 10:41     170326     2025-09-12 09:20  
  PPW 25-19701     18376     PPW     Populus: 345 kV Series Capacitor #2 (C1)          JBSN-JB345(PPW)      1600.0      1600.0      1433.0      2025-09-23 15:14      2025-12-31 19:30      ACTIVE     TRANSMISSION     FORCED      ONPATH     PPW     continuous:Awaiting Parts (Dax Cradic):JBSN-JB345 = 2150. PacifiCorp = 1433. IPCo = 717.:     2025-09-23 15:16     178868     2025-09-23 15:16  
  PPW 25-11740     18044     PPW     Huntington-Spanish Fork 345 kV line,Huntington: CB 321,Huntington: CB 301,Spanish Fork: SWITCH 387A               0.0      0.0      0.0      2025-09-25 07:21      2025-09-30 16:00      ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Spanish Fork-Huntington Pole Replacement and Spanish Fork SW 387A replacement:No impact under normal conditions.:     2025-07-02 13:57     170869     2025-09-25 07:22  
  PPW 25-17887     18314     PPW     Echo Springs-Latham section of the Point of Rocks-Latham 230 kV line          AEOLUSGEN-AEOLUS(PPW) 
  OUTAGE-WYOCENTRAL(PPW) 
  STANDPIPE-WYOCENTRAL(PPW) 
  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-STANDPIPE(PPW) 
  WYOEAST-AEOW(PPW) 

  AEOLUSGEN-AEOLUS(PPW) 
  OUTAGE-WYOCENTRAL(PPW) 
  STANDPIPE-WYOCENTRAL(PPW) 
  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-STANDPIPE(PPW) 
  WYOEAST-AEOW(PPW) 

  AEOLUSGEN-AEOLUS(PPW) 
  OUTAGE-WYOCENTRAL(PPW) 
  STANDPIPE-WYOCENTRAL(PPW) 
  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-STANDPIPE(PPW) 
  WYOEAST-AEOW(PPW)   
  2000.0 
  1.0 
  331.0 
  631.0 
  249.0 
  331.0 
  0.0 

  2000.0 
  1.0 
  331.0 
  631.0 
  249.0 
  331.0 
  0.0 

  2000.0 
  1.0 
  331.0 
  631.0 
  249.0 
  331.0 
  0.0   
  2000.0 
  1.0 
  331.0 
  631.0 
  249.0 
  331.0 
  0.0 

  2000.0 
  1.0 
  331.0 
  631.0 
  249.0 
  331.0 
  0.0 

  2000.0 
  1.0 
  331.0 
  631.0 
  249.0 
  331.0 
  0.0   
  2000.0 
  1.0 
  331.0 
  631.0 
  249.0 
  331.0 
  0.0 

  2000.0 
  1.0 
  331.0 
  631.0 
  249.0 
  331.0 
  0.0 

  2000.0 
  1.0 
  331.0 
  631.0 
  249.0 
  331.0 
  0.0   
  2025-09-19 08:00 
  2025-09-19 08:00 
  2025-09-19 08:00 
  2025-09-19 08:00 
  2025-09-19 08:00 
  2025-09-19 08:00 
  2025-09-19 08:00 

  2025-09-25 08:00 
  2025-09-25 08:00 
  2025-09-25 08:00 
  2025-09-25 08:00 
  2025-09-25 08:00 
  2025-09-25 08:00 
  2025-09-25 08:00 

  2025-09-25 09:57 
  2025-09-25 09:57 
  2025-09-25 09:57 
  2025-09-25 09:57 
  2025-09-25 09:57 
  2025-09-25 09:57 
  2025-09-25 09:57   
  2025-09-19 15:00 
  2025-09-19 15:00 
  2025-09-19 15:00 
  2025-09-19 15:00 
  2025-09-19 15:00 
  2025-09-19 15:00 
  2025-09-19 15:00 

  2025-09-25 09:57 
  2025-09-25 09:57 
  2025-09-25 09:57 
  2025-09-25 09:57 
  2025-09-25 09:57 
  2025-09-25 09:57 
  2025-09-25 09:57 

  2025-09-26 15:09 
  2025-09-26 15:09 
  2025-09-26 15:09 
  2025-09-26 15:09 
  2025-09-26 15:09 
  2025-09-26 15:09 
  2025-09-26 15:09   
  COMPLETED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replacing 2/078 structure, A condition.:AW/4B Curve 107. WAPAEAST-WAPANORTH = 233. WYOCENTRAL-STANDPIPE = 0. TOT4B-WYONORTH = 592. TOT 4B = 825. Potential Real Time Impact to Wyoming Generation:     2025-09-03 15:39     177049     2025-09-26 13:54  
  PPW 25-20102     18384     PPW     Jim Bridger: 345/20 kV Unit #2 Main Bank (T3486),Jim Bridger: SWITCH 10H602               0.0      0.0      0.0      2025-09-27 05:00      2025-09-30 05:00      Active     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Maintenance shutdown:JBSN-JB345 = 2400. PacifiCorp = 1600. IPCo = 800.:Per Transmission Network Diagram 103551.122 v49 Unit 2 XFMR is BES     2025-09-27 04:40     179277     2025-09-27 04:40  
  PPW 25-20102     18383     PPW     Jim Bridger: 345/20 kV Unit #2 Main Bank (T3486),Jim Bridger: SWITCH 10H602          JBSN-JB345(PPW) 

  JBSN-JB345(PPW)   
  1600.0 

  1600.0   
  1600.0 

  1600.0   
  1600.0 

  1600.0   
  2025-09-27 05:00 

  2025-09-27 05:42   
  2025-09-27 05:42 

  2025-09-30 05:00   
  ACTIVE     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Maintenance shutdown:JBSN-JB345 = 2400. PacifiCorp = 1600. IPCo = 800.:Per Transmission Network Diagram 103551.122 v49 Unit 2 XFMR is BES     2025-09-27 04:40     179277     2025-09-27 05:43  
  PPW 25-17893     18315     PPW     Atlantic City-Rock Springs 230 kV line          TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW) 

  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW) 

  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  571.0 
  235.0 
  287.0 
  0.0 
  287.0   
  2025-09-25 06:00 
  2025-09-25 06:00 
  2025-09-25 06:00 
  2025-09-25 06:00 
  2025-09-25 06:00 

  2025-09-27 06:00 
  2025-09-27 06:00 
  2025-09-27 06:00 
  2025-09-27 06:00 
  2025-09-27 06:00 

  2025-09-27 07:13 
  2025-09-27 07:13 
  2025-09-27 07:13 
  2025-09-27 07:13 
  2025-09-27 07:13   
  2025-09-27 06:00 
  2025-09-27 06:00 
  2025-09-27 06:00 
  2025-09-27 06:00 
  2025-09-27 06:00 

  2025-09-27 07:13 
  2025-09-27 07:13 
  2025-09-27 07:13 
  2025-09-27 07:13 
  2025-09-27 07:13 

  2025-10-17 18:00 
  2025-10-17 18:00 
  2025-10-17 18:00 
  2025-10-17 18:00 
  2025-10-17 18:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Working on A conditions.:AW/4B Curve 117. WAPAEAST-WAPANORTH = 235. WYOCENTRAL-WYOEAST=287. TOT4B-WYONORTH = 571. TOT 4B = 806. Potential Real Time Impact to Wyoming Generation:     2025-09-03 15:56     177055     2025-09-27 07:13  
  PPW 25-19184     18356     PPW     Swift #2: Unit #22 Main Transformer - T2103          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-09-28 06:00      2025-10-06 16:00      SCHEDULED     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Swift 2 Runner welding, switching for 25-18882:Swift 2 Unit 22 unavailable.:     2025-09-18 10:03     178351     2025-09-18 10:03  
  PPW 25-18918     18349     PPW     Scheduling Limitation: Path 18 Schedule Limitation (ID-MT AMPS)          ANTE-MLCK(PPW) 
  AVAT.NWMT-NW-MT(PPW) 
  BPAT.NWMT-NW-MT(PPW) 
  MLCK-ANTE(PPW) 
  NW-MT-AVAT.NWMT(PPW) 
  NW-MT-BPAT.NWMT(PPW) 

  ANTE-MLCK(PPW) 
  AVAT.NWMT-NW-MT(PPW) 
  BPAT.NWMT-NW-MT(PPW) 
  MLCK-ANTE(PPW) 
  NW-MT-AVAT.NWMT(PPW) 
  NW-MT-BPAT.NWMT(PPW) 

  ANTE-MLCK(PPW) 
  AVAT.NWMT-NW-MT(PPW) 
  BPAT.NWMT-NW-MT(PPW) 
  MLCK-ANTE(PPW) 
  NW-MT-AVAT.NWMT(PPW) 
  NW-MT-BPAT.NWMT(PPW)   
  66.0 
  90.0 
  90.0 
  90.0 
  90.0 
  45.0 

  66.0 
  90.0 
  90.0 
  90.0 
  90.0 
  45.0 

  66.0 
  90.0 
  90.0 
  90.0 
  90.0 
  45.0   
  66.0 
  90.0 
  90.0 
  90.0 
  90.0 
  45.0 

  66.0 
  90.0 
  90.0 
  90.0 
  90.0 
  45.0 

  66.0 
  90.0 
  90.0 
  90.0 
  90.0 
  45.0   
  0.0 
  0.0 
  0.0 
  0.0 
  0.0 
  0.0 

  0.0 
  0.0 
  0.0 
  0.0 
  0.0 
  0.0 

  66.0 
  90.0 
  90.0 
  90.0 
  90.0 
  45.0   
  2025-09-29 07:00 
  2025-09-29 07:00 
  2025-09-29 07:00 
  2025-09-29 07:00 
  2025-09-29 07:00 
  2025-09-29 07:00 

  2025-09-29 08:00 
  2025-09-29 08:00 
  2025-09-29 08:00 
  2025-09-29 08:00 
  2025-09-29 08:00 
  2025-09-29 08:00 

  2025-10-02 14:00 
  2025-10-02 14:00 
  2025-10-02 14:00 
  2025-10-02 14:00 
  2025-10-02 14:00 
  2025-10-02 14:00   
  2025-09-29 08:00 
  2025-09-29 08:00 
  2025-09-29 08:00 
  2025-09-29 08:00 
  2025-09-29 08:00 
  2025-09-29 08:00 

  2025-10-02 14:00 
  2025-10-02 14:00 
  2025-10-02 14:00 
  2025-10-02 14:00 
  2025-10-02 14:00 
  2025-10-02 14:00 

  2025-10-09 15:00 
  2025-10-09 15:00 
  2025-10-09 15:00 
  2025-10-09 15:00 
  2025-10-09 15:00 
  2025-10-09 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:TBD:AVAT.NWMT-NW-MT = 0 NW-MT-AVAT.NWMT = 0 NW-MT-BPAT.NWMT = 0 BPAT.NWMT-NW-MT = 0 MLCK-ANTE = 0 ANTE-MLCK = 0:     2025-09-15 14:00     178084     2025-09-23 11:20  
  PPW 25-19806     18377     PPW     Scheduling Limitation: Path 8 Schedule Limitation (MT-NW)          ANTE-MLCK(PPW) 
  COLSTRIP-TOWNSEND(PPW) 
  MLCK-ANTE(PPW)   
  66.0 
  157.0 
  90.0   
  66.0 
  157.0 
  90.0   
  51.0 
  121.0 
  51.0   
  2025-09-29 07:00 
  2025-09-29 07:00 
  2025-09-29 07:00   
  2025-10-05 16:00 
  2025-10-05 16:00 
  2025-10-05 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:BPA Garrison 500-230kV Bank:COLSTRIP-TOWNSEND = 121; ANTE-MLCK = 51.:     2025-09-24 13:42     178973     2025-09-24 13:43  
  PPW 25-19522     18367     PPW     Soda: Transformer #1               0.0      0.0      0.0      2025-09-29 08:00      2025-09-30 14:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Doble testing on the Soda Hydro plant #1 transformer.:     2025-09-22 09:28     178689     2025-09-22 09:28  
  PPW 25-18924     18353     PPW     Dave Johnston: CB 1H268,Dave Johnston: CB 1H242          THERMALGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-09-29 08:00      2025-10-03 11:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Modify CT circuits from 1H242 and 1H268 to support backup bus differential relay installation at DJ Sub.:Dave Johnston Unit #3 unavailable.:     2025-09-16 11:37     178090     2025-09-16 11:37  
  PPW 25-14736     18229     PPW     Black Rock-Osceola 230 kV line          GON.PAV-PAVANT(PPW) 
  PAVANT-GON.PAV(PPW) 

  GON.PAV-PAVANT(PPW) 
  PAVANT-GON.PAV(PPW)   
  130.0 
  139.0 

  130.0 
  139.0   
  130.0 
  139.0 

  130.0 
  139.0   
  130.0 
  139.0 

  0.0 
  0.0   
  2025-09-22 08:30 
  2025-09-22 08:30 

  2025-09-29 08:30 
  2025-09-29 08:30   
  2025-09-23 17:00 
  2025-09-23 17:00 

  2025-09-30 17:00 
  2025-09-30 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Changing Wingarms between Blackrock and State Line:PAVANT-GON.PAV = 0.   2025-08-01 11:11     173874     2025-09-22 07:16  
  PPW 25-03491     17721     PPW     Atlantic City: LINE CB 1H116,Atlantic City: SW 1H118,Wyopo: LINERUPTOR 1H99,Wyopo-Atlantic City sect          TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW) 

  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW) 

  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW) 

  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW) 

  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0   
  2025-06-04 11:00 
  2025-06-04 11:00 
  2025-06-04 11:00 
  2025-06-04 11:00 
  2025-06-04 11:00 

  2025-07-30 11:00 
  2025-07-30 11:00 
  2025-07-30 11:00 
  2025-07-30 11:00 
  2025-07-30 11:00 

  2025-08-27 11:00 
  2025-08-27 11:00 
  2025-08-27 11:00 
  2025-08-27 11:00 
  2025-08-27 11:00 

  2025-09-22 10:00 
  2025-09-22 10:00 
  2025-09-22 10:00 
  2025-09-22 10:00 
  2025-09-22 10:00 

  2025-09-29 10:00 
  2025-09-29 10:00 
  2025-09-29 10:00 
  2025-09-29 10:00 
  2025-09-29 10:00   
  2025-06-06 16:30 
  2025-06-06 16:30 
  2025-06-06 16:30 
  2025-06-06 16:30 
  2025-06-06 16:30 

  2025-08-01 16:30 
  2025-08-01 16:30 
  2025-08-01 16:30 
  2025-08-01 16:30 
  2025-08-01 16:30 

  2025-08-29 16:30 
  2025-08-29 16:30 
  2025-08-29 16:30 
  2025-08-29 16:30 
  2025-08-29 16:30 

  2025-09-24 15:00 
  2025-09-24 15:00 
  2025-09-24 15:00 
  2025-09-24 15:00 
  2025-09-24 15:00 

  2025-10-01 15:00 
  2025-10-01 15:00 
  2025-10-01 15:00 
  2025-10-01 15:00 
  2025-10-01 15:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Breaker Minor Maintenance 1H116:AW/4B Curve 117. WAPAEAST-WAPANORTH = 235. WYOEAST-AEOW (Aeolus West) = 1632. TOT4B-WYONORTH = 571. TOT 4B = 806.   2025-02-27 14:17     162573     2025-09-25 11:02  
  PPW 25-17736     18320     PPW     Rolling Hills Wind Collector: 34 kV Circuit #6          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-09-30 07:00      2025-09-30 14:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:RH1-610 pad mount transformer vault replacement:Rolling Hills Wind Collector Feeder #6 unavailable.:     2025-09-05 13:12     176898     2025-09-05 13:12  
  PPW 25-18370     18325     PPW     Antelope-Goshen 161 kV line,Antelope: CB 167          ANTE-GSHN(PPW) 
  GSHN-ANTE(PPW)   
  160.0 
  90.0   
  160.0 
  90.0   
  0.0 
  0.0   
  2025-09-30 08:00 
  2025-09-30 08:00   
  2025-10-03 15:00 
  2025-10-03 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Crew to replace multiple crossarms on Goshen to Antelope 161kv line:ANTE-GSHN & GSHN-ANTE = 0.:     2025-09-09 12:47     177536     2025-09-09 12:49  
  PPW 25-16930     18318     PPW     Firehole-WAPA Flaming Gorge 230 kV line,Little Mountain (WY): LINERUPTER 1H26,WAPA Flaming Gorge: CB          FGE-WYOCENTRAL(PPW) 
  THERMALGEN-PACE(PPW) 
  WYOCENTRAL-FGE(PPW) 

  FGE-WYOCENTRAL(PPW) 
  THERMALGEN-PACE(PPW) 
  WYOCENTRAL-FGE(PPW) 

  FGE-WYOCENTRAL(PPW) 
  THERMALGEN-PACE(PPW) 
  WYOCENTRAL-FGE(PPW)   
  200.0 
  9999.0 
  200.0 

  200.0 
  9999.0 
  200.0 

  200.0 
  9999.0 
  200.0   
  200.0 
  9999.0 
  200.0 

  200.0 
  9999.0 
  200.0 

  200.0 
  9999.0 
  200.0   
  200.0 
  9999.0 
  200.0 

  200.0 
  9999.0 
  200.0 

  0.0 
  0.0 
  0.0   
  2025-09-24 07:00 
  2025-09-24 07:00 
  2025-09-24 07:00 

  2025-09-25 07:00 
  2025-09-25 07:00 
  2025-09-25 07:00 

  2025-10-01 07:00 
  2025-10-01 07:00 
  2025-10-01 07:00   
  2025-09-24 14:00 
  2025-09-24 14:00 
  2025-09-24 14:00 

  2025-09-25 14:00 
  2025-09-25 14:00 
  2025-09-25 14:00 

  2025-10-01 14:00 
  2025-10-01 14:00 
  2025-10-01 14:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Perform WECC Critical maintenance on Powerline Carrier between Firehole Substation and WAPA Flaming Gorge Sub.:Flaming Gorge aggregate generation limited below 90MW. FGE-WYOCENTRAL & WYOCENTRAL-FGE: 0:     2025-09-04 12:04     176082     2025-09-15 09:10  
  PPW 25-15979     18286     PPW     Pomona-BPA Vantage 230 kV line          PACW-NTLOAD(PPW) 

  MIDC-YAKIMA(PPW) 
  PACW-NTLOAD(PPW) 
  YAKIMA-MIDC(PPW)   
  9999.0 

  402.0 
  9999.0 
  402.0   
  9999.0 

  402.0 
  9999.0 
  402.0   
  9999.0 

  402.0 
  0.0 
  402.0   
  2025-09-29 07:00 

  2025-10-01 07:00 
  2025-10-01 07:00 
  2025-10-01 07:00   
  2025-10-01 07:00 

  2025-10-03 17:00 
  2025-10-03 17:00 
  2025-10-03 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Changning out dampers on the river crossing 3/39:No impact to Yakima load service with two 230 kV lines in service.   2025-08-21 11:33     175122     2025-09-24 09:35  
  PPW 25-14749     18231     PPW     Pavant-Sigurd 230 kV line          PACE-PAVANT(PPW) 
  PAVANT-GON.PAV(PPW) 
  PAVANT-PACE(PPW) 

  PACE-PAVANT(PPW) 
  PAVANT-GON.PAV(PPW) 
  PAVANT-PACE(PPW)   
  150.0 
  139.0 
  150.0 

  150.0 
  139.0 
  150.0   
  150.0 
  139.0 
  150.0 

  150.0 
  139.0 
  150.0   
  150.0 
  139.0 
  150.0 

  0.0 
  0.0 
  0.0   
  2025-09-24 07:30 
  2025-09-24 07:30 
  2025-09-24 07:30 

  2025-10-01 07:30 
  2025-10-01 07:30 
  2025-10-01 07:30   
  2025-09-26 17:00 
  2025-09-26 17:00 
  2025-09-26 17:00 

  2025-10-03 17:00 
  2025-10-03 17:00 
  2025-10-03 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Change Wingarm and Insulator Changeouts:PACE-PAVANT, PAVANT-PACE & PAVANT-GON.PAV = 0.   2025-08-01 11:17     173887     2025-09-16 08:46  
  PPW 25-16137     18276     PPW     BPA McNary-Cold Springs section of the BPA McNary-Wallula 230 kV line,Cold Springs-Capstone section          PACW-NTLOAD(PPW) 
  WINDGEN-PACW(PPW) 

  PACW-NTLOAD(PPW) 
  WINDGEN-PACW(PPW) 

  PACW-NTLOAD(PPW) 
  WINDGEN-PACW(PPW) 

  PACW-NTLOAD(PPW) 
  WINDGEN-PACW(PPW) 

  PACW-NTLOAD(PPW) 
  WINDGEN-PACW(PPW) 

  PACW-NTLOAD(PPW) 
  WINDGEN-PACW(PPW) 

  PACW-NTLOAD(PPW) 
  WINDGEN-PACW(PPW)   
  9999.0 
  9999.0 

  9999.0 
  9999.0 

  9999.0 
  9999.0 

  9999.0 
  9999.0 

  9999.0 
  9999.0 

  9999.0 
  9999.0 

  9999.0 
  9999.0   
  9999.0 
  9999.0 

  9999.0 
  9999.0 

  9999.0 
  9999.0 

  9999.0 
  9999.0 

  9999.0 
  9999.0 

  9999.0 
  9999.0 

  9999.0 
  9999.0   
  9999.0 
  9999.0 

  9999.0 
  9999.0 

  9999.0 
  9999.0 

  9999.0 
  9999.0 

  9999.0 
  9999.0 

  9999.0 
  9999.0 

  0.0 
  0.0   
  2025-09-03 10:00 
  2025-09-03 10:00 

  2025-09-05 10:00 
  2025-09-05 10:00 

  2025-09-12 10:00 
  2025-09-12 10:00 

  2025-09-16 09:00 
  2025-09-16 09:00 

  2025-09-24 09:00 
  2025-09-24 09:00 

  2025-09-25 09:00 
  2025-09-25 09:00 

  2025-10-01 09:00 
  2025-10-01 09:00   
  2025-09-03 16:30 
  2025-09-03 16:30 

  2025-09-05 16:30 
  2025-09-05 16:30 

  2025-09-12 16:30 
  2025-09-12 16:30 

  2025-09-16 16:30 
  2025-09-16 16:30 

  2025-09-24 16:30 
  2025-09-24 16:30 

  2025-09-25 16:30 
  2025-09-25 16:30 

  2025-10-01 16:30 
  2025-10-01 16:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace jumpers between SW 1W26, 1W28, cs 1W27:Umatilla, Hermiston & Hinkle will be radial from BPA McNary. Network Load Service Arrangements may be required. With Cold Springs XFMR #1 out of service, Echo Wind Generation will be tied to BPA McNary. Orchard Wind restricted to 8.5MW maximum output.:     2025-08-19 09:30     175281     2025-09-25 09:52  
  PPW 25-18477     18330     PPW     Cold Springs: XFMR 1 T-434774,Cold Springs: CB 3W120          PACW-NTLOAD(PPW) 
  WINDGEN-PACW(PPW) 

  PACW-NTLOAD(PPW) 
  WINDGEN-PACW(PPW) 

  PACW-NTLOAD(PPW) 
  WINDGEN-PACW(PPW)   
  9999.0 
  9999.0 

  9999.0 
  9999.0 

  9999.0 
  9999.0   
  9999.0 
  9999.0 

  9999.0 
  9999.0 

  9999.0 
  9999.0   
  9999.0 
  9999.0 

  9999.0 
  9999.0 

  0.0 
  0.0   
  2025-09-24 09:00 
  2025-09-24 09:00 

  2025-09-25 09:00 
  2025-09-25 09:00 

  2025-10-01 09:00 
  2025-10-01 09:00   
  2025-09-24 16:30 
  2025-09-24 16:30 

  2025-09-25 16:30 
  2025-09-25 16:30 

  2025-10-01 16:30 
  2025-10-01 16:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Construction Holding Clearance:Umatilla, Hermiston & Hinkle will be radial from BPA McNary. Network Load Service Arrangements may be required. With Cold Springs XFMR #1 out of service, Echo Wind Generation will be tied to BPA McNary. Orchard Wind restricted to 8.5MW maximum output.:No planned work from 6/1-9/1.     2025-09-10 09:29     177643     2025-09-25 09:58  
  PPW 25-18249     18347     PPW     Baghouse: CB 1H1000          THERMALGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-10-01 09:00      2025-10-01 12:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace tank heaters :Wyodak generation must be online and producing power.:     2025-09-15 12:25     177415     2025-09-15 12:25  
  PPW 25-18041     18333     PPW     Cold Springs: CB 3W120,Cold Springs: XFMR 1 T-434774          PACW-NTLOAD(PPW) 
  WINDGEN-PACW(PPW) 

  PACW-NTLOAD(PPW) 
  WINDGEN-PACW(PPW) 

  PACW-NTLOAD(PPW) 
  WINDGEN-PACW(PPW)   
  9999.0 
  9999.0 

  9999.0 
  9999.0 

  9999.0 
  9999.0   
  9999.0 
  9999.0 

  9999.0 
  9999.0 

  9999.0 
  9999.0   
  9999.0 
  9999.0 

  9999.0 
  9999.0 

  0.0 
  0.0   
  2025-09-24 16:30 
  2025-09-24 16:30 

  2025-09-25 16:30 
  2025-09-25 16:30 

  2025-10-01 16:30 
  2025-10-01 16:30   
  2025-09-25 13:00 
  2025-09-25 13:00 

  2025-09-29 00:00 
  2025-09-29 00:00 

  2025-10-02 10:00 
  2025-10-02 10:00   
  SCHEDULED     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Energize New Cold Springs Transformer 434774:Umatilla, Hermiston & Hinkle will be radial from BPA McNary. Network Load Service Arrangements may be required. With Cold Springs XFMR #1 out of service, Echo Wind Generation will be tied to BPA McNary. Orchard Wind restricted to 8.5MW maximum output.:No planned work from 6/1-9/1.     2025-09-11 08:47     177205     2025-09-25 09:56  
  PPW 25-09173     17952     PPW     Hopland-Union Gap section of the BPA Moxee-Union Gap 115 kV line,Hopland: Main Bus Disc CB 5Y435,Hop               0.0      0.0      0.0      2025-10-01 22:00      2025-10-10 23:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install Conduit and Panel 4R. Replace SW 2Y52, 2Y531 and MO, and XFMR BK #1 Relay upgrade. :Hopland will be fed from BPA Moxee. Network Load Service Arrangements may be required.:     2025-05-31 21:25     168280     2025-09-18 15:20  
  PPW 25-13899     18220     PPW     Coyote: Reactor #1 116.1 MVAR,Coyote: SW 11B4,Aeolus-Clover 500 kV line,Aeolus: SW 11G56,Clover: SW          AEOLUS-CLOVER(PPW) 
  CLOVER-AEOLUS(PPW) 

  AEOLUS-CLOVER(PPW) 
  CLOVER-AEOLUS(PPW)   
  1394.0 
  1000.0 

  1394.0 
  1000.0   
  1394.0 
  1000.0 

  1394.0 
  1000.0   
  0.0 
  0.0 

  0.0 
  0.0   
  2025-10-02 08:30 
  2025-10-02 08:30 

  2025-10-10 08:30 
  2025-10-10 08:30   
  2025-10-02 09:30 
  2025-10-02 09:30 

  2025-10-10 09:30 
  2025-10-10 09:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Warranty work to replace oil valve on Coyote reactor #1:CLOVER-AEOLUS and AEOLUS-CLOVER=0 DURING SWITCHING ONLY.:     2025-07-31 10:35     173035     2025-07-31 10:41  
  PPW 25-18414     18339     PPW     Dixonville-Glide Tap section of the Dixonville-Toketee Switch Station 115 kV line,Glide Tap-Steamboa          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-10-03 22:00      2025-10-04 10:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Planned outage on Glide sub to complete reconductor on line 39. On the go back, we will energize Glide sub from Boundary Road at approximately 10:00 on 10-4-2025 to open switch 2u24. (Or other specified open jumpers depending on amount of work completed). We will leave the section of line between 2u24 and Dixonville out until end of reconductor (10-17-25) on a separate request:Umpqua River Hydro Project Restriction = 174 Summer/199 Winter.:     2025-09-13 08:37     177580     2025-09-24 09:08  
  PPW 25-15980     18287     PPW     GCPD Wanapum-Pomona 230 kV line,Pomona Heights: POMONAHE GND SW 1Y507          MIDC-YAKIMA(PPW) 
  PACW-NTLOAD(PPW) 
  YAKIMA-MIDC(PPW)   
  402.0 
  9999.0 
  402.0   
  402.0 
  9999.0 
  402.0   
  402.0 
  0.0 
  402.0   
  2025-10-06 07:00 
  2025-10-06 07:00 
  2025-10-06 07:00   
  2025-10-10 17:00 
  2025-10-10 17:00 
  2025-10-10 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Changing out insulators at pole 5/24. replace armor rod on multiple structures.:No impact to Yakima load service with two 230 kV lines in service.   2025-08-21 12:00     175123     2025-08-21 12:01  
  PPW 25-19659     18369     PPW     Scheduling Limitation: Path 18 Schedule Limitation (ID-MT AMPS)          ANTE-MLCK(PPW) 
  AVAT.NWMT-NW-MT(PPW) 
  BPAT.NWMT-NW-MT(PPW) 
  MLCK-ANTE(PPW) 
  NW-MT-AVAT.NWMT(PPW) 
  NW-MT-BPAT.NWMT(PPW)   
  66.0 
  90.0 
  90.0 
  90.0 
  90.0 
  45.0   
  66.0 
  90.0 
  90.0 
  90.0 
  90.0 
  45.0   
  0.0 
  0.0 
  0.0 
  0.0 
  0.0 
  0.0   
  2025-10-06 07:00 
  2025-10-06 07:00 
  2025-10-06 07:00 
  2025-10-06 07:00 
  2025-10-06 07:00 
  2025-10-06 07:00   
  2025-10-09 14:00 
  2025-10-09 14:00 
  2025-10-09 14:00 
  2025-10-09 14:00 
  2025-10-09 14:00 
  2025-10-09 14:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:TBD:AVAT.NWMT-NW-MT = 0 NW-MT-AVAT.NWMT = 0 NW-MT-BPAT.NWMT = 0 BPAT.NWMT-NW-MT = 0 MLCK-ANTE = 0 ANTE-MLCK = 0:     2025-09-23 11:21     178826     2025-09-23 11:21  
  PPW 25-16775     18354     PPW     Lebanon-Crowfoot section of the Fry-Weirich (Tallman) 115 kV line,Lebanon: LEBANON 2M20 MO,Crowfoot:          PACW-NTLOAD(PPW)      9999.0      9999.0      9999.0      2025-10-07 08:00      2025-10-07 15:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install conductors to Mobile sub high side:Sweet Home, Weirich, & Crowfoot will be radial from BPA Albany. Network Load Service Arrangements may be required.:     2025-09-17 14:25     175927     2025-09-17 14:29  
  PPW 25-17055     18306     PPW     Goshen-Threemile Knoll 345 kV line,Goshen (Idaho): TIE CB 10A5,Goshen (Idaho): LINE CB 10A8,Threemil          GSHN-TMK(PPW) 
  JBSN-JB345(PPW) 
  NUT-PATHC(PPW) 
  TMK-GSHN(PPW) 

  GSHN-TMK(PPW) 
  JBSN-JB345(PPW) 
  NUT-PATHC(PPW) 
  PATHC-NUT(PPW) 
  TMK-GSHN(PPW)   
  317.0 
  1600.0 
  1060.0 
  533.0 

  317.0 
  1600.0 
  1060.0 
  1600.0 
  533.0   
  317.0 
  1600.0 
  1060.0 
  533.0 

  317.0 
  1600.0 
  1060.0 
  1600.0 
  533.0   
  317.0 
  1600.0 
  1060.0 
  533.0 

  117.0 
  1066.0 
  945.0 
  1600.0 
  0.0   
  2025-09-17 08:00 
  2025-09-17 08:00 
  2025-09-17 08:00 
  2025-09-17 08:00 

  2025-10-07 08:00 
  2025-10-07 08:00 
  2025-10-07 08:00 
  2025-10-07 08:00 
  2025-10-07 08:00   
  2025-09-18 14:00 
  2025-09-18 14:00 
  2025-09-18 14:00 
  2025-09-18 14:00 

  2025-10-08 14:00 
  2025-10-08 14:00 
  2025-10-08 14:00 
  2025-10-08 14:00 
  2025-10-08 14:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replacing "A" insulators:JBSN-JB345= 1950. PacifiCorp = 1300. IPCo = 650. Potential Real Time Impact to Jim Bridger Generation.   2025-08-29 11:19     176207     2025-09-10 09:32  
  PPW 25-15674     18258     PPW     Mile Hi: CB 5L104          OTHERGEN-PACW(PPW) 

  OTHERGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2025-09-03 08:00 

  2025-10-07 08:00   
  2025-09-03 16:00 

  2025-10-08 16:00   
  SCHEDULED     DISTRIBUTION     PLANNED      ONPATH     PPW     continuous:Relay setting change and test.:Metzger Solar unavailable.:     2025-08-09 12:00     174815     2025-08-26 14:45  
  PPW 25-15768     18324     PPW     Gadsby: 138 kV OPERATE BUS,Gadsby: SWITCH 138A,Gadsby: ABS130A,Gadsby-Third West 138kV line,Gadsby:          THERMALGEN-PACE(PPW)      9999.0      9999.0      0.0      2025-10-08 07:00      2025-10-08 14:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:reconductor over operate bus:Gadsby Units 3, 4, 5 and 6 unavailable.:     2025-09-09 10:33     174909     2025-09-10 12:32  
  PPW 25-15692     18259     PPW     Mile Hi: CB 5L105          OTHERGEN-PACW(PPW) 

  OTHERGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2025-09-04 08:00 

  2025-10-09 08:00   
  2025-09-04 16:00 

  2025-10-10 16:00   
  SCHEDULED     DISTRIBUTION     PLANNED      ONPATH     PPW     continuous:Relay setting change and testing.:Black Cap Solar unavailable.:     2025-08-09 12:00     174833     2025-08-26 14:46  
  PPW 25-19028     18366     PPW     Albina-PGE Curtis 115 kV line,Albina: GND SW 2P504          PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW)   
  325.0 
  325.0   
  325.0 
  325.0   
  299.0 
  299.0   
  2025-10-09 08:00 
  2025-10-09 08:00   
  2025-10-17 17:30 
  2025-10-17 17:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replacing pole.:PACW-PACW.PGE & PACW.PGE-PACW = 201 Summer/299 Winter:     2025-09-22 09:05     178194     2025-09-22 09:07  
  PPW 25-19197     18358     PPW     IPCO Kinport: Series Cap C341,IPCO Kinport: BYPASS SWITCH 303D,IPCO Kinport: KINPORT LINE SWITCH 303          JBSN-JB345(PPW) 
  NUT-PATHC(PPW) 

  JBSN-JB345(PPW) 
  NUT-PATHC(PPW) 

  JBSN-JB345(PPW) 
  NUT-PATHC(PPW)   
  1600.0 
  1060.0 

  1600.0 
  1060.0 

  1600.0 
  1060.0   
  1600.0 
  1060.0 

  1600.0 
  1060.0 

  1600.0 
  1060.0   
  1600.0 
  1060.0 

  1600.0 
  1060.0 

  1467.0 
  600.0   
  2025-09-22 08:00 
  2025-09-22 08:00 

  2025-09-25 08:00 
  2025-09-25 08:00 

  2025-10-09 08:00 
  2025-10-09 08:00   
  2025-09-23 14:30 
  2025-09-23 14:30 

  2025-09-26 14:30 
  2025-09-26 14:30 

  2025-10-10 14:30 
  2025-10-10 14:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Poofy replacement.:NUT-PATHC = 600 Summer/900 Winter.:     2025-09-18 10:19     178364     2025-09-24 10:11  
  PPW 25-13902     18221     PPW     Coyote: Reactor #2 116.1 MVAR,Coyote: SW 11B9,Aeolus: SW 11G56,Clover: SW 11B114,Aeolus-Clover 500 k          AEOLUS-CLOVER(PPW) 
  CLOVER-AEOLUS(PPW) 

  AEOLUS-CLOVER(PPW) 
  CLOVER-AEOLUS(PPW) 

  AEOLUS-CLOVER(PPW) 
  CLOVER-AEOLUS(PPW)   
  1394.0 
  1000.0 

  1394.0 
  1000.0 

  1394.0 
  1000.0   
  1394.0 
  1000.0 

  1394.0 
  1000.0 

  1394.0 
  1000.0   
  0.0 
  0.0 

  1394.0 
  1000.0 

  0.0 
  0.0   
  2025-10-10 08:30 
  2025-10-10 08:30 

  2025-10-10 09:00 
  2025-10-10 09:00 

  2025-10-20 09:00 
  2025-10-20 09:00   
  2025-10-10 09:00 
  2025-10-10 09:00 

  2025-10-20 09:00 
  2025-10-20 09:00 

  2025-10-20 09:30 
  2025-10-20 09:30   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Warranty work to replace oil valve on Coyote reactor #2:CLOVER-AEOLUS and AEOLUS-CLOVER=0 DURING SWITCHING ONLY.:     2025-07-31 10:43     173038     2025-09-10 09:14  
  PPW 25-18420     18340     PPW     Glide Tap-Steamboat section of the Dixonville-Toketee Switch Station 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-10-10 22:00      2025-10-17 09:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Complete line 39 reconductor:Umpqua River Hydro Project Restriction = 174 Summer/199 Winter.:     2025-09-13 11:45     177586     2025-09-15 10:27  
  PPW 25-09174     18000     PPW     Hopland-Union Gap section of the BPA Moxee-Union Gap 115 kV line,Hopland: Bank #1,Hopland: Bank #2               0.0      0.0      0.0      2025-10-10 23:00      2025-10-11 05:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install Bus between SW 2Y51, 2Y61 and 115kV Bus Tie SW:Hopland will be fed from BPA Moxee. Network Load Service Arrangements may be required.:     2025-06-16 08:07     168281     2025-09-16 12:55  
  PPW 25-18858     18370     PPW     Glide Tap-Steamboat section of the Dixonville-Toketee Switch Station 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-10-11 22:00      2025-10-12 09:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Complete line 39 reconductor:Umpqua River Hydro Project Restriction = 174 Summer/199 Winter.:     2025-09-23 11:37     178024     2025-09-23 11:37  
  PPW 25-18859     18371     PPW     Glide Tap-Steamboat section of the Dixonville-Toketee Switch Station 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-10-12 22:00      2025-10-13 09:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Complete line 39 reconductor:Umpqua River Hydro Project Restriction = 174 Summer/199 Winter.:     2025-09-23 11:37     178025     2025-09-23 11:37  
  PPW 25-19187     18357     PPW     Swift #2: Unit #21 Main Transformer - T2102          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-10-13 07:00      2025-10-17 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Swift 21 runner inspection, switching for 25-18884:Swift #2 Unit 21 unavailable.:     2025-09-18 10:08     178354     2025-09-18 10:08  
  PPW 25-06790     18284     PPW     Dave Johnston: #1 Main Bank T2127          THERMALGEN-PACW(PPW) 

  THERMALGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2025-09-15 07:00 

  2025-10-13 07:00   
  2025-09-16 15:00 

  2025-10-16 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:**Commissioning Required** Install metering CT/VT on the 115kV high side of the U1 GSU.:Dave Johnston Unit #1 unavailable.:     2025-08-21 08:53     165891     2025-09-09 14:20  
  PPW 25-18013     18326     PPW     Sunbeam-Treasureton 230 kV line          NUT-PATHC(PPW) 
  NUT-SUNBEAM(PPW) 
  SUNBEAM-NUT(PPW) 

  NUT-PATHC(PPW) 
  NUT-SUNBEAM(PPW) 
  SUNBEAM-NUT(PPW)   
  1060.0 
  1.0 
  45.0 

  1060.0 
  1.0 
  45.0   
  1060.0 
  1.0 
  45.0 

  1060.0 
  1.0 
  45.0   
  1060.0 
  1.0 
  45.0 

  500.0 
  0.0 
  0.0   
  2025-10-06 08:00 
  2025-10-06 08:00 
  2025-10-06 08:00 

  2025-10-13 08:00 
  2025-10-13 08:00 
  2025-10-13 08:00   
  2025-10-10 14:00 
  2025-10-10 14:00 
  2025-10-10 14:00 

  2025-10-20 16:00 
  2025-10-20 16:00 
  2025-10-20 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:STR 420, 433, & 455:NUT-PATHC = 500 Summer/900 Winter. NUT-SUNBEAM & SUNBEAM-NUT = 0. Network Resource Transmission Service arrangements must be made for Moonbeam generation (Power County Wind at Sunbeam) through Idaho Power.:     2025-09-09 13:53     177176     2025-09-22 08:47  
  PPW 25-04835     18040     PPW     Weed Junction: SW 2G27,Weed Junction: PST T-3726,Weed Junction: WEEDJUNC CS 2G50,Crag View: C/S 2G48               0.0      0.0      0.0      2025-10-13 08:00      2025-10-24 00:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:TCOH on Phase shifter at weed JCT:     2025-07-02 08:32     163923     2025-09-18 08:29  
  PPW 25-17957     18327     PPW     Pinto: 345 kV Series Cap Seg 1 & 2,Pinto: SWITCH 373A,Pinto: PINTO GND 363,Pinto: PINTO GND 383          PINTO-FOURCORNE345(PPW)      625.0      625.0      536.0      2025-10-13 09:00      2025-10-17 19:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:MOAB APPARATUS. PLATFORM INSPECTION AND MAINTENANCE:PINTO-FOURCORNE345 (TOT 2B1 N>S) = 536.:     2025-09-09 14:27     177119     2025-09-09 14:27  
  PPW 25-18860     18372     PPW     Glide Tap-Steamboat section of the Dixonville-Toketee Switch Station 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-10-13 22:00      2025-10-14 09:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Complete line 39 reconductor:Umpqua River Hydro Project Restriction = 174 Summer/199 Winter.:     2025-09-23 11:37     178026     2025-09-23 11:37  
  PPW 25-09054     17933     PPW     Gala Solar: Xfmr T1          OTHERGEN-PACW(PPW) 

  OTHERGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  0.0 

  9999.0   
  2025-09-29 18:45 

  2025-10-14 07:00   
  2025-10-01 16:00 

  2025-10-15 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Three-year substation preventative maintenance.:Gala Solar offline.:     2025-05-21 14:37     168161     2025-05-21 14:37  
  PPW 25-07860     17890     PPW     WAPA Thermopolis-Hilltop-WAPA Lovell 115 kV line          YTP-WYONORTH(PPW)      400.0      400.0      377.0      2025-10-14 07:00      2025-10-20 11:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace Nahne Jensen Line switches NJ-5761 and NJ-5765.:YTP-WYONORTH = 377. YTS = Series #11: TTC of 589 (PACE = 377 & LAPT = 212).:     2025-05-02 13:30     166966     2025-05-02 13:30  
  PPW 25-19560     18368     PPW     Gadsby: GSU XFMR #4,Gadsby: GSU XFMR #6          THERMALGEN-PACE(PPW)      9999.0      9999.0      0.0      2025-10-14 08:00      2025-10-15 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Blackstart testing on Units 4 and 6 :Gadby units 4 and 6 unavailable.:     2025-09-22 12:08     178727     2025-09-22 12:08  
  PPW 25-18861     18373     PPW     Glide Tap-Steamboat section of the Dixonville-Toketee Switch Station 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-10-14 22:00      2025-10-15 09:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Complete line 39 reconductor:Umpqua River Hydro Project Restriction = 174 Summer/199 Winter.:     2025-09-23 11:37     178027     2025-09-23 11:37  
  PPW 25-19897     18380     PPW     Blacksmith: 69/34.5 kV TR1,Echo: 69/34 kV Bank #1          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-10-15 07:30      2025-10-15 19:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Annual substation offline maintenance at Orchard Wind (Blacksmith).:Orchard Wind Plant (Blacksmith substation) limited to 0 MW.:     2025-09-25 13:27     179066     2025-09-25 13:34  
  PPW 25-18862     18374     PPW     Glide Tap-Steamboat section of the Dixonville-Toketee Switch Station 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-10-15 22:00      2025-10-16 09:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Complete line 39 reconductor:Umpqua River Hydro Project Restriction = 174 Summer/199 Winter.:     2025-09-23 11:37     178028     2025-09-23 11:37  
  PPW 25-18863     18375     PPW     Glide Tap-Steamboat section of the Dixonville-Toketee Switch Station 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-10-16 22:00      2025-10-17 09:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Complete line 39 reconductor:Umpqua River Hydro Project Restriction = 174 Summer/199 Winter.:     2025-09-23 11:37     178029     2025-09-23 11:37  
  PPW 25-00010     16953     PPW     Hemingway-Summer Lake 500 kV line          H500-SMLK(PPW) 
  PACW-NTLOAD(PPW) 
  SMLK-H500(PPW) 

  H500-SMLK(PPW) 
  PACW-NTLOAD(PPW) 
  SMLK-H500(PPW)   
  1500.0 
  9999.0 
  100.0 

  1500.0 
  9999.0 
  100.0   
  1500.0 
  9999.0 
  100.0 

  1500.0 
  9999.0 
  100.0   
  1500.0 
  9999.0 
  100.0 

  0.0 
  0.0 
  0.0   
  2025-04-01 08:00 
  2025-04-01 08:00 
  2025-04-01 08:00 

  2025-10-17 08:00 
  2025-10-17 08:00 
  2025-10-17 08:00   
  2025-09-14 18:00 
  2025-09-14 18:00 
  2025-09-14 18:00 

  2025-10-31 18:00 
  2025-10-31 18:00 
  2025-10-31 18:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Spacer Replacements:H500-SMLK & SMLK-H500 = 0; BORA-M500 = 959;   2024-04-30 09:25     144659     2024-12-20 09:45  
  PPW 26-00006     18288     PPW     Dave Johnston: #2 Main T2130          THERMALGEN-PACW(PPW) 

  THERMALGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2025-09-17 07:00 

  2025-10-20 07:00   
  2025-09-18 15:00 

  2025-10-23 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:**Commissioning Required** Install metering CT/VT on the 115kV high side of the U2 GSU:Dave Johnston Unit #2 unavailable.:     2025-08-21 12:54     165892     2025-09-09 08:43  
  PPW 25-19238     18363     PPW     Malin: CIRCUIT SWITCHER 4061,Malin: 500/230 kV Bank #1 T3804,5,6          MALIN230-MALIN500(PPW) 
  MALIN500-MALIN230(PPW)   
  300.0 
  300.0   
  300.0 
  300.0   
  0.0 
  0.0   
  2025-10-20 07:30 
  2025-10-20 07:30   
  2025-10-20 16:00 
  2025-10-20 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:SCADA OPERATIONS OF LBD 4061:MALIN230-MALIN500 & MALIN500-MALIN230 = 0.:     2025-09-18 13:03     178405     2025-09-18 13:11  
  PPW 25-08635     17922     PPW     BPA Captain Jack-Grizzly-Ponderosa #1 500 kV line          BPAT.PACW-PONDEROSA230(PPW)      267.0      267.0      267.0      2025-10-21 08:00      2025-10-21 09:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:DE-ENERGIZE LINE FOR DEADLINE SWITCHING AT POND:BPAT.PACW-PONDEROSA230 = 555 Summer/ 700 Winter:     2025-05-15 11:16     167741     2025-05-15 11:16  
  PPW 25-20030     18382     PPW     Merwin: Bank #3          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-10-21 18:00      2025-10-23 18:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Generator disconnect switch issues (Generation Request 25-20026).:Merwin Unit #3 unavailable.:     2025-09-26 12:33     179200     2025-09-26 12:33  
  PPW 25-19909     18381     PPW     Antelope-IPCo Brady 230 kV line,IPCo Brady: SWITCH 202C          ANTE-BRDY(PPW) 
  BRDY-ANTE(PPW)   
  90.0 
  90.0   
  90.0 
  90.0   
  0.0 
  0.0   
  2025-10-23 08:00 
  2025-10-23 08:00   
  2025-11-06 16:00 
  2025-11-06 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace RFL and line relaying, and controls.:ANTE-BRDY & BRDY-ANTE = 0.:     2025-09-25 14:31     179078     2025-09-25 14:34  
  PPW 25-16679     18281     PPW     BPA: AC, DC, WS, and Synchrophasor RAS Controllers          THERMALGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-10-25 11:00      2025-10-25 11:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:RAS WS-A CONTROLLER,MUNRO: RAS WS-B CONTROLLER ANNUAL SYSTEM TESTING   2025-08-20 13:56     175830     2025-08-20 14:05  
  PPW 25-08632     17921     PPW     BPA Captain Jack-Grizzly-Ponderosa #1 500 kV line          BPAT.PACW-PONDEROSA230(PPW)      267.0      267.0      267.0      2025-10-31 14:00      2025-10-31 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:DE-ENERGIZE LINE FOR DEADLINE SWITCHING AT POND:BPAT.PACW-PONDEROSA230 = 555 Summer/ 700 Winter:     2025-05-15 11:14     167738     2025-05-15 11:14  
  PPW 25-16657     18280     PPW     Dave Johnston-TSGT Laramie River Station 230 kV line          DJ-WYOEAST(PPW) 
  WYOEAST-DJ(PPW) 

  DJ-WYOEAST(PPW) 
  WYOEAST-DJ(PPW) 

  DJ-WYOEAST(PPW) 
  WYOEAST-DJ(PPW) 

  DJ-WYOEAST(PPW) 
  WYOEAST-DJ(PPW)   
  790.0 
  790.0 

  790.0 
  790.0 

  790.0 
  790.0 

  790.0 
  790.0   
  790.0 
  790.0 

  790.0 
  790.0 

  790.0 
  790.0 

  790.0 
  790.0   
  790.0 
  790.0 

  790.0 
  790.0 

  790.0 
  790.0 

  478.0 
  478.0   
  2025-09-10 07:00 
  2025-09-10 07:00 

  2025-09-15 07:00 
  2025-09-15 07:00 

  2025-11-03 07:00 
  2025-11-03 07:00 

  2025-11-03 08:00 
  2025-11-03 08:00   
  2025-09-15 07:00 
  2025-09-15 07:00 

  2025-09-19 15:00 
  2025-09-19 15:00 

  2025-11-03 08:00 
  2025-11-03 08:00 

  2025-11-21 16:00 
  2025-11-21 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:**Commissioning Required** Replace CB 1H268 and SW 1H7046:DJ-WYOEAST & WYOEAST-DJ = 442 (Dave Johnston-WAPA Stegall 230 kV line rating):     2025-08-20 13:00     175808     2025-09-12 12:29  
  PPW 25-16504     18274     PPW     Malin-PG&E Round Mountain #2 500 kV line          MALIN500-RDM500(PPW) 
  RDM500-MALIN500(PPW) 

  MALIN500-RDM500(PPW) 
  RDM500-MALIN500(PPW)   
  800.0 
  612.0 

  800.0 
  612.0   
  800.0 
  612.0 

  800.0 
  612.0   
  600.0 
  416.0 

  600.0 
  416.0   
  2025-11-05 05:30 
  2025-11-05 05:30 

  2025-11-06 17:30 
  2025-11-06 17:30   
  2025-11-06 17:30 
  2025-11-06 17:30 

  2025-11-17 17:30 
  2025-11-17 17:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Path restriction for PAC 25-15610.:MALIN500-RDM500 = 600. RDM500-MALIN500 = 416.:     2025-08-18 13:34     175649     2025-09-12 09:36  
  PPW 25-18118     18319     PPW     BPA McNary: CB L366,BPA McNary: Bypass Bus SW to CB L366,BPA McNary: Line SW to CB L366,BPA McNary:          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-11-13 07:00      2025-11-13 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Circuit breaker maintenance.:Orchard Wind Farm restricted to 0 MW.:     2025-09-05 11:26     177282     2025-09-05 11:26  
  PPW 25-10042     17988     PPW     Jim Bridger-Mustang 230 kV line,Mustang-WAPA Spence 230 kV line          JBSN-WYOCENTRAL(PPW) 
  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-JBSN(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  600.0 
  631.0 
  249.0 
  600.0 
  574.0 
  0.0 
  574.0   
  600.0 
  631.0 
  249.0 
  600.0 
  574.0 
  0.0 
  574.0   
  400.0 
  631.0 
  243.0 
  400.0 
  287.0 
  0.0 
  287.0   
  2025-11-19 07:15 
  2025-11-19 07:15 
  2025-11-19 07:15 
  2025-11-19 07:15 
  2025-11-19 07:15 
  2025-11-19 07:15 
  2025-11-19 07:15   
  2025-11-21 14:00 
  2025-11-21 14:00 
  2025-11-21 14:00 
  2025-11-21 14:00 
  2025-11-21 14:00 
  2025-11-21 14:00 
  2025-11-21 14:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Mustang: Remove 230 kV Shoo Fly:AW/4B Curve 121. WAPAEAST-WAPANORTH = 243. WYOEAST-AEOW (Aeolus West) = 1627. TOT4B-WYONORTH = 631. TOT 4B = 874. JBSN-WYOC & WYOC-JBSN = 400. Potential Real Time Impact to Wyoming Generation Great Divide will be radial from WAPA Spence via Mustang. Network Load Service Arrangements may be required.:     2025-06-10 12:20     169155     2025-06-10 12:50  
  PPW 25-16658     18290     PPW     Dave Johnston-WAPA Goshen 230 kV line          DJ-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-DJ(PPW) 

  DJ-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-DJ(PPW) 

  DJ-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-DJ(PPW)   
  790.0 
  0.0 
  790.0 

  790.0 
  0.0 
  790.0 

  790.0 
  0.0 
  790.0   
  790.0 
  0.0 
  790.0 

  790.0 
  0.0 
  790.0 

  790.0 
  0.0 
  790.0   
  790.0 
  0.0 
  790.0 

  790.0 
  0.0 
  790.0 

  441.0 
  0.0 
  441.0   
  2025-09-22 07:00 
  2025-09-22 07:00 
  2025-09-22 07:00 

  2025-12-01 07:00 
  2025-12-01 07:00 
  2025-12-01 07:00 

  2025-12-01 08:00 
  2025-12-01 08:00 
  2025-12-01 08:00   
  2025-09-26 15:00 
  2025-09-26 15:00 
  2025-09-26 15:00 

  2025-12-01 08:00 
  2025-12-01 08:00 
  2025-12-01 08:00 

  2025-12-19 16:00 
  2025-12-19 16:00 
  2025-12-19 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:**Commissioning Required** Replace CB 1H204 and SW 1H7052:DJ-WYOE & WYOE-DJ = 478 (Dave Johnston-TSGT Laramie River Station 230 kV line rating).:     2025-08-22 10:01     175809     2025-09-12 12:29  
  PPW 25-16659     18337     PPW     Dave Johnston: 230 kV North Bus               0.0      0.0      0.0      2026-01-05 08:00      2026-01-23 16:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:**Commissioning Required** Replace CB 1H154 & SW 1H7049:     2025-09-12 12:23     175810     2025-09-12 12:23  
  PPW 25-07978     17897     PPW     WAPA Thermopolis-Hilltop-WAPA Lovell 115 kV line          YTP-WYONORTH(PPW) 

  YTP-WYONORTH(PPW) 

  YTP-WYONORTH(PPW) 

  YTP-WYONORTH(PPW)   
  400.0 

  400.0 

  400.0 

  400.0   
  400.0 

  400.0 

  400.0 

  400.0   
  400.0 

  400.0 

  400.0 

  377.0   
  2025-06-25 11:01 

  2025-07-21 07:00 

  2025-10-27 07:00 

  2026-03-09 07:00   
  2025-06-27 16:00 

  2025-07-24 15:00 

  2025-10-29 11:00 

  2026-03-13 11:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace broken insulators:YTP-WYONORTH = 377. YTS = Series #11: TTC of 589 (PACE = 377 & LAPT = 212).:     2025-05-05 09:53     167084     2025-09-24 14:28  
  PPW 26-00036     18379     PPW     IPCo Midpoint: 500/345 kV Bank T-501          H500-M500(PPW) 
  M500-H500(PPW) 
  PACW-NTLOAD(PPW)   
  800.0 
  1090.0 
  9999.0   
  800.0 
  1090.0 
  9999.0   
  0.0 
  0.0 
  0.0   
  2026-03-10 06:00 
  2026-03-10 06:00 
  2026-03-10 06:00   
  2026-05-29 16:00 
  2026-05-29 16:00 
  2026-05-29 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace and rewire transformer.:M500-H500 & H500-M500= 0.   2025-09-24 14:18     178979     2025-09-24 14:18  
  PPW 26-00007     17980     PPW     Hemingway-Summer Lake 500 kV line          BORA-M500(PPW) 
  H500-SMLK(PPW) 
  PACW-NTLOAD(PPW) 
  SMLK-H500(PPW)   
  1090.0 
  1500.0 
  9999.0 
  100.0   
  1090.0 
  1500.0 
  9999.0 
  100.0   
  959.0 
  0.0 
  0.0 
  0.0   
  2026-05-11 08:00 
  2026-05-11 08:00 
  2026-05-11 08:00 
  2026-05-11 08:00   
  2026-05-22 18:00 
  2026-05-22 18:00 
  2026-05-22 18:00 
  2026-05-22 18:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Spacer Replacements:H500-SMLK & SMLK-H500 = 0; BORA-M500 = 959;   2025-06-09 09:44     168591     2025-06-09 09:46  
  PPW 24-04189     16311     PPW     Cove (OR): 230/69 kV Bank #2 (T3398)          COVEPACW-ROUNDBUTTE(PPW) 
  ROUNDBUTTE-COVEPACW(PPW) 

  COVEPACW-ROUNDBUTTE(PPW) 
  ROUNDBUTTE-COVEPACW(PPW) 

  COVEPACW-ROUNDBUTTE(PPW) 
  ROUNDBUTTE-COVEPACW(PPW) 

  COVEPACW-ROUNDBUTTE(PPW) 
  ROUNDBUTTE-COVEPACW(PPW) 

  COVEPACW-ROUNDBUTTE(PPW) 
  ROUNDBUTTE-COVEPACW(PPW)   
  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0   
  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0   
  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0 

  60.0 
  60.0   
  2024-07-01 12:00 
  2024-07-01 12:00 

  2024-10-14 12:00 
  2024-10-14 12:00 

  2025-04-28 12:00 
  2025-04-28 12:00 

  2025-07-07 12:00 
  2025-07-07 12:00 

  2026-07-06 12:00 
  2026-07-06 12:00   
  2024-07-21 12:00 
  2024-07-21 12:00 

  2024-11-01 12:00 
  2024-11-01 12:00 

  2025-05-30 12:00 
  2025-05-30 12:00 

  2025-08-01 12:00 
  2025-08-01 12:00 

  2026-07-31 12:00 
  2026-07-31 12:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:T-3398 LTC Maintenance and Bushing Replacement:COVEPACW-ROUNDBUTTE & ROUNDBUTTE-COVEPACW = 60.:     2024-03-15 09:39     142013     2025-06-18 08:34  
  PPW 26-00035     18378     PPW     BPA Tumble Creek-Jones Canyon section of Santiam-Jones Canyon 230kV Line          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2026-09-14 08:00      2026-09-24 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Wrecking out tower at 81/1 and replacing with steel monopole.:Leaning Juniper offline during switching only. Leaning Juniper total maximum output limited to 40MW during work.:     2025-09-24 14:09     178978     2025-09-24 14:09  
PRPA Outages:
  TOT-7 OUTAGE (PLANNED)     133914     PRPA     Ault - Weld #2 230kV Line kV           AU-STVRN(PRPA) 
  STVRN-AU(PRPA)   
  282.0 
  282.0   
  282.0 
  282.0   
  173.0 
  173.0   
  2025-05-26 07:00 
  2025-05-26 07:00   
  2025-06-16 06:59 
  2025-06-16 06:59   
  Cancelled     TRANSMISSION     PLANNED      TOT 7     PRPA     Ault - Weld #2 230kV Line kV OOS     2025-03-18 16:59     PRPA55049      2025-04-02 10:44  
  TOT-7 OUTAGE     134920     PRPA     Ault-Weld#2 230kV lines          AU-STVRN(PRPA) 
  STVRN-AU(PRPA) 
  STVRN-TP(PRPA) 
  TP-STVRN(PRPA)   
  155.0 
  155.0 
  127.0 
  127.0   
  155.0 
  155.0 
  127.0 
  127.0   
  95.0 
  95.0 
  78.0 
  78.0   
  2025-05-27 07:00 
  2025-05-27 07:00 
  2025-05-27 07:00 
  2025-05-27 07:00   
  2025-06-16 06:59 
  2025-06-16 06:59 
  2025-06-16 06:59 
  2025-06-16 06:59   
  Completed     TRANSMISSION     PLANNED      TOT 7     PRPA     Ault-Weld#2 230kV lines OOS per WAPA     2025-04-02 11:04     PRPA55333      2025-05-06 13:46  
  TOT-1A OUTAGE (PLANNED)     131063     PRPA     Bonanza-Craig 345KV Line OOS          BOZ-CRG(PRPA) 
  CRG-BOZ(PRPA)   
  28.0 
  28.0   
  28.0 
  28.0   
  0.0 
  0.0   
  2025-05-27 10:00 
  2025-05-27 10:00   
  2025-06-15 16:00 
  2025-06-15 16:00   
  Completed     TRANSMISSION     PLANNED      TOT 1A     PRPA     Bonanza-Craig 345KV Line OOS     2025-01-30 09:50     PRPA54190      2025-05-13 07:29  
  TOT 1A OUTAGE (FORCED)     137886     PRPA     Flaming Gorge-Vernal OOS          BOZ-CRG(PRPA) 
  CRG-BOZ(PRPA)   
  28.0 
  28.0   
  28.0 
  28.0   
  28.0 
  23.0   
  2025-06-15 16:00 
  2025-06-15 16:00   
  2025-06-16 17:00 
  2025-06-16 17:00   
  Completed     TRANSMISSION     FORCED      TOT 1A     PRPA     Flaming Gorge-Vernal OOS (per WACM TSS Desk)     2025-06-15 15:44     PRPA56231      2025-06-15 15:44  
  SEVERANCE-AULT     134936     PRPA     Ault-Severance 230kV line          AU-SEV(PRPA) 
  AU-STVRN(PRPA) 
  SEV-AU(PRPA) 
  STVRN-AU(PRPA) 
  STVRN-TP(PRPA) 
  TP-STVRN(PRPA)   
  670.0 
  155.0 
  670.0 
  155.0 
  127.0 
  127.0   
  670.0 
  155.0 
  670.0 
  155.0 
  127.0 
  127.0   
  0.0 
  90.0 
  0.0 
  90.0 
  74.0 
  74.0   
  2025-06-16 07:00 
  2025-06-16 07:00 
  2025-06-16 07:00 
  2025-06-16 07:00 
  2025-06-16 07:00 
  2025-06-16 07:00   
  2025-07-07 16:00 
  2025-07-07 16:00 
  2025-07-07 16:00 
  2025-07-07 16:00 
  2025-07-07 16:00 
  2025-07-07 16:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     PRPA     Ault-Severance 230kV line, per WAPA     2025-04-02 13:03     PRPA55335      2025-06-12 07:40  
  TOT-7 OUTAGE     134927     PRPA     Ault-Severance 230kV line          AU-STVRN(PRPA) 
  STVRN-AU(PRPA) 
  STVRN-TP(PRPA) 
  TP-STVRN(PRPA)   
  155.0 
  155.0 
  127.0 
  127.0   
  155.0 
  155.0 
  127.0 
  127.0   
  90.0 
  90.0 
  74.0 
  74.0   
  2025-06-16 07:00 
  2025-06-16 07:00 
  2025-06-16 07:00 
  2025-06-16 07:00   
  2025-07-07 16:00 
  2025-07-07 16:00 
  2025-07-07 16:00 
  2025-07-07 16:00   
  Cancelled     TRANSMISSION     PLANNED      TOT 7     PRPA     Ault-Severance 230kV line OOS per WAPA     2025-04-02 11:10     PRPA55334      2025-04-02 13:01  
  TOT-7 OUTAGE (PLANNED)     133911     PRPA     Ault - Severance 230kV Line           AU-STVRN(PRPA) 
  STVRN-AU(PRPA)   
  282.0 
  282.0   
  282.0 
  282.0   
  164.0 
  164.0   
  2025-06-16 07:00 
  2025-06-16 07:00   
  2025-07-07 16:00 
  2025-07-07 16:00   
  Cancelled     TRANSMISSION     PLANNED      TOT 7     PRPA     Ault - Severance 230kV Line OOS     2025-03-18 16:56     PRPA55048      2025-04-02 11:07  
  TOT-5 OUTAGE (FORCED)     137965     PRPA     Wolcott-Cooley Mesa 230 kV Line          AU-CRG(PRPA) 
  CRG-AU(PRPA)   
  153.0 
  190.0   
  153.0 
  190.0   
  153.0 
  165.0   
  2025-06-18 17:40 
  2025-06-18 17:40   
  2025-06-19 00:30 
  2025-06-19 00:30   
  Completed     TRANSMISSION     FORCED      TOT 5     PRPA     Wild Fire in the area     2025-06-18 17:43     PRPA56250      2025-06-19 00:27  
  TOT 1A OUTAGE (FORCED)     138400     PRPA     Enter name          BOZ-CRG(PRPA) 
  CRG-BOZ(PRPA) 

  BOZ-CRG(PRPA) 
  CRG-BOZ(PRPA) 

  BOZ-CRG(PRPA) 
  CRG-BOZ(PRPA)   
  28.0 
  28.0 

  28.0 
  28.0 

  28.0 
  28.0   
  28.0 
  28.0 

  28.0 
  28.0 

  28.0 
  28.0   
  23.0 
  23.0 

  26.0 
  26.0 

  26.0 
  26.0   
  2025-07-09 12:00 
  2025-07-09 12:00 

  2025-07-10 15:57 
  2025-07-10 15:57 

  2025-07-11 16:00 
  2025-07-11 16:00   
  2025-07-10 15:57 
  2025-07-10 15:57 

  2025-07-11 16:00 
  2025-07-11 16:00 

  2025-07-18 23:59 
  2025-07-18 23:59   
  Completed     GENERATION     FORCED      TOT 1A     PRPA     Bonanza generation offline ETR 7/18 per PACE     2025-07-09 11:22     PRPA56471      2025-07-11 11:35  
  TOT 1A OUTAGE (FORCED)     138938     PRPA     BOZ-MONA 345 kV Line          BOZ-CRG(PRPA) 
  CRG-BOZ(PRPA)   
  28.0 
  28.0   
  28.0 
  28.0   
  12.0 
  12.0   
  2025-07-17 19:40 
  2025-07-17 19:40   
  2025-07-18 05:10 
  2025-07-18 05:10   
  Completed     TRANSMISSION     FORCED      TOT 1A     PRPA     enter comments     2025-07-17 19:46     PRPA56600      2025-07-18 05:13  
  TOT 1A OUTAGE (FORCED)     138959     PRPA     Bonanza Unit 1          BOZ-CRG(PRPA) 
  CRG-BOZ(PRPA) 

  BOZ-CRG(PRPA) 
  CRG-BOZ(PRPA) 

  BOZ-CRG(PRPA) 
  CRG-BOZ(PRPA) 

  BOZ-CRG(PRPA) 
  CRG-BOZ(PRPA) 

  BOZ-CRG(PRPA) 
  CRG-BOZ(PRPA)   
  28.0 
  28.0 

  28.0 
  28.0 

  28.0 
  28.0 

  28.0 
  28.0 

  28.0 
  28.0   
  28.0 
  28.0 

  28.0 
  28.0 

  28.0 
  28.0 

  28.0 
  28.0 

  28.0 
  28.0   
  28.0 
  26.0 

  26.0 
  26.0 

  26.0 
  26.0 

  26.0 
  26.0 

  26.0 
  26.0   
  2025-07-19 03:00 
  2025-07-19 03:00 

  2025-08-22 20:00 
  2025-08-22 20:00 

  2025-08-22 23:00 
  2025-08-22 23:00 

  2025-08-27 23:00 
  2025-08-27 23:00 

  2025-08-28 12:00 
  2025-08-28 12:00   
  2025-08-22 20:00 
  2025-08-22 20:00 

  2025-08-22 23:00 
  2025-08-22 23:00 

  2025-08-27 23:00 
  2025-08-27 23:00 

  2025-08-28 12:00 
  2025-08-28 12:00 

  2025-08-30 09:35 
  2025-08-30 09:35   
  Completed     TRANSMISSION     FORCED      TOT 1A     PRPA     Bonanza Unit 1     2025-07-19 02:20     PRPA56607      2025-08-30 09:33  
  CRAIG - AULT (FORCED)     139571     PRPA     Craig-Ault 345kV line          AU-CRG(PRPA) 
  CRG-AU(PRPA) 
  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA) 

  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA)   
  153.0 
  190.0 
  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0   
  153.0 
  190.0 
  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0   
  0.0 
  0.0 
  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0 

  81.0 
  81.0   
  2025-08-02 03:45 
  2025-08-02 03:45 
  2025-08-02 03:45 
  2025-08-02 03:45 

  2025-08-02 04:00 
  2025-08-02 04:00 

  2025-08-02 05:00 
  2025-08-02 05:00 

  2025-08-02 06:00 
  2025-08-02 06:00 

  2025-08-02 07:00 
  2025-08-02 07:00 

  2025-08-02 08:00 
  2025-08-02 08:00 

  2025-08-02 09:00 
  2025-08-02 09:00 

  2025-08-02 10:00 
  2025-08-02 10:00 

  2025-08-02 11:00 
  2025-08-02 11:00 

  2025-08-02 12:00 
  2025-08-02 12:00 

  2025-08-02 13:00 
  2025-08-02 13:00 

  2025-08-02 14:00 
  2025-08-02 14:00 

  2025-08-02 15:00 
  2025-08-02 15:00 

  2025-08-02 16:00 
  2025-08-02 16:00 

  2025-08-02 17:00 
  2025-08-02 17:00 

  2025-08-02 18:00 
  2025-08-02 18:00 

  2025-08-02 19:00 
  2025-08-02 19:00 

  2025-08-02 20:00 
  2025-08-02 20:00 

  2025-08-02 21:00 
  2025-08-02 21:00 

  2025-08-02 22:00 
  2025-08-02 22:00 

  2025-08-02 23:00 
  2025-08-02 23:00 

  2025-08-03 00:00 
  2025-08-03 00:00 

  2025-08-03 01:00 
  2025-08-03 01:00 

  2025-08-03 02:00 
  2025-08-03 02:00 

  2025-08-03 03:00 
  2025-08-03 03:00 

  2025-08-03 04:00 
  2025-08-03 04:00 

  2025-08-03 05:00 
  2025-08-03 05:00 

  2025-08-03 06:00 
  2025-08-03 06:00 

  2025-08-03 07:00 
  2025-08-03 07:00 

  2025-08-03 08:00 
  2025-08-03 08:00 

  2025-08-03 09:00 
  2025-08-03 09:00 

  2025-08-03 10:00 
  2025-08-03 10:00 

  2025-08-03 11:00 
  2025-08-03 11:00 

  2025-08-03 12:00 
  2025-08-03 12:00 

  2025-08-03 13:00 
  2025-08-03 13:00   
  2025-08-03 14:00 
  2025-08-03 14:00 
  2025-08-02 04:00 
  2025-08-02 04:00 

  2025-08-02 05:00 
  2025-08-02 05:00 

  2025-08-02 06:00 
  2025-08-02 06:00 

  2025-08-02 07:00 
  2025-08-02 07:00 

  2025-08-02 08:00 
  2025-08-02 08:00 

  2025-08-02 09:00 
  2025-08-02 09:00 

  2025-08-02 10:00 
  2025-08-02 10:00 

  2025-08-02 11:00 
  2025-08-02 11:00 

  2025-08-02 12:00 
  2025-08-02 12:00 

  2025-08-02 13:00 
  2025-08-02 13:00 

  2025-08-02 14:00 
  2025-08-02 14:00 

  2025-08-02 15:00 
  2025-08-02 15:00 

  2025-08-02 16:00 
  2025-08-02 16:00 

  2025-08-02 17:00 
  2025-08-02 17:00 

  2025-08-02 18:00 
  2025-08-02 18:00 

  2025-08-02 19:00 
  2025-08-02 19:00 

  2025-08-02 20:00 
  2025-08-02 20:00 

  2025-08-02 21:00 
  2025-08-02 21:00 

  2025-08-02 22:00 
  2025-08-02 22:00 

  2025-08-02 23:00 
  2025-08-02 23:00 

  2025-08-03 00:00 
  2025-08-03 00:00 

  2025-08-03 01:00 
  2025-08-03 01:00 

  2025-08-03 02:00 
  2025-08-03 02:00 

  2025-08-03 03:00 
  2025-08-03 03:00 

  2025-08-03 04:00 
  2025-08-03 04:00 

  2025-08-03 05:00 
  2025-08-03 05:00 

  2025-08-03 06:00 
  2025-08-03 06:00 

  2025-08-03 07:00 
  2025-08-03 07:00 

  2025-08-03 08:00 
  2025-08-03 08:00 

  2025-08-03 09:00 
  2025-08-03 09:00 

  2025-08-03 10:00 
  2025-08-03 10:00 

  2025-08-03 11:00 
  2025-08-03 11:00 

  2025-08-03 12:00 
  2025-08-03 12:00 

  2025-08-03 13:00 
  2025-08-03 13:00 

  2025-08-03 14:00 
  2025-08-03 14:00   
  Completed     TRANSMISSION     FORCED      TOT 5     PRPA     Craig-Ault Forced Outage     2025-08-02 03:54     PRPA56811      2025-08-03 13:28  
  TOT-5 OUTAGE (FORCED)     139664     PRPA     Craig-Rifle outage          AU-CRG(PRPA) 
  CRG-AU(PRPA)   
  153.0 
  190.0   
  153.0 
  190.0   
  149.0 
  149.0   
  2025-08-06 07:30 
  2025-08-06 07:30   
  2025-08-06 12:00 
  2025-08-06 12:00   
  Completed     TRANSMISSION     FORCED      TOT 5     PRPA     Craig-Rifle 230kv     2025-08-06 07:31     PRPA56844      2025-08-06 12:03  
  TOT-5 OUTAGE (FORCED)     139674     PRPA     Craig-Rifle 230kv line          AU-CRG(PRPA) 
  CRG-AU(PRPA) 

  AU-CRG(PRPA) 
  CRG-AU(PRPA)   
  153.0 
  190.0 

  153.0 
  190.0   
  153.0 
  190.0 

  153.0 
  190.0   
  149.0 
  149.0 

  149.0 
  149.0   
  2025-08-06 13:15 
  2025-08-06 13:15 

  2025-08-06 23:00 
  2025-08-06 23:00   
  2025-08-06 23:00 
  2025-08-06 23:00 

  2025-08-07 03:00 
  2025-08-07 03:00   
  Completed     TRANSMISSION     FORCED      TOT 5     PRPA     Craig-Rifle 230kv line OOS per WAPA     2025-08-06 13:14     PRPA56850      2025-08-07 02:42  
  TOT 1A OUTAGE (FORCED)     139718     PRPA     Craig Bonanza 345kV          BOZ-CRG(PRPA) 
  CRG-BOZ(PRPA)   
  28.0 
  28.0   
  28.0 
  28.0   
  0.0 
  0.0   
  2025-08-07 04:00 
  2025-08-07 04:00   
  2025-08-07 08:11 
  2025-08-07 08:11   
  Completed     TRANSMISSION     FORCED      TOT 1A     PRPA     Craig Bonanza 345kV line OOS per WAPA     2025-08-07 03:49     PRPA56865      2025-08-07 08:18  
  TOT 1A OUTAGE (FORCED)     139722     PRPA     Craig Bonanza 345kV          BOZ-CRG(PRPA) 
  CRG-BOZ(PRPA)   
  28.0 
  28.0   
  28.0 
  28.0   
  0.0 
  0.0   
  2025-08-07 04:00 
  2025-08-07 04:00   
  2025-08-09 16:00 
  2025-08-09 16:00   
  Cancelled     TRANSMISSION     FORCED      TOT 1A     PRPA     enter comments     2025-08-07 03:51     PRPA56867      2025-08-07 03:54  
  TOT 1A OUTAGE (FORCED)     139733     PRPA     Hayden-Artesia 138kV line          BOZ-CRG(PRPA) 
  CRG-BOZ(PRPA)   
  28.0 
  28.0   
  28.0 
  28.0   
  25.0 
  25.0   
  2025-08-07 09:00 
  2025-08-07 09:00   
  2025-08-10 16:15 
  2025-08-10 16:15   
  Completed     TRANSMISSION     FORCED      TOT 1A     PRPA     enter comments     2025-08-07 08:27     PRPA56871      2025-08-10 16:14  
  TOT-5 OUTAGE (FORCED)     139773     PRPA     Craig-Rifle 230kv line          AU-CRG(PRPA) 
  CRG-AU(PRPA) 

  AU-CRG(PRPA) 
  CRG-AU(PRPA)   
  153.0 
  190.0 

  153.0 
  190.0   
  153.0 
  190.0 

  153.0 
  190.0   
  149.0 
  149.0 

  149.0 
  149.0   
  2025-08-08 11:45 
  2025-08-08 11:45 

  2025-08-09 16:00 
  2025-08-09 16:00   
  2025-08-09 16:00 
  2025-08-09 16:00 

  2025-08-11 07:22 
  2025-08-11 07:22   
  Completed     TRANSMISSION     FORCED      TOT 5     PRPA     Craig-Rifle 230kv line OOS     2025-08-08 11:46     PRPA56891      2025-08-11 07:27  
  TOT-7 OUTAGE     139635     PRPA     Longs Peak-Fort St. Vrain 230 kV line          AU-STVRN(PRPA) 
  STVRN-AU(PRPA) 
  STVRN-TP(PRPA) 
  TP-STVRN(PRPA)   
  155.0 
  155.0 
  127.0 
  127.0   
  155.0 
  155.0 
  127.0 
  127.0   
  239.0 
  239.0 
  0.0 
  0.0   
  2025-08-12 06:30 
  2025-08-12 06:30 
  2025-08-12 06:30 
  2025-08-12 06:30   
  2025-08-12 12:00 
  2025-08-12 12:00 
  2025-08-12 12:00 
  2025-08-12 12:00   
  Completed     TRANSMISSION     PLANNED      TOT 7     PRPA     Longs Peak-Fort St. Vrain 230 kV line. Out of Service     2025-08-05 07:49     PRPA56833      2025-08-05 07:49  
  CRAIG - AULT (PLANNED)     137296     PRPA     Craig-Ault 345kV line          AU-CRG(PRPA) 
  CRG-AU(PRPA) 
  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA)   
  153.0 
  190.0 
  0.0 
  0.0   
  153.0 
  190.0 
  0.0 
  0.0   
  0.0 
  0.0 
  61.0 
  61.0   
  2025-08-17 08:00 
  2025-08-17 08:00 
  2025-08-17 08:00 
  2025-08-17 08:00   
  2025-08-28 16:00 
  2025-08-28 16:00 
  2025-08-28 16:00 
  2025-08-28 16:00   
  Cancelled     TRANSMISSION     PLANNED      TOT 5     PRPA     Craig-Ault Planned Outage     2025-05-12 10:50     PRPA55958      2025-07-30 12:52  
  TOT-1A OUTAGE (PLANNED)     139647     PRPA     Vernal Terminal of Bonanza-Vernal 138KV Line          BOZ-CRG(PRPA) 
  CRG-BOZ(PRPA)   
  28.0 
  28.0   
  28.0 
  28.0   
  26.0 
  26.0   
  2025-08-18 06:00 
  2025-08-18 06:00   
  2025-08-21 15:00 
  2025-08-21 15:00   
  Completed     TRANSMISSION     PLANNED      TOT 1A     PRPA     Vernal Terminal of Bonanza-Vernal 138KV Line OOS, per WAPA.     2025-08-05 13:39     PRPA56838      2025-08-05 13:39  
  TOT-1A OUTAGE (PLANNED)     139690     PRPA     Flaming Gorge-1872 138KV Circuit Breaker           BOZ-CRG(PRPA) 
  CRG-BOZ(PRPA)   
  28.0 
  28.0   
  28.0 
  28.0   
  24.0 
  24.0   
  2025-08-18 07:00 
  2025-08-18 07:00   
  2025-08-18 10:10 
  2025-08-18 10:10   
  Completed     TRANSMISSION     PLANNED      TOT 1A     PRPA     Flaming Gorge-1872 138KV Circuit Breaker OOS per WAPA     2025-08-06 15:00     PRPA56854      2025-08-18 10:09  
  TOT-1A OUTAGE (PLANNED)     137243     PRPA     Hayden-Artesia Tap-Vernal 138KV Line           BOZ-CRG(PRPA) 
  CRG-BOZ(PRPA)   
  28.0 
  28.0   
  28.0 
  28.0   
  26.0 
  26.0   
  2025-08-18 10:00 
  2025-08-18 10:00   
  2025-08-28 11:00 
  2025-08-28 11:00   
  Completed     TRANSMISSION     PLANNED      TOT 1A     PRPA     Hayden-Artesia Tap-Vernal 138KV Line OOS per WAPA     2025-05-07 07:53     PRPA55939      2025-08-28 10:39  
  TOT-1A OUTAGE (PLANNED)     139940     PRPA     Flaming Gorge-1872 138KV Circuit Breaker          BOZ-CRG(PRPA) 
  CRG-BOZ(PRPA)   
  28.0 
  28.0   
  28.0 
  28.0   
  24.0 
  24.0   
  2025-08-20 07:00 
  2025-08-20 07:00   
  2025-08-20 14:00 
  2025-08-20 14:00   
  Completed     TRANSMISSION     PLANNED      TOT 1A     PRPA     Flaming Gorge-1872 138KV Circuit Breaker OOS per WAPA      2025-08-18 11:04     PRPA57003      2025-08-18 11:04  
  TOT-7 OUTAGE     140060     PRPA     Harmony-Fossil Creek Tap-Portner 230 kV line          AU-STVRN(PRPA) 
  STVRN-AU(PRPA) 
  STVRN-TP(PRPA) 
  TP-STVRN(PRPA)   
  155.0 
  155.0 
  127.0 
  127.0   
  155.0 
  155.0 
  127.0 
  127.0   
  82.0 
  82.0 
  0.0 
  0.0   
  2025-09-08 08:00 
  2025-09-08 08:00 
  2025-09-08 08:00 
  2025-09-08 08:00   
  2025-09-12 16:00 
  2025-09-12 16:00 
  2025-09-12 16:00 
  2025-09-12 16:00   
  Cancelled     TRANSMISSION     PLANNED      TOT 7     PRPA     Harmony-Fossil Creek Tap-Portner 230 kV line OOS     2025-08-25 12:05     PRPA57053      2025-08-28 08:58  
  TOT-1A OUTAGE (PLANNED)     141071     PRPA     Flaming Gorge-1872 138KV Circuit Breaker           BOZ-CRG(PRPA) 
  CRG-BOZ(PRPA)   
  28.0 
  28.0   
  28.0 
  28.0   
  24.0 
  24.0   
  2025-09-25 07:00 
  2025-09-25 07:00   
  2025-09-25 14:00 
  2025-09-25 14:00   
  Completed     TRANSMISSION     PLANNED      TOT 1A     PRPA     Flaming Gorge-1872 138KV Circuit Breaker OOS     2025-09-04 17:07     PRPA57202      2025-09-04 17:07  
  SEVERANCE-AULT     140645     PRPA     Ault-Severance 230kV line          AU-SEV(PRPA) 
  AU-STVRN(PRPA) 
  SEV-AU(PRPA) 
  STVRN-AU(PRPA) 
  STVRN-TP(PRPA) 
  TP-STVRN(PRPA)   
  670.0 
  155.0 
  670.0 
  155.0 
  127.0 
  127.0   
  670.0 
  155.0 
  670.0 
  155.0 
  127.0 
  127.0   
  0.0 
  114.0 
  0.0 
  114.0 
  94.0 
  94.0   
  2025-09-29 07:00 
  2025-09-29 07:00 
  2025-09-29 07:00 
  2025-09-29 07:00 
  2025-09-29 07:00 
  2025-09-29 07:00   
  2025-10-17 16:00 
  2025-10-17 16:00 
  2025-10-17 16:00 
  2025-10-17 16:00 
  2025-10-17 16:00 
  2025-10-17 16:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     PRPA     Ault-Severance 230kV line     2025-08-26 09:50     PRPA57091      2025-08-26 13:13  
  SEVERANCE-AULT     140664     PRPA     Ault-Severance 230kV line          AU-SEV(PRPA) 
  AU-STVRN(PRPA) 
  SEV-AU(PRPA) 
  STVRN-AU(PRPA) 
  STVRN-TP(PRPA) 
  TP-STVRN(PRPA)   
  670.0 
  155.0 
  670.0 
  155.0 
  127.0 
  127.0   
  670.0 
  155.0 
  670.0 
  155.0 
  127.0 
  127.0   
  0.0 
  114.0 
  0.0 
  114.0 
  94.0 
  94.0   
  2025-09-29 07:00 
  2025-09-29 07:00 
  2025-09-29 07:00 
  2025-09-29 07:00 
  2025-09-29 07:00 
  2025-09-29 07:00   
  2025-10-17 16:00 
  2025-10-17 16:00 
  2025-10-17 16:00 
  2025-10-17 16:00 
  2025-10-17 16:00 
  2025-10-17 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     PRPA     Ault-Severance 230kV line     2025-08-26 13:19     PRPA57095      2025-08-26 13:19  
  TOT-7 OUTAGE     141130     PRPA     Harmony-Fossil Creek Tap-Portner 230kV line          AU-STVRN(PRPA) 
  STVRN-AU(PRPA) 
  STVRN-TP(PRPA) 
  TP-STVRN(PRPA)   
  155.0 
  155.0 
  127.0 
  127.0   
  155.0 
  155.0 
  127.0 
  127.0   
  90.0 
  90.0 
  0.0 
  0.0   
  2025-11-03 08:00 
  2025-11-03 08:00 
  2025-11-03 08:00 
  2025-11-03 08:00   
  2025-11-07 16:00 
  2025-11-07 16:00 
  2025-11-07 16:00 
  2025-11-07 16:00   
  Scheduled     TRANSMISSION     PLANNED      TOT 7     PRPA     Harmony-Fossil Creek Tap-Portner 230kV line OOS     2025-09-10 11:15     PRPA57224      2025-09-10 11:15  
PSCO Outages:
  NOMOGRAM     116019     PSCO     Nomogram          MSST-PSCO(PSCO) 
  PSCO.SOUTH-PSCO(PSCO) 

  MSST-PSCO(PSCO) 

  MSST-PSCO(PSCO) 
  PSCO.SOUTH-PSCO(PSCO) 

  MSST-PSCO(PSCO) 
  PSCO.SOUTH-PSCO(PSCO) 

  MSST-PSCO(PSCO) 
  PSCO.SOUTH-PSCO(PSCO)   
  4986.0 
  2529.0 

  4986.0 

  4986.0 
  2529.0 

  4986.0 
  2529.0 

  4986.0 
  2529.0   
  4986.0 
  2529.0 

  4986.0 

  4986.0 
  2529.0 

  4986.0 
  2529.0 

  4986.0 
  2529.0   
  2800.0 
  2000.0 

  3000.0 

  2650.0 
  2000.0 

  2500.0 
  2000.0 

  2500.0 
  2000.0   
  2024-01-31 13:00 
  2024-01-31 13:00 

  2024-07-17 15:10 

  2024-12-03 19:00 
  2024-12-03 19:00 

  2025-02-07 16:00 
  2025-02-07 16:00 

  2030-01-31 14:00 
  2030-01-31 14:00   
  2024-07-17 15:10 
  2024-12-03 19:00 

  2024-12-03 19:00 

  2025-02-07 16:00 
  2025-02-07 16:00 

  2030-01-31 14:00 
  2030-01-31 14:00 

  2035-12-31 22:00 
  2035-12-31 22:00   
  Active     TRANSMISSION     PLANNED      ONPATH     PSCO     TTC updates based on Nomogram studies.     2024-01-31 12:40     PSCO49317      2025-06-13 14:03  
  TOT 2A RESTRICTION     135229     PSCO               TOT2AS-TOT2AN(PSCO) 

  TOT2AS-TOT2AN(PSCO) 

  TOT2AS-TOT2AN(PSCO) 

  TOT2AS-TOT2AN(PSCO) 

  TOT2AS-TOT2AN(PSCO) 

  TOT2AS-TOT2AN(PSCO) 

  TOT2AS-TOT2AN(PSCO) 

  TOT2AS-TOT2AN(PSCO) 

  TOT2AS-TOT2AN(PSCO)   
  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0   
  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0   
  188.0 

  100.0 

  188.0 

  0.0 

  180.0 

  188.0 

  180.0 

  188.0 

  188.0   
  2025-04-10 17:00 

  2025-04-19 07:40 

  2025-04-20 00:00 

  2025-08-06 13:00 

  2025-08-06 13:22 

  2025-08-06 13:25 

  2025-08-06 17:00 

  2025-08-06 18:00 

  2025-08-07 20:00   
  2025-04-19 07:40 

  2025-04-20 00:00 

  2025-08-06 13:00 

  2025-08-06 13:22 

  2025-08-06 13:25 

  2025-08-06 17:00 

  2025-08-06 18:00 

  2025-08-07 20:00 

  2026-01-31 18:00   
  Active     TRANSMISSION     FORCED      ONPATH     PSCO          2025-04-10 16:46     PSCO55445      2025-08-06 13:24  
  MSST GENERATION     137970     PSCO     CHYE/CHYW to CACR to PAWN 345K PATH          GENERATOR-PSCO(PSCO) 

  GENERATOR-PSCO(PSCO)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  2025-06-19 08:00 

  2025-06-27 00:00   
  2025-06-27 00:00 

  2025-09-26 14:08   
  Completed     TRANSMISSION     FORCED      ONPATH     PSCO     While the Pathway (new 345KV lines) have been energized and placed in service from CHYE/CHYW to Goose Creek to Canal Crossing. Current limitations remain in place until MSST RAS changes have been approved/Certified. Date of approval/certification uncertain but is expected to be completed in th fall months..     2025-06-19 07:35     PSCO56251      2025-09-26 14:07  
  TOT 2A RESTRICTION     139946     PSCO               TOT2AN-TOT2AS(PSCO) 

  TOT2AN-TOT2AS(PSCO) 

  TOT2AN-TOT2AS(PSCO) 

  TOT2AN-TOT2AS(PSCO) 

  TOT2AN-TOT2AS(PSCO) 

  TOT2AN-TOT2AS(PSCO)   
  60.0 

  60.0 

  60.0 

  60.0 

  60.0 

  60.0   
  60.0 

  60.0 

  60.0 

  60.0 

  60.0 

  60.0   
  40.0 

  30.0 

  30.0 

  30.0 

  30.0 

  30.0   
  2025-08-18 19:00 

  2025-08-18 20:00 

  2025-08-27 22:00 

  2025-08-28 16:00 

  2025-09-01 00:00 

  2025-09-08 00:00   
  2025-08-18 20:00 

  2025-08-27 22:00 

  2025-08-28 16:00 

  2025-09-01 00:00 

  2025-09-08 00:00 

  2025-09-22 00:00   
  Completed     TRANSMISSION     FORCED      ONPATH     PSCO          2025-08-18 11:32     PSCO57005      2025-09-05 07:04  
  TOT 5 RESTRICTION     137324     PSCO     Malta to Hopkins 230kV Line          TOT5E-TOT5W(PSCO) 
  TOT5W-TOT5E(PSCO)   
  388.0 
  480.0   
  388.0 
  480.0   
  250.0 
  250.0   
  2025-08-22 08:00 
  2025-08-22 08:00   
  2025-08-30 16:00 
  2025-08-30 16:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     PSCO     Malta to Hopkins 230kV Line outage     2025-05-13 16:42     PSCO55970      2025-08-20 07:18  
  PAWNEE-MISSILE SITE TTC     138298     PSCO     Pawnee to Brick Center 230KV line          MSST-PAWN(PSCO) 
  PAWN-MSST(PSCO)   
  3062.0 
  3062.0   
  3062.0 
  3062.0   
  2340.0 
  2340.0   
  2025-08-27 07:30 
  2025-08-27 07:30   
  2025-08-29 17:00 
  2025-08-29 17:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     PSCO     Restrict Pawnee to Missile Site TTC due to Pawnee to Brick Center 230kV line planned outage     2025-07-03 16:57     PSCO56393      2025-07-03 16:57  
  LAMAR DC TIE     140759     PSCO               LAMR230-LAMR345(PSCO) 
  LAMR345-LAMR230(PSCO)   
  210.0 
  210.0   
  210.0 
  210.0   
  0.0 
  0.0   
  2025-08-28 06:00 
  2025-08-28 06:00   
  2025-08-28 15:29 
  2025-08-28 15:29   
  Completed     TRANSMISSION     FORCED      ONPATH     PSCO          2025-08-28 06:03     PSCO57122      2025-08-28 15:29  
  TOT 2A RESTRICTION     140799     PSCO               TOT2AN-TOT2AS(PSCO)      60.0      60.0      15.0      2025-08-30 06:00      2025-08-31 01:00      Completed     TRANSMISSION     FORCED      ONPATH     PSCO          2025-08-30 05:58     PSCO57131      2025-08-30 23:49  
  PAWNEE-MISSILE SITE TTC     138301     PSCO     Pawnee to Brick Center 230KV line          MSST-PAWN(PSCO) 
  PAWN-MSST(PSCO)   
  3062.0 
  3062.0   
  3062.0 
  3062.0   
  2340.0 
  2340.0   
  2025-09-02 07:30 
  2025-09-02 07:30   
  2025-09-05 17:00 
  2025-09-05 17:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     PSCO     Restrict Pawnee to Missile Site TTC due to Pawnee to Brick Center 230kV line planned outage     2025-07-03 17:00     PSCO56394      2025-07-03 17:00  
  ALAMOSA TERMINAL GEN.     141036     PSCO     Alamosa Terminal Must Run          GENERATOR-PSCO(PSCO)      9999.0      9999.0      9999.0      2025-09-04 15:00      2025-09-04 23:00      Completed     TRANSMISSION     FORCED      ONPATH     PSCO     Must run 1 unit at min for area support     2025-09-04 14:06     PSCO57191      2025-09-04 14:06  
  ATER UNIT #1 MUST RUN     141083     PSCO               GENERATOR-PSCO(PSCO)      9999.0      9999.0      9999.0      2025-09-05 15:00      2025-09-05 15:48      Terminated     TRANSMISSION     FORCED      ONPATH     PSCO     Must run 1 unit at min for area support     2025-09-05 12:42     PSCO57206      2025-09-05 15:48  
  ATER UNITS     132912     PSCO     Alamosa Terminal must run          GENERATOR-PSCO(PSCO)      9999.0      9999.0      9999.0      2025-09-15 08:00      2025-11-16 16:00      Active     TRANSMISSION     PLANNED      ONPATH     PSCO     Alamosa CTs must run, 1 unit minimum 5MW with 2nd unit available as needed for voltage support due to PONC-SARG & ATER-HOME outages     2025-02-19 15:46     PSCO54699      2025-02-19 15:46  
  CABIN CREEK GENERATION     140751     PSCO     Cabin Creek 230kV Bus outage          GENERATOR-PSCO(PSCO)      9999.0      9999.0      9999.0      2025-09-16 07:00      2025-10-07 16:00      Active     TRANSMISSION     PLANNED      ONPATH     PSCO     Cabin Creek A and B generators will be unavailable due to a scheduled bus outage     2025-08-27 16:54     PSCO57119      2025-08-27 16:54  
  TOT 5 RESTRICTION     140748     PSCO     Cabin Creek to Dillon 230kV line          TOT5E-TOT5W(PSCO) 
  TOT5W-TOT5E(PSCO)   
  388.0 
  480.0   
  388.0 
  480.0   
  350.0 
  350.0   
  2025-09-16 07:00 
  2025-09-16 07:00   
  2025-09-16 16:00 
  2025-09-16 16:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     PSCO     TOT 5 reduction while shoofly is set up to bypass Cabin Creek for bus outage. Following this outage the 5003 line will go directly to Dillon     2025-08-27 16:51     PSCO57118      2025-08-27 16:51  
  BOON/LAMAR AREA     141354     PSCO     Lamar DC Tie/Co. Green/Twin Buttes 1 2          GENERATOR-PSCO(PSCO)      9999.0      9999.0      9999.0      2025-09-22 07:00      2026-02-28 10:00      Active     TRANSMISSION     PLANNED      ONPATH     PSCO     Lamar DC tie imports and Colorado Green, Twin Buttes 1 & 2 will be limited to 319MW or less during this construction phase. Limits are dictated by real time system conditions.     2025-09-20 09:21     PSCO57385      2025-09-20 14:27  
  MSST GENERATION     138043     PSCO     Work on MSST RAS          GENERATOR-PSCO(PSCO)      9999.0      9999.0      9999.0      2025-09-22 08:00      2025-09-26 14:06      Completed     TRANSMISSION     PLANNED      ONPATH     PSCO     MSST generation limited to 900MWs. Includes Rush Creek 1&2, Bronco Plains 1&2, Cheyenne East & West, Limon Wind, Cedar Point and Titan Solar     2025-06-23 06:32     PSCO56280      2025-09-26 14:05  
  TOT 2A RESTRICTION     141363     PSCO               TOT2AN-TOT2AS(PSCO)      60.0      60.0      45.0      2025-09-22 17:00      2025-10-22 18:00      Active     TRANSMISSION     FORCED      ONPATH     PSCO          2025-09-22 16:28     PSCO57391      2025-09-22 16:28  
  COMANCHE TO PSCO     140681     PSCO     Comanche to Daniels Park 345kV line          COMA-PSCO.SOUTH(PSCO) 
  PSCO.SOUTH-COMA(PSCO)   
  2529.0 
  2529.0   
  2529.0 
  2529.0   
  1836.0 
  1836.0   
  2025-09-23 08:00 
  2025-09-23 08:00   
  2025-09-23 17:00 
  2025-09-23 17:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     PSCO     1 Comanche to Daniels Park 345kV line planned outage for static repair     2025-08-26 17:01     PSCO57102      2025-09-23 07:25  
  TRANSMISSION OUTAGE     141388     PSCO     Comanche to Daniels Park 345kV line          COMA-PSCO.SOUTH(PSCO) 
  PSCO.SOUTH-COMA(PSCO)   
  2529.0 
  2529.0   
  2529.0 
  2529.0   
  1836.0 
  1836.0   
  2025-09-26 08:00 
  2025-09-26 08:00   
  2025-09-26 14:08 
  2025-09-26 14:08   
  Terminated     TRANSMISSION     PLANNED      ONPATH     PSCO     Comanche - Daniels Park 345kV line outage     2025-09-24 18:34     PSCO57422      2025-09-26 14:08  
  TOT 5 RESTRICTION     140884     PSCO     Rifle to Hopkins 230KV line          TOT5W-TOT5E(PSCO)      480.0      480.0      250.0      2025-09-29 07:00      2025-10-10 16:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     PSCO          2025-09-03 14:42     PSCO57160      2025-09-03 14:42  
  TOT7 RESTRICTION     140678     PSCO     WAPA Ault to Severance 230kV Line          TOT7N-TOT7S(PSCO) 
  TOT7S-TOT7N(PSCO)   
  525.0 
  525.0   
  525.0 
  525.0   
  298.0 
  298.0   
  2025-09-29 07:00 
  2025-09-29 07:00   
  2025-10-17 16:00 
  2025-10-17 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     PSCO     WAPA Ault to Severance 230kV Line planned outage     2025-08-26 16:45     PSCO57101      2025-08-26 16:45  
  FT. ST. VRAIN GEN     133562     PSCO     FT. Lupton to Ft. St. Vrain 230kV Lines          GENERATOR-PSCO(PSCO)      9999.0      9999.0      9999.0      2025-10-01 08:00      2025-10-08 16:00      Scheduled     TRANSMISSION     FORCED      ONPATH     PSCO     Ft. St. Vrain, Spindle Hill and TOT7 Imports limited to a combined total of 1,100MW due to both Ft. St. Vrain - Ft. Lupton 230kV Lines being out at the same time for the dates and times below.      2025-03-07 16:16     PSCO54919      2025-04-02 14:05  
  TRANSMISSION OUTAGE     141351     PSCO     Pawnee to Fort Lupton 230kV Line          MSST-PAWN(PSCO) 
  PAWN-MSST(PSCO)   
  3062.0 
  3062.0   
  3062.0 
  3062.0   
  2581.0 
  2581.0   
  2025-10-10 07:00 
  2025-10-10 07:00   
  2025-10-15 15:00 
  2025-10-15 15:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     PSCO          2025-09-19 18:11     PSCO57384      2025-09-19 18:11  
  FSVR TO PSCO     133585     PSCO     Fort St Vrain to Keenesburg 230kV line          STVRN-PSCO(PSCO)      2028.0      2028.0      1716.0      2025-10-16 07:00      2025-11-06 16:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     PSCO          2025-03-09 18:54     PSCO54927      2025-09-03 14:56  
  TOT 5 RESTRICTION     139851     PSCO     Foidel Creek to Wolcott 230kV line          TOT5E-TOT5W(PSCO) 
  TOT5W-TOT5E(PSCO)   
  388.0 
  480.0   
  388.0 
  480.0   
  255.0 
  255.0   
  2025-10-29 08:00 
  2025-10-29 08:00   
  2025-11-03 16:00 
  2025-11-03 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     PSCO     Foidel Creek - Wolcott 230kV Line: Replace structures     2025-08-13 18:59     PSCO56911      2025-08-13 18:59  
  BLACK START TESTING     141116     PSCO     Cabin Creek A unit          TOT5W-TOT5E(PSCO)      480.0      480.0      350.0      2025-11-04 07:00      2025-11-04 10:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     PSCO     Both Units unavailable during testing.TOT 5 restriction     2025-09-09 12:12     PSCO57221      2025-09-09 12:12  
  BLACK START TESTING     141118     PSCO     Plains End 2          GENERATOR-PSCO(PSCO)      9999.0      9999.0      9999.0      2025-11-13 07:00      2025-11-13 10:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     PSCO     Plains End 2 unavailable during testing.     2025-09-09 12:15     PSCO57222      2025-09-09 12:15  
  KEENSBURG AREA GENERATION     141110     PSCO     Keenesburg to Cedar Creek               0.0      0.0      0.0      2026-01-01 08:00      2026-01-01 17:00      Cancelled     TRANSMISSION     PLANNED      ONPATH     PSCO     Ceadr Creek 1 & 2, and Mountain Breeze will be unavailable during this outage.     2025-09-09 09:18     PSCO57219      2025-09-09 09:20  
  KEENSBURG AREA GENERATION     141108     PSCO     Cedar Creek to Keenesburg 230kV Line          GENERATOR-PSCO(PSCO)      9999.0      9999.0      9999.0      2026-01-08 08:00      2026-01-14 17:00      Scheduled     TRANSMISSION     FORCED      ONPATH     PSCO     Cedar Creek, Mountain Breeze and Cedar Creek 2 generation unavailable for the duration of line outage.     2025-09-08 18:23     PSCO57218      2025-09-08 18:23  
  ATER #1 #2     141114     PSCO     Alamosa Terminal to Homelake 69kV line          GENERATOR-PSCO(PSCO)      9999.0      9999.0      9999.0      2026-03-09 10:00      2026-05-17 16:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     PSCO     Alamosa Terminal must run 1 unit at 5MW for area stability.     2025-09-09 09:25     PSCO57220      2025-09-09 09:25  
PSEI Outages:
  TPWR-PSEI limitation     83901     PSEI     Breaker 825 CT rating limitation          PSEI.SYSTEM-TPWR.STAR(PSEI) 
  TPWR.STAR-PSEI.SYSTEM(PSEI)   
  240.0 
  240.0   
  240.0 
  240.0   
  228.0 
  228.0   
  2010-11-01 15:00 
  2010-11-01 15:00   
  2030-11-01 00:00 
  2030-11-01 00:00   
  Active     TRANSMISSION     FORCED      ONPATH     PSEI     Breaker 825 has CT rating limiting transfers both directions to 228 MWs     2010-11-01 14:52     PSEI38337      2010-11-01 14:52  
  NewRevised CENT-PSEI     84264     PSEI     Centralia-Tono path          CENTRALIA-PSEI.SYSTEM(PSEI)      400.0      400.0      398.0      2010-11-08 16:00      2030-01-01 00:00      Active     TRANSMISSION     FORCED      ONPATH     PSEI     CT's in the Tono transformer have a rating factor of 1.0 so should be limited to 398 MVA on the Tono banks (2000:5 CT ratio) with the current metering.     2010-11-08 15:44     PSEI38514      2010-11-08 15:44  
  JD-COB Uprate 2011     98437     PSEI     Pacific AC Intertie          JOHNDAY-COB(PSEI)      400.0      0.0      350.0      2011-08-01 00:00      2040-01-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     PSEI     BPAT is path operator - determines OTC and PSEIs share - uprate project complete, posting 350 MW year round for forward sales     2011-07-27 17:06     PSEI44671      2011-07-27 17:06  
  JD-COB Upgrade     100195     PSEI     Pacific AC Intertie          JOHNDAY-COB(PSEI)      400.0      0.0      400.0      2011-10-01 00:00      2041-10-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     PSEI     BPAT completed upgrade project - PSEI management determined PSEIs share 400 year around     2011-08-30 14:22     PSEI45364      2011-08-30 14:22  
  New PSEI-SUMAS TTC     106292     PSEI     City of Sumas          PSEI.SYSTEM-SUMAS(PSEI)      7.0      0.0      10.0      2012-01-01 00:00      2028-10-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     PSEI     Studies associated with Network Service to this load show increased capacity to serve load     2011-11-18 14:04     PSEI47219      2011-11-18 14:04  
  CENTRALIA-PSEI.SYSTEM     170800     PSEI     Tono          CENTRALIA-PSEI.SYSTEM(PSEI)      400.0      0.0      400.0      2014-11-26 12:00      2040-11-26 00:00      Active     TRANSMISSION     PLANNED      ONPATH     PSEI     contract limit     2014-11-26 10:47     PSEI70549      2014-11-26 10:47  
  COB - JD     542489     PSEI               COB-JOHNDAY(PSEI)      306.0      306.0      308.0      2025-06-06 15:00      2025-11-01 00:00      Active     TRANSMISSION     FORCED      ONPATH     PSEI     Reduction of TTC on COI by path operator, BPAT as Path Operator establishes the path rating.     2025-06-04 14:45     PSEI199228      2025-06-04 14:45  
  COLSTRIP-PSEI (PATH 8)     555958     PSEI               BROADVIEW-TOWNSEND(PSEI) 
  COLSTRIP-BROADVIEW(PSEI)   
  758.0 
  746.0   
  758.0 
  746.0   
  588.0 
  588.0   
  2025-09-29 07:00 
  2025-09-29 07:00   
  2025-10-05 16:00 
  2025-10-05 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     PSEI     Reduction of TTC on CTS by path operator, NWMT as Path Operator establishes the path rating.     2025-09-24 13:25     PSEI204019      2025-09-24 13:25  
SMD1 Outages:
  COI DERATE (N-S AND S-N)     154856     BANC     COI DERATE          COTP N-S(BANC) 
  COTP S-N(BANC) 

  COTP N-S(BANC) 
  COTP S-N(BANC) 

  COTP N-S(BANC) 
  COTP S-N(BANC)   
  5100.0 
  3675.0 

  5100.0 
  3675.0 

  5100.0 
  3675.0   
  5100.0 
  3675.0 

  5100.0 
  3675.0 

  5100.0 
  3675.0   
  4600.0 
  2800.0 

  4350.0 
  3625.0 

  4350.0 
  2800.0   
  2025-06-01 00:00 
  2025-06-01 00:00 

  2025-08-29 18:00 
  2025-08-29 18:00 

  2025-08-29 18:26 
  2025-08-29 18:26   
  2025-08-29 18:00 
  2025-08-29 18:00 

  2025-08-29 18:26 
  2025-08-29 18:26 

  2025-11-01 00:00 
  2025-11-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     SMD1     COI DERATE: N>S 4600MW, S>N 2800 Seasonal Limit     2025-04-24 22:11     BANC54721      2025-08-29 18:26  
  COI DERATE (N-S AND S-N)     155200     BANC               COTP N-S(BANC) 
  COTP S-N(BANC) 

  COTP N-S(BANC) 
  COTP S-N(BANC) 

  COTP N-S(BANC) 
  COTP S-N(BANC) 

  COTP N-S(BANC) 
  COTP S-N(BANC) 

  COTP N-S(BANC) 
  COTP S-N(BANC) 

  COTP N-S(BANC) 
  COTP S-N(BANC)   
  5100.0 
  3675.0 

  5100.0 
  3675.0 

  5100.0 
  3675.0 

  5100.0 
  3675.0 

  5100.0 
  3675.0 

  5100.0 
  3675.0   
  5100.0 
  3675.0 

  5100.0 
  3675.0 

  5100.0 
  3675.0 

  5100.0 
  3675.0 

  5100.0 
  3675.0 

  5100.0 
  3675.0   
  3700.0 
  3575.0 

  4325.0 
  3575.0 

  4350.0 
  3625.0 

  4350.0 
  3575.0 

  4325.0 
  3575.0 

  4350.0 
  3600.0   
  2025-06-13 15:00 
  2025-06-13 15:00 

  2025-06-20 08:17 
  2025-06-20 08:17 

  2025-08-29 18:17 
  2025-08-29 18:17 

  2025-09-03 07:12 
  2025-09-03 07:12 

  2025-09-12 16:00 
  2025-09-12 16:00 

  2025-09-12 17:00 
  2025-09-12 17:00   
  2025-06-20 08:17 
  2025-06-20 08:17 

  2025-08-29 18:17 
  2025-08-29 18:17 

  2025-09-03 07:12 
  2025-09-03 07:12 

  2025-09-12 16:00 
  2025-09-12 16:00 

  2025-09-12 17:00 
  2025-09-12 17:00 

  2025-11-01 00:00 
  2025-11-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     SMD1     DERATE: N>S 4350 MW, S>N 3600 MW. TBM-RDM 1 and 2 Series caps.     2025-06-04 22:25     BANC54786      2025-09-12 17:13  
  COI DERATE (N-S AND S-N)     155669     BANC               COTP N-S(BANC) 
  COTP S-N(BANC)   
  5100.0 
  3675.0   
  5100.0 
  3675.0   
  4600.0 
  2800.0   
  2025-09-22 00:01 
  2025-09-22 00:01   
  2025-09-28 23:59 
  2025-09-28 23:59   
  Active     TRANSMISSION     PLANNED      ONPATH     SMD1     DERATE: BPA VARIOUS EQUIPMENT. 4600 N>S, 2800 S>N     2025-09-02 17:44     BANC54869      2025-09-02 17:44  
  COI DERATE (N-S AND S-N)     155784     BANC     COI N-S, S-N DERATE          COTP N-S(BANC) 
  COTP S-N(BANC)   
  5100.0 
  3675.0   
  5100.0 
  3675.0   
  4275.0 
  3400.0   
  2025-09-22 07:00 
  2025-09-22 07:00   
  2025-10-02 18:00 
  2025-10-02 18:00   
  Active     TRANSMISSION     PLANNED      ONPATH     SMD1     DERATE: Vaca-Tesla 500kV, Malin 4080 Disconnect, TBM SCAP, COI N-S 4275 MW, S-N 3400     2025-09-17 18:18     BANC54885      2025-09-22 05:42  
  COI DERATE (N-S AND S-N)     155825     BANC     COI DERATE          COTP N-S(BANC) 
  COTP S-N(BANC)   
  5100.0 
  3675.0   
  5100.0 
  3675.0   
  3225.0 
  2400.0   
  2025-10-01 07:00 
  2025-10-01 07:00   
  2025-10-02 18:00 
  2025-10-02 18:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     SMD1     DERATE: COI N>S 3225 MW S>N 2400 MW. TBM: RDM 1 & 2 SCAPs OOS; VAC-TES 500kV Line; OLN-TCY 500kV Line.     2025-09-24 18:27     BANC54888      2025-09-24 18:27  
  COI DERATE (N-S ONLY)     155719     BANC     COI DERATE (N-S ONLY)          COTP N-S(BANC) 

  COTP N-S(BANC)   
  5100.0 

  5100.0   
  5100.0 

  5100.0   
  4330.0 

  4330.0   
  2025-10-01 08:00 

  2025-10-06 00:00   
  2025-10-06 00:00 

  2025-10-15 15:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     SMD1     DERATE: N-S 4330 MW, S-N unchanged. BPA-Ponderosa-Captain Jack Sect of the Griz-Captain Jack 1 500 kV line.     2025-09-10 21:12     BANC54880      2025-09-12 20:11  
  COI DERATE (N-S AND S-N)     155828     BANC     COI DERATE          COTP N-S(BANC) 
  COTP S-N(BANC)   
  5100.0 
  3675.0   
  5100.0 
  3675.0   
  3475.0 
  2925.0   
  2025-10-02 17:00 
  2025-10-02 17:00   
  2025-10-03 17:00 
  2025-10-03 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     SMD1     DERATE: COI N>S 3475 MW S>N 2925 MW. TBM: RDM 1 & 2 SCAPs OOS; MLN: RDM 2 500kV SCAPs; OLN-TCY 500kV Line.     2025-09-24 18:32     BANC54889      2025-09-24 18:32  
  COI DERATE (N-S AND S-N)     155831     BANC     COI DERATE          COTP N-S(BANC) 
  COTP S-N(BANC)   
  5100.0 
  3675.0   
  5100.0 
  3675.0   
  4450.0 
  3200.0   
  2025-10-03 17:00 
  2025-10-03 17:00   
  2025-10-31 16:00 
  2025-10-31 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     SMD1     DERATE: COI N>S 4450 MW S>N 3200 MW. TBM: RDM 1 & 2 SCAPs OOS; OLN-TCY 500kV Line.     2025-09-24 18:40     BANC54890      2025-09-24 18:40  
  COI DERATE (N-S AND S-N)     155741     BANC     COI DERATE          COTP N-S(BANC) 
  COTP S-N(BANC)   
  5100.0 
  3675.0   
  5100.0 
  3675.0   
  2550.0 
  0.0   
  2025-10-10 08:00 
  2025-10-10 08:00   
  2025-10-14 15:00 
  2025-10-14 15:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     SMD1     DERATE: N-S 2550 MW, S-N 0 MW. PACW Meridian-Klamath Cogen 500kv line.     2025-09-12 20:18     BANC54881      2025-09-12 20:18  
  COI DERATE (N-S AND S-N)     155744     BANC     COI DERATE          COTP N-S(BANC) 
  COTP S-N(BANC)   
  5100.0 
  3675.0   
  5100.0 
  3675.0   
  3077.0 
  1635.0   
  2025-10-15 08:00 
  2025-10-15 08:00   
  2025-10-15 15:00 
  2025-10-15 15:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     SMD1     DERATE: N-S 3077 MW, S-N 1635 MW. BPA Various Equipment Outages.     2025-09-12 20:24     BANC54882      2025-09-12 20:24  
SPPC Outages:
SRP Outages:
  CORONADO-SILVERKING 500KV     423489     SRP     Coronado - Silverking 500kV Line          CORONADO500-SILVERKIN500(SRP)      0.0      0.0      0.0      2025-10-06 05:00      2025-10-17 15:00      Scheduled     TRANSMISSION     PLANNED      OFFPATH     SRP      Line Crew to replace spacers, corona rings, and step bolts along circuit.     2025-09-17 13:03     SRP162817      2025-09-17 13:03  
SWTC Outages:
  GREENLEE/AEPCO-GRNLEE/TEP     555650     SWTC     Greenlee Tie          GREENLEE345-GRENLESWT345(SWTC) 
  GRENLESWT345-GREENLEE345(SWTC)   
  193.0 
  193.0   
  193.0 
  193.0   
  0.0 
  0.0   
  2025-09-29 08:00 
  2025-09-29 08:00   
  2025-10-02 16:00 
  2025-10-02 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     SWTC          2025-09-18 11:26     SWTC203843      2025-09-18 11:26  
  REDTAIL DOS CONDADOS 230     555653     SWTC     Redtail-Dos Condados          APACHE230-DOSCONDAD230(SWTC) 
  DOSCONDAD230-APACHE230(SWTC)   
  471.0 
  471.0   
  471.0 
  471.0   
  0.0 
  0.0   
  2025-10-06 08:00 
  2025-10-06 08:00   
  2025-10-09 16:00 
  2025-10-09 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     SWTC          2025-09-18 11:41     SWTC203844      2025-09-18 11:41  
  GREENLEE/AEPCO-GRNLEE/TEP     556005     SWTC     Greenlee/AEPCO-GRNLEE/TEP          GREENLEE345-GRENLESWT345(SWTC) 
  GRENLESWT345-GREENLEE345(SWTC)   
  193.0 
  193.0   
  193.0 
  193.0   
  0.0 
  0.0   
  2025-10-06 10:00 
  2025-10-06 10:00   
  2025-10-06 13:00 
  2025-10-06 13:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     SWTC          2025-09-25 16:26     SWTC204041      2025-09-25 16:26  
  REDTAIL DOS CONDADOS 230     555656     SWTC     Redtail-Dos Condados          APACHE230-DOSCONDAD230(SWTC) 
  DOSCONDAD230-APACHE230(SWTC)   
  471.0 
  471.0   
  471.0 
  471.0   
  0.0 
  0.0   
  2025-10-13 08:00 
  2025-10-13 08:00   
  2025-10-16 16:00 
  2025-10-16 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     SWTC          2025-09-18 11:47     SWTC203845      2025-09-18 11:47  
  APACHE REDTAIL 230     555683     SWTC     Apache-Redtail 230kV          APACHE230-DOSCONDAD230(SWTC) 
  DOSCONDAD230-APACHE230(SWTC)   
  471.0 
  471.0   
  471.0 
  471.0   
  0.0 
  0.0   
  2025-10-20 08:00 
  2025-10-20 08:00   
  2025-10-23 16:00 
  2025-10-23 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     SWTC     Clearance points are SW RT222, SW AP222, SW AP233     2025-09-18 15:28     SWTC203851      2025-09-18 15:28  
  MARANA -MARANA TAP     555988     SWTC     Marana-Marana Tap          MARANA115-MARANA115(SWTC)      143.0      143.0      0.0      2025-10-27 06:00      2025-11-20 16:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     SWTC          2025-09-25 13:26     SWTC204035      2025-09-25 13:26  
  APACHE REDTAIL 230     555686     SWTC     Apache-Redtail 230kV          APACHE230-DOSCONDAD230(SWTC) 
  DOSCONDAD230-APACHE230(SWTC)   
  471.0 
  471.0   
  471.0 
  471.0   
  0.0 
  0.0   
  2025-10-27 08:00 
  2025-10-27 08:00   
  2025-10-30 16:00 
  2025-10-30 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     SWTC     Clearance points are SW RT222, SW AP222, SW AP233     2025-09-18 15:33     SWTC203852      2025-09-18 15:33  
TANC Outages:
TEPC Outages:
  SPRINGERVILLE - CATRON     554594     TEPC               CATRON345-SPRINGER345(TEPC) 
  SPRINGER345-CATRON345(TEPC)   
  2390.0 
  2390.0   
  2390.0 
  2390.0   
  0.0 
  0.0   
  2025-09-03 13:00 
  2025-09-03 13:00   
  2025-09-04 14:00 
  2025-09-04 14:00   
  Cancelled     TRANSMISSION     FORCED      ONPATH     TEPC     SPV - Catron 345      2025-09-03 12:23     TEPC203421      2025-09-03 12:25  
  PINALWEST345-SOUTHLOOP345     553100     TEPC               PINALWEST345-SOUTHLOOP345(TEPC) 
  SOUTHLOOP345-PINALWEST345(TEPC)   
  908.0 
  908.0   
  908.0 
  908.0   
  0.0 
  0.0   
  2025-09-08 22:00 
  2025-09-08 22:00   
  2025-09-09 03:00 
  2025-09-09 03:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     TEPC          2025-08-20 07:12     TEPC202892      2025-09-09 02:59  
  PINALWEST345-SOUTHLOOP345     553109     TEPC               PINALWEST345-SOUTHLOOP345(TEPC) 
  SOUTHLOOP345-PINALWEST345(TEPC)   
  908.0 
  908.0   
  908.0 
  908.0   
  908.0 
  908.0   
  2025-09-09 22:00 
  2025-09-09 22:00   
  2025-09-10 09:00 
  2025-09-10 09:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     TEPC     Night outage. Crew needs line de-energized while replacing bushings on South Loop 345kV reactor (313C)     2025-08-20 07:53     TEPC202894      2025-09-08 12:47  
  PINALWEST345-SOUTHLOOP345     554693     TEPC               PINALWEST345-SOUTHLOOP345(TEPC) 
  SOUTHLOOP345-PINALWEST345(TEPC)   
  908.0 
  908.0   
  908.0 
  908.0   
  0.0 
  0.0   
  2025-09-22 22:00 
  2025-09-22 22:00   
  2025-09-23 06:00 
  2025-09-23 06:00   
  Completed     TRANSMISSION     FORCED      ONPATH     TEPC      Night outage. Crew needs line de-energized while replacing bushings on South Loop 345kV reactor (313C)     2025-09-05 10:05     TEPC203470      2025-09-23 05:28  
  SAG500-TORT500     534875     TEPC               SAGUARO500-TORTOLITA500(TEPC) 
  TORTOLITA500-SAGUARO500(TEPC)   
  692.0 
  692.0   
  692.0 
  692.0   
  0.0 
  0.0   
  2025-10-13 08:00 
  2025-10-13 08:00   
  2025-11-21 16:00 
  2025-11-21 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     TEPC          2025-04-23 12:26     TEPC196767      2025-04-23 12:26  
  WESTWING -PINAL WEST 345     533988     TEPC               PINALWEST345-WESTWING345(TEPC) 
  WESTWING345-PINALWEST345(TEPC)   
  703.0 
  703.0   
  703.0 
  703.0   
  0.0 
  0.0   
  2026-02-02 08:00 
  2026-02-02 08:00   
  2026-02-11 16:00 
  2026-02-11 16:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     TEPC          2025-04-17 13:13     TEPC196435      2025-07-28 14:25  
  WESTWING -PINAL WEST 345     549569     TEPC               PINALWEST345-WESTWING345(TEPC) 
  WESTWING345-PINALWEST345(TEPC)   
  703.0 
  703.0   
  703.0 
  703.0   
  0.0 
  0.0   
  2026-02-02 08:00 
  2026-02-02 08:00   
  2026-02-06 14:00 
  2026-02-06 14:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     TEPC          2025-07-29 12:41     TEPC201774      2025-07-29 12:41  
  WESTWING -PINAL WEST 345     549572     TEPC               PINALWEST345-WESTWING345(TEPC) 
  WESTWING345-PINALWEST345(TEPC)   
  703.0 
  703.0   
  703.0 
  703.0   
  0.0 
  0.0   
  2026-03-06 08:00 
  2026-03-06 08:00   
  2026-03-20 14:00 
  2026-03-20 14:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     TEPC          2025-07-29 12:50     TEPC201775      2025-07-29 12:50  
  WW-PW-SL     533670     TEPC               PINALWEST345-WESTWING345(TEPC) 
  WESTWING345-PINALWEST345(TEPC)   
  703.0 
  703.0   
  703.0 
  703.0   
  0.0 
  0.0   
  2026-03-06 08:00 
  2026-03-06 08:00   
  2026-03-20 14:00 
  2026-03-20 14:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     TEPC     Part of T7 transformer replacement projectPhase 1Full station outage is needed to disconnect T7 from the system.     2025-04-15 14:54     TEPC196346      2025-07-29 12:51  
TPWT Outages:
TSGT Outages:
  FIRE IMPACTED FACILITIES     552235     TSGT     Meeker-McBryde 345kV Meeker-Magnolia 138kV lines          TSGTWEST-TSGTWEST(TSGT) 

  TSGTWEST-TSGTWEST(TSGT)   
  0.0 

  0.0   
  0.0 

  0.0   
  0.0 

  0.0   
  2025-08-14 08:00 

  2025-10-01 00:00   
  2025-10-01 00:00 

  2025-12-01 17:00   
  Active     TRANSMISSION     FORCED      ONPATH     TSGT     White River's Meeker - McBryde 345kV and Meeker - Magnolia 138kV lines are out of service due to fire. The largest portion of White River's load is being served from Calamity Ridge and requires TSPM to procure PTP transmission service on DGT's system until further notice. Stop date is a rough estimate and will be updated as conditions change.     2025-08-14 07:57     TSGT202623      2025-09-25 09:53  
  PATH TTC IMPACT     554484     TSGT     DAVE JOHNSTON - LRS 345 KV LINE          DJ-LRS230(TSGT) 
  LRS230-DJ(TSGT) 
  TOT3INFO-TOT3INFO(TSGT) 

  DJ-LRS230(TSGT) 
  LRS230-DJ(TSGT) 
  TOT3INFO-TOT3INFO(TSGT)   
  164.0 
  168.0 
  400.0 

  164.0 
  168.0 
  400.0   
  164.0 
  168.0 
  400.0 

  164.0 
  168.0 
  400.0   
  0.0 
  0.0 
  400.0 

  0.0 
  0.0 
  400.0   
  2025-09-03 08:00 
  2025-09-03 08:00 
  2025-09-03 08:00 

  2025-09-03 17:00 
  2025-09-03 17:00 
  2025-09-03 17:00   
  2025-09-03 17:00 
  2025-09-03 17:00 
  2025-09-03 17:00 

  2025-09-16 11:00 
  2025-09-16 11:00 
  2025-09-16 11:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage limits TOT 3 path TTC. Limit may change based upon system conditions.     2025-09-02 12:24     TSGT203390      2025-09-16 10:19  
  PATH TTC IMPACT     554968     TSGT     AXIAL - HAYDEN 138KV LINE          CRG-RFL(TSGT) 
  RFL-CRG(TSGT)   
  537.0 
  537.0   
  537.0 
  537.0   
  412.0 
  412.0   
  2025-09-15 08:00 
  2025-09-15 08:00   
  2025-09-19 17:00 
  2025-09-19 17:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage limits path TTC.     2025-09-09 05:38     TSGT203587      2025-09-09 05:38  
  PATH TTC IMPACT     522849     TSGT     BLACK LAKE - TAOS 115KV LINE          BLLK-TAOS(TSGT) 
  TAOS-BLLK(TSGT) 

  BLLK-TAOS(TSGT) 
  TAOS-BLLK(TSGT)   
  238.0 
  238.0 

  238.0 
  238.0   
  238.0 
  238.0 

  238.0 
  238.0   
  0.0 
  0.0 

  0.0 
  0.0   
  2025-09-15 09:00 
  2025-09-15 09:00 

  2025-09-21 17:00 
  2025-09-21 17:00   
  2025-09-21 17:00 
  2025-09-21 17:00 

  2025-10-12 17:00 
  2025-10-12 17:00   
  Active     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage limits path TTC.     2025-02-18 11:21     TSGT192778      2025-08-26 06:39  
  TOT 5 RESTRICTION     552472     TSGT     CABIN CREEK - DILLION          CRG-TOT5GW(TSGT) 
  TOT5GW-CRG(TSGT)   
  260.0 
  210.0   
  260.0 
  210.0   
  260.0 
  210.0   
  2025-09-16 08:00 
  2025-09-16 08:00   
  2025-09-16 09:00 
  2025-09-16 09:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage can impact TSGT's TOT 5 path TTC depending upon if outage is forced or planned.     2025-08-16 07:33     TSGT202715      2025-08-16 07:33  
  PATH TTC IMPACT     555647     TSGT     GALLUP - YAH-TA-HEY 115KV LINE          GALLUP.FTM-YATH(TSGT) 
  YATH-GALLUP.FTM(TSGT)   
  112.0 
  112.0   
  112.0 
  112.0   
  0.0 
  0.0   
  2025-09-18 05:42 
  2025-09-18 05:42   
  2025-09-19 18:00 
  2025-09-19 18:00   
  Completed     TRANSMISSION     FORCED      ONPATH     TSGT     Outage limits path TTC. Member load affected.     2025-09-18 05:45     TSGT203842      2025-09-19 17:35  
  PATH TTC IMPACT     555050     TSGT     Belen - Socorro 115kV Line          BELN-SOCO(TSGT) 
  SOCO-BELN(TSGT)   
  120.0 
  120.0   
  120.0 
  120.0   
  0.0 
  0.0   
  2025-09-18 11:00 
  2025-09-18 11:00   
  2026-01-05 11:00 
  2026-01-05 11:00   
  Active     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage limits path TTC.     2025-09-10 05:18     TSGT203620      2025-09-10 05:18  
  PATH TTC IMPACT     522853     TSGT     BLACK LAKE - TAOS 115KV LINE          BLLK-TAOS(TSGT) 
  TAOS-BLLK(TSGT)   
  238.0 
  238.0   
  238.0 
  238.0   
  0.0 
  0.0   
  2025-09-22 08:00 
  2025-09-22 08:00   
  2025-09-28 19:00 
  2025-09-28 19:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage limits path TTC.     2025-02-18 11:28     TSGT192780      2025-08-26 06:40  
  GENERATION RESTRICTION     555813     TSGT     CRAIG 345/230/13.8KV T1          TSGTWEST-TSGTWEST(TSGT)      0.0      0.0      0.0      2025-09-22 16:00      2025-09-22 17:00      Completed     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage does not impact TTC. Generation Restriction.     2025-09-22 15:20     TSGT203929      2025-09-22 15:20  
  RADIAL LOAD     555865     TSGT     PONCHA - SMELTERTOWN 115KV LINE          TSGTWEST-TSGTWEST(TSGT)      0.0      0.0      0.0      2025-09-23 06:00      2025-09-23 07:00      Completed     TRANSMISSION     PLANNED      ONPATH     TSGT     TTC is not impacted. Member load affected.     2025-09-23 05:44     TSGT203967      2025-09-23 05:44  
  TOT 1 RESTRICTION     555659     TSGT     CALAMITY RIDGE - WHITE RIVER CITY          BOZ-CRG(TSGT) 
  CALRIDGE-CRG(TSGT) 
  CRG-BOZ(TSGT) 
  CRG-CALRIDGE(TSGT)   
  29.0 
  105.0 
  29.0 
  105.0   
  29.0 
  105.0 
  29.0 
  105.0   
  26.0 
  0.0 
  26.0 
  0.0   
  2025-09-29 05:00 
  2025-09-29 05:00 
  2025-09-29 05:00 
  2025-09-29 05:00   
  2025-10-10 17:00 
  2025-10-10 17:00 
  2025-10-10 17:00 
  2025-10-10 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage limits TOT1 path TTC.     2025-09-18 13:48     TSGT203846      2025-09-18 13:48  
  PATH TTC IMPACT     522856     TSGT     BLACK LAKE - TAOS 115KV LINE          BLLK-TAOS(TSGT) 
  TAOS-BLLK(TSGT)   
  238.0 
  238.0   
  238.0 
  238.0   
  0.0 
  0.0   
  2025-09-29 08:00 
  2025-09-29 08:00   
  2025-10-05 19:00 
  2025-10-05 19:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage limits path TTC.     2025-02-18 11:33     TSGT192781      2025-08-26 06:40  
  PATH TTC IMPACT     555630     TSGT     DONA ANA - ALAMOGORDO          ALAMOGRDO115-DONAANA115(TSGT) 
  DONAANA115-ALAMOGRDO115(TSGT)   
  159.0 
  159.0   
  159.0 
  159.0   
  0.0 
  0.0   
  2025-09-29 08:00 
  2025-09-29 08:00   
  2025-10-02 17:30 
  2025-10-02 17:30   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage limits path TTC. Member load affected.     2025-09-17 14:39     TSGT203835      2025-09-17 14:39  
  TOT 1 RESTRICTION     553908     TSGT     CALAMITY RIDGE - WHITE RIVER CITY          BOZ-CRG(TSGT) 
  CALRIDGE-CRG(TSGT) 
  CRG-BOZ(TSGT) 
  CRG-CALRIDGE(TSGT)   
  29.0 
  105.0 
  29.0 
  105.0   
  29.0 
  105.0 
  29.0 
  105.0   
  26.0 
  0.0 
  26.0 
  0.0   
  2025-09-29 09:00 
  2025-09-29 09:00 
  2025-09-29 09:00 
  2025-09-29 09:00   
  2025-10-17 12:00 
  2025-10-17 12:00 
  2025-10-17 12:00 
  2025-10-17 12:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage limits TOT 1 and path TTC. Member load affected.     2025-08-26 10:35     TSGT203177      2025-09-18 13:51  
  TOT 3 RESTRICTION     517451     TSGT     Stegall - Sidney 230KV Line          SCSW-SGW(TSGT) 
  SGW-SCSW(TSGT) 
  TOT3INFO-TOT3INFO(TSGT)   
  71.0 
  82.0 
  400.0   
  71.0 
  82.0 
  400.0   
  0.0 
  0.0 
  400.0   
  2025-09-29 10:00 
  2025-09-29 10:00 
  2025-09-29 10:00   
  2025-10-11 17:00 
  2025-10-11 17:00 
  2025-10-11 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage limits TOT 3 path TTC. Limit may change based upon system conditions.     2025-01-23 08:43     TSGT191090      2025-01-23 08:43  
  PATH TTC IMPACT     555949     TSGT     LARAMIE RIVER STATION T2          LRS230-LRS69(TSGT)      50.0      50.0      0.0      2025-10-01 08:00      2025-10-01 17:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage limits path TTC. Member load affected.     2025-09-24 10:27     TSGT204016      2025-09-24 10:27  
  GENERATION RESTRICTION     555967     TSGT     DEERING LAKE - OTIS 115KV LINE SECTION           TSGTEAST-TSGTEAST(TSGT)      0.0      0.0      0.0      2025-10-06 08:00      2025-10-10 16:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage does not impact TTC. GENERATION RESTRICTION     2025-09-25 06:05     TSGT204023      2025-09-25 06:05  
  PATH TTC IMPACT     522859     TSGT     BLACK LAKE - TAOS 115KV LINE          BLLK-TAOS(TSGT) 
  TAOS-BLLK(TSGT)   
  238.0 
  238.0   
  238.0 
  238.0   
  0.0 
  0.0   
  2025-10-06 08:00 
  2025-10-06 08:00   
  2025-10-12 19:00 
  2025-10-12 19:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage limits path TTC.     2025-02-18 11:39     TSGT192782      2025-08-26 06:41  
  RADIAL LOAD     555969     TSGT     OTIS - DEERING LAKE 115KV LINE SECTION          TSGTEAST-TSGTEAST(TSGT)      0.0      0.0      0.0      2025-10-06 08:00      2025-10-10 16:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage does not impact TTC. Member load affected.     2025-09-25 06:09     TSGT204024      2025-09-25 06:09  
  TOT 3 RESTRICTION     555971     TSGT     MYERS TAP - ROUND TOP 115LV LINE SECTION          TOT3INFO-TOT3INFO(TSGT)      400.0      400.0      400.0      2025-10-13 07:00      2025-10-13 16:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage limits TOT 3 path TTC. Limit may change based upon system conditions.     2025-09-25 07:04     TSGT204025      2025-09-25 07:04  
  PATH TTC IMPACT     522864     TSGT     BLACK LAKE - TAOS 115KV LINE          BLLK-TAOS(TSGT) 
  TAOS-BLLK(TSGT)   
  238.0 
  238.0   
  238.0 
  238.0   
  0.0 
  0.0   
  2025-10-13 08:00 
  2025-10-13 08:00   
  2025-10-19 19:00 
  2025-10-19 19:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage limits path TTC.     2025-02-18 11:44     TSGT192784      2025-02-18 11:44  
  PATH TTC IMPACT     522846     TSGT     BLACK LAKE - TAOS 115KV LINE          BLLK-TAOS(TSGT) 
  TAOS-BLLK(TSGT)   
  238.0 
  238.0   
  238.0 
  238.0   
  0.0 
  0.0   
  2025-10-20 08:00 
  2025-10-20 08:00   
  2025-10-26 19:00 
  2025-10-26 19:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage limits path TTC.     2025-02-18 11:07     TSGT192777      2025-02-18 11:07  
WALC Outages:
  GAVILANPK230-PNPKWALC230     64727     WALC     GPK-PPK 230kV Line          GAVILANPK230-PNPKWALC230(WALC) 
  PNPKWALC230-GAVILANPK230(WALC)   
  400.0 
  400.0   
  400.0 
  400.0   
  0.0 
  0.0   
  2025-09-15 07:00 
  2025-09-15 07:00   
  2025-09-23 09:23 
  2025-09-23 09:23   
  Completed     TRANSMISSION     PLANNED      ONPATH     WALC          2025-08-18 10:35     WALC19888      2025-09-23 09:22  
  Adelanto-Mktplc 1 500kV     64949     WALC     Adelanto-Marketplace 1 500 line          LUGO-MARKETPLACE(WALC) 
  MARKETPLACE-LUGO(WALC)   
  108.0 
  108.0   
  108.0 
  108.0   
  0.0 
  0.0   
  2025-09-15 08:00 
  2025-09-15 08:00   
  2025-09-15 10:00 
  2025-09-15 10:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     WALC     See LADWP Outage 142620     2025-09-09 03:32     WALC20025      2025-09-09 03:32  
  HeadgateRck-Parker     65019     WALC     Headgate Rock-Parker 161kv Line          BLYTHE161-SWAZSYS(WALC) 
  PARKER161-SWAZSYS(WALC) 
  SWAZSYS-BLYTHE161(WALC) 
  SWAZSYS-PARKER161(WALC)   
  330.0 
  441.0 
  330.0 
  441.0   
  330.0 
  441.0 
  330.0 
  441.0   
  320.0 
  294.0 
  320.0 
  294.0   
  2025-09-17 06:00 
  2025-09-17 06:00 
  2025-09-17 06:00 
  2025-09-17 06:00   
  2025-09-17 14:00 
  2025-09-17 14:00 
  2025-09-17 14:00 
  2025-09-17 14:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     WALC     Headgate Rock-Parker 161kv Line OOS. Urgent outage     2025-09-16 09:28     WALC20060      2025-09-17 13:34  
  ED4-ED5 115KV     65031     WALC               ED5-ED4(WALC)      100.0      100.0      0.0      2025-09-18 08:00      2025-09-18 13:00      Completed     TRANSMISSION     PLANNED      ONPATH     WALC          2025-09-17 18:01     WALC20064      2025-09-17 18:01  
  COOLIDGE-SUNDANCE 2 230k     65081     WALC     COOLIDGE-SUNDANCE 2 230k          COOLIDGE-SUNDANCE(WALC) 
  SUNDANCE-COOLIDGE(WALC)   
  451.0 
  734.0   
  451.0 
  734.0   
  377.0 
  377.0   
  2025-09-24 06:10 
  2025-09-24 06:10   
  2025-09-26 13:00 
  2025-09-26 13:00   
  Terminated     TRANSMISSION     FORCED      ONPATH     WALC          2025-09-24 06:08     WALC20089      2025-09-26 13:08  
  NAV-CRY SeriesComp Bypass     65103     WALC     Navajo-Crystal 500kV Series Compensation Bypassed          CRYSTAL500-MCCULLOUG500(WALC) 
  CRYSTAL500-NAVAJO500(WALC) 
  MCCULLOUG500-CRYSTAL500(WALC) 
  NAVAJO500-CRYSTAL500(WALC) 

  CRYSTAL500-MCCULLOUG500(WALC) 
  CRYSTAL500-NAVAJO500(WALC) 
  MCCULLOUG500-CRYSTAL500(WALC) 
  NAVAJO500-CRYSTAL500(WALC)   
  500.0 
  500.0 
  500.0 
  500.0 

  500.0 
  500.0 
  500.0 
  500.0   
  500.0 
  500.0 
  500.0 
  500.0 

  500.0 
  500.0 
  500.0 
  500.0   
  423.0 
  423.0 
  423.0 
  423.0 

  423.0 
  423.0 
  423.0 
  423.0   
  2025-09-25 19:20 
  2025-09-25 19:20 
  2025-09-25 19:20 
  2025-09-25 19:20 

  2025-09-26 12:00 
  2025-09-26 12:00 
  2025-09-26 12:00 
  2025-09-26 12:00   
  2025-09-26 12:00 
  2025-09-26 12:00 
  2025-09-26 12:00 
  2025-09-26 12:00 

  2025-09-26 14:00 
  2025-09-26 14:00 
  2025-09-26 14:00 
  2025-09-26 14:00   
  Completed     TRANSMISSION     FORCED      ONPATH     WALC          2025-09-25 19:17     WALC20098      2025-09-26 13:47  
  LIB PU11A Series Cap     64738     WALC     LIBERTY          LIBERTY230-PEACOCK230(WALC) 
  PEACOCK230-LIBERTY230(WALC)   
  450.0 
  450.0   
  450.0 
  450.0   
  300.0 
  300.0   
  2025-09-29 07:00 
  2025-09-29 07:00   
  2025-09-30 15:00 
  2025-09-30 15:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     WALC     LIBERTY PU11A series cap bypassed for planned maintenance     2025-08-19 05:50     WALC19893      2025-08-19 05:50  
  ED5-MARANA 115 KV LINE     64675     WALC     ED5-MARANA 115 KV LINE          ED5-MARANA115(WALC) 
  MARANA115-ED5(WALC)   
  159.0 
  159.0   
  159.0 
  159.0   
  0.0 
  0.0   
  2025-10-01 05:00 
  2025-10-01 05:00   
  2026-03-06 19:00 
  2026-03-06 19:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     WALC     ED5-MARANA 115 KV LINE OOS     2025-08-12 02:23     WALC19877      2025-08-12 02:23  
  ED4-ED5 115 KV LINE     64678     WALC     ED4-ED5 115 KV LINE          ED5-ED4(WALC)      100.0      100.0      0.0      2025-10-01 07:00      2025-11-22 17:00      Cancelled     TRANSMISSION     PLANNED      ONPATH     WALC     ED4-ED5 115 KV LINE OOS     2025-08-12 02:26     WALC19878      2025-09-18 05:01  
  ED4-ED5 115KV     65033     WALC               ED5-ED4(WALC)      100.0      100.0      0.0      2025-10-01 08:00      2025-11-10 17:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     WALC          2025-09-17 18:07     WALC20065      2025-09-17 18:07  
  LONEBUTTE MAIN XFER BUSES     65096     WALC     LOB 230kV Main and Xfer Buses          LIBERTY230-LONEBUTTE230(WALC) 
  LONEBUTTE230-LIBERTY230(WALC) 
  LONEBUTTE230-SUNDANCE(WALC) 
  LONEBUTTE230-TESTTRACK230(WALC) 
  SUNDANCE-LONEBUTTE230(WALC) 
  TESTTRACK230-LONEBUTTE230(WALC)   
  719.0 
  719.0 
  377.0 
  319.0 
  377.0 
  319.0   
  719.0 
  719.0 
  377.0 
  319.0 
  377.0 
  319.0   
  0.0 
  0.0 
  0.0 
  0.0 
  0.0 
  0.0   
  2025-10-14 23:00 
  2025-10-14 23:00 
  2025-10-14 23:00 
  2025-10-14 23:00 
  2025-10-14 23:00 
  2025-10-14 23:00   
  2025-10-15 09:00 
  2025-10-15 09:00 
  2025-10-15 09:00 
  2025-10-15 09:00 
  2025-10-15 09:00 
  2025-10-15 09:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     WALC     This is a complete outage of the Lone Butte substation 230kV Main and Transfer Buses. Both 230/69kV XFMRs will be de-energized and all 230kV Lines will be open-ended for the duration of the outage.     2025-09-25 00:51     WALC20097      2025-09-25 00:51  
  ED5-TTT 230kV Line     65108     WALC     ED5 - Test Track 230kV Line          ED5-TESTTRACK230(WALC) 
  TESTTRACK230-ED5(WALC)   
  375.0 
  375.0   
  375.0 
  375.0   
  0.0 
  0.0   
  2025-10-20 08:00 
  2025-10-20 08:00   
  2025-10-31 09:00 
  2025-10-31 09:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     WALC          2025-09-26 03:49     WALC20099      2025-09-26 03:49  
  PARKER XFMR KX4A AND KX6A     64865     WALC               PARKER161-PARKER230(WALC) 
  PARKER230-PARKER161(WALC)   
  334.0 
  334.0   
  334.0 
  334.0   
  0.0 
  0.0   
  2025-10-20 08:00 
  2025-10-20 08:00   
  2025-10-20 17:00 
  2025-10-20 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     WALC          2025-09-03 04:13     WALC19978      2025-09-03 04:13  
  ED5-TTT 230kV Line     64958     WALC     ED5 - Test Track 230kV Line          ED5-TESTTRACK230(WALC) 
  TESTTRACK230-ED5(WALC)   
  375.0 
  375.0   
  375.0 
  375.0   
  0.0 
  0.0   
  2025-10-21 08:00 
  2025-10-21 08:00   
  2025-10-22 15:00 
  2025-10-22 15:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     WALC          2025-09-09 04:11     WALC20028      2025-09-26 03:50  
  PAD KX4A AND KX6A XFMRS     64955     WALC     Parker 230/161 XFMRS (both)          PARKER161-PARKER230(WALC) 
  PARKER230-PARKER161(WALC)   
  334.0 
  334.0   
  334.0 
  334.0   
  0.0 
  0.0   
  2025-10-22 08:00 
  2025-10-22 08:00   
  2025-10-22 17:00 
  2025-10-22 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     WALC     Both 230/161kV XFMRS at PAD OOS     2025-09-09 03:51     WALC20027      2025-09-09 03:51  
  PAD XFMRS KW4A and KW6A     64969     WALC     PAD 230/161kV XFMRS KW4A KW6A          PARKER161-PARKER230(WALC) 
  PARKER230-PARKER161(WALC)   
  334.0 
  334.0   
  334.0 
  334.0   
  0.0 
  0.0   
  2025-10-23 08:00 
  2025-10-23 08:00   
  2025-10-23 17:00 
  2025-10-23 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     WALC     Both 230/161kV XFMRS at Parker     2025-09-10 03:54     WALC20037      2025-09-10 03:54  
  MRN-RSK 115kV Line     65093     WALC     Marana - Rattlesnake 115kV Line          MARANA115-TUCSON115(WALC) 
  TUCSON115-MARANA115(WALC)   
  96.0 
  120.0   
  96.0 
  120.0   
  0.0 
  0.0   
  2025-10-27 07:00 
  2025-10-27 07:00   
  2025-11-14 19:00 
  2025-11-14 19:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     WALC          2025-09-25 00:34     WALC20096      2025-09-25 00:34  
  BLYTHE-PARKER #2 LINE     65071     WALC     BLYTHE-PARKER #2 LINE          BLYTHE161-SWAZSYS(WALC) 
  PARKER161-SWAZSYS(WALC) 
  SWAZSYS-BLYTHE161(WALC) 
  SWAZSYS-PARKER161(WALC)   
  330.0 
  441.0 
  330.0 
  441.0   
  330.0 
  441.0 
  330.0 
  441.0   
  320.0 
  294.0 
  320.0 
  294.0   
  2025-10-28 07:00 
  2025-10-28 07:00 
  2025-10-28 07:00 
  2025-10-28 07:00   
  2025-10-30 17:00 
  2025-10-30 17:00 
  2025-10-30 17:00 
  2025-10-30 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     WALC     BLYTHE-PARKER #2 LINE OOS     2025-09-23 04:18     WALC20087      2025-09-23 04:18  
  LOB-PHX 230kV Line     64824     WALC     Lone Butte - Phoenix 230kV Line          LIBERTY230-LONEBUTTE230(WALC) 
  LONEBUTTE230-LIBERTY230(WALC)   
  719.0 
  719.0   
  719.0 
  719.0   
  377.0 
  377.0   
  2025-11-03 08:00 
  2025-11-03 08:00   
  2025-11-07 15:00 
  2025-11-07 15:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     WALC          2025-08-29 00:00     WALC19949      2025-08-29 00:00  
  WESTWING T1 TRANSFORMER     65068     WALC     WESTWING 500/230KV T-1 TRANSFORMER          WESTWING230-WESTWING500(WALC) 
  WESTWING500-WESTWING230(WALC)   
  817.0 
  817.0   
  817.0 
  817.0   
  410.0 
  410.0   
  2025-11-10 08:00 
  2025-11-10 08:00   
  2025-11-13 18:00 
  2025-11-13 18:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     WALC     WESTWING 500/230KV T1 TRANSFORMER OOS     2025-09-23 04:15     WALC20086      2025-09-23 04:15  
  ED2-ED4 115KV     65035     WALC     ED2-ED4 115KV           ED4-ED2(WALC)      100.0      100.0      0.0      2025-11-12 08:00      2025-12-15 17:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     WALC          2025-09-17 18:21     WALC20066      2025-09-17 18:21  
  LIB-PAD #1 230kV Line     64952     WALC     HSS-PAD 230kV Line          LIBERTY230-PARKER230(WALC) 
  PARKER230-LIBERTY230(WALC)   
  812.0 
  812.0   
  713.0 
  812.0   
  300.0 
  300.0   
  2025-11-24 08:00 
  2025-11-24 08:00   
  2025-11-26 13:00 
  2025-11-26 13:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     WALC     LIB - HSS - HCR - PAD is LIB-PAD #1. HSS-PAD is outaged. LIB-PAD #2 in service.     2025-09-09 03:41     WALC20026      2025-09-09 03:41  
WASN Outages:
WITP Outages: