LDWP Outages 
Apr 19, 2024 - May 19, 2024
Report created on Apr 19, 2024 at 02:00 (PPT)
Outage
Name
Outage
Id
Company Facility Flow
Gate
Segment/
JOTSFacility
Original
TTC In
Original
TTC Out
New
TTC
Start Time (PPT) Stop Time (PPT) Status Outage
Category
Outage
Type
Path
Impact
Report
TPs
Annotation Creation Time (PPT) EventId Last Updated (PPT)
  NWOR     134980     LDWP               NWOR (E-W)(LDWP) 
  NWOR (W-E)(LDWP) 

  NWOR (E-W)(LDWP) 
  NWOR (W-E)(LDWP) 

  NWOR (E-W)(LDWP) 
  NWOR (W-E)(LDWP) 

  NWOR (E-W)(LDWP) 
  NWOR (W-E)(LDWP) 

  NWOR (E-W)(LDWP) 
  NWOR (W-E)(LDWP) 

  NWOR (E-W)(LDWP) 
  NWOR (W-E)(LDWP)   
  0.0 
  0.0 

  2592.0 
  2662.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0   
  0.0 
  0.0 

  2592.0 
  2662.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0   
  2565.0 
  2635.0 

  2565.0 
  2635.0 

  2565.0 
  2635.0 

  2565.0 
  2635.0 

  2565.0 
  2635.0 

  2565.0 
  2635.0   
  2023-04-30 16:00 
  2023-04-30 16:00 

  2023-06-09 18:00 
  2023-06-09 18:00 

  2023-06-11 00:00 
  2023-06-11 00:00 

  2023-07-05 11:25 
  2023-07-05 11:25 

  2024-01-03 17:00 
  2024-01-03 17:00 

  2024-07-01 15:00 
  2024-07-01 15:00   
  2023-06-09 18:00 
  2023-06-09 18:00 

  2023-06-11 00:00 
  2023-06-11 00:00 

  2023-07-05 11:25 
  2023-07-05 11:25 

  2024-01-03 17:00 
  2024-01-03 17:00 

  2024-07-01 15:00 
  2024-07-01 15:00 

  2024-12-02 17:00 
  2024-12-02 17:00   
  Active     TRANSMISSION     PLANNED      ONPATH     LDWP     NWOR MCC-VIC 1 CAP OUT PER BID 16491 MCC-VIC 2 BYPASSED PER RT JOTS ENTRY. VALUES REPORTED VIA ATTACHMENTS TO BID 27342. FS.      2023-04-20 11:50     LDWP51063      2024-02-06 14:47  
  NWOR     135334     LDWP               NWOR (E-W)(LDWP) 
  NWOR (W-E)(LDWP) 

  NWOR (E-W)(LDWP) 
  NWOR (W-E)(LDWP)   
  0.0 
  0.0 

  0.0 
  0.0   
  0.0 
  0.0 

  0.0 
  0.0   
  2578.0 
  2648.0 

  2578.0 
  2648.0   
  2023-06-10 00:00 
  2023-06-10 00:00 

  2024-07-01 15:00 
  2024-07-01 15:00   
  2024-07-01 15:00 
  2024-07-01 15:00 

  2025-02-07 15:00 
  2025-02-07 15:00   
  Active     TRANSMISSION     PLANNED      ONPATH     LDWP     MCC-VIC 2 Series Compensation Bypassed     2023-06-09 10:02     LDWP51137      2024-02-06 13:23  
  VIC-LA     136376     LDWP               LA-VIC(LDWP) 
  VIC-LA(LDWP) 

  LA-VIC(LDWP) 
  VIC-LA(LDWP)   
  4500.0 
  4500.0 

  4500.0 
  4500.0   
  4300.0 
  4300.0 

  4500.0 
  4500.0   
  3050.0 
  3050.0 

  3050.0 
  3050.0   
  2024-01-14 04:00 
  2024-01-14 04:00 

  2024-04-07 18:00 
  2024-04-07 18:00   
  2024-04-07 18:00 
  2024-04-07 18:00 

  2024-04-20 18:00 
  2024-04-20 18:00   
  Active     TRANSMISSION     PLANNED      ONPATH     LDWP     VIC-LA 2023/11/16 10:19 BID 26925 TRANS PATROL: VICTORVILLE-RINALDI 1 500KV LINE (-OUT/CLEARED/CBS & DISC OPEN]; {RELOCATE TRANSMISSION TOWERS TO ADJUST ALIGNMENT] {VIC-LA & PDCI DE-RATES} (AWAITING LIMITS) AE     2023-11-16 10:38     LDWP51436      2024-04-06 06:59  
  PDCI (PATH 65)     136379     LDWP               PNDC (S-N)(LDWP) 

  PNDC (S-N)(LDWP)   
  975.0 

  975.0   
  975.0 

  975.0   
  0.0 

  0.0   
  2024-01-14 04:00 

  2024-04-07 18:00   
  2024-04-07 18:00 

  2024-04-20 18:00   
  Active     TRANSMISSION     PLANNED      ONPATH     LDWP     PNDC 2023/11/16 10:19 BID 26925 TRANS PATROL: VICTORVILLE-RINALDI 1 500KV LINE (-OUT/CLEARED/CBS & DISC OPEN]; {RELOCATE TRANSMISSION TOWERS TO ADJUST ALIGNMENT] {VIC-LA & PDCI DE-RATES} (AWAITING LIMITS) AE     2023-11-16 10:40     LDWP51437      2024-04-06 07:06  
  MISC     136476     LDWP               LA-SYL(LDWP) 
  SYL-LA(LDWP)   
  2050.0 
  2200.0   
  2050.0 
  2200.0   
  1100.0 
  1400.0   
  2024-01-27 13:00 
  2024-01-27 13:00   
  2024-11-27 16:00 
  2024-11-27 16:00   
  Cancelled     TRANSMISSION     FORCED      ONPATH     LDWP     LA-SYL 2023/11/24 10:23 BID 73542 SYLMAR-SS: SYLMAR-RINALDI 230-KV LINE 3 (-OUT-), [INCLUDING CB'S E-32 & E-33 AT RIN-RS DUE TO BLEED-THROUGH ISSUES];[INCLUDES CB E-32 AT SYL-SS]; (SYLMAR-SS STATION WASH DE-ENERGIZED); [IN CONJUNCTION WITH HASKELL CANYON-SYLMAR 230-KV LINE 1]. FS.     2023-11-27 08:39     LDWP51469      2023-11-27 08:40  
  INT-DC (PATH 27)     137352     LDWP               INT DC (NE-SW)(LDWP) 
  INT DC (SW-NE)(LDWP)   
  2400.0 
  1400.0   
  2400.0 
  1400.0   
  1200.0 
  1200.0   
  2024-04-10 22:00 
  2024-04-10 22:00   
  2024-04-22 22:00 
  2024-04-22 22:00   
  Active     TRANSMISSION     PLANNED      ONPATH     LDWP     INT DC 2024/03/25 11:59 OUTAGE 75944 INTERMOUNTAIN-ADELANTO POLE 2 REMAINS (-OUT-), ADL-CS/INT-CS: POLE 2 CONVERTERS (OUT/CLEARED-) FOR 2024 ANNUAL SIR; {INTERMOUNTAIN- ADELANTO POLE 1 RETURNS TO SERVICE - ON-LINE}; {INTERMOUNTAIN-ADELANTO POLE 2 IN METALLIC RETURN ONLY} [PATH 27: STS / INT-DC: NOW AVAILABLE FOR 1200-MW]. FS.     2024-03-25 13:35     LDWP51757      2024-03-25 13:38  
  IPP NET IMPORTS     137294     LDWP               IPP NET IMPORTS(LDWP) 

  IPP NET IMPORTS(LDWP) 

  IPP NET IMPORTS(LDWP)   
  551.0 

  558.0 

  558.0   
  551.0 

  558.0 

  558.0   
  462.0 

  462.0 

  462.0   
  2024-04-15 08:00 

  2024-04-17 15:00 

  2024-04-17 19:00   
  2024-04-17 15:00 

  2024-04-17 19:00 

  2024-04-29 15:00   
  Active     TRANSMISSION     FORCED      ONPATH     LDWP     IPP NET IMPORTS 2024/03/13 08:46 BID 74716 PACE: HUNTINGTON-PINTO 1 345KV LINE (-OUT/CLEARED-) [REPLACE JUMPER INSULATORS] {PACE # 24-00416} (IPP NET IMPORTS LIMIT). FS.      2024-03-13 08:52     LDWP51747      2024-04-17 17:41  
  IPP NET IMPORTS     137346     LDWP               IPP NET IMPORTS(LDWP)      558.0      558.0      462.0      2024-04-17 15:00      2024-04-29 15:00      Cancelled     TRANSMISSION     FORCED      ONPATH     LDWP     IPP NET IMPORTS 2024/03/25 10:27 OUTAGE 76568 PACE: HUNTINGTON-PINTO 1 345KV LINE (-OUT / CLEARED-) [CAMP WILLIAMS - 4 CORNERS 345KV LINE, HUNTINGTON TO PINTO SEGMENT] REPLACE (8) STRUCTURES - "DEADEND PROJECT" STR# 844, 930, 963, 995, 1039, 1086, 1115, 1149. FS.     2024-03-25 10:36     LDWP51756      2024-04-15 13:33  
  VIC-LA     137419     LDWP               LA-VIC(LDWP) 
  VIC-LA(LDWP)   
  4500.0 
  4500.0   
  4500.0 
  4500.0   
  3050.0 
  3050.0   
  2024-04-20 18:00 
  2024-04-20 18:00   
  2024-04-22 15:00 
  2024-04-22 15:00   
  Scheduled     TRANSMISSION     FORCED      ONPATH     LDWP     VIC-LA 2024/04/09 10:44 OUTAGE 76858 RINALDI-RS: VICTORVILLE-RINALDI 500-KV LINE 1 / BANK G (LINE OPENED ENDED AT RIN-RS; REMAINS OUT/ENERGIZED ONLY); {AFFECTS PDCI/VIC-LA PATHS)[AT RIN-RS: INSTALL, DECLARE NEW BANK G-2 C-PHASE, THEN ENERGIZE VIA VIC-SS, TEST, & SOAK FOR 24-HRS AT RIN-RS]; {AFFECTS PDCI/VIC-LA PATHS). FS.     2024-04-09 14:05     LDWP51767      2024-04-09 14:05  
  PDCI (PATH 65)     137422     LDWP               PNDC (S-N)(LDWP)      975.0      975.0      0.0      2024-04-20 18:00      2024-04-22 15:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     LDWP     PNDC 2024/04/09 10:44 OUTAGE 76858 RINALDI-RS: VICTORVILLE-RINALDI 500-KV LINE 1 / BANK G (LINE OPENED ENDED AT RIN-RS; REMAINS OUT/ENERGIZED ONLY); {AFFECTS PDCI/VIC-LA PATHS)[AT RIN-RS: INSTALL, DECLARE NEW BANK G-2 C-PHASE, THEN ENERGIZE VIA VIC-SS, TEST, & SOAK FOR 24-HRS AT RIN-RS]; {AFFECTS PDCI/VIC-LA PATHS). FS.     2024-04-09 14:08     LDWP51768      2024-04-09 14:08  
  MISC     137453     LDWP               LA-TOL(LDWP) 
  TOL-LA(LDWP)   
  1400.0 
  1400.0   
  1400.0 
  1400.0   
  1350.0 
  1350.0   
  2024-04-21 07:00 
  2024-04-21 07:00   
  2024-04-21 15:00 
  2024-04-21 15:00   
  Scheduled     TRANSMISSION     FORCED      ONPATH     LDWP     LA-TOL 2024/04/10 15:50 BID 76708 RS-E / SYSTEM PROTECTION: VALLEY-TOLUCA 2 230KV LINE (-OUT / INCLUDING CBS-) [REPLACE DVC21 RELAY / TEST RELAY AND TRIP CBS] AE     2024-04-11 07:22     LDWP51780      2024-04-11 07:22  
  NEOR (PATH 49)     137286     LDWP               MED5-WW(LDWP) 
  WW-MED5(LDWP)   
  365.0 
  365.0   
  365.0 
  365.0   
  232.0 
  232.0   
  2024-04-21 07:00 
  2024-04-21 07:00   
  2024-04-26 17:00 
  2024-04-26 17:00   
  Scheduled     TRANSMISSION     FORCED      ONPATH     LDWP     WW-MD5 2024/03/12 14:27 OUTAGE 75538 SRP / PERKINS: PERKINS-MEAD 500KV SERIES CAPACITOR (-OUT / CLEARED-) [ANNUAL MAINTENANCE AND REPAIR] {SRP # 00380-24} (PATH 49 DE-RATE). FS.     2024-03-12 14:38     LDWP51745      2024-03-12 14:38  
  NEOR (PATH 49)     137456     LDWP               MED5-WW(LDWP) 
  WW-MED5(LDWP)   
  365.0 
  365.0   
  365.0 
  365.0   
  232.0 
  232.0   
  2024-04-22 06:00 
  2024-04-22 06:00   
  2024-04-25 16:00 
  2024-04-25 16:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     LDWP     WW-MD5 2024/04/10 19:11 BID 76865 SCE / ELDORADO: ELDORADO-MOENKOPI 500KV LINE SERIES CAPACITORS (-OUT / CLEARED-) [REMOVING SERIES CAPS AT ELDORADO] {APS # 24-08954} (PATH 49 DERATE) AE     2024-04-11 10:27     LDWP51781      2024-04-11 10:28  
  NEOR (PATH 49)     137461     LDWP               CRY-NAV (LDWP)(LDWP) 
  NAV-CRY (LDWP)(LDWP) 
  NAV-CRY (NVE)(LDWP) 
  NAV-CRY (WALC)(LDWP)   
  967.0 
  967.0 
  533.0 
  500.0   
  967.0 
  967.0 
  533.0 
  500.0   
  704.0 
  704.0 
  393.0 
  366.0   
  2024-04-22 06:00 
  2024-04-22 06:00 
  2024-04-22 06:00 
  2024-04-22 06:00   
  2024-04-25 16:00 
  2024-04-25 16:00 
  2024-04-25 16:00 
  2024-04-25 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     LDWP     NEOR 2024/04/10 19:11 BID 76865 SCE / ELDORADO: ELDORADO-MOENKOPI 500KV LINE SERIES CAPACITORS (-OUT / CLEARED-) [REMOVING SERIES CAPS AT ELDORADO] {APS # 24-08954} (PATH 49 DERATE) AE     2024-04-11 10:32     LDWP51782      2024-04-11 10:32  
  INT-DC (PATH 27)     137357     LDWP               INT DC (NE-SW)(LDWP) 
  INT DC (SW-NE)(LDWP)   
  2400.0 
  1400.0   
  2400.0 
  1400.0   
  1250.0 
  1250.0   
  2024-04-22 22:00 
  2024-04-22 22:00   
  2024-07-01 00:00 
  2024-07-01 00:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     LDWP     INT DC 2024/03/25 11:59 OUTAGE 75944 -RETURN- INTERMOUNTAIN-ADELANTO POLE 2 REMAINS (-OUT-), ADL-CS/INT-CS: POLE 2 CONVERTERS (OUT/CLEARED-) FOR 2024 ANNUAL SIR; {INTERMOUNTAIN- ADELANTO POLE 1 RETURNS TO SERVICE - ON-LINE}; {INTERMOUNTAIN-ADELANTO POLE 2 IN METALLIC RETURN ONLY} [PATH 27: STS / INT-DC: NOW AVAILABLE FOR 1200-MW]. FS.     2024-03-25 13:46     LDWP51758      2024-03-25 13:46  
  VIC-LA     137445     LDWP               LA-VIC(LDWP) 
  VIC-LA(LDWP)   
  4500.0 
  4500.0   
  4500.0 
  4500.0   
  2850.0 
  2850.0   
  2024-04-23 08:00 
  2024-04-23 08:00   
  2024-04-23 18:00 
  2024-04-23 18:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     LDWP     VIC-LA 2024/10/04 10:51 BID 76975 ADELANTO-TOLUCA 500-KV LINE 1 / BANK G / BANK H (-OUT/OPEN ENDED); [230-KV CB'S ONLY OPENED @ RS-E]; (REMAINS ENERGIZED {TO INVESTIGATE & REPAIR BANK G LTC TAP CHANGER B-PHASE NOT OPERATIONAL] AE     2024-04-10 11:02     LDWP51777      2024-04-10 11:02  
  PDCI (PATH 65)     137448     LDWP               PNDC (S-N)(LDWP)      975.0      975.0      0.0      2024-04-23 08:00      2024-04-23 18:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     LDWP     PNDC 2024/10/04 10:51 BID 76975 ADELANTO-TOLUCA 500-KV LINE 1 / BANK G / BANK H (-OUT/OPEN ENDED); [230-KV CB'S ONLY OPENED @ RS-E]; (REMAINS ENERGIZED {TO INVESTIGATE & REPAIR BANK G LTC TAP CHANGER B-PHASE NOT OPERATIONAL] AE     2024-04-10 11:06     LDWP51778      2024-04-10 11:06  
  MISC     137450     LDWP               LA-TOL(LDWP) 
  TOL-LA(LDWP)   
  1400.0 
  1400.0   
  1400.0 
  1400.0   
  1300.0 
  1300.0   
  2024-04-23 08:00 
  2024-04-23 08:00   
  2024-04-23 18:00 
  2024-04-23 18:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     LDWP     LA-TOL 2024/10/04 10:51 BID 76975 ADELANTO-TOLUCA 500-KV LINE 1 / BANK G / BANK H (-OUT/OPEN ENDED); [230-KV CB'S ONLY OPENED @ RS-E]; (REMAINS ENERGIZED {TO INVESTIGATE & REPAIR BANK G LTC TAP CHANGER B-PHASE NOT OPERATIONAL] AE     2024-04-10 11:09     LDWP51779      2024-04-10 11:09  
  NWOR     137494     LDWP               NWOR (E-W)(LDWP) 
  NWOR (W-E)(LDWP)   
  2592.0 
  2662.0   
  2592.0 
  2662.0   
  1992.0 
  2062.0   
  2024-04-24 05:00 
  2024-04-24 05:00   
  2024-04-30 00:00 
  2024-04-30 00:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     LDWP     NWOR 2024/17/04 08:36 BID 76026 SCE / LUGO: ELDORADO-LUGO 500KV LINE (-OUT / CLEARED-) [SUPPORT THE LUGO SERIES CAPACITOR TESTING] {SCE # 24-015417} (PATH 46 DE-RATE) AE     2024-04-17 10:26     LDWP51786      2024-04-17 10:26  
  NWOR     137497     LDWP               NWOR (E-W)(LDWP) 
  NWOR (W-E)(LDWP)   
  0.0 
  0.0   
  0.0 
  0.0   
  1923.0 
  1993.0   
  2024-04-26 08:00 
  2024-04-26 08:00   
  2024-04-26 15:00 
  2024-04-26 15:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     LDWP     NWOR 2024/17/04 08:37 BID 76785 SCE / JULIAN HINDS: JULIAN HINDS-MIRAGE 220KV LINE (-OUT / CLEARED-) [REPAIR LINE GROUND DISCONNECTS] {SCE # 24-020001} (PATH 46 DE-RATE) AE     2024-04-17 10:43     LDWP51787      2024-04-17 10:43  
  PDCI (PATH 65)     137440     LDWP               PNDC (S-N)(LDWP)      975.0      975.0      0.0      2024-04-27 05:00      2024-04-28 21:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     LDWP     PNDC 2024/10/04 10:40 BID 75917 RS-E: BANK H 500/230-KV (-OUT/CLEARED-); [CB'S & DISC'S OPENED HIGH/LOW SIDES]; (AFFECTS VIC-LA/PDCI) {TO INVESTIGATE & REPAIR BANK H -13.8KV TERTIARY WINDING GROUND} [CONTINUOUS OUTAGE}. AE     2024-04-10 10:53     LDWP51775      2024-04-10 10:53  
  VIC-LA     137442     LDWP               LA-VIC(LDWP) 
  VIC-LA(LDWP)   
  4500.0 
  4500.0   
  4500.0 
  4500.0   
  2850.0 
  2850.0   
  2024-04-27 05:00 
  2024-04-27 05:00   
  2024-04-28 21:00 
  2024-04-28 21:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     LDWP     VIC-LA 2024/10/04 10:40 BID 75917 RS-E: BANK H 500/230-KV (-OUT/CLEARED-); [CB'S & DISC'S OPENED HIGH/LOW SIDES]; (AFFECTS VIC-LA/PDCI) {TO INVESTIGATE & REPAIR BANK H -13.8KV TERTIARY WINDING GROUND} [CONTINUOUS OUTAGE}. AE     2024-04-10 10:54     LDWP51776      2024-04-10 10:54  
  NWOR     137471     LDWP               NWOR (E-W)(LDWP) 
  NWOR (W-E)(LDWP)   
  0.0 
  0.0   
  0.0 
  0.0   
  2062.0 
  2132.0   
  2024-05-06 05:00 
  2024-05-06 05:00   
  2024-05-08 17:00 
  2024-05-08 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     LDWP     NWOR 2024/04/12 11:09 OUTAGE 76465 VICTORVILLE SS / SYSTEM PROTECTION / ESC: MCCULLOUGH-VICTORVILLE 1 500KV LINE (-OUT / CLEARED / INCLUDING CBS-) [RELAY TESTING / ISOLATE LINE SERIES CAPACITOR FOR REMOVAL / REPLACEMENT] {PATH 46 DE-RATE}. FS.     2024-04-12 11:25     LDWP51784      2024-04-12 11:25  