Combined wesTTrans Transmission Outages
Jun 16, 2025 
Outage
Name
Outage
Id
Company Facility Flow
Gate
Segment Original
TTC In
Original
TTC Out
New
TTC
Start Time (PS) Stop Time (PS) Status Outage
Category
Outage
Type
Path
Impact
Report
TPs
Comments Creation Time (PS) Event ID Last Updated (PS)
AVAT Outages:
AZPS Outages:
BEPW Outages:
  SGE-SGW     61961     BEPW     SGE>SGW          SGE>SGW(BEPW) 
  SGW>SGE(BEPW) 

  SGE>SGW(BEPW) 
  SGW>SGE(BEPW) 

  SGE>SGW(BEPW) 
  SGW>SGE(BEPW) 

  SGE>SGW(BEPW) 
  SGW>SGE(BEPW) 

  SGE>SGW(BEPW) 
  SGW>SGE(BEPW) 

  SGE>SGW(BEPW) 
  SGW>SGE(BEPW) 

  SGE>SGW(BEPW) 
  SGW>SGE(BEPW) 

  SGE>SGW(BEPW) 
  SGW>SGE(BEPW)   
  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0   
  110.0 
  110.0 

  110.0 
  110.0 

  110.0 
  110.0 

  110.0 
  110.0 

  110.0 
  110.0 

  110.0 
  110.0 

  110.0 
  110.0 

  110.0 
  110.0   
  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0   
  2023-07-27 23:00 
  2023-07-27 23:00 

  2023-08-04 16:00 
  2023-08-04 16:00 

  2023-09-30 16:00 
  2023-09-30 16:00 

  2024-08-31 16:00 
  2024-08-31 16:00 

  2024-12-31 22:00 
  2024-12-31 22:00 

  2025-03-31 21:00 
  2025-03-31 21:00 

  2025-05-29 15:00 
  2025-05-29 15:00 

  2025-06-05 10:00 
  2025-06-05 10:00   
  2023-08-04 16:00 
  2023-08-04 16:00 

  2023-09-30 16:00 
  2023-09-30 16:00 

  2024-08-31 16:00 
  2024-08-31 16:00 

  2024-12-31 22:00 
  2024-12-31 22:00 

  2025-03-31 21:00 
  2025-03-31 21:00 

  2025-05-29 15:00 
  2025-05-29 15:00 

  2025-06-05 10:00 
  2025-06-05 10:00 

  2025-06-23 12:00 
  2025-06-23 12:00   
  Active     Transmission     Forced      OnPath     BEPW,WACM     SGE DC Tie unavailable due to forced outage. CROW 1-00425807     2024-09-18 00:07     BEPW18853      2025-06-14 19:01  
  System Conditions     62899     WACM     TOT 3 BASIN (BEPW)     TOT 3 BASIN (BEPW)     AU>LRS(BEPW) 
  KEOT>LRS(BEPW) 
  LRS>AU(BEPW) 
  LRS>KEOT(BEPW)   
  722.0     722.0     344.0 
  202.0 
  344.0 
  202.0   
  2025-05-26 06:00 
  2025-05-26 06:00 
  2025-05-26 06:00 
  2025-05-26 06:00   
  2025-06-16 09:00 
  2025-06-16 09:00 
  2025-06-16 09:00 
  2025-06-16 09:00   
  Completed     Transmission     Planned      OnPath     BEPW,WACM     C-25-0124; INFO-25-1218; TOT-3 to Series 23.     2025-02-19 19:47     WACM19248      2025-06-16 08:16  
  CRG-BOZ     62446     CRCM     TOT-1A (CRCM), BOZ-CRG          BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 

  BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM)   
  218.0 
  285.0 

  218.0 
  285.0   
  218.0 
  285.0 

  218.0 
  285.0   
  0.0 
  0.0 

  0.0 
  0.0   
  2025-05-27 09:00 
  2025-05-27 09:00 

  2025-05-28 17:10 
  2025-05-28 17:10   
  2025-05-28 17:10 
  2025-05-28 17:10 

  2025-06-15 14:00 
  2025-06-15 14:00   
  Completed     Transmission     Planned      OnPath     BEPW,CRCM,LAPT,WACM     C-25-0006; TOT1A to Series 2     2024-12-04 20:08     CRCM19059      2025-06-15 13:45  
  System Conditions     62520     WACM     TOT-1A     TOT-1A     BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 
  CRG>SWR(CRCM) 
  SWR>CRG(CRCM) 
  SWR>VNL(CRCM) 
  VNL>FGE(CRCM) 
  VNL>SWR(CRCM)   
  395.0     395.0     325.0 
  325.0 
  175.0 
  175.0 
  175.0 
  300.0 
  175.0   
  2025-05-28 08:00 
  2025-05-28 08:00 
  2025-05-28 08:00 
  2025-05-28 08:00 
  2025-05-28 08:00 
  2025-05-28 08:00 
  2025-05-28 08:00   
  2025-06-06 16:00 
  2025-06-06 16:00 
  2025-06-06 16:00 
  2025-06-06 16:00 
  2025-06-06 16:00 
  2025-06-06 16:00 
  2025-06-06 16:00   
  Cancelled     Transmission     Planned      OnPath     BEPW,CRCM,LAPT,WACM     INFO-25-0048. TOT1A to Series14.     2024-12-16 19:31     WACM19079      2024-12-16 20:08  
  Summer 2025 Limit     63974     WACM     TOT-3 (BEPW)     TOT 3 BASIN (BEPW)     AU>LRS(BEPW) 
  KEOT>LRS(BEPW) 
  LRS>AU(BEPW) 
  LRS>KEOT(BEPW)   
  722.0     722.0     493.9 
  290.1 
  493.9 
  290.1   
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00   
  2025-11-01 10:00 
  2025-11-01 10:00 
  2025-11-01 10:00 
  2025-11-01 10:00   
  Active     Transmission     Planned      OnPath     BEPW,WACM     TOT-3 Summer 2025 Ratings of 1818 MW for system intact (Cell A1). Using Cell A2 with zero DC tie schedule the Limit will be 1534 MW and BEPWs share of transfer is 515 JK.     2025-06-02 08:47     WACM19584      2025-06-02 08:47  
  System Conditions     63996     WACM     TOT3 BASIN (BEPW)     TOT 3 BASIN (BEPW)     AU>LRS(BEPW) 
  KEOT>LRS(BEPW) 
  LRS>AU(BEPW) 
  LRS>KEOT(BEPW)   
  722.0     722.0     232.5 
  136.5 
  232.5 
  136.5   
  2025-06-19 07:00 
  2025-06-19 07:00 
  2025-06-19 07:00 
  2025-06-19 07:00   
  2025-06-19 16:00 
  2025-06-19 16:00 
  2025-06-19 16:00 
  2025-06-19 16:00   
  Scheduled     Transmission     Planned      OffPath     BEPW,WACM     INFO-25-1490; G-25-1373; TOT3 to Series 10     2025-06-05 11:38     WACM19590      2025-06-05 11:50  
  System Conditions     63881     WACM     TOT-3 Basin     TOT 3 BASIN (BEPW)     AU>LRS(BEPW) 
  KEOT>LRS(BEPW) 
  LRS>AU(BEPW) 
  LRS>KEOT(BEPW)   
  722.0     722.0     232.5 
  136.5 
  232.5 
  136.5   
  2025-06-23 06:00 
  2025-06-23 06:00 
  2025-06-23 06:00 
  2025-06-23 06:00   
  2025-06-26 17:00 
  2025-06-26 17:00 
  2025-06-26 17:00 
  2025-06-26 17:00   
  Scheduled     Transmission     Planned      OnPath     BEPW,WACM     INFO-25-1339. C-25-1302. TOT-3 to series 5.     2025-05-16 20:46     WACM19551      2025-05-16 20:46  
  System Conditions     63476     WACM     TOT-3 (LAPT)     TOT-3     ARH>AU(LAPT) 
  AU>ARH(LAPT) 
  AU>SCSW(LAPT) 
  SCSW>AU(LAPT)   
  509.0     509.0     171.4 
  171.4 
  100.6 
  100.6   
  2025-06-24 08:00 
  2025-06-24 08:00 
  2025-06-24 08:00 
  2025-06-24 08:00   
  2025-06-27 14:00 
  2025-06-27 14:00 
  2025-06-27 14:00 
  2025-06-27 14:00   
  Scheduled     Transmission     Planned      OnPath     BEPW,CRCM,LAPT,WACM     INFO-25-0958; Series 22     2025-04-04 16:44     WACM19427      2025-04-04 17:01  
  System Conditions     63477     WACM     TOT-3 BASIN (BEPW)     TOT 3 BASIN (BEPW)     AU>LRS(BEPW) 
  KEOT>LRS(BEPW) 
  LRS>AU(BEPW) 
  LRS>KEOT(BEPW)   
  722.0     722.0     219.2 
  128.8 
  219.2 
  128.8   
  2025-06-24 08:00 
  2025-06-24 08:00 
  2025-06-24 08:00 
  2025-06-24 08:00   
  2025-06-27 14:00 
  2025-06-27 14:00 
  2025-06-27 14:00 
  2025-06-27 14:00   
  Scheduled     Transmission     Planned      OnPath     BEPW,WACM     INFO-25-0958; Series 22     2025-04-04 16:51     WACM19428      2025-04-04 16:51  
  AU-LRS     63919     BEPW     TOT-3 (BASIN), LRS>AU 345 kV          AU>LRS(BEPW) 
  LRS>AU(BEPW)   
  448.0 
  448.0   
  448.0 
  448.0   
  0.0 
  0.0   
  2025-06-25 15:00 
  2025-06-25 15:00   
  2025-06-25 17:00 
  2025-06-25 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BEPW,LAPT,WACM     INFO-25-0616; TSO C-25-0614; Series 2     2025-05-24 16:53     BEPW19568      2025-05-24 16:53  
  System Conditions     63917     WACM     TOT-3     TOT-3     ARH>AU(LAPT) 
  AU>ARH(LAPT) 
  AU>SCSW(LAPT) 
  SCSW>AU(LAPT)   
  509.0     509.0     124.7 
  124.7 
  73.3 
  73.3   
  2025-06-25 15:00 
  2025-06-25 15:00 
  2025-06-25 15:00 
  2025-06-25 15:00   
  2025-06-25 17:00 
  2025-06-25 17:00 
  2025-06-25 17:00 
  2025-06-25 17:00   
  Scheduled     Transmission     Planned      OnPath     BEPW,LAPT,WACM     INFO-25-0616; TSO C-25-0614; Series 2     2025-05-24 16:49     WACM19566      2025-05-24 16:49  
  System Conditions     63918     WACM     TOT-3 BASIN     TOT 3 BASIN (BEPW)     AU>LRS(BEPW) 
  KEOT>LRS(BEPW) 
  LRS>AU(BEPW) 
  LRS>KEOT(BEPW)   
  722.0     722.0     159.4 
  93.6 
  159.4 
  93.6   
  2025-06-25 15:00 
  2025-06-25 15:00 
  2025-06-25 15:00 
  2025-06-25 15:00   
  2025-06-25 17:00 
  2025-06-25 17:00 
  2025-06-25 17:00 
  2025-06-25 17:00   
  Scheduled     Transmission     Planned      OnPath     BEPW,LAPT,WACM     INFO-25-0616; TSO C-25-0614; Series 2     2025-05-24 16:51     WACM19567      2025-05-24 16:51  
  System Conditions     63876     WACM     TOT-3 Basin     TOT 3 BASIN (BEPW)     AU>LRS(BEPW) 
  KEOT>LRS(BEPW) 
  LRS>AU(BEPW) 
  LRS>KEOT(BEPW)   
  722.0     722.0     257.7 
  151.3 
  257.7 
  151.3   
  2025-07-15 07:00 
  2025-07-15 07:00 
  2025-07-15 07:00 
  2025-07-15 07:00   
  2025-07-17 16:00 
  2025-07-17 16:00 
  2025-07-17 16:00 
  2025-07-17 16:00   
  Scheduled     Transmission     Planned      OnPath     BEPW,WACM     INFO-25-1326. C-25-1227. TOT-3 to series 21.     2025-05-16 20:31     WACM19548      2025-05-16 20:31  
  System Conditions     63816     WACM     TOT-3 (LAPT)     TOT-3     ARH>AU(LAPT) 
  AU>ARH(LAPT) 
  AU>SCSW(LAPT) 
  SCSW>AU(LAPT)   
  509.0     509.0     243.2 
  243.2 
  142.8 
  142.8   
  2025-07-18 06:00 
  2025-07-18 06:00 
  2025-07-18 06:00 
  2025-07-18 06:00   
  2025-07-20 17:00 
  2025-07-20 17:00 
  2025-07-20 17:00 
  2025-07-20 17:00   
  Scheduled     Transmission     Planned      OnPath     BEPW,CRCM,LAPT,WACM     INFO-25-1311; C-25-1228; Series 20     2025-05-14 00:06     WACM19523      2025-05-14 00:06  
  System Conditions     63817     WACM     TOT-3 BASIN (BEPW)     TOT 3 BASIN (BEPW)     AU>LRS(BEPW) 
  KEOT>LRS(BEPW) 
  LRS>AU(BEPW) 
  LRS>KEOT(BEPW)   
  722.0     722.0     310.6 
  182.4 
  310.6 
  182.4   
  2025-07-18 06:00 
  2025-07-18 06:00 
  2025-07-18 06:00 
  2025-07-18 06:00   
  2025-07-20 17:00 
  2025-07-20 17:00 
  2025-07-20 17:00 
  2025-07-20 17:00   
  Scheduled     Transmission     Planned      OnPath     BEPW,WACM     INFO-25-1311; C-25-1228; Series 20     2025-05-14 00:14     WACM19524      2025-05-14 00:14  
  System Conditions     63827     WACM     TOT-3 Basin     TOT 3 BASIN (BEPW)     AU>LRS(BEPW) 
  KEOT>LRS(BEPW) 
  LRS>AU(BEPW) 
  LRS>KEOT(BEPW)   
  722.0     722.0     256.4 
  150.6 
  256.4 
  150.6   
  2025-08-14 07:00 
  2025-08-14 07:00 
  2025-08-14 07:00 
  2025-08-14 07:00   
  2025-08-15 16:00 
  2025-08-15 16:00 
  2025-08-15 16:00 
  2025-08-15 16:00   
  Scheduled     Transmission     Planned      OffPath     BEPW,WACM     INFO-25-1316. TOT-3 to series 6.     2025-05-14 16:42     WACM19532      2025-05-14 16:42  
  DJ-LRS230     62803     BEPW     DJ-LRS230          DJ>LRS230(BEPW) 
  LRS230>DJ(BEPW)   
  0.0 
  0.0   
  223.0 
  227.0   
  0.0 
  0.0   
  2025-09-02 07:00 
  2025-09-02 07:00   
  2025-09-19 16:00 
  2025-09-19 16:00   
  Scheduled     Transmission     Planned      OnPath     BEPW,WACM     ICC-25-0507; INFO-25-126     2025-02-04 18:33     BEPW19196      2025-05-12 17:47  
  System Conditions     62802     WACM     TOT-3 (BEPW)     TOT 3 BASIN (BEPW)     AU>LRS(BEPW) 
  KEOT>LRS(BEPW) 
  LRS>AU(BEPW) 
  LRS>KEOT(BEPW)   
  722.0     722.0     272.8 
  160.2 
  272.8 
  160.2   
  2025-09-02 07:00 
  2025-09-02 07:00 
  2025-09-02 07:00 
  2025-09-02 07:00   
  2025-09-19 16:00 
  2025-09-19 16:00 
  2025-09-19 16:00 
  2025-09-19 16:00   
  Scheduled     Transmission     Planned      OffPath     BEPW,WACM     TOT-3 to Series 9; ICC-25-0507; INFO-25-126     2025-02-04 18:32     WACM19195      2025-05-12 17:46  
  LRS-KEOT 345     55540     BEPW     LRS>KEOT          KEOT>LRS(BEPW) 
  LRS>KEOT(BEPW)   
  323.0 
  323.0   
  323.0 
  323.0   
  0.0 
  0.0   
  2025-09-11 07:00 
  2025-09-11 07:00   
  2025-11-21 17:00 
  2025-11-21 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BEPW,WACM     C-22-0096     2022-08-11 14:30     BEPW16706      2023-08-23 23:21  
  LRS-STY 345     58050     BEPW     TOT-3 (BASIN), LRS>STY 345          LRS>STY(BEPW) 
  STY>LRS(BEPW)   
  0.0 
  0.0   
  0.0 
  0.0   
  0.0 
  0.0   
  2025-09-11 07:00 
  2025-09-11 07:00   
  2025-11-21 15:00 
  2025-11-21 15:00   
  Cancelled     TRANSMISSION     FORCED      ONPATH     BEPW,WACM     Outage: C-22-0096     2023-05-03 23:52     BEPW17562      2023-06-21 12:23  
  System Conditions     58049     WACM     TOT-3 (BASIN)     TOT 3 BASIN (BEPW)     AU>LRS(BEPW) 
  KEOT>LRS(BEPW) 
  LRS>AU(BEPW) 
  LRS>KEOT(BEPW)   
  722.0     722.0     187.7 
  110.3 
  187.7 
  110.3   
  2025-09-11 07:00 
  2025-09-11 07:00 
  2025-09-11 07:00 
  2025-09-11 07:00   
  2025-11-25 15:00 
  2025-11-25 15:00 
  2025-11-25 15:00 
  2025-11-25 15:00   
  Cancelled     Transmission     Forced      OnPath     BEPW,WACM     C-22-0096; Series #3     2023-05-03 23:41     WACM17561      2023-06-21 12:23  
  System Conditions     55543     WACM     TOT-3 (BEPW)     TOT 3 BASIN (BEPW)     AU>LRS(BEPW) 
  KEOT>LRS(BEPW) 
  LRS>AU(BEPW) 
  LRS>KEOT(BEPW)   
  722.0     722.0     184.6 
  108.4 
  184.6 
  108.4   
  2025-09-11 14:00 
  2025-09-11 14:00 
  2025-09-11 14:00 
  2025-09-11 14:00   
  2025-11-21 17:00 
  2025-11-21 17:00 
  2025-11-21 17:00 
  2025-11-21 17:00   
  Scheduled     Transmission     Planned      OnPath     BEPW,WACM     C-22-0096; TOT-3 to Series 3     2022-08-11 14:34     WACM16707      2023-08-23 23:19  
  SGW-SCSW     62916     BEPW     TOT-3 (BASIN), SGW-SCSW          SCSW>SGW(BEPW) 
  SGW>SCSW(BEPW)   
  96.0 
  111.0   
  0.0 
  0.0   
  0.0 
  0.0   
  2025-09-29 07:00 
  2025-09-29 07:00   
  2025-10-11 16:00 
  2025-10-11 16:00   
  Scheduled     Transmission     Planned      OnPath     BEPW     ICC-25-0357; TOT3 to Series 4.     2025-02-20 00:44     BEPW19259      2025-04-16 07:19  
  System Conditions     63560     WACM     TOT 3 BASIN (BEPW)     TOT 3 BASIN (BEPW)     AU>LRS(BEPW) 
  KEOT>LRS(BEPW) 
  LRS>AU(BEPW) 
  LRS>KEOT(BEPW)   
  722.0     722.0     204.1 
  119.9 
  204.1 
  119.9   
  2025-09-29 07:00 
  2025-09-29 07:00 
  2025-09-29 07:00 
  2025-09-29 07:00   
  2025-10-11 16:00 
  2025-10-11 16:00 
  2025-10-11 16:00 
  2025-10-11 16:00   
  Scheduled     Transmission     Planned      OffPath     BEPW,WACM     ICC-25-0357; TOT-3 to Series 4     2025-04-16 07:10     WACM19459      2025-04-16 07:10  
  System Conditions     62912     WACM     TOT-3 BASIN (BEPW)          AU>LRS(BEPW) 
  LRS>AU(BEPW)   
  448.0 
  448.0   
  448.0 
  448.0   
  0.0 
  0.0   
  2025-09-29 08:00 
  2025-09-29 08:00   
  2025-10-11 17:00 
  2025-10-11 17:00   
  Cancelled     Transmission     Planned      OffPath     BEPW,WACM          2025-02-20 00:31     WACM19257      2025-04-16 06:43  
BHBE Outages:
BHCT Outages:
  BHCT 22-8221.1     132915     BHCT     WEST CANON-HOGBACK 115KV LINE               0.0      0.0      0.0      2025-04-21 08:01      2025-07-30 15:00      ACTIVE     TRANSMISSION     PLANNED      ONPATH     BHCT     HOGBACK-WEST CANON 115 KV LINE - BHCE-CCW (0), CCW-BHCE (0)     2025-02-19 16:01     22-8221.1     2025-06-11 10:28  
BPAT Outages:
  COI     2483     BPAT     COI Path Rating          AC_N>S(BPAT) 
  AC_S>N(BPAT) 

  AC_N>S(BPAT) 
  AC_S>N(BPAT) 

  AC_N>S(BPAT) 
  AC_S>N(BPAT) 

  AC_N>S(BPAT) 
  AC_S>N(BPAT) 

  AC_N>S(BPAT) 
  AC_S>N(BPAT) 

  AC_N>S(BPAT) 
  AC_S>N(BPAT) 

  AC_N>S(BPAT) 
  AC_S>N(BPAT)   
  4800.0 
  3675.0 

  4800.0 
  3675.0 

  4800.0 
  3675.0 

  4800.0 
  3675.0 

  4800.0 
  1400.0 

  4800.0 
  3675.0 

  4800.0 
  3675.0   
  2007-11-23 12:00 
  2007-11-23 12:00 

  2010-01-01 00:00 
  2010-01-01 00:00 

  2010-11-17 00:00 
  2010-11-17 00:00 

  2012-03-01 00:00 
  2012-03-01 00:00 

  2022-12-20 00:00 
  2022-12-20 00:00 

  2023-01-05 13:00 
  2023-01-05 13:00 

  2033-01-01 00:00 
  2033-01-01 00:00   
  2010-01-01 00:00 
  2010-01-01 00:00 

  2010-11-17 00:00 
  2010-11-17 00:00 

  2012-03-01 00:00 
  2012-03-01 00:00 

  2022-12-20 00:00 
  2022-12-20 00:00 

  2023-01-05 13:00 
  2023-01-05 13:00 

  2033-01-01 00:00 
  2033-01-01 00:00 

  2035-01-01 00:00 
  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Path Rating     2007-11-23 12:40     BPAT2116      2025-01-28 07:56  
  PDCI     2477     BPAT     PDCI_Path_Rating          DC_N>S(BPAT) 
  DC_S>N(BPAT) 

  DC_N>S(BPAT) 
  DC_S>N(BPAT) 

  DC_N>S(BPAT) 
  DC_S>N(BPAT) 

  DC_N>S(BPAT) 
  DC_S>N(BPAT) 

  DC_N>S(BPAT) 
  DC_S>N(BPAT) 

  DC_N>S(BPAT) 
  DC_S>N(BPAT) 

  DC_N>S(BPAT) 
  DC_S>N(BPAT)   
  2990.0 
  2084.0 

  2990.0 
  2084.0 

  2990.0 
  2084.0 

  3100.0 
  1904.0 

  3100.0 
  1904.0 

  3100.0 
  1904.0 

  3100.0 
  1904.0   
  2007-11-23 13:00 
  2007-11-23 13:00 

  2010-01-01 00:00 
  2010-01-01 00:00 

  2012-03-01 00:00 
  2012-03-01 00:00 

  2017-12-12 00:00 
  2017-12-12 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00 

  2028-01-01 00:00 
  2028-01-01 00:00 

  2033-01-01 00:00 
  2033-01-01 00:00   
  2010-01-01 00:00 
  2010-01-01 00:00 

  2012-03-01 00:00 
  2012-03-01 00:00 

  2017-12-12 00:00 
  2017-12-12 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00 

  2028-01-01 00:00 
  2028-01-01 00:00 

  2033-01-01 00:00 
  2033-01-01 00:00 

  2035-01-01 00:00 
  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Path Rating     2007-11-23 12:16     BPAT2114      2025-01-28 07:59  
  LAGR     2642     BPAT     LAGR_Path_Rating          LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT)   
  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0   
  2007-11-23 17:00 
  2007-11-23 17:00 

  2010-01-01 00:00 
  2010-01-01 00:00 

  2012-03-01 00:00 
  2012-03-01 00:00 

  2023-01-01 00:00 
  2023-01-01 00:00 

  2024-01-01 00:00 
  2024-01-01 00:00 

  2025-01-01 00:00 
  2025-01-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00 

  2028-01-01 00:00 
  2028-01-01 00:00 

  2033-01-01 00:00 
  2033-01-01 00:00   
  2010-01-01 00:00 
  2010-01-01 00:00 

  2012-03-01 00:00 
  2012-03-01 00:00 

  2023-01-01 00:00 
  2023-01-01 00:00 

  2024-01-01 00:00 
  2024-01-01 00:00 

  2025-01-01 00:00 
  2025-01-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00 

  2028-01-01 00:00 
  2028-01-01 00:00 

  2033-01-01 00:00 
  2033-01-01 00:00 

  2035-01-01 00:00 
  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Path Rating     2007-11-23 15:34     BPAT2145      2025-01-28 08:00  
  WOG     2798     BPAT     WOG_Path_Rating          WOGARR_E>W(BPAT) 

  WOGARR_E>W(BPAT) 

  WOGARR_E>W(BPAT) 

  WOGARR_E>W(BPAT) 

  WOGARR_E>W(BPAT) 

  WOGARR_E>W(BPAT) 

  WOGARR_E>W(BPAT) 

  WOGARR_E>W(BPAT)   
  2000.0 

  2000.0 

  2000.0 

  2200.0 

  2200.0 

  2200.0 

  2200.0 

  2200.0   
  2007-11-23 19:00 

  2010-01-01 00:00 

  2012-03-01 00:00 

  2019-08-15 00:00 

  2019-10-01 14:00 

  2019-10-09 10:00 

  2028-01-01 00:00 

  2033-01-01 00:00   
  2010-01-01 00:00 

  2012-03-01 00:00 

  2019-08-15 00:00 

  2019-10-01 14:00 

  2019-10-09 10:00 

  2028-01-01 00:00 

  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Path Rating     2007-11-23 18:09     BPAT2182      2025-01-28 08:07  
  WOG     2810     BPAT     WOG_Path_Rating_W-E          WOGARR_W>E(BPAT) 

  WOGARR_W>E(BPAT) 

  WOGARR_W>E(BPAT) 

  WOGARR_W>E(BPAT) 

  WOGARR_W>E(BPAT) 

  WOGARR_W>E(BPAT) 

  WOGARR_W>E(BPAT) 

  WOGARR_W>E(BPAT)   
  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0   
  2007-11-23 19:00 

  2009-08-21 08:00 

  2010-01-01 00:00 

  2012-03-01 00:00 

  2019-10-01 14:00 

  2019-10-09 10:00 

  2028-01-01 00:00 

  2033-01-01 00:00   
  2009-08-21 08:00 

  2010-01-01 00:00 

  2012-03-01 00:00 

  2019-10-01 14:00 

  2019-10-09 10:00 

  2028-01-01 00:00 

  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Path Rating     2007-11-23 18:53     BPAT2186      2025-01-28 08:08  
  RATS     2847     BPAT     RATS_Path_Rating          RATS_N>S(BPAT) 
  RATS_S>N(BPAT) 

  RATS_N>S(BPAT) 
  RATS_S>N(BPAT) 

  RATS_N>S(BPAT) 
  RATS_S>N(BPAT) 

  RATS_N>S(BPAT) 
  RATS_S>N(BPAT) 

  RATS_N>S(BPAT) 
  RATS_S>N(BPAT) 

  RATS_N>S(BPAT) 
  RATS_S>N(BPAT) 

  RATS_N>S(BPAT) 
  RATS_S>N(BPAT)   
  300.0 
  300.0 

  300.0 
  300.0 

  300.0 
  300.0 

  300.0 
  300.0 

  300.0 
  300.0 

  300.0 
  300.0 

  300.0 
  300.0   
  2007-11-28 00:00 
  2007-11-28 00:00 

  2010-01-01 00:00 
  2010-01-01 00:00 

  2012-03-01 00:00 
  2012-03-01 00:00 

  2023-01-01 00:00 
  2023-01-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00 

  2028-01-01 00:00 
  2028-01-01 00:00 

  2033-01-01 00:00 
  2033-01-01 00:00   
  2010-01-01 00:00 
  2010-01-01 00:00 

  2012-03-01 00:00 
  2012-03-01 00:00 

  2023-01-01 00:00 
  2023-01-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00 

  2028-01-01 00:00 
  2028-01-01 00:00 

  2033-01-01 00:00 
  2033-01-01 00:00 

  2035-01-01 00:00 
  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Path Rating     2007-11-26 09:09     BPAT2191      2025-01-28 08:04  
  WOH     48745     BPAT     WOH_Path Rating          WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT)   
  4250.0 

  4250.0 

  4250.0 

  4250.0 

  4250.0 

  4250.0 

  4250.0   
  2008-11-01 00:00 

  2010-01-01 00:00 

  2012-03-01 00:00 

  2019-10-01 14:00 

  2019-10-09 09:00 

  2028-01-01 00:00 

  2033-01-01 00:00   
  2010-01-01 00:00 

  2012-03-01 00:00 

  2019-10-01 14:00 

  2019-10-09 09:00 

  2028-01-01 00:00 

  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of Hatwai Path Rating     2008-10-08 15:30     BPAT7061      2025-01-28 08:08  
  JDW     152758     BPAT     JDW_Path_Limit          JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT)   
  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0   
  2011-03-15 09:00 

  2012-03-01 00:00 

  2023-01-01 00:00 

  2024-01-01 00:00 

  2025-01-01 00:00 

  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00   
  2012-03-01 00:00 

  2023-01-01 00:00 

  2024-01-01 00:00 

  2025-01-01 00:00 

  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Long term limit     2011-03-15 08:44     BPAT22259      2025-01-28 07:59  
  RCW     152760     BPAT     RCW_Path_Limit          ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT)   
  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0   
  2011-03-15 09:00 

  2012-03-01 00:00 

  2023-01-01 00:00 

  2024-01-01 00:00 

  2025-01-01 00:00 

  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00   
  2012-03-01 00:00 

  2023-01-01 00:00 

  2024-01-01 00:00 

  2025-01-01 00:00 

  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Long term limit     2011-03-15 08:46     BPAT22260      2025-01-28 08:05  
  14_Month     173144     BPAT     LAG_All_Lines_in_Service          LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT)   
  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0   
  2011-11-01 00:00 
  2011-11-01 00:00 

  2012-05-01 00:00 
  2012-05-01 00:00 

  2012-06-01 00:00 
  2012-06-01 00:00 

  2012-11-01 00:00 
  2012-11-01 00:00 

  2014-02-01 00:00 
  2014-02-01 00:00 

  2014-03-01 00:00 
  2014-03-01 00:00 

  2014-04-01 00:00 
  2014-04-01 00:00 

  2014-05-01 00:00 
  2014-05-01 00:00 

  2014-06-01 00:00 
  2014-06-01 00:00 

  2014-07-01 00:00 
  2014-07-01 00:00 

  2014-08-01 00:00 
  2014-08-01 00:00 

  2015-10-01 00:00 
  2015-10-01 00:00 

  2015-11-01 00:00 
  2015-11-01 00:00 

  2015-12-01 00:00 
  2015-12-01 00:00 

  2015-12-01 12:00 
  2015-12-01 12:00 

  2017-02-01 00:00 
  2017-02-01 00:00 

  2017-03-01 00:00 
  2017-03-01 00:00 

  2017-04-01 00:00 
  2017-04-01 00:00 

  2017-05-01 00:00 
  2017-05-01 00:00 

  2017-06-01 00:00 
  2017-06-01 00:00 

  2017-07-01 00:00 
  2017-07-01 00:00 

  2017-08-01 00:00 
  2017-08-01 00:00 

  2017-09-01 00:00 
  2017-09-01 00:00 

  2017-10-01 00:00 
  2017-10-01 00:00 

  2017-11-01 00:00 
  2017-11-01 00:00 

  2017-11-30 23:00 
  2017-11-30 23:00 

  2018-01-01 00:00 
  2018-01-01 00:00 

  2018-02-01 00:00 
  2018-02-01 00:00 

  2018-03-01 00:00 
  2018-03-01 00:00 

  2018-04-01 00:00 
  2018-04-01 00:00 

  2018-05-01 00:00 
  2018-05-01 00:00 

  2018-06-01 00:00 
  2018-06-01 00:00 

  2018-07-01 00:00 
  2018-07-01 00:00 

  2018-08-01 00:00 
  2018-08-01 00:00 

  2018-09-01 00:00 
  2018-09-01 00:00 

  2018-10-01 00:00 
  2018-10-01 00:00 

  2018-11-01 00:00 
  2018-11-01 00:00 

  2018-12-01 00:00 
  2018-12-01 00:00 

  2019-01-01 00:00 
  2019-01-01 00:00 

  2019-02-01 00:00 
  2019-02-01 00:00 

  2019-03-01 00:00 
  2019-03-01 00:00 

  2019-04-01 00:00 
  2019-04-01 00:00 

  2019-05-01 00:00 
  2019-05-01 00:00 

  2019-06-01 00:00 
  2019-06-01 00:00 

  2019-07-01 00:00 
  2019-07-01 00:00 

  2019-08-01 00:00 
  2019-08-01 00:00 

  2019-09-01 00:00 
  2019-09-01 00:00 

  2019-10-01 00:00 
  2019-10-01 00:00 

  2019-11-01 00:00 
  2019-11-01 00:00 

  2019-12-01 00:00 
  2019-12-01 00:00 

  2020-01-01 00:00 
  2020-01-01 00:00 

  2020-03-01 00:00 
  2020-03-01 00:00 

  2020-04-01 00:00 
  2020-04-01 00:00 

  2020-05-01 00:00 
  2020-05-01 00:00 

  2020-06-01 00:00 
  2020-06-01 00:00 

  2020-07-01 00:00 
  2020-07-01 00:00 

  2020-08-01 00:00 
  2020-08-01 00:00 

  2020-09-01 00:00 
  2020-09-01 00:00 

  2020-10-01 00:00 
  2020-10-01 00:00 

  2020-11-01 00:00 
  2020-11-01 00:00 

  2020-12-01 00:00 
  2020-12-01 00:00 

  2021-02-01 00:00 
  2021-02-01 00:00 

  2021-03-01 00:00 
  2021-03-01 00:00 

  2021-04-01 00:00 
  2021-04-01 00:00 

  2021-05-01 00:00 
  2021-05-01 00:00 

  2021-06-01 00:00 
  2021-06-01 00:00 

  2021-07-01 00:00 
  2021-07-01 00:00 

  2021-08-01 00:00 
  2021-08-01 00:00 

  2021-09-01 00:00 
  2021-09-01 00:00 

  2021-10-01 00:00 
  2021-10-01 00:00 

  2021-11-01 00:00 
  2021-11-01 00:00 

  2021-12-01 00:00 
  2021-12-01 00:00 

  2022-01-01 00:00 
  2022-01-01 00:00 

  2022-02-01 00:00 
  2022-02-01 00:00 

  2022-03-01 00:00 
  2022-03-01 00:00 

  2022-04-01 00:00 
  2022-04-01 00:00 

  2022-05-01 00:00 
  2022-05-01 00:00 

  2022-06-01 00:00 
  2022-06-01 00:00 

  2022-07-01 00:00 
  2022-07-01 00:00 

  2022-08-01 00:00 
  2022-08-01 00:00 

  2022-09-01 00:00 
  2022-09-01 00:00 

  2022-10-01 00:00 
  2022-10-01 00:00 

  2022-11-01 00:00 
  2022-11-01 00:00 

  2022-12-01 00:00 
  2022-12-01 00:00 

  2023-01-01 00:00 
  2023-01-01 00:00 

  2023-02-01 00:00 
  2023-02-01 00:00 

  2023-03-01 00:00 
  2023-03-01 00:00 

  2023-04-01 00:00 
  2023-04-01 00:00 

  2023-05-01 00:00 
  2023-05-01 00:00 

  2023-06-01 00:00 
  2023-06-01 00:00 

  2023-07-01 00:00 
  2023-07-01 00:00 

  2023-08-01 00:00 
  2023-08-01 00:00 

  2023-09-01 00:00 
  2023-09-01 00:00 

  2023-10-01 00:00 
  2023-10-01 00:00 

  2023-11-01 00:00 
  2023-11-01 00:00 

  2023-12-01 00:00 
  2023-12-01 00:00 

  2024-01-01 00:00 
  2024-01-01 00:00 

  2024-02-01 00:00 
  2024-02-01 00:00 

  2024-03-01 00:00 
  2024-03-01 00:00 

  2024-04-01 00:00 
  2024-04-01 00:00 

  2024-05-01 00:00 
  2024-05-01 00:00 

  2024-06-01 00:00 
  2024-06-01 00:00 

  2024-07-01 00:00 
  2024-07-01 00:00 

  2024-08-01 00:00 
  2024-08-01 00:00 

  2024-09-01 00:00 
  2024-09-01 00:00 

  2024-10-01 00:00 
  2024-10-01 00:00 

  2024-11-01 00:00 
  2024-11-01 00:00 

  2024-12-01 00:00 
  2024-12-01 00:00 

  2025-01-01 00:00 
  2025-01-01 00:00 

  2025-02-01 00:00 
  2025-02-01 00:00 

  2025-03-01 00:00 
  2025-03-01 00:00 

  2025-04-01 00:00 
  2025-04-01 00:00 

  2025-05-01 00:00 
  2025-05-01 00:00 

  2025-06-01 00:00 
  2025-06-01 00:00 

  2025-07-01 00:00 
  2025-07-01 00:00 

  2025-08-01 00:00 
  2025-08-01 00:00 

  2025-09-01 00:00 
  2025-09-01 00:00 

  2025-10-01 00:00 
  2025-10-01 00:00 

  2025-11-01 00:00 
  2025-11-01 00:00 

  2025-12-01 00:00 
  2025-12-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00 

  2026-02-01 00:00 
  2026-02-01 00:00 

  2026-03-01 00:00 
  2026-03-01 00:00 

  2026-04-01 00:00 
  2026-04-01 00:00 

  2026-05-01 00:00 
  2026-05-01 00:00 

  2026-06-01 00:00 
  2026-06-01 00:00 

  2026-07-01 00:00 
  2026-07-01 00:00 

  2026-08-01 00:00 
  2026-08-01 00:00   
  2012-05-01 00:00 
  2012-05-01 00:00 

  2012-06-01 00:00 
  2012-06-01 00:00 

  2012-11-01 00:00 
  2012-11-01 00:00 

  2014-02-01 00:00 
  2014-02-01 00:00 

  2014-03-01 00:00 
  2014-03-01 00:00 

  2014-04-01 00:00 
  2014-04-01 00:00 

  2014-05-01 00:00 
  2014-05-01 00:00 

  2014-06-01 00:00 
  2014-06-01 00:00 

  2014-07-01 00:00 
  2014-07-01 00:00 

  2014-08-01 00:00 
  2014-08-01 00:00 

  2015-10-01 00:00 
  2015-10-01 00:00 

  2015-11-01 00:00 
  2015-11-01 00:00 

  2015-12-01 00:00 
  2015-12-01 00:00 

  2015-12-01 12:00 
  2015-12-01 12:00 

  2017-02-01 00:00 
  2017-02-01 00:00 

  2017-03-01 00:00 
  2017-03-01 00:00 

  2017-04-01 00:00 
  2017-04-01 00:00 

  2017-05-01 00:00 
  2017-05-01 00:00 

  2017-06-01 00:00 
  2017-06-01 00:00 

  2017-07-01 00:00 
  2017-07-01 00:00 

  2017-08-01 00:00 
  2017-08-01 00:00 

  2017-09-01 00:00 
  2017-09-01 00:00 

  2017-10-01 00:00 
  2017-10-01 00:00 

  2017-11-01 00:00 
  2017-11-01 00:00 

  2017-11-30 23:00 
  2017-11-30 23:00 

  2018-01-01 00:00 
  2018-01-01 00:00 

  2018-02-01 00:00 
  2018-02-01 00:00 

  2018-03-01 00:00 
  2018-03-01 00:00 

  2018-04-01 00:00 
  2018-04-01 00:00 

  2018-05-01 00:00 
  2018-05-01 00:00 

  2018-06-01 00:00 
  2018-06-01 00:00 

  2018-07-01 00:00 
  2018-07-01 00:00 

  2018-08-01 00:00 
  2018-08-01 00:00 

  2018-09-01 00:00 
  2018-09-01 00:00 

  2018-10-01 00:00 
  2018-10-01 00:00 

  2018-11-01 00:00 
  2018-11-01 00:00 

  2018-12-01 00:00 
  2018-12-01 00:00 

  2019-01-01 00:00 
  2019-01-01 00:00 

  2019-02-01 00:00 
  2019-02-01 00:00 

  2019-03-01 00:00 
  2019-03-01 00:00 

  2019-04-01 00:00 
  2019-04-01 00:00 

  2019-05-01 00:00 
  2019-05-01 00:00 

  2019-06-01 00:00 
  2019-06-01 00:00 

  2019-07-01 00:00 
  2019-07-01 00:00 

  2019-08-01 00:00 
  2019-08-01 00:00 

  2019-09-01 00:00 
  2019-09-01 00:00 

  2019-10-01 00:00 
  2019-10-01 00:00 

  2019-11-01 00:00 
  2019-11-01 00:00 

  2019-12-01 00:00 
  2019-12-01 00:00 

  2020-01-01 00:00 
  2020-01-01 00:00 

  2020-03-01 00:00 
  2020-03-01 00:00 

  2020-04-01 00:00 
  2020-04-01 00:00 

  2020-05-01 00:00 
  2020-05-01 00:00 

  2020-06-01 00:00 
  2020-06-01 00:00 

  2020-07-01 00:00 
  2020-07-01 00:00 

  2020-08-01 00:00 
  2020-08-01 00:00 

  2020-09-01 00:00 
  2020-09-01 00:00 

  2020-10-01 00:00 
  2020-10-01 00:00 

  2020-11-01 00:00 
  2020-11-01 00:00 

  2020-12-01 00:00 
  2020-12-01 00:00 

  2021-02-01 00:00 
  2021-02-01 00:00 

  2021-03-01 00:00 
  2021-03-01 00:00 

  2021-04-01 00:00 
  2021-04-01 00:00 

  2021-05-01 00:00 
  2021-05-01 00:00 

  2021-06-01 00:00 
  2021-06-01 00:00 

  2021-07-01 00:00 
  2021-07-01 00:00 

  2021-08-01 00:00 
  2021-08-01 00:00 

  2021-09-01 00:00 
  2021-09-01 00:00 

  2021-10-01 00:00 
  2021-10-01 00:00 

  2021-11-01 00:00 
  2021-11-01 00:00 

  2021-12-01 00:00 
  2021-12-01 00:00 

  2022-01-01 00:00 
  2022-01-01 00:00 

  2022-02-01 00:00 
  2022-02-01 00:00 

  2022-03-01 00:00 
  2022-03-01 00:00 

  2022-04-01 00:00 
  2022-04-01 00:00 

  2022-05-01 00:00 
  2022-05-01 00:00 

  2022-06-01 00:00 
  2022-06-01 00:00 

  2022-07-01 00:00 
  2022-07-01 00:00 

  2022-08-01 00:00 
  2022-08-01 00:00 

  2022-09-01 00:00 
  2022-09-01 00:00 

  2022-10-01 00:00 
  2022-10-01 00:00 

  2022-11-01 00:00 
  2022-11-01 00:00 

  2022-12-01 00:00 
  2022-12-01 00:00 

  2023-01-01 00:00 
  2023-01-01 00:00 

  2023-02-01 00:00 
  2023-02-01 00:00 

  2023-03-01 00:00 
  2023-03-01 00:00 

  2023-04-01 00:00 
  2023-04-01 00:00 

  2023-05-01 00:00 
  2023-05-01 00:00 

  2023-06-01 00:00 
  2023-06-01 00:00 

  2023-07-01 00:00 
  2023-07-01 00:00 

  2023-08-01 00:00 
  2023-08-01 00:00 

  2023-09-01 00:00 
  2023-09-01 00:00 

  2023-10-01 00:00 
  2023-10-01 00:00 

  2023-11-01 00:00 
  2023-11-01 00:00 

  2023-12-01 00:00 
  2023-12-01 00:00 

  2024-01-01 00:00 
  2024-01-01 00:00 

  2024-02-01 00:00 
  2024-02-01 00:00 

  2024-03-01 00:00 
  2024-03-01 00:00 

  2024-04-01 00:00 
  2024-04-01 00:00 

  2024-05-01 00:00 
  2024-05-01 00:00 

  2024-06-01 00:00 
  2024-06-01 00:00 

  2024-07-01 00:00 
  2024-07-01 00:00 

  2024-08-01 00:00 
  2024-08-01 00:00 

  2024-09-01 00:00 
  2024-09-01 00:00 

  2024-10-01 00:00 
  2024-10-01 00:00 

  2024-11-01 00:00 
  2024-11-01 00:00 

  2024-12-01 00:00 
  2024-12-01 00:00 

  2025-01-01 00:00 
  2025-01-01 00:00 

  2025-02-01 00:00 
  2025-02-01 00:00 

  2025-03-01 00:00 
  2025-03-01 00:00 

  2025-04-01 00:00 
  2025-04-01 00:00 

  2025-05-01 00:00 
  2025-05-01 00:00 

  2025-06-01 00:00 
  2025-06-01 00:00 

  2025-07-01 00:00 
  2025-07-01 00:00 

  2025-08-01 00:00 
  2025-08-01 00:00 

  2025-09-01 00:00 
  2025-09-01 00:00 

  2025-10-01 00:00 
  2025-10-01 00:00 

  2025-11-01 00:00 
  2025-11-01 00:00 

  2025-12-01 00:00 
  2025-12-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00 

  2026-02-01 00:00 
  2026-02-01 00:00 

  2026-03-01 00:00 
  2026-03-01 00:00 

  2026-04-01 00:00 
  2026-04-01 00:00 

  2026-05-01 00:00 
  2026-05-01 00:00 

  2026-06-01 00:00 
  2026-06-01 00:00 

  2026-07-01 00:00 
  2026-07-01 00:00 

  2026-08-01 00:00 
  2026-08-01 00:00 

  2026-09-01 00:00 
  2026-09-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     LaGrande -All Lines in Service (Year Round)     2011-10-21 14:38     BPAT25449      2025-05-30 13:52  
  14_Month     173147     BPAT     RCW_All_Lines_in_Service          ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT)   
  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0   
  2011-11-01 00:00 

  2012-05-01 00:00 

  2012-11-01 00:00 

  2014-02-01 00:00 

  2014-03-01 00:00 

  2014-04-01 00:00 

  2014-05-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2015-10-01 00:00 

  2015-11-01 00:00 

  2015-12-01 00:00 

  2015-12-01 12:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2017-12-30 00:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00 

  2019-11-01 00:00 

  2019-12-01 00:00 

  2020-01-01 00:00 

  2020-03-01 00:00 

  2020-04-01 00:00 

  2020-05-01 00:00 

  2020-06-01 00:00 

  2020-07-01 00:00 

  2020-08-01 00:00 

  2020-09-01 00:00 

  2020-10-01 00:00 

  2020-11-01 00:00 

  2020-12-01 00:00 

  2021-02-01 00:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00   
  2012-05-01 00:00 

  2012-11-01 00:00 

  2014-02-01 00:00 

  2014-03-01 00:00 

  2014-04-01 00:00 

  2014-05-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2015-10-01 00:00 

  2015-11-01 00:00 

  2015-12-01 00:00 

  2015-12-01 12:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2017-12-30 00:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00 

  2019-11-01 00:00 

  2019-12-01 00:00 

  2020-01-01 00:00 

  2020-03-01 00:00 

  2020-04-01 00:00 

  2020-05-01 00:00 

  2020-06-01 00:00 

  2020-07-01 00:00 

  2020-08-01 00:00 

  2020-09-01 00:00 

  2020-10-01 00:00 

  2020-11-01 00:00 

  2020-12-01 00:00 

  2021-02-01 00:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Rock Creek - All Lines in Service (Year Round)     2011-10-21 14:39     BPAT25450      2025-05-30 13:50  
  14_Month     173150     BPAT     JDW_All_Lines_in_Service          JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT)   
  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0 

  1255.0   
  2011-11-01 00:00 

  2012-05-01 00:00 

  2012-11-01 00:00 

  2014-02-01 00:00 

  2014-03-01 00:00 

  2014-04-01 00:00 

  2014-05-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2015-10-01 00:00 

  2015-11-01 00:00 

  2015-12-01 00:00 

  2015-12-01 12:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00 

  2019-11-01 00:00 

  2019-12-01 00:00 

  2020-01-01 00:00 

  2020-03-01 00:00 

  2020-04-01 00:00 

  2020-05-01 00:00 

  2020-06-01 00:00 

  2020-07-01 00:00 

  2020-08-01 00:00 

  2020-09-01 00:00 

  2020-10-01 00:00 

  2020-11-01 00:00 

  2020-12-01 00:00 

  2021-02-01 00:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-04-07 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00   
  2012-05-01 00:00 

  2012-11-01 00:00 

  2014-02-01 00:00 

  2014-03-01 00:00 

  2014-04-01 00:00 

  2014-05-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2015-10-01 00:00 

  2015-11-01 00:00 

  2015-12-01 00:00 

  2015-12-01 12:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00 

  2019-11-01 00:00 

  2019-12-01 00:00 

  2020-01-01 00:00 

  2020-03-01 00:00 

  2020-04-01 00:00 

  2020-05-01 00:00 

  2020-06-01 00:00 

  2020-07-01 00:00 

  2020-08-01 00:00 

  2020-09-01 00:00 

  2020-10-01 00:00 

  2020-11-01 00:00 

  2020-12-01 00:00 

  2021-02-01 00:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-04-07 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     John Day Wind - All Lines in Service (Year Round)     2011-10-21 14:41     BPAT25451      2025-05-30 13:50  
  WOCN     181812     BPAT     WOCN_LT          C-CASC_N(BPAT)      10000.0      2012-03-01 09:00      2032-01-01 00:00      Cancelled     TRANSMISSION     PLANNED      ONPATH     BPAT     WOCN long-term limit     2012-02-29 14:15     BPAT26934      2012-02-29 14:15  
  14_Month     185758     BPAT     WOM_All_Lines_in_Service          WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT)   
  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0   
  2012-04-01 00:00 

  2012-05-01 00:00 

  2012-06-01 00:00 

  2012-11-01 00:00 

  2013-03-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2015-10-01 00:00 

  2015-11-01 00:00 

  2015-12-01 00:00 

  2015-12-01 12:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00 

  2019-11-01 00:00 

  2019-12-01 00:00 

  2020-01-01 00:00 

  2020-03-01 00:00 

  2020-04-01 00:00 

  2020-05-01 00:00 

  2020-06-01 00:00 

  2020-07-01 00:00 

  2020-08-01 00:00 

  2020-09-01 00:00 

  2020-10-01 00:00 

  2020-11-01 00:00 

  2020-12-01 00:00 

  2021-02-01 00:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00   
  2012-05-01 00:00 

  2012-06-01 00:00 

  2012-11-01 00:00 

  2013-03-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2015-10-01 00:00 

  2015-11-01 00:00 

  2015-12-01 00:00 

  2015-12-01 12:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00 

  2019-11-01 00:00 

  2019-12-01 00:00 

  2020-01-01 00:00 

  2020-03-01 00:00 

  2020-04-01 00:00 

  2020-05-01 00:00 

  2020-06-01 00:00 

  2020-07-01 00:00 

  2020-08-01 00:00 

  2020-09-01 00:00 

  2020-10-01 00:00 

  2020-11-01 00:00 

  2020-12-01 00:00 

  2021-02-01 00:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of McNary - All Lines in Service (Year Round)     2012-03-29 12:34     BPAT27351      2025-05-30 14:22  
  14_Month     191688     BPAT     WOH_All_lines_in_service          WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT)   
  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0   
  2012-06-01 08:00 

  2012-11-01 00:00 

  2014-02-01 00:00 

  2014-03-01 00:00 

  2014-04-01 00:00 

  2014-05-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2015-10-01 00:00 

  2015-11-01 00:00 

  2015-12-01 00:00 

  2015-12-01 12:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00 

  2019-10-01 14:00 

  2019-10-09 09:00 

  2020-12-01 00:00 

  2021-02-01 00:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00   
  2012-11-01 00:00 

  2014-02-01 00:00 

  2014-03-01 00:00 

  2014-04-01 00:00 

  2014-05-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2015-10-01 00:00 

  2015-11-01 00:00 

  2015-12-01 00:00 

  2015-12-01 12:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00 

  2019-10-01 14:00 

  2019-10-09 09:00 

  2020-12-01 00:00 

  2021-02-01 00:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of Hatwai - All Lines in Service (Year Round)     2012-05-30 07:33     BPAT28676      2025-05-30 14:26  
  14_Month     203317     BPAT     SOB_All_Lines_in_Service          SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT)   
  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1260.0 

  1260.0 

  1260.0 

  1260.0 

  1260.0 

  1260.0 

  1260.0 

  1260.0 

  1260.0 

  1260.0 

  1260.0 

  1260.0 

  1260.0 

  1260.0   
  2012-11-01 09:00 

  2014-02-01 00:00 

  2014-03-01 00:00 

  2014-04-01 00:00 

  2014-05-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2014-09-01 00:00 

  2014-10-01 00:00 

  2014-11-01 00:00 

  2014-12-01 00:00 

  2015-01-01 00:00 

  2015-02-01 00:00 

  2015-03-01 00:00 

  2015-04-01 00:00 

  2015-05-01 00:00 

  2015-06-01 00:00 

  2015-07-01 00:00 

  2015-08-01 00:00 

  2015-09-01 00:00 

  2015-11-01 00:00 

  2015-12-01 00:00 

  2015-12-01 12:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00 

  2019-11-01 00:00 

  2019-12-01 00:00 

  2020-01-01 00:00 

  2020-03-01 00:00 

  2020-04-01 00:00 

  2020-05-01 00:00 

  2020-06-01 00:00 

  2020-07-01 00:00 

  2020-08-01 00:00 

  2020-09-01 00:00 

  2020-10-01 00:00 

  2020-11-01 00:00 

  2020-11-18 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00   
  2014-02-01 00:00 

  2014-03-01 00:00 

  2014-04-01 00:00 

  2014-05-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2014-09-01 00:00 

  2014-10-01 00:00 

  2014-11-01 00:00 

  2014-12-01 00:00 

  2015-01-01 00:00 

  2015-02-01 00:00 

  2015-03-01 00:00 

  2015-04-01 00:00 

  2015-05-01 00:00 

  2015-06-01 00:00 

  2015-07-01 00:00 

  2015-08-01 00:00 

  2015-09-01 00:00 

  2015-11-01 00:00 

  2015-12-01 00:00 

  2015-12-01 12:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00 

  2019-11-01 00:00 

  2019-12-01 00:00 

  2020-01-01 00:00 

  2020-03-01 00:00 

  2020-04-01 00:00 

  2020-05-01 00:00 

  2020-06-01 00:00 

  2020-07-01 00:00 

  2020-08-01 00:00 

  2020-09-01 00:00 

  2020-10-01 00:00 

  2020-11-01 00:00 

  2020-11-18 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     South of Boundary - All Lines in Service (Year Round)     2012-10-25 14:00     BPAT31256      2025-05-30 14:24  
  14_Month     210658     BPAT     WOJD_All_Lines_in_Service          WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT)   
  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0 

  4350.0   
  2013-02-21 00:00 

  2013-03-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2015-08-27 09:00 

  2016-12-01 00:00 

  2017-01-01 00:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2020-08-01 00:00 

  2020-09-01 00:00 

  2020-10-01 00:00 

  2020-11-01 00:00 

  2020-12-01 00:00 

  2021-02-01 00:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00   
  2013-03-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2015-08-27 09:00 

  2016-12-01 00:00 

  2017-01-01 00:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2020-08-01 00:00 

  2020-09-01 00:00 

  2020-10-01 00:00 

  2020-11-01 00:00 

  2020-12-01 00:00 

  2021-02-01 00:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of John Day - All Lines in Service (Year Round)     2013-02-19 10:46     BPAT33076      2025-05-30 14:22  
  14_Month     215522     BPAT     WNAPM_All_lines_in_service          WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT)   
  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0   
  2013-06-04 00:00 

  2014-08-01 00:00 

  2015-08-27 14:00 

  2015-11-23 11:00 

  2016-03-24 11:00 

  2016-05-26 10:00 

  2016-06-24 15:00 

  2016-08-04 08:00 

  2016-08-26 13:00 

  2016-10-05 15:00 

  2016-11-07 14:00 

  2017-01-03 14:00 

  2017-03-03 14:00 

  2017-05-02 15:00 

  2017-06-28 14:00 

  2017-07-26 14:00 

  2017-08-28 14:00 

  2017-09-28 15:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00 

  2019-10-01 13:00 

  2019-10-09 10:00 

  2020-12-01 00:00 

  2021-02-01 00:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00   
  2014-08-01 00:00 

  2015-08-27 14:00 

  2015-11-23 11:00 

  2016-03-24 11:00 

  2016-05-26 10:00 

  2016-06-24 15:00 

  2016-08-04 08:00 

  2016-08-26 13:00 

  2016-10-05 15:00 

  2016-11-07 14:00 

  2017-01-03 14:00 

  2017-03-03 14:00 

  2017-05-02 15:00 

  2017-06-28 14:00 

  2017-07-26 14:00 

  2017-08-28 14:00 

  2017-09-28 15:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00 

  2019-10-01 13:00 

  2019-10-09 10:00 

  2020-12-01 00:00 

  2021-02-01 00:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Wanapum Injection - All Lines in Service (Year Round)     2013-05-31 09:59     BPAT34494      2025-05-30 14:25  
  SCSTER NOEL     241257     BPAT     SOC NOEL Long Term          N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT) 

  SCSTER_N>S(BPAT) 

  N_ECOL_S>N(BPAT) 

  N_ECOL_S>N(BPAT) 

  N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT) 

  N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT)   
  2800.0 
  1850.0 

  1880.0 

  2800.0 

  2800.0 

  2800.0 
  1880.0 

  2800.0 
  1880.0   
  2015-11-01 00:00 
  2015-11-01 00:00 

  2019-09-20 00:00 

  2025-01-01 00:00 

  2026-01-01 00:00 

  2028-01-01 00:00 
  2028-01-01 00:00 

  2033-01-01 00:00 
  2033-01-01 00:00   
  2025-01-01 00:00 
  2019-09-20 00:00 

  2028-01-01 00:00 

  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00 
  2033-01-01 00:00 

  2035-01-01 00:00 
  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     SCSTER & N_ECOL Long-term limit     2015-01-30 10:54     BPAT44295      2025-01-28 08:04  
  NOHANF     241268     BPAT     North of Hanford          NOHANF(BPAT) 

  NOHANF(BPAT) 

  NOHANF(BPAT) 

  NOHANF(BPAT) 

  NOHANF(BPAT)   
  4450.0 

  4450.0 

  4450.0 

  4450.0 

  4450.0   
  2015-11-01 00:00 

  2025-01-01 13:00 

  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00   
  2025-01-01 13:00 

  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     NOHANF Long-term limit     2015-01-30 11:06     BPAT44298      2025-01-28 08:02  
  WOMCNY     255118     BPAT     West of McNary LT Rating          WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT)   
  4500.0 

  4500.0 

  4500.0 

  4500.0   
  2015-11-02 00:00 

  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00   
  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of McNary Long-Term Limit.     2015-10-27 10:32     BPAT51473      2025-01-28 08:10  
  WOJD     255121     BPAT     West of John Day Long-Term Limit          WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT)   
  4300.0 

  4350.0 

  4350.0 

  4350.0   
  2015-11-02 00:00 

  2019-11-13 15:00 

  2028-01-01 00:00 

  2033-01-01 00:00   
  2019-11-13 15:00 

  2028-01-01 00:00 

  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of John Day Long Term Limit.     2015-10-27 10:35     BPAT51474      2025-01-28 08:10  
  WOSLATT     255124     BPAT     West of Slatt Path Rating          WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT)   
  4200.0 

  4200.0 

  4200.0 

  4200.0   
  2015-11-02 00:00 

  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00   
  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of Slatt Long-term Limit.     2015-10-27 10:37     BPAT51475      2025-01-28 08:11  
  RAVR_PAUL     255209     BPAT     Raver -Paul LT Rating          RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT)   
  1450.0 

  1450.0 

  1450.0 

  1450.0   
  2015-11-02 00:00 

  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00   
  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Raver-Paul Long-term Limit.     2015-10-27 14:00     BPAT51479      2025-01-28 08:04  
  SOALSN     255215     BPAT     South of Allston Path Rating          SOALSN(BPAT) 

  SOALSN(BPAT) 

  SOALSN(BPAT) 

  SOALSN(BPAT)   
  2950.0 

  3100.0 

  3200.0 

  3200.0   
  2015-11-02 00:00 

  2022-05-05 00:00 

  2023-08-29 00:00 

  2033-01-01 00:00   
  2022-05-05 00:00 

  2023-08-29 00:00 

  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     South of Allston Long-term Limit.     2015-10-27 14:05     BPAT51481      2025-01-28 08:06  
  W_LOMO     255224     BPAT     West of LOMO Path Rating          W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT)   
  4200.0 

  4200.0 

  4200.0 

  4200.0   
  2015-11-02 00:00 

  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00   
  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of Lower Monumental Long-term Limit.     2015-10-27 14:15     BPAT51482      2025-01-28 08:11  
  WOCS     255230     BPAT     West of Cascades South Path Rating          C-CASC_S(BPAT) 

  C-CASC_S(BPAT) 

  C-CASC_S(BPAT) 

  C-CASC_S(BPAT)   
  7500.0 

  7500.0 

  7500.0 

  7500.0   
  2015-11-02 00:00 

  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00   
  2026-01-01 00:00 

  2028-01-01 00:00 

  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of Cascades South Long-term Limit.     2015-10-27 14:21     BPAT51484      2025-01-28 07:58  
  14 MONTH     255188     BPAT     Northern Intertie ALIS          NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_WEST_N>S(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT)   
  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2850.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0   
  2015-11-04 00:00 
  2015-11-04 00:00 
  2015-11-04 00:00 
  2015-11-04 00:00 
  2015-11-04 00:00 
  2015-11-04 00:00 

  2017-02-01 00:00 
  2017-02-01 00:00 
  2017-02-01 00:00 
  2017-02-01 00:00 
  2017-02-01 00:00 
  2017-02-01 00:00 

  2017-03-01 00:00 
  2017-03-01 00:00 
  2017-03-01 00:00 
  2017-03-01 00:00 
  2017-03-01 00:00 
  2017-03-01 00:00 

  2017-04-01 00:00 
  2017-04-01 00:00 
  2017-04-01 00:00 
  2017-04-01 00:00 
  2017-04-01 00:00 
  2017-04-01 00:00 

  2017-05-01 00:00 
  2017-05-01 00:00 
  2017-05-01 00:00 
  2017-05-01 00:00 
  2017-05-01 00:00 
  2017-05-01 00:00 

  2017-06-01 00:00 
  2017-06-01 00:00 
  2017-06-01 00:00 
  2017-06-01 00:00 
  2017-06-01 00:00 
  2017-06-01 00:00 

  2017-07-01 00:00 
  2017-07-01 00:00 
  2017-07-01 00:00 
  2017-07-01 00:00 
  2017-07-01 00:00 
  2017-07-01 00:00 

  2017-08-01 00:00 
  2017-08-01 00:00 
  2017-08-01 00:00 
  2017-08-01 00:00 
  2017-08-01 00:00 
  2017-08-01 00:00 

  2017-09-01 00:00 
  2017-09-01 00:00 
  2017-09-01 00:00 
  2017-09-01 00:00 
  2017-09-01 00:00 
  2017-09-01 00:00 

  2017-10-01 00:00 
  2017-10-01 00:00 
  2017-10-01 00:00 
  2017-10-01 00:00 
  2017-10-01 00:00 
  2017-10-01 00:00 

  2017-11-01 00:00 
  2017-11-01 00:00 
  2017-11-01 00:00 
  2017-11-01 00:00 
  2017-11-01 00:00 
  2017-11-01 00:00 

  2017-11-30 23:00 
  2017-11-30 23:00 
  2017-11-30 23:00 
  2017-11-30 23:00 
  2017-11-30 23:00 
  2017-11-30 23:00 

  2017-12-31 23:00 
  2017-12-31 23:00 
  2017-12-31 23:00 
  2017-12-31 23:00 
  2017-12-31 23:00 
  2017-12-31 23:00 

  2018-01-01 00:00 
  2018-01-01 00:00 
  2018-01-01 00:00 
  2018-01-01 00:00 
  2018-01-01 00:00 
  2018-01-01 00:00 

  2018-02-01 00:00 
  2018-02-01 00:00 
  2018-02-01 00:00 
  2018-02-01 00:00 
  2018-02-01 00:00 
  2018-02-01 00:00 

  2018-03-01 00:00 
  2018-03-01 00:00 
  2018-03-01 00:00 
  2018-03-01 00:00 
  2018-03-01 00:00 
  2018-03-01 00:00 

  2018-04-01 00:00 
  2018-04-01 00:00 
  2018-04-01 00:00 
  2018-04-01 00:00 
  2018-04-01 00:00 
  2018-04-01 00:00 

  2018-05-01 00:00 
  2018-05-01 00:00 
  2018-05-01 00:00 
  2018-05-01 00:00 
  2018-05-01 00:00 
  2018-05-01 00:00 

  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 

  2018-07-01 00:00 
  2018-07-01 00:00 
  2018-07-01 00:00 
  2018-07-01 00:00 
  2018-07-01 00:00 
  2018-07-01 00:00 

  2018-08-01 00:00 
  2018-08-01 00:00 
  2018-08-01 00:00 
  2018-08-01 00:00 
  2018-08-01 00:00 
  2018-08-01 00:00 

  2018-10-01 00:00 
  2018-10-01 00:00 
  2018-10-01 00:00 
  2018-10-01 00:00 
  2018-10-01 00:00 
  2018-10-01 00:00 

  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 

  2019-11-01 00:00 
  2019-11-01 00:00 
  2019-11-01 00:00 
  2019-11-01 00:00 

  2019-12-01 00:00 
  2019-12-01 00:00 
  2019-12-01 00:00 
  2019-12-01 00:00 
  2019-12-01 00:00 
  2019-12-01 00:00 

  2020-01-01 00:00 
  2020-01-01 00:00 
  2020-01-01 00:00 
  2020-01-01 00:00 
  2020-01-01 00:00 
  2020-01-01 00:00 

  2020-03-01 00:00 
  2020-03-01 00:00 
  2020-03-01 00:00 
  2020-03-01 00:00 
  2020-03-01 00:00 
  2020-03-01 00:00 

  2020-04-01 00:00 
  2020-04-01 00:00 
  2020-04-01 00:00 
  2020-04-01 00:00 
  2020-04-01 00:00 
  2020-04-01 00:00 

  2020-05-01 00:00 
  2020-05-01 00:00 
  2020-05-01 00:00 
  2020-05-01 00:00 
  2020-05-01 00:00 
  2020-05-01 00:00 

  2020-06-01 00:00 
  2020-06-01 00:00 
  2020-06-01 00:00 
  2020-06-01 00:00 
  2020-06-01 00:00 
  2020-06-01 00:00 

  2020-07-01 00:00 
  2020-07-01 00:00 
  2020-07-01 00:00 
  2020-07-01 00:00 
  2020-07-01 00:00 
  2020-07-01 00:00 

  2020-08-01 00:00 
  2020-08-01 00:00 
  2020-08-01 00:00 
  2020-08-01 00:00 
  2020-08-01 00:00 
  2020-08-01 00:00 

  2020-09-01 00:00 
  2020-09-01 00:00 
  2020-09-01 00:00 
  2020-09-01 00:00 
  2020-09-01 00:00 
  2020-09-01 00:00 

  2020-10-01 00:00 
  2020-10-01 00:00 
  2020-10-01 00:00 
  2020-10-01 00:00 
  2020-10-01 00:00 
  2020-10-01 00:00 

  2020-11-01 00:00 
  2020-11-01 00:00 
  2020-11-01 00:00 
  2020-11-01 00:00 
  2020-11-01 00:00 
  2020-11-01 00:00 

  2020-12-01 00:00 
  2020-12-01 00:00 
  2020-12-01 00:00 
  2020-12-01 00:00 
  2020-12-01 00:00 
  2020-12-01 00:00 

  2021-02-01 00:00 
  2021-02-01 00:00 
  2021-02-01 00:00 
  2021-02-01 00:00 
  2021-02-01 00:00 
  2021-02-01 00:00 

  2021-03-01 00:00 
  2021-03-01 00:00 
  2021-03-01 00:00 
  2021-03-01 00:00 
  2021-03-01 00:00 
  2021-03-01 00:00 

  2021-04-01 00:00 
  2021-04-01 00:00 
  2021-04-01 00:00 
  2021-04-01 00:00 
  2021-04-01 00:00 
  2021-04-01 00:00 

  2021-05-01 00:00 
  2021-05-01 00:00 
  2021-05-01 00:00 
  2021-05-01 00:00 
  2021-05-01 00:00 
  2021-05-01 00:00 

  2021-06-01 00:00 
  2021-06-01 00:00 
  2021-06-01 00:00 
  2021-06-01 00:00 
  2021-06-01 00:00 
  2021-06-01 00:00 

  2021-07-01 00:00 
  2021-07-01 00:00 
  2021-07-01 00:00 
  2021-07-01 00:00 
  2021-07-01 00:00 
  2021-07-01 00:00 

  2021-08-01 00:00 
  2021-08-01 00:00 
  2021-08-01 00:00 
  2021-08-01 00:00 
  2021-08-01 00:00 
  2021-08-01 00:00 

  2021-09-01 00:00 
  2021-09-01 00:00 
  2021-09-01 00:00 
  2021-09-01 00:00 
  2021-09-01 00:00 
  2021-09-01 00:00 

  2021-10-01 00:00 
  2021-10-01 00:00 
  2021-10-01 00:00 
  2021-10-01 00:00 
  2021-10-01 00:00 
  2021-10-01 00:00 

  2021-11-01 00:00 
  2021-11-01 00:00 
  2021-11-01 00:00 
  2021-11-01 00:00 
  2021-11-01 00:00 
  2021-11-01 00:00 

  2021-12-01 00:00 
  2021-12-01 00:00 
  2021-12-01 00:00 
  2021-12-01 00:00 
  2021-12-01 00:00 
  2021-12-01 00:00 

  2022-01-01 00:00 
  2022-01-01 00:00 
  2022-01-01 00:00 
  2022-01-01 00:00 
  2022-01-01 00:00 
  2022-01-01 00:00 

  2022-02-01 00:00 
  2022-02-01 00:00 
  2022-02-01 00:00 
  2022-02-01 00:00 
  2022-02-01 00:00 
  2022-02-01 00:00 

  2022-03-01 00:00 
  2022-03-01 00:00 
  2022-03-01 00:00 
  2022-03-01 00:00 
  2022-03-01 00:00 
  2022-03-01 00:00 

  2022-04-01 00:00 
  2022-04-01 00:00 
  2022-04-01 00:00 
  2022-04-01 00:00 
  2022-04-01 00:00 
  2022-04-01 00:00 

  2022-05-01 00:00 
  2022-05-01 00:00 
  2022-05-01 00:00 
  2022-05-01 00:00 
  2022-05-01 00:00 
  2022-05-01 00:00 

  2022-06-01 00:00 
  2022-06-01 00:00 
  2022-06-01 00:00 
  2022-06-01 00:00 
  2022-06-01 00:00 
  2022-06-01 00:00 

  2022-07-01 00:00 
  2022-07-01 00:00 
  2022-07-01 00:00 
  2022-07-01 00:00 
  2022-07-01 00:00 
  2022-07-01 00:00 

  2022-08-01 00:00 
  2022-08-01 00:00 
  2022-08-01 00:00 
  2022-08-01 00:00 
  2022-08-01 00:00 
  2022-08-01 00:00 

  2022-09-01 00:00 
  2022-09-01 00:00 
  2022-09-01 00:00 
  2022-09-01 00:00 
  2022-09-01 00:00 
  2022-09-01 00:00 

  2022-10-01 00:00 
  2022-10-01 00:00 
  2022-10-01 00:00 
  2022-10-01 00:00 
  2022-10-01 00:00 
  2022-10-01 00:00 

  2022-11-01 00:00 
  2022-11-01 00:00 
  2022-11-01 00:00 
  2022-11-01 00:00 
  2022-11-01 00:00 
  2022-11-01 00:00 

  2022-12-01 00:00 
  2022-12-01 00:00 
  2022-12-01 00:00 
  2022-12-01 00:00 
  2022-12-01 00:00 
  2022-12-01 00:00 

  2023-01-01 00:00 
  2023-01-01 00:00 
  2023-01-01 00:00 
  2023-01-01 00:00 
  2023-01-01 00:00 
  2023-01-01 00:00 

  2023-02-01 00:00 
  2023-02-01 00:00 
  2023-02-01 00:00 
  2023-02-01 00:00 
  2023-02-01 00:00 
  2023-02-01 00:00 

  2023-03-01 00:00 
  2023-03-01 00:00 
  2023-03-01 00:00 
  2023-03-01 00:00 
  2023-03-01 00:00 
  2023-03-01 00:00 

  2023-04-01 00:00 
  2023-04-01 00:00 
  2023-04-01 00:00 
  2023-04-01 00:00 
  2023-04-01 00:00 
  2023-04-01 00:00 

  2023-05-01 00:00 
  2023-05-01 00:00 
  2023-05-01 00:00 
  2023-05-01 00:00 
  2023-05-01 00:00 
  2023-05-01 00:00 

  2023-06-01 00:00 
  2023-06-01 00:00 
  2023-06-01 00:00 
  2023-06-01 00:00 
  2023-06-01 00:00 
  2023-06-01 00:00 

  2023-07-01 00:00 
  2023-07-01 00:00 
  2023-07-01 00:00 
  2023-07-01 00:00 
  2023-07-01 00:00 
  2023-07-01 00:00 

  2023-08-01 00:00 
  2023-08-01 00:00 
  2023-08-01 00:00 
  2023-08-01 00:00 
  2023-08-01 00:00 
  2023-08-01 00:00 

  2023-09-01 00:00 
  2023-09-01 00:00 
  2023-09-01 00:00 
  2023-09-01 00:00 
  2023-09-01 00:00 
  2023-09-01 00:00 

  2023-10-01 00:00 
  2023-10-01 00:00 
  2023-10-01 00:00 
  2023-10-01 00:00 
  2023-10-01 00:00 
  2023-10-01 00:00 

  2023-11-01 00:00 
  2023-11-01 00:00 
  2023-11-01 00:00 
  2023-11-01 00:00 
  2023-11-01 00:00 
  2023-11-01 00:00 

  2023-12-01 00:00 
  2023-12-01 00:00 
  2023-12-01 00:00 
  2023-12-01 00:00 
  2023-12-01 00:00 
  2023-12-01 00:00 

  2024-01-01 00:00 
  2024-01-01 00:00 
  2024-01-01 00:00 
  2024-01-01 00:00 
  2024-01-01 00:00 
  2024-01-01 00:00 

  2024-02-01 00:00 
  2024-02-01 00:00 
  2024-02-01 00:00 
  2024-02-01 00:00 
  2024-02-01 00:00 
  2024-02-01 00:00 

  2024-03-01 00:00 
  2024-03-01 00:00 
  2024-03-01 00:00 
  2024-03-01 00:00 
  2024-03-01 00:00 
  2024-03-01 00:00 

  2024-04-01 00:00 
  2024-04-01 00:00 
  2024-04-01 00:00 
  2024-04-01 00:00 
  2024-04-01 00:00 
  2024-04-01 00:00 

  2024-05-01 00:00 
  2024-05-01 00:00 
  2024-05-01 00:00 
  2024-05-01 00:00 
  2024-05-01 00:00 
  2024-05-01 00:00 

  2024-06-01 00:00 
  2024-06-01 00:00 
  2024-06-01 00:00 
  2024-06-01 00:00 
  2024-06-01 00:00 
  2024-06-01 00:00 

  2024-07-01 00:00 
  2024-07-01 00:00 
  2024-07-01 00:00 
  2024-07-01 00:00 
  2024-07-01 00:00 
  2024-07-01 00:00 

  2024-08-01 00:00 
  2024-08-01 00:00 
  2024-08-01 00:00 
  2024-08-01 00:00 
  2024-08-01 00:00 
  2024-08-01 00:00 

  2024-09-01 00:00 
  2024-09-01 00:00 
  2024-09-01 00:00 
  2024-09-01 00:00 
  2024-09-01 00:00 
  2024-09-01 00:00 

  2024-10-01 00:00 
  2024-10-01 00:00 
  2024-10-01 00:00 
  2024-10-01 00:00 
  2024-10-01 00:00 
  2024-10-01 00:00 

  2024-11-01 00:00 
  2024-11-01 00:00 
  2024-11-01 00:00 
  2024-11-01 00:00 
  2024-11-01 00:00 
  2024-11-01 00:00 

  2024-12-01 00:00 
  2024-12-01 00:00 
  2024-12-01 00:00 
  2024-12-01 00:00 
  2024-12-01 00:00 
  2024-12-01 00:00 

  2025-01-01 00:00 
  2025-01-01 00:00 
  2025-01-01 00:00 
  2025-01-01 00:00 
  2025-01-01 00:00 
  2025-01-01 00:00 

  2025-02-01 00:00 
  2025-02-01 00:00 
  2025-02-01 00:00 
  2025-02-01 00:00 
  2025-02-01 00:00 
  2025-02-01 00:00 

  2025-03-01 00:00 
  2025-03-01 00:00 
  2025-03-01 00:00 
  2025-03-01 00:00 
  2025-03-01 00:00 
  2025-03-01 00:00 

  2025-04-01 00:00 
  2025-04-01 00:00 
  2025-04-01 00:00 
  2025-04-01 00:00 
  2025-04-01 00:00 
  2025-04-01 00:00 

  2025-05-01 00:00 
  2025-05-01 00:00 
  2025-05-01 00:00 
  2025-05-01 00:00 
  2025-05-01 00:00 
  2025-05-01 00:00 

  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 

  2025-07-01 00:00 
  2025-07-01 00:00 
  2025-07-01 00:00 
  2025-07-01 00:00 
  2025-07-01 00:00 
  2025-07-01 00:00 

  2025-08-01 00:00 
  2025-08-01 00:00 
  2025-08-01 00:00 
  2025-08-01 00:00 
  2025-08-01 00:00 
  2025-08-01 00:00 

  2025-09-01 00:00 
  2025-09-01 00:00 
  2025-09-01 00:00 
  2025-09-01 00:00 
  2025-09-01 00:00 
  2025-09-01 00:00 

  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 

  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 

  2025-12-01 00:00 
  2025-12-01 00:00 
  2025-12-01 00:00 
  2025-12-01 00:00 
  2025-12-01 00:00 
  2025-12-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00 
  2026-01-01 00:00 
  2026-01-01 00:00 
  2026-01-01 00:00 
  2026-01-01 00:00 

  2026-02-01 00:00 
  2026-02-01 00:00 
  2026-02-01 00:00 
  2026-02-01 00:00 
  2026-02-01 00:00 
  2026-02-01 00:00 

  2026-03-01 00:00 
  2026-03-01 00:00 
  2026-03-01 00:00 
  2026-03-01 00:00 
  2026-03-01 00:00 
  2026-03-01 00:00 

  2026-04-01 00:00 
  2026-04-01 00:00 
  2026-04-01 00:00 
  2026-04-01 00:00 
  2026-04-01 00:00 
  2026-04-01 00:00 

  2026-05-01 00:00 
  2026-05-01 00:00 
  2026-05-01 00:00 
  2026-05-01 00:00 
  2026-05-01 00:00 
  2026-05-01 00:00 

  2026-06-01 00:00 
  2026-06-01 00:00 
  2026-06-01 00:00 
  2026-06-01 00:00 
  2026-06-01 00:00 
  2026-06-01 00:00 

  2026-07-01 00:00 
  2026-07-01 00:00 
  2026-07-01 00:00 
  2026-07-01 00:00 
  2026-07-01 00:00 
  2026-07-01 00:00 

  2026-08-01 00:00 
  2026-08-01 00:00 
  2026-08-01 00:00 
  2026-08-01 00:00 
  2026-08-01 00:00 
  2026-08-01 00:00   
  2017-02-01 00:00 
  2017-02-01 00:00 
  2017-02-01 00:00 
  2017-02-01 00:00 
  2017-02-01 00:00 
  2017-02-01 00:00 

  2017-03-01 00:00 
  2017-03-01 00:00 
  2017-03-01 00:00 
  2017-03-01 00:00 
  2017-03-01 00:00 
  2017-03-01 00:00 

  2017-04-01 00:00 
  2017-04-01 00:00 
  2017-04-01 00:00 
  2017-04-01 00:00 
  2017-04-01 00:00 
  2017-04-01 00:00 

  2017-05-01 00:00 
  2017-05-01 00:00 
  2017-05-01 00:00 
  2017-05-01 00:00 
  2017-05-01 00:00 
  2017-05-01 00:00 

  2017-06-01 00:00 
  2017-06-01 00:00 
  2017-06-01 00:00 
  2017-06-01 00:00 
  2017-06-01 00:00 
  2017-06-01 00:00 

  2017-07-01 00:00 
  2017-07-01 00:00 
  2017-07-01 00:00 
  2017-07-01 00:00 
  2017-07-01 00:00 
  2017-07-01 00:00 

  2017-08-01 00:00 
  2017-08-01 00:00 
  2017-08-01 00:00 
  2017-08-01 00:00 
  2017-08-01 00:00 
  2017-08-01 00:00 

  2017-09-01 00:00 
  2017-09-01 00:00 
  2017-09-01 00:00 
  2017-09-01 00:00 
  2017-09-01 00:00 
  2017-09-01 00:00 

  2017-10-01 00:00 
  2017-10-01 00:00 
  2017-10-01 00:00 
  2017-10-01 00:00 
  2017-10-01 00:00 
  2017-10-01 00:00 

  2017-11-01 00:00 
  2017-11-01 00:00 
  2017-11-01 00:00 
  2017-11-01 00:00 
  2017-11-01 00:00 
  2017-11-01 00:00 

  2017-11-30 23:00 
  2017-11-30 23:00 
  2017-11-30 23:00 
  2017-11-30 23:00 
  2017-11-30 23:00 
  2017-11-30 23:00 

  2017-12-31 23:00 
  2017-12-31 23:00 
  2017-12-31 23:00 
  2017-12-31 23:00 
  2017-12-31 23:00 
  2017-12-31 23:00 

  2018-01-01 00:00 
  2018-01-01 00:00 
  2018-01-01 00:00 
  2018-01-01 00:00 
  2018-01-01 00:00 
  2018-01-01 00:00 

  2018-02-01 00:00 
  2018-02-01 00:00 
  2018-02-01 00:00 
  2018-02-01 00:00 
  2018-02-01 00:00 
  2018-02-01 00:00 

  2018-03-01 00:00 
  2018-03-01 00:00 
  2018-03-01 00:00 
  2018-03-01 00:00 
  2018-03-01 00:00 
  2018-03-01 00:00 

  2018-04-01 00:00 
  2018-04-01 00:00 
  2018-04-01 00:00 
  2018-04-01 00:00 
  2018-04-01 00:00 
  2018-04-01 00:00 

  2018-05-01 00:00 
  2018-05-01 00:00 
  2018-05-01 00:00 
  2018-05-01 00:00 
  2018-05-01 00:00 
  2018-05-01 00:00 

  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 

  2018-07-01 00:00 
  2018-07-01 00:00 
  2018-07-01 00:00 
  2018-07-01 00:00 
  2018-07-01 00:00 
  2018-07-01 00:00 

  2018-08-01 00:00 
  2018-08-01 00:00 
  2018-08-01 00:00 
  2018-08-01 00:00 
  2018-08-01 00:00 
  2018-08-01 00:00 

  2018-10-01 00:00 
  2018-10-01 00:00 
  2018-10-01 00:00 
  2018-10-01 00:00 
  2018-10-01 00:00 
  2018-10-01 00:00 

  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 

  2019-11-01 00:00 
  2019-11-01 00:00 
  2019-11-01 00:00 
  2019-12-01 00:00 
  2019-11-01 00:00 
  2019-12-01 00:00 

  2019-12-01 00:00 
  2019-12-01 00:00 
  2019-12-01 00:00 
  2019-12-01 00:00 

  2020-01-01 00:00 
  2020-01-01 00:00 
  2020-01-01 00:00 
  2020-01-01 00:00 
  2020-01-01 00:00 
  2020-01-01 00:00 

  2020-03-01 00:00 
  2020-03-01 00:00 
  2020-03-01 00:00 
  2020-03-01 00:00 
  2020-03-01 00:00 
  2020-03-01 00:00 

  2020-04-01 00:00 
  2020-04-01 00:00 
  2020-04-01 00:00 
  2020-04-01 00:00 
  2020-04-01 00:00 
  2020-04-01 00:00 

  2020-05-01 00:00 
  2020-05-01 00:00 
  2020-05-01 00:00 
  2020-05-01 00:00 
  2020-05-01 00:00 
  2020-05-01 00:00 

  2020-06-01 00:00 
  2020-06-01 00:00 
  2020-06-01 00:00 
  2020-06-01 00:00 
  2020-06-01 00:00 
  2020-06-01 00:00 

  2020-07-01 00:00 
  2020-07-01 00:00 
  2020-07-01 00:00 
  2020-07-01 00:00 
  2020-07-01 00:00 
  2020-07-01 00:00 

  2020-08-01 00:00 
  2020-08-01 00:00 
  2020-08-01 00:00 
  2020-08-01 00:00 
  2020-08-01 00:00 
  2020-08-01 00:00 

  2020-09-01 00:00 
  2020-09-01 00:00 
  2020-09-01 00:00 
  2020-09-01 00:00 
  2020-09-01 00:00 
  2020-09-01 00:00 

  2020-10-01 00:00 
  2020-10-01 00:00 
  2020-10-01 00:00 
  2020-10-01 00:00 
  2020-10-01 00:00 
  2020-10-01 00:00 

  2020-11-01 00:00 
  2020-11-01 00:00 
  2020-11-01 00:00 
  2020-11-01 00:00 
  2020-11-01 00:00 
  2020-11-01 00:00 

  2020-12-01 00:00 
  2020-12-01 00:00 
  2020-12-01 00:00 
  2020-12-01 00:00 
  2020-12-01 00:00 
  2020-12-01 00:00 

  2021-02-01 00:00 
  2021-02-01 00:00 
  2021-02-01 00:00 
  2021-02-01 00:00 
  2021-02-01 00:00 
  2021-02-01 00:00 

  2021-03-01 00:00 
  2021-03-01 00:00 
  2021-03-01 00:00 
  2021-03-01 00:00 
  2021-03-01 00:00 
  2021-03-01 00:00 

  2021-04-01 00:00 
  2021-04-01 00:00 
  2021-04-01 00:00 
  2021-04-01 00:00 
  2021-04-01 00:00 
  2021-04-01 00:00 

  2021-05-01 00:00 
  2021-05-01 00:00 
  2021-05-01 00:00 
  2021-05-01 00:00 
  2021-05-01 00:00 
  2021-05-01 00:00 

  2021-06-01 00:00 
  2021-06-01 00:00 
  2021-06-01 00:00 
  2021-06-01 00:00 
  2021-06-01 00:00 
  2021-06-01 00:00 

  2021-07-01 00:00 
  2021-07-01 00:00 
  2021-07-01 00:00 
  2021-07-01 00:00 
  2021-07-01 00:00 
  2021-07-01 00:00 

  2021-08-01 00:00 
  2021-08-01 00:00 
  2021-08-01 00:00 
  2021-08-01 00:00 
  2021-08-01 00:00 
  2021-08-01 00:00 

  2021-09-01 00:00 
  2021-09-01 00:00 
  2021-09-01 00:00 
  2021-09-01 00:00 
  2021-09-01 00:00 
  2021-09-01 00:00 

  2021-10-01 00:00 
  2021-10-01 00:00 
  2021-10-01 00:00 
  2021-10-01 00:00 
  2021-10-01 00:00 
  2021-10-01 00:00 

  2021-11-01 00:00 
  2021-11-01 00:00 
  2021-11-01 00:00 
  2021-11-01 00:00 
  2021-11-01 00:00 
  2021-11-01 00:00 

  2021-12-01 00:00 
  2021-12-01 00:00 
  2021-12-01 00:00 
  2021-12-01 00:00 
  2021-12-01 00:00 
  2021-12-01 00:00 

  2022-01-01 00:00 
  2022-01-01 00:00 
  2022-01-01 00:00 
  2022-01-01 00:00 
  2022-01-01 00:00 
  2022-01-01 00:00 

  2022-02-01 00:00 
  2022-02-01 00:00 
  2022-02-01 00:00 
  2022-02-01 00:00 
  2022-02-01 00:00 
  2022-02-01 00:00 

  2022-03-01 00:00 
  2022-03-01 00:00 
  2022-03-01 00:00 
  2022-03-01 00:00 
  2022-03-01 00:00 
  2022-03-01 00:00 

  2022-04-01 00:00 
  2022-04-01 00:00 
  2022-04-01 00:00 
  2022-04-01 00:00 
  2022-04-01 00:00 
  2022-04-01 00:00 

  2022-05-01 00:00 
  2022-05-01 00:00 
  2022-05-01 00:00 
  2022-05-01 00:00 
  2022-05-01 00:00 
  2022-05-01 00:00 

  2022-06-01 00:00 
  2022-06-01 00:00 
  2022-06-01 00:00 
  2022-06-01 00:00 
  2022-06-01 00:00 
  2022-06-01 00:00 

  2022-07-01 00:00 
  2022-07-01 00:00 
  2022-07-01 00:00 
  2022-07-01 00:00 
  2022-07-01 00:00 
  2022-07-01 00:00 

  2022-08-01 00:00 
  2022-08-01 00:00 
  2022-08-01 00:00 
  2022-08-01 00:00 
  2022-08-01 00:00 
  2022-08-01 00:00 

  2022-09-01 00:00 
  2022-09-01 00:00 
  2022-09-01 00:00 
  2022-09-01 00:00 
  2022-09-01 00:00 
  2022-09-01 00:00 

  2022-10-01 00:00 
  2022-10-01 00:00 
  2022-10-01 00:00 
  2022-10-01 00:00 
  2022-10-01 00:00 
  2022-10-01 00:00 

  2022-11-01 00:00 
  2022-11-01 00:00 
  2022-11-01 00:00 
  2022-11-01 00:00 
  2022-11-01 00:00 
  2022-11-01 00:00 

  2022-12-01 00:00 
  2022-12-01 00:00 
  2022-12-01 00:00 
  2022-12-01 00:00 
  2022-12-01 00:00 
  2022-12-01 00:00 

  2023-01-01 00:00 
  2023-01-01 00:00 
  2023-01-01 00:00 
  2023-01-01 00:00 
  2023-01-01 00:00 
  2023-01-01 00:00 

  2023-02-01 00:00 
  2023-02-01 00:00 
  2023-02-01 00:00 
  2023-02-01 00:00 
  2023-02-01 00:00 
  2023-02-01 00:00 

  2023-03-01 00:00 
  2023-03-01 00:00 
  2023-03-01 00:00 
  2023-03-01 00:00 
  2023-03-01 00:00 
  2023-03-01 00:00 

  2023-04-01 00:00 
  2023-04-01 00:00 
  2023-04-01 00:00 
  2023-04-01 00:00 
  2023-04-01 00:00 
  2023-04-01 00:00 

  2023-05-01 00:00 
  2023-05-01 00:00 
  2023-05-01 00:00 
  2023-05-01 00:00 
  2023-05-01 00:00 
  2023-05-01 00:00 

  2023-06-01 00:00 
  2023-06-01 00:00 
  2023-06-01 00:00 
  2023-06-01 00:00 
  2023-06-01 00:00 
  2023-06-01 00:00 

  2023-07-01 00:00 
  2023-07-01 00:00 
  2023-07-01 00:00 
  2023-07-01 00:00 
  2023-07-01 00:00 
  2023-07-01 00:00 

  2023-08-01 00:00 
  2023-08-01 00:00 
  2023-08-01 00:00 
  2023-08-01 00:00 
  2023-08-01 00:00 
  2023-08-01 00:00 

  2023-09-01 00:00 
  2023-09-01 00:00 
  2023-09-01 00:00 
  2023-09-01 00:00 
  2023-09-01 00:00 
  2023-09-01 00:00 

  2023-10-01 00:00 
  2023-10-01 00:00 
  2023-10-01 00:00 
  2023-10-01 00:00 
  2023-10-01 00:00 
  2023-10-01 00:00 

  2023-11-01 00:00 
  2023-11-01 00:00 
  2023-11-01 00:00 
  2023-11-01 00:00 
  2023-11-01 00:00 
  2023-11-01 00:00 

  2023-12-01 00:00 
  2023-12-01 00:00 
  2023-12-01 00:00 
  2023-12-01 00:00 
  2023-12-01 00:00 
  2023-12-01 00:00 

  2024-01-01 00:00 
  2024-01-01 00:00 
  2024-01-01 00:00 
  2024-01-01 00:00 
  2024-01-01 00:00 
  2024-01-01 00:00 

  2024-02-01 00:00 
  2024-02-01 00:00 
  2024-02-01 00:00 
  2024-02-01 00:00 
  2024-02-01 00:00 
  2024-02-01 00:00 

  2024-03-01 00:00 
  2024-03-01 00:00 
  2024-03-01 00:00 
  2024-03-01 00:00 
  2024-03-01 00:00 
  2024-03-01 00:00 

  2024-04-01 00:00 
  2024-04-01 00:00 
  2024-04-01 00:00 
  2024-04-01 00:00 
  2024-04-01 00:00 
  2024-04-01 00:00 

  2024-05-01 00:00 
  2024-05-01 00:00 
  2024-05-01 00:00 
  2024-05-01 00:00 
  2024-05-01 00:00 
  2024-05-01 00:00 

  2024-06-01 00:00 
  2024-06-01 00:00 
  2024-06-01 00:00 
  2024-06-01 00:00 
  2024-06-01 00:00 
  2024-06-01 00:00 

  2024-07-01 00:00 
  2024-07-01 00:00 
  2024-07-01 00:00 
  2024-07-01 00:00 
  2024-07-01 00:00 
  2024-07-01 00:00 

  2024-08-01 00:00 
  2024-08-01 00:00 
  2024-08-01 00:00 
  2024-08-01 00:00 
  2024-08-01 00:00 
  2024-08-01 00:00 

  2024-09-01 00:00 
  2024-09-01 00:00 
  2024-09-01 00:00 
  2024-09-01 00:00 
  2024-09-01 00:00 
  2024-09-01 00:00 

  2024-10-01 00:00 
  2024-10-01 00:00 
  2024-10-01 00:00 
  2024-10-01 00:00 
  2024-10-01 00:00 
  2024-10-01 00:00 

  2024-11-01 00:00 
  2024-11-01 00:00 
  2024-11-01 00:00 
  2024-11-01 00:00 
  2024-11-01 00:00 
  2024-11-01 00:00 

  2024-12-01 00:00 
  2024-12-01 00:00 
  2024-12-01 00:00 
  2024-12-01 00:00 
  2024-12-01 00:00 
  2024-12-01 00:00 

  2025-01-01 00:00 
  2025-01-01 00:00 
  2025-01-01 00:00 
  2025-01-01 00:00 
  2025-01-01 00:00 
  2025-01-01 00:00 

  2025-02-01 00:00 
  2025-02-01 00:00 
  2025-02-01 00:00 
  2025-02-01 00:00 
  2025-02-01 00:00 
  2025-02-01 00:00 

  2025-03-01 00:00 
  2025-03-01 00:00 
  2025-03-01 00:00 
  2025-03-01 00:00 
  2025-03-01 00:00 
  2025-03-01 00:00 

  2025-04-01 00:00 
  2025-04-01 00:00 
  2025-04-01 00:00 
  2025-04-01 00:00 
  2025-04-01 00:00 
  2025-04-01 00:00 

  2025-05-01 00:00 
  2025-05-01 00:00 
  2025-05-01 00:00 
  2025-05-01 00:00 
  2025-05-01 00:00 
  2025-05-01 00:00 

  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 

  2025-07-01 00:00 
  2025-07-01 00:00 
  2025-07-01 00:00 
  2025-07-01 00:00 
  2025-07-01 00:00 
  2025-07-01 00:00 

  2025-08-01 00:00 
  2025-08-01 00:00 
  2025-08-01 00:00 
  2025-08-01 00:00 
  2025-08-01 00:00 
  2025-08-01 00:00 

  2025-09-01 00:00 
  2025-09-01 00:00 
  2025-09-01 00:00 
  2025-09-01 00:00 
  2025-09-01 00:00 
  2025-09-01 00:00 

  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 
  2025-10-01 00:00 

  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 

  2025-12-01 00:00 
  2025-12-01 00:00 
  2025-12-01 00:00 
  2025-12-01 00:00 
  2025-12-01 00:00 
  2025-12-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00 
  2026-01-01 00:00 
  2026-01-01 00:00 
  2026-01-01 00:00 
  2026-01-01 00:00 

  2026-02-01 00:00 
  2026-02-01 00:00 
  2026-02-01 00:00 
  2026-02-01 00:00 
  2026-02-01 00:00 
  2026-02-01 00:00 

  2026-03-01 00:00 
  2026-03-01 00:00 
  2026-03-01 00:00 
  2026-03-01 00:00 
  2026-03-01 00:00 
  2026-03-01 00:00 

  2026-04-01 00:00 
  2026-04-01 00:00 
  2026-04-01 00:00 
  2026-04-01 00:00 
  2026-04-01 00:00 
  2026-04-01 00:00 

  2026-05-01 00:00 
  2026-05-01 00:00 
  2026-05-01 00:00 
  2026-05-01 00:00 
  2026-05-01 00:00 
  2026-05-01 00:00 

  2026-06-01 00:00 
  2026-06-01 00:00 
  2026-06-01 00:00 
  2026-06-01 00:00 
  2026-06-01 00:00 
  2026-06-01 00:00 

  2026-07-01 00:00 
  2026-07-01 00:00 
  2026-07-01 00:00 
  2026-07-01 00:00 
  2026-07-01 00:00 
  2026-07-01 00:00 

  2026-08-01 00:00 
  2026-08-01 00:00 
  2026-08-01 00:00 
  2026-08-01 00:00 
  2026-08-01 00:00 
  2026-08-01 00:00 

  2026-09-01 00:00 
  2026-09-01 00:00 
  2026-09-01 00:00 
  2026-09-01 00:00 
  2026-09-01 00:00 
  2026-09-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Northern Intertie -All Lines in Service (Year Round)     2015-10-27 11:37     BPAT51477      2025-05-30 13:49  
  WOCN     255892     BPAT     West of Cascades North Path Rating          C-CASC_N(BPAT) 

  C-CASC_N(BPAT) 

  C-CASC_N(BPAT) 

  C-CASC_N(BPAT)   
  10700.0 

  10700.0 

  10700.0 

  10700.0   
  2015-11-10 00:00 

  2019-10-01 14:00 

  2028-01-01 00:00 

  2033-01-01 00:00   
  2019-10-01 14:00 

  2028-01-01 00:00 

  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of Cascades North Long-term Limit.     2015-11-09 10:26     BPAT51802      2025-01-28 07:57  
  14 MONTH     260712     BPAT     West of LOMO E>W All Lines in Service          W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT)   
  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0   
  2016-03-17 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00 

  2019-11-01 00:00 

  2019-12-01 00:00 

  2020-01-01 00:00 

  2020-03-01 00:00 

  2020-04-01 00:00 

  2020-05-01 00:00 

  2020-06-01 00:00 

  2020-07-01 00:00 

  2020-08-01 00:00 

  2020-09-01 00:00 

  2020-10-01 00:00 

  2020-11-01 00:00 

  2020-12-01 00:00 

  2021-02-01 00:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00   
  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00 

  2019-11-01 00:00 

  2019-12-01 00:00 

  2020-01-01 00:00 

  2020-03-01 00:00 

  2020-04-01 00:00 

  2020-05-01 00:00 

  2020-06-01 00:00 

  2020-07-01 00:00 

  2020-08-01 00:00 

  2020-09-01 00:00 

  2020-10-01 00:00 

  2020-11-01 00:00 

  2020-12-01 00:00 

  2021-02-01 00:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of LOMO - All Lines in Service (Year Round)     2016-03-16 13:36     BPAT53767      2025-05-30 14:25  
  14 MONTH     261306     BPAT     Columbia Injection ALIS          CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT)   
  1100.0 

  1100.0 

  1100.0 

  1100.0 

  1100.0 

  1100.0 

  1100.0 

  1100.0 

  1100.0 

  1100.0 

  1100.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0 

  1300.0   
  2016-04-02 00:00 

  2016-05-26 10:00 

  2017-05-02 15:00 

  2017-06-05 10:00 

  2017-11-28 14:00 

  2017-12-20 12:00 

  2017-12-20 13:00 

  2018-02-28 17:00 

  2018-04-19 15:00 

  2018-05-14 11:00 

  2018-05-14 13:00 

  2018-06-01 00:00 

  2018-08-10 14:00 

  2019-10-01 00:00 

  2019-10-01 13:00 

  2019-10-09 10:00 

  2019-11-22 09:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00   
  2016-05-26 10:00 

  2017-05-02 15:00 

  2017-06-05 10:00 

  2017-11-28 14:00 

  2017-12-20 12:00 

  2017-12-20 13:00 

  2018-02-28 17:00 

  2018-04-19 15:00 

  2018-05-14 11:00 

  2018-05-14 13:00 

  2018-06-01 00:00 

  2018-08-10 14:00 

  2019-10-01 00:00 

  2019-10-01 13:00 

  2019-10-09 10:00 

  2019-11-22 09:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Columbia Injection All Lines in Service. (Year Round)     2016-04-01 14:58     BPAT53960      2025-05-30 14:24  
  14 MONTH     262981     BPAT     West of Slatt ALIS          WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT)   
  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0 

  4600.0   
  2016-05-12 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2020-08-01 00:00 

  2020-09-01 00:00 

  2020-10-01 00:00 

  2020-11-01 00:00 

  2020-12-01 00:00 

  2021-02-01 00:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00   
  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2020-08-01 00:00 

  2020-09-01 00:00 

  2020-10-01 00:00 

  2020-11-01 00:00 

  2020-12-01 00:00 

  2021-02-01 00:00 

  2021-03-01 00:00 

  2021-04-01 00:00 

  2021-05-01 00:00 

  2021-06-01 00:00 

  2021-07-01 00:00 

  2021-08-01 00:00 

  2021-09-01 00:00 

  2021-10-01 00:00 

  2021-11-01 00:00 

  2021-12-01 00:00 

  2022-01-01 00:00 

  2022-02-01 00:00 

  2022-03-01 00:00 

  2022-04-01 00:00 

  2022-05-01 00:00 

  2022-06-01 00:00 

  2022-07-01 00:00 

  2022-08-01 00:00 

  2022-09-01 00:00 

  2022-10-01 00:00 

  2022-11-01 00:00 

  2022-12-01 00:00 

  2023-01-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of Slatt - All Lines in Service (Year Round).     2016-05-11 12:16     BPAT54573      2025-05-30 14:26  
  NOJDAY     271567     BPAT     NJD_Path_Rating          NOJDAY(BPAT) 

  NOJDAY(BPAT)   
  8400.0 

  8400.0   
  2016-11-01 00:00 

  2026-01-01 00:00   
  2023-03-23 01:00 

  2023-03-23 01:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     NOJDAY Path Rating     2016-10-27 13:55     BPAT58592      2017-12-11 11:26  
  14 MONTH     279736     BPAT     RAVR PAUL          RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT)   
  1625.0 

  1640.0 

  1330.0 

  1800.0 

  1600.0 

  1630.0 

  1560.0 

  1560.0 

  1561.0 

  1528.0 

  1561.0 

  1561.0 

  1561.0 

  1561.0 

  1561.0 

  1561.0 

  1561.0 

  1463.0 

  1561.0 

  1555.0 

  1555.0 

  1555.0   
  2017-04-01 00:00 

  2017-07-01 00:00 

  2018-06-01 00:00 

  2019-06-01 00:00 

  2019-11-18 10:00 

  2020-06-01 00:00 

  2021-06-01 00:00 

  2022-05-11 00:00 

  2022-06-01 00:00 

  2023-06-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-11-01 00:00 

  2025-06-01 00:00 

  2026-06-01 00:00 

  2026-08-01 00:00   
  2017-07-01 00:00 

  2018-06-01 00:00 

  2019-06-01 00:00 

  2019-11-18 10:00 

  2020-06-01 00:00 

  2021-06-01 00:00 

  2022-05-11 00:00 

  2022-06-01 00:00 

  2023-06-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-11-01 00:00 

  2025-06-01 00:00 

  2026-06-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     RAVR_PAUL All Lines in Service.      2017-03-31 09:29     BPAT62912      2025-05-30 14:21  
  NI     306408     BPAT     NI          NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT)   
  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0   
  2018-10-31 00:00 
  2018-10-31 00:00 
  2018-10-31 00:00 
  2018-10-31 00:00 
  2018-10-31 00:00 
  2018-10-31 00:00   
  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     BPAT     NI Path Rating     2018-10-30 08:20     BPAT76509      2018-10-30 08:37  
  NI     306422     BPAT     NI          NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT)   
  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0   
  2018-10-31 00:00 
  2018-10-31 00:00 
  2018-10-31 00:00 
  2018-10-31 00:00 
  2018-10-31 00:00 
  2018-10-31 00:00   
  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     BPAT     NI Path Rating     2018-10-30 08:41     BPAT76511      2018-10-30 09:57  
  NI     306487     BPAT     NI          NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT)   
  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0 

  400.0 
  400.0 
  3150.0 
  2500.0 
  2850.0 
  2500.0   
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 

  2019-11-01 00:00 
  2019-11-01 00:00 
  2019-11-01 00:00 
  2019-11-01 00:00 
  2019-11-01 00:00 
  2019-11-01 00:00 

  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00 

  2033-01-01 00:00 
  2033-01-01 00:00 
  2033-01-01 00:00 
  2033-01-01 00:00 
  2033-01-01 00:00 
  2033-01-01 00:00   
  2019-11-01 00:00 
  2019-11-01 00:00 
  2019-11-01 00:00 
  2019-11-01 00:00 
  2019-11-01 00:00 
  2019-11-01 00:00 

  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00 

  2033-01-01 00:00 
  2033-01-01 00:00 
  2033-01-01 00:00 
  2033-01-01 00:00 
  2033-01-01 00:00 
  2033-01-01 00:00 

  2035-01-01 00:00 
  2035-01-01 00:00 
  2035-01-01 00:00 
  2035-01-01 00:00 
  2035-01-01 00:00 
  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     NI Path Rating     2018-10-31 08:51     BPAT76534      2025-01-28 08:01  
  NI     84603     BPAT     NI_Studied_Nomogram          NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT)   
  1571.0 
  1409.0 
  1571.0 
  1409.0 

  1571.0 
  1409.0 
  1571.0 
  1409.0 

  1571.0 
  1409.0 
  1571.0 
  1409.0   
  2019-12-01 00:00 
  2019-12-01 00:00 
  2019-12-01 00:00 
  2019-12-01 00:00 

  2024-01-01 00:00 
  2024-01-01 00:00 
  2024-01-01 00:00 
  2024-01-01 00:00 

  2025-01-01 00:00 
  2025-01-01 00:00 
  2025-01-01 00:00 
  2025-01-01 00:00   
  2024-01-01 00:00 
  2024-01-01 00:00 
  2024-01-01 00:00 
  2024-01-01 00:00 

  2025-01-01 00:00 
  2025-01-01 00:00 
  2025-01-01 00:00 
  2025-01-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00 
  2026-01-01 00:00 
  2026-01-01 00:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     BPAT     NI Studied Nomogram     2009-07-17 15:07     BPAT10813      2018-10-04 11:46  
  MI     323348     BPAT     MI_Path_TTC          MI_E>W(BPAT) 

  MI_E>W(BPAT) 

  MI_E>W(BPAT)   
  1930.0 

  1930.0 

  1930.0   
  2020-02-11 00:00 

  2029-01-01 00:00 

  2033-01-01 00:00   
  2029-01-01 00:00 

  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Townsend-Garrison (NWE path operator)     2020-02-10 07:57     BPAT84124      2025-01-28 08:00  
  COI PDCI     46533     BPAT     COI PDCI          AC_S>N(BPAT) 
  DC_S>N(BPAT) 

  AC_S>N(BPAT) 
  DC_S>N(BPAT)   
  2450.0 
  1904.0 

  2450.0 
  1904.0   
  2020-04-01 00:00 
  2020-04-01 00:00 

  2025-01-01 00:00 
  2025-01-01 00:00   
  2025-01-01 00:00 
  2025-01-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     BPAT     Studied Nomogram COI&PDCI SN     2008-09-22 10:44     BPAT6706      2019-01-28 09:16  
  SATSOP     333174     BPAT     SATSOP_Path_Limit          SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT)   
  650.0 

  680.0 

  680.0   
  2020-09-16 11:00 

  2024-11-13 00:00 

  2033-01-01 00:00   
  2024-11-13 00:00 

  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Long Term Limit     2020-09-16 10:49     BPAT89170      2025-01-28 08:05  
  14 MONTH     333180     BPAT     SATSOP_All_Lines_in_Service          SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT) 

  SATSOP_GEN(BPAT)   
  650.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0 

  680.0   
  2020-09-16 12:00 

  2021-11-09 00:00 

  2022-04-02 00:00 

  2022-11-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00   
  2021-11-09 00:00 

  2022-04-02 00:00 

  2022-11-01 00:00 

  2023-02-01 00:00 

  2023-03-01 00:00 

  2023-04-01 00:00 

  2023-05-01 00:00 

  2023-06-01 00:00 

  2023-07-01 00:00 

  2023-08-01 00:00 

  2023-09-01 00:00 

  2023-10-01 00:00 

  2023-11-01 00:00 

  2023-12-01 00:00 

  2024-01-01 00:00 

  2024-02-01 00:00 

  2024-03-01 00:00 

  2024-04-01 00:00 

  2024-05-01 00:00 

  2024-06-01 00:00 

  2024-07-01 00:00 

  2024-08-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     SATSOP - All Lines in Service (Year Round)      2020-09-16 11:32     BPAT89172      2025-05-30 13:52  
  GRZN     366631     BPAT     GRZN          GRZN_N>S(BPAT)      4800.0      2023-05-17 00:00      2099-01-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     GRZN N>S Long-term Limit     2023-05-16 13:42     BPAT104227      2023-05-16 13:42  
  14 MONTH     367003     BPAT     GRZN          GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT)   
  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0 

  4800.0   
  2023-06-01 00:00 

  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00   
  2024-09-01 00:00 

  2024-10-01 00:00 

  2024-11-01 00:00 

  2024-12-01 00:00 

  2025-01-01 00:00 

  2025-02-01 00:00 

  2025-03-01 00:00 

  2025-04-01 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2025-08-01 00:00 

  2025-09-01 00:00 

  2025-10-01 00:00 

  2025-11-01 00:00 

  2025-12-01 00:00 

  2026-01-01 00:00 

  2026-02-01 00:00 

  2026-03-01 00:00 

  2026-04-01 00:00 

  2026-05-01 00:00 

  2026-06-01 00:00 

  2026-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     GRZN All Lines in Service     2023-05-22 08:09     BPAT104451      2025-05-30 14:27  
  SBNDRY     369914     BPAT     SBNDRY          SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT)   
  1350.0 

  1350.0   
  2023-08-22 00:00 

  2033-01-01 00:00   
  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     South of Boundary Long Term Limit     2023-08-21 11:12     BPAT105687      2025-01-28 08:06  
  CLMBIA     369916     BPAT     CLMBIA          CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT)   
  1010.0 

  1010.0   
  2023-08-22 00:00 

  2033-01-01 00:00   
  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Columbia Injection Long Term Limit     2023-08-21 11:14     BPAT105688      2025-01-28 07:58  
  WANAPM     369918     BPAT     WANAPM          WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT)   
  750.0 

  750.0   
  2023-08-22 00:00 

  2033-01-01 00:00   
  2033-01-01 00:00 

  2035-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Wanapum Injection Long Term Limit     2023-08-21 11:16     BPAT105689      2025-01-28 08:07  
  NOPE     372090     BPAT     NOPE S>N          NOPE_S>N(BPAT) 

  NOPE_S>N(BPAT)   
  2000.0 

  1400.0   
  2023-10-18 00:00 

  2023-12-01 12:00   
  2023-12-01 12:00 

  2099-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     NOPE S>N Long-Term Limit     2023-10-17 13:18     BPAT106649      2023-12-01 11:17  
  NI     374753     BPAT     NI          NI_TOTL_N>S(BPAT) 
  NI_WEST_N>S(BPAT) 

  NI_TOTL_N>S(BPAT) 
  NI_WEST_N>S(BPAT) 

  NI_TOTL_N>S(BPAT) 
  NI_WEST_N>S(BPAT)   
  2400.0 
  2000.0 

  2400.0 
  2000.0 

  2400.0 
  2000.0   
  2023-12-15 00:00 
  2023-12-15 00:00 

  2024-09-14 00:00 
  2024-09-14 00:00 

  2025-03-31 16:00 
  2025-03-31 16:00   
  2024-09-14 00:00 
  2024-09-14 00:00 

  2025-03-31 16:00 
  2025-03-31 16:00 

  2026-01-01 00:00 
  2026-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     BCH - CHAPMAN: 5CX1     2023-12-14 07:35     BPAT108183      2025-03-31 07:37  
  14 MONTH     376653     BPAT     SOA          SOALSN(BPAT) 

  SOALSN(BPAT) 

  SOALSN(BPAT) 

  SOALSN(BPAT) 

  SOALSN(BPAT)   
  3500.0 

  3500.0 

  3500.0 

  3009.0 

  3009.0   
  2024-02-14 00:00 

  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2026-08-01 00:00   
  2025-05-01 00:00 

  2025-06-01 00:00 

  2025-07-01 00:00 

  2026-08-01 00:00 

  2026-09-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     SOA - All lines in service MW limit reflects forecasted NW generation updates     2024-02-13 11:02     BPAT109109      2025-05-30 14:17  
  NI     388138     BPAT     NI          NI_EAST_S>N(BPAT)      200.0      2025-01-15 00:00      2026-01-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     BCH - VARIOUS EQUIPMENT     2025-01-14 12:54     BPAT114151      2025-01-14 12:54  
  WOCS     375932     BPAT     WOCS          C-CASC_S(BPAT)      5692.0      2025-04-01 00:00      2025-11-01 00:00      Cancelled     TRANSMISSION     PLANNED      ONPATH     BPAT     WOCS 2025 Spring/Summer Seasonal Limit     2024-01-19 11:21     BPAT108766      2024-01-19 11:22  
  14 MONTH     375935     BPAT     WOCS          C-CASC_S(BPAT)      6934.0      2025-06-01 00:00      2025-11-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     WOCS - 2025 Summer Seasonal Limit     2024-01-19 11:22     BPAT108767      2025-05-30 14:13  
  14 MONTH     378151     BPAT     NWACI PDCI RATS          AC_N>S(BPAT) 
  AC_S>N(BPAT) 
  DC_N>S(BPAT) 
  DC_S>N(BPAT) 
  RATS_N>S(BPAT) 
  RATS_S>N(BPAT)   
  4600.0 
  2800.0 
  3100.0 
  2084.0 
  300.0 
  200.0   
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00   
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     NWACI & PDCI & RATS 2025 SUMMER SEASONAL LIMITS     2024-03-27 11:15     BPAT109750      2025-04-24 14:59  
  14 MONTH     378158     BPAT     WOG          WOGARR_E>W(BPAT)      2200.0      2025-06-01 00:00      2025-11-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     WOG_E>W SUMMER 2025 Seasonal limit     2024-03-27 11:18     BPAT109751      2024-03-27 11:18  
  14 MONTH     378160     BPAT     WOG          WOGARR_W>E(BPAT)      1245.0      2025-06-01 00:00      2025-11-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     WOG_W>E SUMMER 2025 Seasonal limit     2024-03-27 11:20     BPAT109752      2024-03-27 11:20  
  14 MONTH     378173     BPAT     WOCN          C-CASC_N(BPAT)      8323.0      2025-06-01 00:00      2025-11-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     WOCN - SUMMER 2025 SEASONAL LIMIT     2024-03-27 11:28     BPAT109753      2025-03-14 08:10  
  14 MONTH     378176     BPAT     NOEL          N_ECOL_S>N(BPAT)      2288.0      2025-06-01 00:00      2025-11-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     NOEL - SUMMER 2025 SEASONAL LIMIT     2024-03-27 11:35     BPAT109754      2025-05-12 11:07  
  14 MONTH     378178     BPAT     SCSTER          SCSTER_N>S(BPAT)      1636.0      2025-06-01 00:00      2025-11-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     SCSTER - SUMMER 2025 SEASONAL LIMIT     2024-03-27 11:37     BPAT109755      2025-05-12 11:08  
  14 MONTH     378180     BPAT     NOHANF          NOHANF(BPAT) 
  NOHANF_S>N(BPAT)   
  4000.0 
  5000.0   
  2025-06-01 00:00 
  2025-06-01 00:00   
  2025-11-01 00:00 
  2025-11-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     NOHANF - SUMMER 2025 SEASONAL LIMIT     2024-03-27 11:41     BPAT109756      2024-05-13 11:58  
  14 MONTH     378184     BPAT     NOPE S>N          NOPE_S>N(BPAT)      1215.0      2025-06-01 00:00      2025-11-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     NOPE S>N - 2025 Summer Seasonal Limit     2024-03-27 11:44     BPAT109758      2025-05-30 09:01  
  14 MONTH     391986     BPAT     SOALSN          SOALSN(BPAT)      3356.0      2025-06-01 00:00      2025-07-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     SOA - 2025 Summer Seasonal Limit     2025-05-14 08:44     BPAT115675      2025-05-14 08:55  
  PDCI     392215     BPAT     PDCI          DC_S>N(BPAT)      975.0      2025-06-01 00:00      2025-11-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     LADWP - PDCI SOUTH>NORTH SCHEDULING LIMIT     2025-05-22 10:03     BPAT115761      2025-05-22 10:03  
  GRZN     391928     BPAT     GRZN          GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT) 

  GRZN_N>S(BPAT)   
  4700.0 

  4700.0 

  4700.0   
  2025-06-06 09:00 

  2025-06-08 16:00 

  2025-06-15 16:00   
  2025-06-08 16:00 

  2025-06-15 16:00 

  2025-06-20 17:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     PAC - DIXONVILLE: ALVERY 1 500kV LINE SERIES CAP     2025-05-13 09:43     BPAT115659      2025-06-11 09:12  
  MI     392410     BPAT     MI          MI_E>W(BPAT)      1600.0      2025-06-09 08:00      2025-06-26 15:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - GARRISON-TAFT 1 500kV LINE (17846675)     2025-05-28 13:33     BPAT115832      2025-05-28 13:33  
  WOG     392412     BPAT     WOG          WOGARR_E>W(BPAT)      1600.0      2025-06-09 08:00      2025-06-26 15:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - GARRISON - TAFT 1 500kV LINE (17846675)     2025-05-28 13:35     BPAT115833      2025-05-28 13:35  
  NWACI     392745     BPAT     NWACI          AC_N>S(BPAT) 
  AC_S>N(BPAT)   
  3700.0 
  3575.0   
  2025-06-13 15:00 
  2025-06-13 15:00   
  2025-11-01 00:00 
  2025-11-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     PG&E - TABLE MOUNTAIN: ROUND MOUNTAIN 1 & 2 SERIES CAPS OOS     2025-06-04 14:41     BPAT115949      2025-06-05 14:46  
  NOHANF     392740     BPAT     NOHANF          NOHANF(BPAT) 
  NOHANF_S>N(BPAT)   
  4000.0 
  5000.0   
  2025-06-15 15:00 
  2025-06-15 15:00   
  2025-06-23 00:00 
  2025-06-23 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - GRAND COULEE: PCBs 2292 AND 2296     2025-06-04 12:54     BPAT115948      2025-06-04 12:54  
  RT N. OUTAGE     393013     BPAT               NI_EAST_N>S(BPAT) 
  NI_TOTL_N>S(BPAT)   
  250.0 
  2250.0   
  2025-06-16 00:00 
  2025-06-16 00:00   
  2025-06-17 00:00 
  2025-06-17 00:00   
  Active     TRANSMISSION     FORCED      ONPATH     BPAT     Updated Path Limits     2025-06-15 19:59     BPAT116065      2025-06-15 19:59  
  SCSTER NOEL     392703     BPAT     SCSTER NOEL          N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT)   
  2649.0 
  2346.0   
  2025-06-16 00:00 
  2025-06-16 00:00   
  2025-06-23 00:00 
  2025-06-23 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - VARIOUS EQUIPMENT (STUDY 0388-ST25-R0)     2025-06-03 12:19     BPAT115934      2025-06-03 12:19  
  WOCN     392706     BPAT     WOCN          C-CASC_N(BPAT)      8323.0      2025-06-16 00:00      2025-06-23 00:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - VARIOUS EQUIPMENT (18058127) (SOL 9308)     2025-06-03 12:22     BPAT115935      2025-06-03 12:22  
  NWACI PDCI     392497     BPAT     NWACI PDCI          AC_N>S(BPAT) 
  AC_S>N(BPAT) 
  DC_N>S(BPAT) 
  DC_S>N(BPAT)   
  4500.0 
  2800.0 
  3100.0 
  2084.0   
  2025-06-16 00:00 
  2025-06-16 00:00 
  2025-06-16 00:00 
  2025-06-16 00:00   
  2025-06-23 00:00 
  2025-06-23 00:00 
  2025-06-23 00:00 
  2025-06-23 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - VARIOUS EQUIPMENT (SOL NWACI S>N 3675)     2025-05-29 14:17     BPAT115871      2025-05-29 14:17  
  PDCI     392653     BPAT     PDCI          DC_N>S(BPAT) 
  DC_S>N(BPAT) 

  DC_N>S(BPAT) 
  DC_S>N(BPAT) 

  DC_N>S(BPAT) 
  DC_S>N(BPAT) 

  DC_N>S(BPAT) 
  DC_S>N(BPAT)   
  3100.0 
  2084.0 

  3100.0 
  2084.0 

  3100.0 
  2084.0 

  3100.0 
  2084.0   
  2025-06-16 07:00 
  2025-06-16 07:00 

  2025-06-17 07:00 
  2025-06-17 07:00 

  2025-06-18 07:00 
  2025-06-18 07:00 

  2025-06-19 07:00 
  2025-06-19 07:00   
  2025-06-16 17:00 
  2025-06-16 17:00 

  2025-06-17 17:00 
  2025-06-17 17:00 

  2025-06-18 17:00 
  2025-06-18 17:00 

  2025-06-19 17:00 
  2025-06-19 17:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - CELILO: BIG EDDY 1 500kV LINE AC HARMONIC FILTER PCB 5511 (15 MINUTE SCHEDULING NOT AVAILABLE ON PDCI) (17899649)     2025-06-02 08:47     BPAT115916      2025-06-02 08:47  
  MI     392736     BPAT     MI          MI_E>W(BPAT)      1600.0      2025-06-16 07:00      2025-06-19 17:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     NWE - BROADVIEW-GARRISON 1 500kV LINE (14854315), BPA - GARRISON-TAFT 1 500kV LINE (17846675)     2025-06-04 12:01     BPAT115946      2025-06-06 12:26  
  WOG     392738     BPAT     WOG          WOGARR_E>W(BPAT)      1600.0      2025-06-16 07:00      2025-06-19 17:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     NWE - BROADVIEW-GARRISON 1 500kV LINE (14854315), BPA - GARRISON-TAFT 1 500kV LINE (17846675)     2025-06-04 12:04     BPAT115947      2025-06-06 12:27  
  RT WOG OUTAGE     393009     BPAT               WOGARR_E>W(BPAT)      1600.0      2025-06-16 07:00      2025-06-17 00:00      Active     TRANSMISSION     FORCED      ONPATH     BPAT     NWE - BROADVIEW-GARRISON 1 500kV LINE (14854315), BPA - GARRISON-TAFT 1 500kV LINE      2025-06-15 19:53     BPAT116062      2025-06-15 19:53  
  RT N. OUTAGE     393023     BPAT               NI_EAST_N>S(BPAT) 
  NI_TOTL_N>S(BPAT)   
  300.0 
  2300.0   
  2025-06-17 00:00 
  2025-06-17 00:00   
  2025-06-18 00:00 
  2025-06-18 00:00   
  Scheduled     TRANSMISSION     FORCED      ONPATH     BPAT     Updated Path Limits     2025-06-16 19:21     BPAT116068      2025-06-16 19:21  
  RT WOG OUTAGE     393034     BPAT               WOGARR_E>W(BPAT)      1600.0      2025-06-17 00:00      2025-06-18 00:00      Scheduled     TRANSMISSION     FORCED      ONPATH     BPAT     NWE - BROADVIEW-GARRISON 1 500kV LINE (14854315), BPA - GARRISON-TAFT 1 500kV LINE (17846675)     2025-06-16 19:29     BPAT116074      2025-06-16 19:29  
  NWACI     392773     BPAT     NWACI          AC_N>S(BPAT) 
  AC_S>N(BPAT)   
  3000.0 
  2675.0   
  2025-06-17 06:00 
  2025-06-17 06:00   
  2025-06-18 18:00 
  2025-06-18 18:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     PG&E - TABLE MOUNTAIN: ROUND MOUNTAIN 1 & 2 SERIES CAP OOS, PG&E - ROUND MOUNTAIN-TABLE MOUNTAIN 2 500kV LINE 17744207     2025-06-05 13:57     BPAT115962      2025-06-05 13:57  
  SATSOP     392664     BPAT     SATSOP          SATSOP_GEN(BPAT)      680.0      2025-06-17 07:00      2025-06-17 16:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - SATSOP-AERDEEN 3 230kV LINE (17490879)     2025-06-02 09:27     BPAT115919      2025-06-02 09:27  
  SOALSN     392921     BPAT     SOALSN          SOALSN(BPAT)      2917.0      2025-06-17 08:00      2025-06-17 12:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     PGE - HARBORTON-RIVERGATE 230kV LINE (18101413)     2025-06-11 12:27     BPAT116021      2025-06-11 12:27  
  SBNDRY     392666     BPAT     SBNDRY          SBNDRY_N>S(BPAT)      830.0      2025-06-18 07:00      2025-06-18 15:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - BELL-USK 1 230kV LINE     2025-06-02 09:35     BPAT115920      2025-06-02 09:35  
  NI     392536     BPAT     NI          NI_TOTL_S>N(BPAT) 
  NI_WEST_S>N(BPAT)   
  2000.0 
  2000.0   
  2025-06-18 08:00 
  2025-06-18 08:00   
  2025-07-02 16:00 
  2025-07-02 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     PGE - GRIZZLY-MALIN 2 500kV LINE (17293918)     2025-05-30 08:58     BPAT115880      2025-05-30 08:58  
  GRZN     392502     BPAT     GRZN          GRZN_N>S(BPAT)      4400.0      2025-06-18 08:00      2025-06-23 00:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     PGE - GRIZZLY-MALIN NO 2 500kV LINE     2025-05-29 14:22     BPAT115872      2025-05-29 14:22  
  NWACI PDCI     392504     BPAT     NWACI PDCI          AC_N>S(BPAT) 
  AC_S>N(BPAT) 
  DC_N>S(BPAT) 
  DC_S>N(BPAT)   
  4000.0 
  2400.0 
  3100.0 
  2084.0   
  2025-06-18 08:00 
  2025-06-18 08:00 
  2025-06-18 08:00 
  2025-06-18 08:00   
  2025-06-23 00:00 
  2025-06-23 00:00 
  2025-06-23 00:00 
  2025-06-23 00:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     PGE - GRIZZLY-MALIN NO 2 500kV LINE (SOL NWACI S>N 3675)     2025-05-29 14:27     BPAT115873      2025-05-29 14:27  
  NWACI PDCI     392511     BPAT     NWACI PDCI          AC_N>S(BPAT) 
  AC_S>N(BPAT) 
  DC_N>S(BPAT) 
  DC_S>N(BPAT)   
  4000.0 
  2400.0 
  0.0 
  0.0   
  2025-06-21 03:00 
  2025-06-21 03:00 
  2025-06-21 03:00 
  2025-06-21 03:00   
  2025-06-22 20:00 
  2025-06-22 20:00 
  2025-06-22 20:00 
  2025-06-22 20:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     PGE - GRIZZLY-MALIN NO 2 500kV LINE, BPA - CELILO-SYLMAR 1000kV LINE, BIG EDDY-CELILO 1 & 2 500kV LINES     2025-05-29 14:36     BPAT115874      2025-05-29 14:36  
  PDCI     392864     BPAT     PDCI          DC_S>N(BPAT)      0.0      2025-06-22 05:00      2025-06-22 19:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     LADWP - ADELANTO-RINALDI 1 500kV LINE     2025-06-09 10:08     BPAT115999      2025-06-09 10:08  
  WOCN     392895     BPAT     WOCN          C-CASC_N(BPAT)      8266.0      2025-06-23 00:00      2025-06-30 00:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - VARIOUS EQUIPMENT (18098873) (SOL 9813)     2025-06-10 09:35     BPAT116010      2025-06-10 09:35  
  SCSTER NOEL     392897     BPAT     SCSTER NOEL          N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT)   
  2650.0 
  2308.0   
  2025-06-23 00:00 
  2025-06-23 00:00   
  2025-06-30 00:00 
  2025-06-30 00:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - VARIOUS EQUIPMENT (STUDY 0414-ST25-R0)     2025-06-10 09:36     BPAT116011      2025-06-10 09:36  
  NOHANF     392770     BPAT     NOHANF          NOHANF(BPAT) 
  NOHANF_S>N(BPAT)   
  4000.0 
  5000.0   
  2025-06-23 00:00 
  2025-06-23 00:00   
  2025-06-30 00:00 
  2025-06-30 00:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - GRAND COULEE: PCBs 2292 AND 2296     2025-06-05 13:54     BPAT115961      2025-06-05 13:54  
  NWACI PDCI     392688     BPAT     NWACI PDCI          AC_N>S(BPAT) 
  AC_S>N(BPAT) 
  DC_N>S(BPAT) 
  DC_S>N(BPAT)   
  4000.0 
  2400.0 
  3100.0 
  2084.0   
  2025-06-23 00:00 
  2025-06-23 00:00 
  2025-06-23 00:00 
  2025-06-23 00:00   
  2025-06-30 00:00 
  2025-06-30 00:00 
  2025-06-30 00:00 
  2025-06-30 00:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     PGE - GRIZZLY-MALIN NO 2 500kV LINE (SOL NWACI S>N 3675)     2025-06-03 08:46     BPAT115930      2025-06-03 08:49  
  NWACI PDCI     392693     BPAT     NWACI PDCI          AC_N>S(BPAT) 
  AC_S>N(BPAT) 
  DC_N>S(BPAT) 
  DC_S>N(BPAT)   
  4600.0 
  2800.0 
  3100.0 
  2084.0   
  2025-06-23 00:00 
  2025-06-23 00:00 
  2025-06-23 00:00 
  2025-06-23 00:00   
  2025-06-30 00:00 
  2025-06-30 00:00 
  2025-06-30 00:00 
  2025-06-30 00:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - VARIOUS EQUIPMENT (SOL NWACI S>N 3675)     2025-06-03 08:48     BPAT115931      2025-06-03 08:48  
  GRZN     392699     BPAT     GRZN          GRZN_N>S(BPAT)      4400.0      2025-06-23 00:00      2025-06-30 00:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     PGE - GRIZZLY-MALIN NO 2 500kV LINE     2025-06-03 08:53     BPAT115932      2025-06-03 08:53  
  PDCI     392656     BPAT     PDCI          DC_N>S(BPAT) 
  DC_S>N(BPAT)   
  3100.0 
  2084.0   
  2025-06-23 07:00 
  2025-06-23 07:00   
  2025-06-26 17:00 
  2025-06-26 17:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - CELILO: BIG EDDY 2 500kV LINE AC HARMONIC FILTER PCB 5516 (15 MINUTE SCHEDULING NOT AVAILABLE ON PDCI) (17899653)     2025-06-02 08:50     BPAT115917      2025-06-02 08:50  
  PDCI     392661     BPAT     PDCI          DC_N>S(BPAT) 
  DC_S>N(BPAT) 

  DC_N>S(BPAT) 
  DC_S>N(BPAT) 

  DC_N>S(BPAT) 
  DC_S>N(BPAT) 

  DC_N>S(BPAT) 
  DC_S>N(BPAT)   
  3100.0 
  2084.0 

  3100.0 
  2084.0 

  3100.0 
  2084.0 

  3100.0 
  2084.0   
  2025-06-23 07:00 
  2025-06-23 07:00 

  2025-06-24 07:00 
  2025-06-24 07:00 

  2025-06-25 07:00 
  2025-06-25 07:00 

  2025-06-26 07:00 
  2025-06-26 07:00   
  2025-06-23 17:00 
  2025-06-23 17:00 

  2025-06-24 17:00 
  2025-06-24 17:00 

  2025-06-25 17:00 
  2025-06-25 17:00 

  2025-06-26 17:00 
  2025-06-26 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - CELILO: BIG EDDY 2 500kV LINE AC HARMONIC FILTER PCB 5516 (15 MINUTE SCHEDULING NOT AVAILABLE ON PDCI) (17899653)     2025-06-02 08:51     BPAT115918      2025-06-02 08:51  
  GRZN     392701     BPAT     GRZN          GRZN_N>S(BPAT)      4600.0      2025-06-23 09:00      2025-06-27 15:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - REDMOND-PILOT BUTTE 1 230kV LINE     2025-06-03 08:55     BPAT115933      2025-06-03 08:55  
  SCSTER NOEL     392900     BPAT     SCSTER NOEL          N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT)   
  2585.0 
  2146.0   
  2025-06-25 07:00 
  2025-06-25 07:00   
  2025-06-25 17:00 
  2025-06-25 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     PSE - SEDRO WOOLLEY-BOTHELL-HORSE RANCH TAP 230kV LINE (STUDY 0415-ST25-R0)     2025-06-10 09:38     BPAT116012      2025-06-10 09:38  
  SBNDRY     392816     BPAT     SBNDRY          SBNDRY_N>S(BPAT)      820.0      2025-06-25 07:00      2025-06-25 15:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - BELL: 230kV MAIN BUS SECTION 1     2025-06-06 12:31     BPAT115977      2025-06-06 12:31  
  RAVR_PAUL     392818     BPAT     RAVR PAUL          RAVR_PAUL(BPAT)      1486.0      2025-06-27 07:00      2025-06-27 17:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - OLYMPIA: 230kV WEST MAIN BUS     2025-06-06 12:33     BPAT115978      2025-06-06 12:33  
  SATSOP     392820     BPAT     SATSOP          SATSOP_GEN(BPAT)      520.0      2025-06-27 07:00      2025-06-27 17:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - OLYMPIA: 230kV WEST MAIN BUS     2025-06-06 12:36     BPAT115979      2025-06-06 12:36  
  NOHANF     392925     BPAT     NOHANF          NOHANF(BPAT) 
  NOHANF_S>N(BPAT)   
  4000.0 
  5000.0   
  2025-06-29 00:00 
  2025-06-29 00:00   
  2025-07-07 00:00 
  2025-07-07 00:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - GRAND COULEE: PCBs 2292 AND 2296 (VARIOUS)     2025-06-11 14:42     BPAT116023      2025-06-11 14:42  
  SCSTER NOEL     392971     BPAT     SCSTER NOEL          N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT)   
  2650.0 
  2308.0   
  2025-06-30 00:00 
  2025-06-30 00:00   
  2025-07-07 00:00 
  2025-07-07 00:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - VARIOUS EQUIPMENT (STUDY 0422-ST25-R0)     2025-06-13 10:49     BPAT116042      2025-06-13 10:49  
  WOCN     392974     BPAT     WOCN          C-CASC_N(BPAT)      8168.0      2025-06-30 00:00      2025-07-07 00:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - VARIOUS EQUPMENT (SOL 9770) (18119683)     2025-06-13 11:08     BPAT116043      2025-06-13 11:08  
  NWACI PDCI     392802     BPAT     NWACI PDCI          AC_N>S(BPAT) 
  AC_S>N(BPAT) 
  DC_N>S(BPAT) 
  DC_S>N(BPAT)   
  4600.0 
  2800.0 
  3100.0 
  2084.0   
  2025-06-30 00:00 
  2025-06-30 00:00 
  2025-06-30 00:00 
  2025-06-30 00:00   
  2025-07-07 00:00 
  2025-07-07 00:00 
  2025-07-07 00:00 
  2025-07-07 00:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - VARIOUS EQUIPMENT (SOL NWACI S>N 3675)     2025-06-06 11:09     BPAT115974      2025-06-06 11:09  
  NWACI PDCI     392807     BPAT     NWACI PDCI          AC_N>S(BPAT) 
  AC_S>N(BPAT) 
  DC_N>S(BPAT) 
  DC_S>N(BPAT)   
  4000.0 
  2400.0 
  3100.0 
  2084.0   
  2025-06-30 00:00 
  2025-06-30 00:00 
  2025-06-30 00:00 
  2025-06-30 00:00   
  2025-07-02 16:00 
  2025-07-02 16:00 
  2025-07-02 16:00 
  2025-07-02 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     PGE - GRIZZLY-MALIN NO 2 500kV LINE (SOL NWACI S>N 3675)     2025-06-06 11:12     BPAT115975      2025-06-06 11:12  
  GRZN     392812     BPAT     GRZN          GRZN_N>S(BPAT)      4400.0      2025-06-30 00:00      2025-07-02 16:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     PGE - GRIZZLY-MALIN NO 2 500kV LINE     2025-06-06 11:16     BPAT115976      2025-06-06 11:16  
  PDCI     392956     BPAT     PDCI          DC_N>S(BPAT)      2041.0      2025-06-30 06:00      2025-08-08 21:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     LADWP - GOULD-SYLMAR 220kV LINE 1, LADWP - EAGLE ROCK-SYLMAR 220kV LINE 1, LADWP - N-1 CONTINGENCY LOSS OF BANK G     2025-06-12 14:26     BPAT116035      2025-06-12 14:26  
  NWACI PDCI     393018     BPAT     NWACI PDCI          AC_N>S(BPAT) 
  AC_S>N(BPAT) 
  DC_N>S(BPAT) 
  DC_S>N(BPAT)   
  4600.0 
  2800.0 
  3100.0 
  2084.0   
  2025-07-07 00:00 
  2025-07-07 00:00 
  2025-07-07 00:00 
  2025-07-07 00:00   
  2025-07-14 00:00 
  2025-07-14 00:00 
  2025-07-14 00:00 
  2025-07-14 00:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - VARIOUS EQUIPMENT (SOL NWACI S>N 3675)     2025-06-16 11:26     BPAT116067      2025-06-16 11:26  
  PDCI     392670     BPAT     PDCI          DC_N>S(BPAT) 
  DC_S>N(BPAT) 

  DC_N>S(BPAT) 
  DC_S>N(BPAT) 

  DC_N>S(BPAT) 
  DC_S>N(BPAT) 

  DC_N>S(BPAT) 
  DC_S>N(BPAT)   
  3100.0 
  2084.0 

  3100.0 
  2084.0 

  3100.0 
  2084.0 

  3100.0 
  2084.0   
  2025-07-07 07:00 
  2025-07-07 07:00 

  2025-07-08 07:00 
  2025-07-08 07:00 

  2025-07-09 07:00 
  2025-07-09 07:00 

  2025-07-10 07:00 
  2025-07-10 07:00   
  2025-07-07 17:00 
  2025-07-07 17:00 

  2025-07-08 17:00 
  2025-07-08 17:00 

  2025-07-09 17:00 
  2025-07-09 17:00 

  2025-07-10 17:00 
  2025-07-10 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA - CELILO: BIG EDDY 2 500kV LINE AC HARMONIC FILTER PCB 5512 (15 MINUTE SCHEDULING NOT AVAILABLE ON PDCI) (17899645)     2025-06-02 12:21     BPAT115921      2025-06-02 12:21  
CLPT Outages:
  CLPT 000184.1     131107     CLPT     CHEYENNE PRAIRIE-CAMPSTOOL 115 KV LINE #2               0.0      0.0      0.0      2025-03-17 09:32      2025-06-23 18:00      ACTIVE     TRANSMISSION     PLANNED      ONPATH     CLPT     CHEYENNE PRAIRIE-CAMPSTOOL 115KV LINE #2 - ARH-ARH (0)     2025-01-31 11:43     000184.1     2025-06-10 17:51  
  CLPT 001165.1     136997     CLPT     WEST CHEYENNE-KING RANCH 115 KV LINE               0.0      0.0      0.0      2025-05-20 07:00      2025-06-27 17:00      Active     TRANSMISSION     PLANNED      ONPATH     CLPT     ORCHARD VALLEY - BISON, BISON - WEST CHEYENNE 115KV LINES - ARH-ARH (0)     2025-04-30 19:14     001165.1     2025-04-30 19:14  
  CLPT 001165.2     136996     CLPT     ORCHARD VALLEY-BISON 115               0.0      0.0      0.0      2025-05-20 08:17      2025-06-27 17:00      ACTIVE     TRANSMISSION     PLANNED      ONPATH     CLPT     ORCHARD VALLEY - BISON, BISON - WEST CHEYENNE 115KV LINES - ARH-ARH (0)     2025-04-30 19:14     001165.2     2025-05-20 08:18  
  CLPT 001602.1     137783     CLPT     NORTH RANGE-WARREN USAF 115               0.0      0.0      0.0      2025-06-17 07:00      2025-06-17 11:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     CLPT     NORTH RANGE-WARREN USAF 115KV LINE OPEN-ENDED AT NORTH RANGE - ARH-ARH (0)     2025-06-10 13:38     001602.1     2025-06-10 13:38  
  CLPT 001603.1     137784     CLPT     NORTH RANGE-WARREN USAF 115               0.0      0.0      0.0      2025-06-19 09:00      2025-06-19 17:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     CLPT     NORTH RANGE-WARREN USAF 115KV LINE OPEN-ENDED AT NORTH RANGE - ARH-ARH (0)     2025-06-10 13:43     001603.1     2025-06-10 13:43  
  CLPT 001338.2     137724     CLPT     CHEYENNE PRAIRIE-SWEETGRASS 115 #1               0.0      0.0      0.0      2025-06-23 07:00      2025-06-26 17:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     CLPT     CHEYENNE PRAIRIE - SWEETGRASS 115KV LINES #1 & 2 - ARH-ARH (0)     2025-06-02 12:20     001338.2     2025-06-05 11:50  
  CLPT 001338.1     137725     CLPT     CHEYENNE PRAIRIE-SWEETGRASS 115 #2               0.0      0.0      0.0      2025-06-23 07:00      2025-06-26 17:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     CLPT     CHEYENNE PRAIRIE - SWEETGRASS 115KV LINES #1 & 2 - ARH-ARH (0)     2025-06-02 12:20     001338.1     2025-06-05 11:58  
  CLPT 001338.3     137735     CLPT     CHEYENNE PRAIRIE-SWEETGRASS 115 LINE #2               0.0      0.0      0.0      2025-06-23 07:00      2025-06-26 17:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     CLPT     CHEYENNE PRAIRIE - SWEETGRASS 115KV LINES #1 & 2 - ARH-ARH (0)     2025-06-02 15:03     001338.3     2025-06-02 15:03  
  CLPT 001338.4     137736     CLPT     CHEYENNE PRAIRIE-SWEETGRASS 115 LINE #1               0.0      0.0      0.0      2025-06-23 07:00      2025-06-26 17:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     CLPT     CHEYENNE PRAIRIE - SWEETGRASS 115KV LINES #1 & 2 - ARH-ARH (0)     2025-06-02 15:03     001338.4     2025-06-02 15:03  
CRCM Outages:
  SHR2-KAYLHV     63481     CRCM     KAYLHV-SHR2          KAYLHV>SHR2(CRCM) 
  SHR2>KAYLHV(CRCM)   
  350.0 
  400.0   
  350.0 
  400.0   
  0.0 
  0.0   
  2025-04-07 10:45 
  2025-04-07 10:45   
  2025-06-05 20:00 
  2025-06-05 20:00   
  Completed     TRANSMISSION     FORCED      ONPATH     CRCM,WACM     INFO-25-0468 Line OOS     2025-04-07 10:47     CRCM19430      2025-06-05 19:11  
  CRG-BOZ     62446     CRCM     TOT-1A (CRCM), BOZ-CRG          BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 

  BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM)   
  218.0 
  285.0 

  218.0 
  285.0   
  218.0 
  285.0 

  218.0 
  285.0   
  0.0 
  0.0 

  0.0 
  0.0   
  2025-05-27 09:00 
  2025-05-27 09:00 

  2025-05-28 17:10 
  2025-05-28 17:10   
  2025-05-28 17:10 
  2025-05-28 17:10 

  2025-06-15 14:00 
  2025-06-15 14:00   
  Completed     Transmission     Planned      OnPath     BEPW,CRCM,LAPT,WACM     C-25-0006; TOT1A to Series 2     2024-12-04 20:08     CRCM19059      2025-06-15 13:45  
  System Conditions     62445     WACM     TOT-1A     TOT-1A     BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 
  CRG>SWR(CRCM) 
  SWR>CRG(CRCM) 
  SWR>VNL(CRCM) 
  VNL>FGE(CRCM) 
  VNL>SWR(CRCM)   
  395.0     395.0     52.0 
  52.0 
  28.0 
  28.0 
  28.0 
  48.0 
  28.0   
  2025-05-27 09:00 
  2025-05-27 09:00 
  2025-05-27 09:00 
  2025-05-27 09:00 
  2025-05-27 09:00 
  2025-05-27 09:00 
  2025-05-27 09:00   
  2025-06-15 14:00 
  2025-06-15 14:00 
  2025-06-15 14:00 
  2025-06-15 14:00 
  2025-06-15 14:00 
  2025-06-15 14:00 
  2025-06-15 14:00   
  Completed     Transmission     Planned      OnPath     CRCM,WACM     C-25-0006; TOT1A / Path 30 to Series 2     2024-12-04 19:44     WACM19058      2025-06-15 13:44  
  System Conditions     64016     WACM     TOT-1A     TOT-1A     BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 
  CRG>SWR(CRCM) 
  SWR>CRG(CRCM) 
  SWR>VNL(CRCM) 
  VNL>FGE(CRCM) 
  VNL>SWR(CRCM)   
  395.0     395.0     247.0 
  247.0 
  133.0 
  133.0 
  133.0 
  228.0 
  133.0   
  2025-05-27 09:00 
  2025-05-27 09:00 
  2025-05-27 09:00 
  2025-05-27 09:00 
  2025-05-27 09:00 
  2025-05-27 09:00 
  2025-05-27 09:00   
  2025-06-15 14:00 
  2025-06-15 14:00 
  2025-06-15 14:00 
  2025-06-15 14:00 
  2025-06-15 14:00 
  2025-06-15 14:00 
  2025-06-15 14:00   
  Completed     Transmission     Planned      OnPath     CRCM,WACM     TOT-1A to Series 14 per TSGT Outage ID 533120, C-25-0006     2025-06-06 06:28     WACM19594      2025-06-15 13:46  
  System Conditions     61705     WACM     TOT-1A     TOT-1A     BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 
  CRG>SWR(CRCM) 
  SWR>CRG(CRCM) 
  SWR>VNL(CRCM) 
  VNL>FGE(CRCM) 
  VNL>SWR(CRCM)   
  395.0     395.0     247.0 
  247.0 
  133.0 
  133.0 
  133.0 
  228.0 
  133.0   
  2025-05-28 07:00 
  2025-05-28 07:00 
  2025-05-28 07:00 
  2025-05-28 07:00 
  2025-05-28 07:00 
  2025-05-28 07:00 
  2025-05-28 07:00   
  2025-06-06 17:00 
  2025-06-06 17:00 
  2025-06-06 17:00 
  2025-06-06 17:00 
  2025-06-06 17:00 
  2025-06-06 17:00 
  2025-06-06 17:00   
  Cancelled     Transmission     Planned      OnPath     CRCM,WACM     INFO-25-0048; Series 14     2024-08-16 21:20     WACM18769      2025-05-06 22:31  
  System Conditions     62520     WACM     TOT-1A     TOT-1A     BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 
  CRG>SWR(CRCM) 
  SWR>CRG(CRCM) 
  SWR>VNL(CRCM) 
  VNL>FGE(CRCM) 
  VNL>SWR(CRCM)   
  395.0     395.0     325.0 
  325.0 
  175.0 
  175.0 
  175.0 
  300.0 
  175.0   
  2025-05-28 08:00 
  2025-05-28 08:00 
  2025-05-28 08:00 
  2025-05-28 08:00 
  2025-05-28 08:00 
  2025-05-28 08:00 
  2025-05-28 08:00   
  2025-06-06 16:00 
  2025-06-06 16:00 
  2025-06-06 16:00 
  2025-06-06 16:00 
  2025-06-06 16:00 
  2025-06-06 16:00 
  2025-06-06 16:00   
  Cancelled     Transmission     Planned      OnPath     BEPW,CRCM,LAPT,WACM     INFO-25-0048. TOT1A to Series14.     2024-12-16 19:31     WACM19079      2024-12-16 20:08  
  Summer 2025 Limit     63973     WACM     TOT-1A     TOT-1A     BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 
  CRG>SWR(CRCM) 
  SWR>CRG(CRCM) 
  SWR>VNL(CRCM) 
  VNL>FGE(CRCM) 
  VNL>SWR(CRCM)   
  395.0     395.0     196.3 
  196.3 
  105.7 
  105.7 
  105.7 
  181.2 
  105.7   
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00   
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00   
  Active     Transmission     Planned      OnPath     CRCM,WACM     TOT-1A Summer Ratings- Maximum Seasonal TTC of 505 MW -JK     2025-06-02 08:42     WACM19583      2025-06-02 08:42  
  Summer 2025 Limit     63976     WACM     TOT-5     TOT-5     AU>CRG(CRCM) 
  BLUE>CRG(CRCM) 
  CCW>MIDW(CRCM) 
  CRG>AU(CRCM) 
  MIDW>CCW(CRCM)   
  750.0     750.0     456.8 
  21.8 
  246.5 
  456.8 
  246.5   
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00   
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00   
  Active     Transmission     Planned      OnPath     CRCM,WACM     TOT-5 Summer 2025 Rating for system intact is 1680 MW. CRCM Share is 725 MW. JK     2025-06-02 08:50     WACM19586      2025-06-02 08:50  
  System Conditions     63767     WACM     TOT-1A     TOT-1A     BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 
  CRG>SWR(CRCM) 
  SWR>CRG(CRCM) 
  SWR>VNL(CRCM) 
  VNL>FGE(CRCM) 
  VNL>SWR(CRCM)   
  395.0     395.0     238.5 
  238.5 
  128.5 
  128.5 
  128.5 
  220.2 
  128.5   
  2025-06-02 06:00 
  2025-06-02 06:00 
  2025-06-02 06:00 
  2025-06-02 06:00 
  2025-06-02 06:00 
  2025-06-02 06:00 
  2025-06-02 06:00   
  2025-06-05 16:00 
  2025-06-05 16:00 
  2025-06-05 16:00 
  2025-06-05 16:00 
  2025-06-05 16:00 
  2025-06-05 16:00 
  2025-06-05 16:00   
  Cancelled     Transmission     Planned      OnPath     CRCM,WACM     INFO-25-1226; TOT-1A to series 14     2025-05-07 19:29     WACM19508      2025-06-02 01:22  
  CRG-SWR     63986     CRCM     TOT-1A (CRCM), CRG-SWR          CRG>SWR(CRCM) 
  SWR>CRG(CRCM)   
  140.0 
  140.0   
  140.0 
  140.0   
  0.0 
  0.0   
  2025-06-02 14:00 
  2025-06-02 14:00   
  2025-06-04 06:00 
  2025-06-04 06:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     CRCM,WACM     System Conditions and Reliability     2025-06-02 12:40     CRCM19588      2025-06-04 05:28  
  System Conditions     63985     WACM     TOT1A     TOT-1A     BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 
  CRG>SWR(CRCM) 
  SWR>CRG(CRCM) 
  SWR>VNL(CRCM) 
  VNL>FGE(CRCM) 
  VNL>SWR(CRCM)   
  395.0     395.0     112.5 
  112.5 
  60.5 
  60.5 
  60.5 
  103.8 
  60.5   
  2025-06-02 14:00 
  2025-06-02 14:00 
  2025-06-02 14:00 
  2025-06-02 14:00 
  2025-06-02 14:00 
  2025-06-02 14:00 
  2025-06-02 14:00   
  2025-06-04 06:00 
  2025-06-04 06:00 
  2025-06-04 06:00 
  2025-06-04 06:00 
  2025-06-04 06:00 
  2025-06-04 06:00 
  2025-06-04 06:00   
  Completed     Transmission     Planned      OnPath     CRCM,WACM     System Conditions and Reliability. TOT-1A to series 7 (Series 2 is more limiting)     2025-06-02 12:37     WACM19587      2025-06-04 05:29  
  System Conditions     64045     WACM     TOT-2A     TOT-2A     CCI>SHR2(CRCM) 
  HSP>SJ345(CRCM) 
  SHR2>CCI(CRCM) 
  SJ345>HSP(CRCM)   
  420.0     420.0     176.2 
  119.8 
  176.2 
  119.8   
  2025-06-11 15:00 
  2025-06-11 15:00 
  2025-06-11 15:00 
  2025-06-11 15:00   
  2025-06-11 21:00 
  2025-06-11 21:00 
  2025-06-11 21:00 
  2025-06-11 21:00   
  Completed     Transmission     Forced      OffPath     CRCM,WACM     Line Trip     2025-06-11 15:10     WACM19614      2025-06-11 20:23  
  CRG-CCI     64046     CRCM     CCI-CRG          CCI>CRG(CRCM) 
  CRG>CCI(CRCM)   
  442.0 
  442.0   
  442.0 
  442.0   
  0.0 
  0.0   
  2025-06-11 15:05 
  2025-06-11 15:05   
  2025-06-11 21:00 
  2025-06-11 21:00   
  Completed     TRANSMISSION     FORCED      ONPATH     CRCM,WACM     Line Trip     2025-06-11 15:13     CRCM19615      2025-06-11 20:23  
  RFL-CCI     64049     CRCM               CCI>CRG(CRCM) 
  CCI>RFL(CRCM) 
  CRG>CCI(CRCM) 
  RFL>CCI(CRCM)   
  442.0 
  442.0 
  442.0 
  442.0   
  442.0 
  442.0 
  442.0 
  442.0   
  0.0 
  0.0 
  0.0 
  0.0   
  2025-06-11 15:10 
  2025-06-11 15:10 
  2025-06-11 15:10 
  2025-06-11 15:10   
  2025-06-11 21:00 
  2025-06-11 21:00 
  2025-06-11 21:00 
  2025-06-11 21:00   
  Completed     TRANSMISSION     FORCED      ONPATH     CRCM,WACM     Line Trip     2025-06-11 15:16     CRCM19616      2025-06-11 20:23  
  System Conditions     64072     WACM     TOT1A     TOT-1A     BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 
  CRG>SWR(CRCM) 
  SWR>CRG(CRCM) 
  SWR>VNL(CRCM) 
  VNL>FGE(CRCM) 
  VNL>SWR(CRCM)   
  395.0     395.0     176.1 
  176.1 
  94.8 
  94.8 
  94.8 
  162.6 
  94.8   
  2025-06-14 14:00 
  2025-06-14 14:00 
  2025-06-14 14:00 
  2025-06-14 14:00 
  2025-06-14 14:00 
  2025-06-14 14:00 
  2025-06-14 14:00   
  2025-06-16 09:00 
  2025-06-16 09:00 
  2025-06-16 09:00 
  2025-06-16 09:00 
  2025-06-16 09:00 
  2025-06-16 09:00 
  2025-06-16 09:00   
  Completed     Transmission     Forced      OffPath     CRCM,WACM     G-25-1578; TOT1A to Series 16     2025-06-14 14:02     WACM19624      2025-06-16 08:48  
  FGE-VNL     64073     CRCM     TOT-1A (CRCM), FGE-VNL          FGE>VNL(CRCM) 
  VNL>FGE(CRCM)   
  170.0 
  170.0   
  170.0 
  170.0   
  85.0 
  85.0   
  2025-06-14 15:00 
  2025-06-14 15:00   
  2025-06-16 08:50 
  2025-06-16 08:50   
  Completed     TRANSMISSION     FORCED      ONPATH     CRCM,WACM     G-25-1578; TOT1 Series 16     2025-06-14 14:26     CRCM19625      2025-06-16 08:49  
  System Conditions     63476     WACM     TOT-3 (LAPT)     TOT-3     ARH>AU(LAPT) 
  AU>ARH(LAPT) 
  AU>SCSW(LAPT) 
  SCSW>AU(LAPT)   
  509.0     509.0     171.4 
  171.4 
  100.6 
  100.6   
  2025-06-24 08:00 
  2025-06-24 08:00 
  2025-06-24 08:00 
  2025-06-24 08:00   
  2025-06-27 14:00 
  2025-06-27 14:00 
  2025-06-27 14:00 
  2025-06-27 14:00   
  Scheduled     Transmission     Planned      OnPath     BEPW,CRCM,LAPT,WACM     INFO-25-0958; Series 22     2025-04-04 16:44     WACM19427      2025-04-04 17:01  
  TRS-AU     63478     CRCM     TRS-AU          AU>CRG(CRCM) 
  CRG>AU(CRCM)   
  258.0 
  258.0   
  425.0 
  425.0   
  258.0 
  258.0   
  2025-06-24 08:00 
  2025-06-24 08:00   
  2025-06-27 14:00 
  2025-06-27 14:00   
  Scheduled     Transmission     Planned      OnPath     CRCM,WACM     INFO-25-0958     2025-04-04 16:59     CRCM19429      2025-04-04 17:00  
  CCW-MIDW     63838     CRCM     TOT-5 (CRCM), CCW-MIDW          CCW>MIDW(CRCM) 
  MIDW>CCW(CRCM)   
  250.0 
  442.0   
  250.0 
  442.0   
  0.0 
  0.0   
  2025-06-25 08:00 
  2025-06-25 08:00   
  2025-06-25 14:00 
  2025-06-25 14:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     CRCM,WACM     INFO-25-1321.      2025-05-14 17:04     CRCM19537      2025-05-14 17:04  
  PON-CCW     63835     CRCM     TOT-5 (CRCM), CCW-PON          CCW>PON(CRCM) 
  PON>CCW(CRCM)   
  0.0 
  0.0   
  442.0 
  250.0   
  0.0 
  0.0   
  2025-06-25 08:00 
  2025-06-25 08:00   
  2025-06-25 14:00 
  2025-06-25 14:00   
  Scheduled     Transmission     Planned      OnPath     CRCM,WACM     INFO-25-1321.     2025-05-14 17:02     CRCM19536      2025-05-14 17:05  
  System Conditions     63834     WACM     TOT-5     TOT-5     AU>CRG(CRCM) 
  BLUE>CRG(CRCM) 
  CCW>MIDW(CRCM) 
  CRG>AU(CRCM) 
  MIDW>CCW(CRCM)   
  750.0     750.0     308.7 
  14.7 
  166.6 
  308.7 
  166.6   
  2025-06-25 08:00 
  2025-06-25 08:00 
  2025-06-25 08:00 
  2025-06-25 08:00 
  2025-06-25 08:00   
  2025-06-25 14:00 
  2025-06-25 14:00 
  2025-06-25 14:00 
  2025-06-25 14:00 
  2025-06-25 14:00   
  Scheduled     Transmission     Planned      OffPath     CRCM,LAPT,WACM     INFO-25-1321. TOT-5 to series 32.     2025-05-14 17:01     WACM19535      2025-05-14 17:01  
  System Conditions     63531     WACM     TOT-1A     TOT-1A     BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 
  CRG>SWR(CRCM) 
  SWR>CRG(CRCM) 
  SWR>VNL(CRCM) 
  VNL>FGE(CRCM) 
  VNL>SWR(CRCM)   
  395.0     395.0     176.1 
  176.1 
  94.8 
  94.8 
  94.8 
  162.6 
  94.8   
  2025-07-08 06:00 
  2025-07-08 06:00 
  2025-07-08 06:00 
  2025-07-08 06:00 
  2025-07-08 06:00 
  2025-07-08 06:00 
  2025-07-08 06:00   
  2025-07-10 12:00 
  2025-07-10 12:00 
  2025-07-10 12:00 
  2025-07-10 12:00 
  2025-07-10 12:00 
  2025-07-10 12:00 
  2025-07-10 12:00   
  Cancelled     Transmission     Planned      OffPath     CRCM,WACM     INFO-25-1061. TOT-1A to series 6     2025-04-13 17:01     WACM19444      2025-04-30 10:01  
  System Conditions     63532     WACM     TOT-1A     TOT-1A     BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 
  CRG>SWR(CRCM) 
  SWR>CRG(CRCM) 
  SWR>VNL(CRCM) 
  VNL>FGE(CRCM) 
  VNL>SWR(CRCM)   
  395.0     395.0     176.1 
  176.1 
  94.8 
  94.8 
  94.8 
  162.6 
  94.8   
  2025-07-08 06:00 
  2025-07-08 06:00 
  2025-07-08 06:00 
  2025-07-08 06:00 
  2025-07-08 06:00 
  2025-07-08 06:00 
  2025-07-08 06:00   
  2025-07-10 12:00 
  2025-07-10 12:00 
  2025-07-10 12:00 
  2025-07-10 12:00 
  2025-07-10 12:00 
  2025-07-10 12:00 
  2025-07-10 12:00   
  Cancelled     Transmission     Planned      OffPath     CRCM,WACM     C-25-0360. TOT-1A to series 6.     2025-04-13 17:03     WACM19445      2025-04-30 10:02  
  System Conditions     63698     WACM     TOT-1A     TOT-1A     BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 
  CRG>SWR(CRCM) 
  SWR>CRG(CRCM) 
  SWR>VNL(CRCM) 
  VNL>FGE(CRCM) 
  VNL>SWR(CRCM)   
  395.0     395.0     176.1 
  176.1 
  94.8 
  94.8 
  94.8 
  162.6 
  94.8   
  2025-07-08 06:00 
  2025-07-08 06:00 
  2025-07-08 06:00 
  2025-07-08 06:00 
  2025-07-08 06:00 
  2025-07-08 06:00 
  2025-07-08 06:00   
  2025-07-10 11:00 
  2025-07-10 11:00 
  2025-07-10 11:00 
  2025-07-10 11:00 
  2025-07-10 11:00 
  2025-07-10 11:00 
  2025-07-10 11:00   
  Scheduled     Transmission     Planned      OffPath     CRCM,WACM     INFO-25-1061; C-25-0360; TOT-1A to Series 6     2025-04-30 09:38     WACM19485      2025-04-30 10:00  
  System Conditions     64025     WACM     TOT-1A     TOT-1A     BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 
  CRG>SWR(CRCM) 
  SWR>CRG(CRCM) 
  SWR>VNL(CRCM) 
  VNL>FGE(CRCM) 
  VNL>SWR(CRCM)   
  395.0     395.0     185.3 
  185.3 
  99.8 
  99.8 
  99.8 
  171.0 
  99.8   
  2025-07-08 06:00 
  2025-07-08 06:00 
  2025-07-08 06:00 
  2025-07-08 06:00 
  2025-07-08 06:00 
  2025-07-08 06:00 
  2025-07-08 06:00   
  2025-07-10 12:00 
  2025-07-10 12:00 
  2025-07-10 12:00 
  2025-07-10 12:00 
  2025-07-10 12:00 
  2025-07-10 12:00 
  2025-07-10 12:00   
  Scheduled     Transmission     Planned      OffPath     CRCM,WACM     INFO-25-1061 / C-25-0360. TOT-1A to series 6     2025-06-09 20:07     WACM19603      2025-06-09 20:07  
  System Conditions     63816     WACM     TOT-3 (LAPT)     TOT-3     ARH>AU(LAPT) 
  AU>ARH(LAPT) 
  AU>SCSW(LAPT) 
  SCSW>AU(LAPT)   
  509.0     509.0     243.2 
  243.2 
  142.8 
  142.8   
  2025-07-18 06:00 
  2025-07-18 06:00 
  2025-07-18 06:00 
  2025-07-18 06:00   
  2025-07-20 17:00 
  2025-07-20 17:00 
  2025-07-20 17:00 
  2025-07-20 17:00   
  Scheduled     Transmission     Planned      OnPath     BEPW,CRCM,LAPT,WACM     INFO-25-1311; C-25-1228; Series 20     2025-05-14 00:06     WACM19523      2025-05-14 00:06  
  CRG-SWR     61683     CRCM     TOT-1A (CRCM), CRG-SWR          CRG>SWR(CRCM) 
  SWR>CRG(CRCM)   
  140.0 
  140.0   
  140.0 
  140.0   
  0.0 
  0.0   
  2025-07-28 07:00 
  2025-07-28 07:00   
  2025-08-02 16:00 
  2025-08-02 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     CRCM,WACM     ICC-25-0040. TOT-1A to series 7 also.     2024-08-11 19:53     CRCM18759      2024-08-11 19:53  
  System Conditions     61682     WACM     TOT-1A     TOT-1A     BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 
  CRG>SWR(CRCM) 
  SWR>CRG(CRCM) 
  SWR>VNL(CRCM) 
  VNL>FGE(CRCM) 
  VNL>SWR(CRCM)   
  395.0     395.0     117.0 
  117.0 
  63.0 
  63.0 
  63.0 
  108.0 
  63.0   
  2025-07-28 07:00 
  2025-07-28 07:00 
  2025-07-28 07:00 
  2025-07-28 07:00 
  2025-07-28 07:00 
  2025-07-28 07:00 
  2025-07-28 07:00   
  2025-08-02 16:00 
  2025-08-02 16:00 
  2025-08-02 16:00 
  2025-08-02 16:00 
  2025-08-02 16:00 
  2025-08-02 16:00 
  2025-08-02 16:00   
  Scheduled     Transmission     Planned      OnPath     CRCM,WACM     ICC-25-0040. TOT-1A to series 7.     2024-08-11 19:50     WACM18758      2024-08-11 19:50  
  CRG-SWR     61679     CRCM     TOT-1A (CRCM), CRG-SWR          CRG>SWR(CRCM) 
  SWR>CRG(CRCM)   
  140.0 
  140.0   
  140.0 
  140.0   
  0.0 
  0.0   
  2025-08-11 07:00 
  2025-08-11 07:00   
  2025-08-16 15:00 
  2025-08-16 15:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     CRCM,WACM     ICC-25-0039. TOT-1A to series 7 also.     2024-08-11 19:35     CRCM18757      2024-08-11 19:35  
  System Conditions     61678     WACM     TOT-1A     TOT-1A     BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 
  CRG>SWR(CRCM) 
  SWR>CRG(CRCM) 
  SWR>VNL(CRCM) 
  VNL>FGE(CRCM) 
  VNL>SWR(CRCM)   
  395.0     395.0     117.0 
  117.0 
  63.0 
  63.0 
  63.0 
  108.0 
  63.0   
  2025-08-11 07:00 
  2025-08-11 07:00 
  2025-08-11 07:00 
  2025-08-11 07:00 
  2025-08-11 07:00 
  2025-08-11 07:00 
  2025-08-11 07:00   
  2025-08-16 15:00 
  2025-08-16 15:00 
  2025-08-16 15:00 
  2025-08-16 15:00 
  2025-08-16 15:00 
  2025-08-16 15:00 
  2025-08-16 15:00   
  Scheduled     Transmission     Planned      OnPath     CRCM,WACM     ICC-25-0039. TOT-1A to series 7.     2024-08-11 19:32     WACM18756      2024-08-11 19:32  
  System Conditions     62919     WACM     TOT-5     TOT-5     AU>CRG(CRCM) 
  BLUE>CRG(CRCM) 
  CCW>MIDW(CRCM) 
  CRG>AU(CRCM) 
  MIDW>CCW(CRCM)   
  750.0     750.0     472.5 
  22.5 
  255.0 
  472.5 
  255.0   
  2025-08-11 08:00 
  2025-08-11 08:00 
  2025-08-11 08:00 
  2025-08-11 08:00 
  2025-08-11 08:00   
  2025-08-19 17:00 
  2025-08-19 17:00 
  2025-08-19 17:00 
  2025-08-19 17:00 
  2025-08-19 17:00   
  Scheduled     Transmission     Planned      OffPath     CRCM,WACM     INFO-25-0593; TOT5 to Series 10.     2025-02-20 01:26     WACM19260      2025-02-20 01:26  
CSU Outages:
DGT Outages:
EPE Outages:
  EDDY DC CONVERTER     364399     EPE     EDDY HVDC terminal          EDDY230-EDDY345(EPE) 
  EDDY345-EDDY230(EPE) 

  EDDY230-EDDY345(EPE) 
  EDDY345-EDDY230(EPE) 

  EDDY230-EDDY345(EPE) 
  EDDY345-EDDY230(EPE) 

  EDDY230-EDDY345(EPE) 
  EDDY345-EDDY230(EPE)   
  133.0 
  133.0 

  133.0 
  133.0 

  133.0 
  133.0 

  133.0 
  133.0   
  133.0 
  133.0 

  133.0 
  133.0 

  133.0 
  133.0 

  133.0 
  133.0   
  86.0 
  86.0 

  86.0 
  86.0 

  86.0 
  86.0 

  86.0 
  86.0   
  2022-08-01 00:00 
  2022-08-01 00:00 

  2022-12-31 23:59 
  2022-12-31 23:59 

  2023-12-31 23:59 
  2023-12-31 23:59 

  2025-01-01 00:00 
  2025-01-01 00:00   
  2022-12-31 23:59 
  2022-12-31 23:59 

  2023-12-31 23:59 
  2023-12-31 23:59 

  2025-01-01 00:00 
  2025-01-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     EPE     Reliability Constraints     2022-06-01 14:23     EPE144221      2024-09-30 10:08  
  LUNA345-AFTON345     516242     EPE               AFTON345-LUNA345(EPE) 
  LUNA345-AFTON345(EPE)   
  930.0 
  930.0   
  930.0 
  930.0   
  0.0 
  0.0   
  2025-10-06 08:00 
  2025-10-06 08:00   
  2025-11-22 16:00 
  2025-11-22 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     EPE     Line clearance needed to connect substation. SMNIC=566 (EPE=388, PNM=111, TSGT=67). EPIC=450.     2025-01-15 09:09     EPE190623      2025-05-07 10:37  
IID Outages:
IPCO Outages:
  BORAHWEST     114472     IPCO     Burns Series Cap Bypass          BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO) 

  BorahWest(IPCO)   
  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0   
  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0 

  2557.0   
  2250.0 

  2250.0 

  2250.0 

  2250.0 

  2250.0 

  2250.0 

  2250.0 

  2250.0 

  2510.0 

  2510.0 

  2510.0 

  2510.0 

  2510.0 

  2510.0 

  2510.0 

  2510.0 

  2510.0 

  2510.0 

  2510.0   
  2023-12-19 21:25 

  2023-12-20 17:00 

  2023-12-21 17:00 

  2023-12-26 23:59 

  2023-12-27 23:59 

  2024-01-05 23:59 

  2024-01-19 16:00 

  2024-02-02 16:00 

  2024-02-09 10:20 

  2024-03-01 16:00 

  2024-03-29 16:00 

  2024-04-30 16:00 

  2024-05-31 16:00 

  2024-06-28 16:00 

  2024-07-31 16:00 

  2024-12-31 16:00 

  2025-05-01 16:00 

  2025-06-01 01:00 

  2025-06-13 00:00   
  2023-12-20 17:00 

  2023-12-21 17:00 

  2023-12-26 23:59 

  2023-12-27 23:59 

  2024-01-05 23:59 

  2024-01-19 16:00 

  2024-02-02 16:00 

  2024-02-09 10:20 

  2024-03-01 16:00 

  2024-03-29 16:00 

  2024-04-30 16:00 

  2024-05-31 16:00 

  2024-06-28 16:00 

  2024-07-31 16:00 

  2024-12-31 16:00 

  2025-05-01 16:00 

  2025-06-01 01:00 

  2025-06-13 00:00 

  2025-07-01 00:00   
  Active     TRANSMISSION     FORCED      ONPATH     IPCO     BURNS SERIES CAPS FULL BYPASS     2023-12-19 21:28     IPCO48734      2025-06-10 09:50  
  BURNS SC FULL BYPASS     117113     IPCO     Burns Series Caps Full Bypass          IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-TOT75(IPCO) 

  IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-TOT75(IPCO) 

  IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-TOT75(IPCO) 

  IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 

  IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-TOT75(IPCO) 

  IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-TOT75(IPCO) 

  IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-TOT75(IPCO) 

  IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-TOT75(IPCO) 

  IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-TOT75(IPCO) 

  IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-TOT75(IPCO) 

  IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-TOT75(IPCO) 

  IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-TOT75(IPCO) 

  IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  SMLK-TOT75(IPCO)   
  2230.0 
  1340.0 
  450.0 

  2230.0 
  1340.0 
  450.0 

  2230.0 
  1340.0 
  450.0 

  2190.0 
  1200.0 

  2190.0 
  1200.0 
  450.0 

  2190.0 
  1200.0 
  450.0 

  2190.0 
  1200.0 
  450.0 

  2190.0 
  1200.0 
  450.0 

  2230.0 
  1340.0 
  450.0 

  2230.0 
  1340.0 
  450.0 

  2190.0 
  1200.0 
  450.0 

  2190.0 
  1200.0 
  450.0 

  2190.0 
  1200.0 
  450.0   
  2230.0 
  1340.0 
  450.0 

  2230.0 
  1340.0 
  450.0 

  2190.0 
  1200.0 
  450.0 

  2190.0 
  1200.0 

  2190.0 
  1200.0 
  450.0 

  2190.0 
  1200.0 
  450.0 

  2190.0 
  1200.0 
  450.0 

  2230.0 
  1340.0 
  450.0 

  2230.0 
  1340.0 
  450.0 

  2190.0 
  1200.0 
  450.0 

  2190.0 
  1200.0 
  450.0 

  2190.0 
  1200.0 
  450.0 

  2190.0 
  1200.0 
  450.0   
  2230.0 
  1145.0 
  535.0 

  2230.0 
  1145.0 
  438.0 

  2230.0 
  1145.0 
  438.0 

  2145.0 
  1145.0 

  2145.0 
  1145.0 
  438.0 

  2145.0 
  1145.0 
  438.0 

  2145.0 
  1145.0 
  438.0 

  2145.0 
  1145.0 
  438.0 

  2230.0 
  1145.0 
  438.0 

  2230.0 
  1145.0 
  438.0 

  2230.0 
  1145.0 
  438.0 

  2230.0 
  1145.0 
  438.0 

  2230.0 
  1145.0 
  438.0   
  2024-02-09 10:05 
  2024-02-09 10:05 
  2024-02-09 10:05 

  2024-02-27 11:59 
  2024-02-27 11:59 
  2024-02-27 11:59 

  2024-03-29 16:00 
  2024-03-29 16:00 
  2024-03-29 16:00 

  2024-04-14 12:10 
  2024-04-14 12:10 

  2024-04-30 16:00 
  2024-04-30 16:00 
  2024-04-30 16:00 

  2024-05-31 16:00 
  2024-05-31 16:00 
  2024-05-31 16:00 

  2024-06-28 16:00 
  2024-06-28 16:00 
  2024-06-28 16:00 

  2024-07-31 16:00 
  2024-07-31 16:00 
  2024-07-31 16:00 

  2024-11-04 04:31 
  2024-11-04 04:31 
  2024-11-04 04:31 

  2024-12-31 16:00 
  2024-12-31 16:00 
  2024-12-31 16:00 

  2025-05-01 16:00 
  2025-05-01 16:00 
  2025-05-01 16:00 

  2025-06-01 01:00 
  2025-06-01 01:00 
  2025-06-01 01:00 

  2025-06-13 00:00 
  2025-06-13 00:00 
  2025-06-13 00:00   
  2024-02-27 11:59 
  2024-02-27 11:59 
  2024-02-27 11:59 

  2024-03-29 16:00 
  2024-03-29 16:00 
  2024-03-29 16:00 

  2024-04-14 12:10 
  2024-04-14 12:10 
  2024-04-30 16:00 

  2024-04-30 16:00 
  2024-04-30 16:00 

  2024-05-31 16:00 
  2024-05-31 16:00 
  2024-05-31 16:00 

  2024-06-28 16:00 
  2024-06-28 16:00 
  2024-06-28 16:00 

  2024-07-31 16:00 
  2024-07-31 16:00 
  2024-07-31 16:00 

  2024-11-04 04:31 
  2024-11-04 04:31 
  2024-11-04 04:31 

  2024-12-31 16:00 
  2024-12-31 16:00 
  2024-12-31 16:00 

  2025-05-01 16:00 
  2025-05-01 16:00 
  2025-05-01 16:00 

  2025-06-01 01:00 
  2025-06-01 01:00 
  2025-06-01 01:00 

  2025-06-13 00:00 
  2025-06-13 00:00 
  2025-06-13 00:00 

  2025-07-01 00:00 
  2025-07-01 00:00 
  2025-07-01 00:00   
  Active     TRANSMISSION     FORCED      ONPATH     IPCO     BURNS SERIES CAPS FULL BYPASS     2024-02-09 10:10     IPCO49502      2025-06-10 09:50  
  JBSNWEST     127814     IPCO     TMKL Series Cap C2          JBSN-POP(IPCO) 

  JBSN-POP(IPCO) 

  JBSN-POP(IPCO) 

  JBSN-POP(IPCO)   
  800.0 

  800.0 

  800.0 

  800.0   
  800.0 

  800.0 

  800.0 

  800.0   
  717.0 

  717.0 

  717.0 

  717.0   
  2024-09-23 14:48 

  2024-11-13 18:00 

  2025-01-06 17:00 

  2025-01-31 17:00   
  2024-11-13 18:00 

  2025-01-06 17:00 

  2025-01-31 17:00 

  2025-12-31 18:00   
  Active     TRANSMISSION     PLANNED      ONPATH     IPCO     Per Path 19 Operator (PAC) Request     2024-09-23 14:51     IPCO52468      2024-12-30 14:18  
  HINE-HBPA     133089     IPCO     HINES - WJDY          IDNW-NORTHWEST(IPCO) 
  IPCEIM-LAGRANDE(IPCO) 
  LAGRANDE-IPCEIM(IPCO) 
  LAGRANDE-OTECTAP(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  OTECTAP-LAGRANDE(IPCO) 

  IDNW-NORTHWEST(IPCO) 
  IPCEIM-LAGRANDE(IPCO) 
  LAGRANDE-IPCEIM(IPCO) 
  LAGRANDE-OTECTAP(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  OTECTAP-LAGRANDE(IPCO)   
  2190.0 
  9999.0 
  9999.0 
  350.0 
  1200.0 
  413.0 

  2190.0 
  9999.0 
  9999.0 
  350.0 
  1200.0 
  413.0   
  2190.0 
  9999.0 
  9999.0 
  350.0 
  1200.0 
  413.0 

  2190.0 
  9999.0 
  9999.0 
  350.0 
  1200.0 
  413.0   
  2190.0 
  363.0 
  300.0 
  300.0 
  1120.0 
  363.0 

  2105.0 
  363.0 
  300.0 
  300.0 
  1120.0 
  363.0   
  2025-05-19 06:00 
  2025-05-19 06:00 
  2025-05-19 06:00 
  2025-05-19 06:00 
  2025-05-19 06:00 
  2025-05-19 06:00 

  2025-05-30 10:33 
  2025-05-30 10:33 
  2025-05-30 10:33 
  2025-05-30 10:33 
  2025-05-30 10:33 
  2025-05-30 10:33   
  2025-05-30 10:33 
  2025-05-30 10:33 
  2025-05-30 10:33 
  2025-05-30 10:33 
  2025-05-30 10:33 
  2025-05-30 10:33 

  2025-06-12 12:00 
  2025-06-12 12:00 
  2025-06-12 12:00 
  2025-06-12 12:00 
  2025-06-12 12:00 
  2025-06-12 12:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     IPCO     Hines-Harney Out of Service     2025-02-24 16:19     IPCO54764      2025-06-11 22:02  
  N. AMPS     137686     IPCO     Broadview-Garrison 1 500kV Line          NW-MT-BPAT.NWMT(IPCO)      125.0      125.0      87.0      2025-06-09 08:00      2025-06-13 15:00      Completed     TRANSMISSION     PLANNED      ONPATH     IPCO     Per Path 18 Operator (NWMT) Request     2025-05-29 12:17     IPCO56147      2025-05-29 12:17  
  N. AMPS     137688     IPCO     BPA Garrison-Taft 1 500kV Line          NW-MT-BPAT.NWMT(IPCO)      125.0      125.0      87.0      2025-06-09 08:00      2025-06-26 15:00      Active     TRANSMISSION     PLANNED      ONPATH     IPCO     Per Path 18 Operator (NWMT) Request     2025-05-29 12:23     IPCO56148      2025-05-29 12:23  
  ANTS-MLCK     137733     IPCO     Mill Creek Phase Shifting Transformer          MLCK-ANTE(IPCO)      296.0      296.0      250.0      2025-06-11 08:00      2025-06-11 16:00      Completed     TRANSMISSION     PLANNED      ONPATH     IPCO     Per Path 18 Operator (NWMT) Request     2025-06-02 12:50     IPCO56158      2025-06-02 12:50  
  IDAHO-NORTHWEST     137834     IPCO     BPA RILEY-STARVATION RIDGE 115KV          IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 

  IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO)   
  2190.0 
  1200.0 

  2190.0 
  1200.0   
  2190.0 
  1200.0 

  2190.0 
  1200.0   
  2105.0 
  1120.0 

  2105.0 
  1120.0   
  2025-06-12 12:00 
  2025-06-12 12:00 

  2025-06-12 16:00 
  2025-06-12 16:00   
  2025-06-12 16:00 
  2025-06-12 16:00 

  2025-06-12 16:06 
  2025-06-12 16:06   
  Terminated     TRANSMISSION     PLANNED      ONPATH     IPCO     BPA RILEY-STARVATION RIDGE 115KV     2025-06-12 07:25     IPCO56220      2025-06-12 16:06  
  HINE-HBPA     137814     IPCO     HINES - WJDY          IDNW-NORTHWEST(IPCO) 
  IPCEIM-LAGRANDE(IPCO) 
  LAGRANDE-IPCEIM(IPCO) 
  LAGRANDE-OTECTAP(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  OTECTAP-LAGRANDE(IPCO)   
  2190.0 
  9999.0 
  9999.0 
  350.0 
  1200.0 
  413.0   
  2190.0 
  9999.0 
  9999.0 
  350.0 
  1200.0 
  413.0   
  2105.0 
  363.0 
  300.0 
  300.0 
  1120.0 
  363.0   
  2025-06-12 16:10 
  2025-06-12 16:10 
  2025-06-12 16:10 
  2025-06-12 16:10 
  2025-06-12 16:10 
  2025-06-12 16:10   
  2025-06-20 16:00 
  2025-06-20 16:00 
  2025-06-20 16:00 
  2025-06-20 16:00 
  2025-06-20 16:00 
  2025-06-20 16:00   
  Active     TRANSMISSION     FORCED      ONPATH     IPCO     Hines-Harney Out of Service     2025-06-11 22:11     IPCO56203      2025-06-12 16:12  
  N. AMPS     137773     IPCO     Garrison-Taft 1 500kV, Broadview Garrison #1          NW-MT-BPAT.NWMT(IPCO)      125.0      125.0      87.0      2025-06-16 07:00      2025-06-19 17:00      Active     TRANSMISSION     PLANNED      ONPATH     IPCO     Per Path 18 Operator (NWMT) Request     2025-06-06 10:46     IPCO56172      2025-06-06 10:46  
  M345-RGSUB     137837     IPCO     Midpoint-Rogerson 345kV Line          IPCEIM-M345(IPCO) 
  M345-IPCEIM(IPCO) 
  MPSN-RGSUB(IPCO) 
  RGSUB-MPSN(IPCO)   
  9999.0 
  9999.0 
  1000.0 
  1000.0   
  9999.0 
  9999.0 
  1000.0 
  1000.0   
  0.0 
  0.0 
  0.0 
  0.0   
  2025-06-17 05:00 
  2025-06-17 05:00 
  2025-06-17 05:00 
  2025-06-17 05:00   
  2025-06-17 14:00 
  2025-06-17 14:00 
  2025-06-17 14:00 
  2025-06-17 14:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     IPCO     Midpoint-Rogerson 345kV Line     2025-06-12 12:25     IPCO56221      2025-06-12 12:25  
  HCPR-HRCN     137889     IPCO     Hells Canyon - Hurricane 230kV          HURR-TOTOR(IPCO) 
  IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  TOTOR-HURR(IPCO) 
  TOTOR-NORTHWEST(IPCO) 
  WALLAWALLA-IPCEIM(IPCO)   
  400.0 
  2190.0 
  1200.0 
  400.0 
  510.0 
  9999.0   
  400.0 
  2190.0 
  1200.0 
  400.0 
  510.0 
  9999.0   
  0.0 
  1800.0 
  970.0 
  0.0 
  400.0 
  0.0   
  2025-06-28 06:00 
  2025-06-28 06:00 
  2025-06-28 06:00 
  2025-06-28 06:00 
  2025-06-28 06:00 
  2025-06-28 06:00   
  2025-06-28 13:00 
  2025-06-28 13:00 
  2025-06-28 13:00 
  2025-06-28 13:00 
  2025-06-28 13:00 
  2025-06-28 13:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     IPCO     Hells Canyon - Hurricane 230kV      2025-06-16 09:11     IPCO56232      2025-06-16 09:11  
  HCPR-BLPR     137896     IPCO     Hells Canyon - Brownlee 230KV          HCPR-OBPRNORTH(IPCO) 
  HURR-TOTOR(IPCO) 
  IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  OBPRNORTH-HCPR(IPCO) 
  TOTOR-HURR(IPCO) 
  WALLAWALLA-IPCEIM(IPCO)   
  9999.0 
  400.0 
  2190.0 
  1200.0 
  9999.0 
  400.0 
  9999.0   
  9999.0 
  400.0 
  2190.0 
  1200.0 
  9999.0 
  400.0 
  9999.0   
  0.0 
  0.0 
  1800.0 
  970.0 
  0.0 
  400.0 
  0.0   
  2025-06-29 06:00 
  2025-06-29 06:00 
  2025-06-29 06:00 
  2025-06-29 06:00 
  2025-06-29 06:00 
  2025-06-29 06:00 
  2025-06-29 06:00   
  2025-06-29 16:00 
  2025-06-29 16:00 
  2025-06-29 16:00 
  2025-06-29 16:00 
  2025-06-29 16:00 
  2025-06-29 16:00 
  2025-06-29 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     IPCO     Hells Canyon - Brownlee 230KV     2025-06-16 09:14     IPCO56233      2025-06-16 09:14  
LAPT Outages:
  System Conditions     62898     WACM     TOT-3     TOT-3     ARH>AU(LAPT) 
  AU>ARH(LAPT) 
  AU>SCSW(LAPT) 
  SCSW>AU(LAPT)   
  509.0     509.0     269.0 
  269.0 
  158.0 
  158.0   
  2025-05-26 06:00 
  2025-05-26 06:00 
  2025-05-26 06:00 
  2025-05-26 06:00   
  2025-06-16 09:00 
  2025-06-16 09:00 
  2025-06-16 09:00 
  2025-06-16 09:00   
  Completed     Transmission     Planned      OnPath     LAPT,WACM     C-25-0124; INFO-25-1218; TOT-3 to Series 23.     2025-02-19 19:37     WACM19247      2025-06-16 08:16  
  CRG-BOZ     62446     CRCM     TOT-1A (CRCM), BOZ-CRG          BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 

  BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM)   
  218.0 
  285.0 

  218.0 
  285.0   
  218.0 
  285.0 

  218.0 
  285.0   
  0.0 
  0.0 

  0.0 
  0.0   
  2025-05-27 09:00 
  2025-05-27 09:00 

  2025-05-28 17:10 
  2025-05-28 17:10   
  2025-05-28 17:10 
  2025-05-28 17:10 

  2025-06-15 14:00 
  2025-06-15 14:00   
  Completed     Transmission     Planned      OnPath     BEPW,CRCM,LAPT,WACM     C-25-0006; TOT1A to Series 2     2024-12-04 20:08     CRCM19059      2025-06-15 13:45  
  System Conditions     62520     WACM     TOT-1A     TOT-1A     BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 
  CRG>SWR(CRCM) 
  SWR>CRG(CRCM) 
  SWR>VNL(CRCM) 
  VNL>FGE(CRCM) 
  VNL>SWR(CRCM)   
  395.0     395.0     325.0 
  325.0 
  175.0 
  175.0 
  175.0 
  300.0 
  175.0   
  2025-05-28 08:00 
  2025-05-28 08:00 
  2025-05-28 08:00 
  2025-05-28 08:00 
  2025-05-28 08:00 
  2025-05-28 08:00 
  2025-05-28 08:00   
  2025-06-06 16:00 
  2025-06-06 16:00 
  2025-06-06 16:00 
  2025-06-06 16:00 
  2025-06-06 16:00 
  2025-06-06 16:00 
  2025-06-06 16:00   
  Cancelled     Transmission     Planned      OnPath     BEPW,CRCM,LAPT,WACM     INFO-25-0048. TOT1A to Series14.     2024-12-16 19:31     WACM19079      2024-12-16 20:08  
  Summer 2025 Limit     63975     WACM     TOT-3 (LAPT)     TOT-3     ARH>AU(LAPT) 
  AU>ARH(LAPT) 
  AU>SCSW(LAPT) 
  SCSW>AU(LAPT)   
  509.0     509.0     321.3 
  321.3 
  188.7 
  188.7   
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00 
  2025-06-01 00:00   
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00 
  2025-11-01 00:00   
  Active     Transmission     Planned      OnPath     LAPT,WACM     TOT-3 Summer 2025 Ratings of 1818 MW for system intact (Cell A1). Using Cell A2 with zero DC tie schedule the Limit will be 1743 MW and LAPTs share of transfer is 510 MW. JK     2025-06-02 08:48     WACM19585      2025-06-02 08:48  
  SCSE-SCSW     62531     LAPT     SCSE-SCSW          SCSE>SCSW(LAPT) 
  SCSW>SCSE(LAPT)   
  200.0 
  200.0   
  0.0 
  0.0   
  0.0 
  0.0   
  2025-06-02 07:00 
  2025-06-02 07:00   
  2025-06-12 14:00 
  2025-06-12 14:00   
  Completed     Transmission     Planned      OnPath     LAPT,WACM     C-25-0135     2024-12-17 21:09     LAPT19084      2025-06-12 14:03  
  SCSE-SCSW     64078     LAPT     SCSE-SCSW          SCSE>SCSW(LAPT) 
  SCSW>SCSE(LAPT)   
  200.0 
  200.0   
  200.0 
  200.0   
  0.0 
  0.0   
  2025-06-15 00:00 
  2025-06-15 00:00   
  2025-06-15 15:00 
  2025-06-15 15:00   
  Completed     TRANSMISSION     FORCED      ONPATH     LAPT,WACM     Sidney Forced offline, investigating     2025-06-15 00:00     LAPT19627      2025-06-15 15:00  
  SCSE-SCSW     64108     LAPT     SCSE-SCSW          SCSE>SCSW(LAPT) 
  SCSW>SCSE(LAPT)   
  200.0 
  200.0   
  200.0 
  200.0   
  0.0 
  0.0   
  2025-06-16 00:00 
  2025-06-16 00:00   
  2025-06-16 08:00 
  2025-06-16 08:00   
  Completed     TRANSMISSION     FORCED      ONPATH     LAPT,WACM     Sidney forced offline, investigating     2025-06-15 23:32     LAPT19641      2025-06-16 07:57  
  System Conditions     63995     WACM     TOT-3     TOT-3     ARH>AU(LAPT) 
  AU>ARH(LAPT) 
  AU>SCSW(LAPT) 
  SCSW>AU(LAPT)   
  509.0     509.0     181.4 
  181.4 
  106.6 
  106.6   
  2025-06-19 07:00 
  2025-06-19 07:00 
  2025-06-19 07:00 
  2025-06-19 07:00   
  2025-06-19 16:00 
  2025-06-19 16:00 
  2025-06-19 16:00 
  2025-06-19 16:00   
  Scheduled     Transmission     Planned      OffPath     LAPT,WACM     INFO-25-1490; G-25-1373; TOT3 to Series 10     2025-06-05 11:34     WACM19589      2025-06-05 11:49  
  ARH-AU     63882     LAPT     TOT-3 (LAPT), ARH-AU          ARH>AU(LAPT) 
  AU>ARH(LAPT)   
  277.0 
  302.0   
  277.0 
  302.0   
  0.0 
  0.0   
  2025-06-23 06:00 
  2025-06-23 06:00   
  2025-06-26 17:00 
  2025-06-26 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     LAPT,WACM     INFO-25-1339. C-25-1302. TOT-3 to series 5.     2025-05-16 20:47     LAPT19552      2025-05-16 20:47  
  System Conditions     63880     WACM     TOT-3     TOT-3     ARH>AU(LAPT) 
  AU>ARH(LAPT) 
  AU>SCSW(LAPT) 
  SCSW>AU(LAPT)   
  509.0     509.0     181.4 
  181.4 
  106.6 
  106.6   
  2025-06-23 06:00 
  2025-06-23 06:00 
  2025-06-23 06:00 
  2025-06-23 06:00   
  2025-06-26 17:00 
  2025-06-26 17:00 
  2025-06-26 17:00 
  2025-06-26 17:00   
  Scheduled     Transmission     Planned      OnPath     LAPT,WACM     INFO-25-1339. C-25-1302. TOT-3 to series 5.     2025-05-16 20:43     WACM19550      2025-05-16 20:43  
  System Conditions     63476     WACM     TOT-3 (LAPT)     TOT-3     ARH>AU(LAPT) 
  AU>ARH(LAPT) 
  AU>SCSW(LAPT) 
  SCSW>AU(LAPT)   
  509.0     509.0     171.4 
  171.4 
  100.6 
  100.6   
  2025-06-24 08:00 
  2025-06-24 08:00 
  2025-06-24 08:00 
  2025-06-24 08:00   
  2025-06-27 14:00 
  2025-06-27 14:00 
  2025-06-27 14:00 
  2025-06-27 14:00   
  Scheduled     Transmission     Planned      OnPath     BEPW,CRCM,LAPT,WACM     INFO-25-0958; Series 22     2025-04-04 16:44     WACM19427      2025-04-04 17:01  
  System Conditions     63733     WACM     YT-South     YT-SOUTH     YTW>DJ(LAPT)      225.0     225.0     212.0      2025-06-24 08:00      2025-06-25 12:00      Cancelled     Transmission     Planned      OffPath     LAPT,WACM     C-25-1165 / INFO-25-1191; YT-S to Series 11.     2025-05-03 01:07     WACM19496      2025-05-14 17:23  
  System Conditions     63736     WACM     YT-South     YT-SOUTH     YTW>DJ(LAPT)      225.0     225.0     212.0      2025-06-24 08:00      2025-06-25 12:00      Cancelled     Transmission     Planned      OffPath     LAPT,WACM     INFO-25-1191; YT-S to Series 11.     2025-05-03 01:24     WACM19499      2025-05-03 01:29  
  SCSE-SCSW     63831     LAPT     SCSE-SCSW          SCSE>SCSW(LAPT) 
  SCSW>SCSE(LAPT)   
  200.0 
  200.0   
  200.0 
  200.0   
  0.0 
  0.0   
  2025-06-25 06:30 
  2025-06-25 06:30   
  2025-06-25 16:00 
  2025-06-25 16:00   
  Scheduled     TRANSMISSION     FORCED      ONPATH     LAPT,WACM     INFO-25-1320.     2025-05-14 16:50     LAPT19534      2025-05-14 16:50  
  System Conditions     63834     WACM     TOT-5     TOT-5     AU>CRG(CRCM) 
  BLUE>CRG(CRCM) 
  CCW>MIDW(CRCM) 
  CRG>AU(CRCM) 
  MIDW>CCW(CRCM)   
  750.0     750.0     308.7 
  14.7 
  166.6 
  308.7 
  166.6   
  2025-06-25 08:00 
  2025-06-25 08:00 
  2025-06-25 08:00 
  2025-06-25 08:00 
  2025-06-25 08:00   
  2025-06-25 14:00 
  2025-06-25 14:00 
  2025-06-25 14:00 
  2025-06-25 14:00 
  2025-06-25 14:00   
  Scheduled     Transmission     Planned      OffPath     CRCM,LAPT,WACM     INFO-25-1321. TOT-5 to series 32.     2025-05-14 17:01     WACM19535      2025-05-14 17:01  
  AU-LRS     63919     BEPW     TOT-3 (BASIN), LRS>AU 345 kV          AU>LRS(BEPW) 
  LRS>AU(BEPW)   
  448.0 
  448.0   
  448.0 
  448.0   
  0.0 
  0.0   
  2025-06-25 15:00 
  2025-06-25 15:00   
  2025-06-25 17:00 
  2025-06-25 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BEPW,LAPT,WACM     INFO-25-0616; TSO C-25-0614; Series 2     2025-05-24 16:53     BEPW19568      2025-05-24 16:53  
  System Conditions     63917     WACM     TOT-3     TOT-3     ARH>AU(LAPT) 
  AU>ARH(LAPT) 
  AU>SCSW(LAPT) 
  SCSW>AU(LAPT)   
  509.0     509.0     124.7 
  124.7 
  73.3 
  73.3   
  2025-06-25 15:00 
  2025-06-25 15:00 
  2025-06-25 15:00 
  2025-06-25 15:00   
  2025-06-25 17:00 
  2025-06-25 17:00 
  2025-06-25 17:00 
  2025-06-25 17:00   
  Scheduled     Transmission     Planned      OnPath     BEPW,LAPT,WACM     INFO-25-0616; TSO C-25-0614; Series 2     2025-05-24 16:49     WACM19566      2025-05-24 16:49  
  System Conditions     63918     WACM     TOT-3 BASIN     TOT 3 BASIN (BEPW)     AU>LRS(BEPW) 
  KEOT>LRS(BEPW) 
  LRS>AU(BEPW) 
  LRS>KEOT(BEPW)   
  722.0     722.0     159.4 
  93.6 
  159.4 
  93.6   
  2025-06-25 15:00 
  2025-06-25 15:00 
  2025-06-25 15:00 
  2025-06-25 15:00   
  2025-06-25 17:00 
  2025-06-25 17:00 
  2025-06-25 17:00 
  2025-06-25 17:00   
  Scheduled     Transmission     Planned      OnPath     BEPW,LAPT,WACM     INFO-25-0616; TSO C-25-0614; Series 2     2025-05-24 16:51     WACM19567      2025-05-24 16:51  
  System Conditions     63841     WACM     YT-South     YT-SOUTH     YTW>DJ(LAPT)      225.0     225.0     212.0      2025-06-30 07:00      2025-07-03 16:00      Scheduled     Transmission     Planned      OffPath     LAPT,WACM     C-25-1165/INFO-25-1191; YT-S to Series 11.     2025-05-14 17:17     WACM19538      2025-05-14 17:23  
  System Conditions     64021     WACM     YT-South     YT-SOUTH     YTW>DJ(LAPT)      225.0     225.0     147.0      2025-07-14 09:00      2025-07-18 17:00      Scheduled     Transmission     Planned      OffPath     LAPT,WACM     C-25-1497 / INFO-25-1492; YT-S to Series 08.     2025-06-08 23:25     WACM19599      2025-06-08 23:25  
  NYUM-SCSW     63877     LAPT     NYUM-SCSW          NYUM>SCSW(LAPT) 
  SCSW>NYUM(LAPT)   
  0.0 
  0.0   
  198.0 
  198.0   
  0.0 
  0.0   
  2025-07-15 07:00 
  2025-07-15 07:00   
  2025-07-17 16:00 
  2025-07-17 16:00   
  Scheduled     Transmission     Planned      OnPath     LAPT,WACM     INFO-25/1326. C-25-1227.     2025-05-16 20:34     LAPT19549      2025-05-16 20:35  
  System Conditions     63875     WACM     TOT-3     TOT-3     ARH>AU(LAPT) 
  AU>ARH(LAPT) 
  AU>SCSW(LAPT) 
  SCSW>AU(LAPT)   
  509.0     509.0     201.6 
  201.6 
  118.4 
  118.4   
  2025-07-15 07:00 
  2025-07-15 07:00 
  2025-07-15 07:00 
  2025-07-15 07:00   
  2025-07-17 16:00 
  2025-07-17 16:00 
  2025-07-17 16:00 
  2025-07-17 16:00   
  Scheduled     Transmission     Planned      OnPath     LAPT,WACM     INFO-25-1326. C-25-1227. TOT-3 to series 21     2025-05-16 20:28     WACM19547      2025-05-16 20:28  
  System Conditions     64037     WACM     TOT-4B     TOT-4B     DJ>YTW(LAPT)      230.0     230.0     243.0      2025-07-16 06:00      2025-07-18 13:00      Scheduled     Transmission     Planned      OnPath     LAPT,WACM     ICC-25-1553; INFO-25-1555; Series 121     2025-06-11 07:08     WACM19611      2025-06-11 07:08  
  System Conditions     63816     WACM     TOT-3 (LAPT)     TOT-3     ARH>AU(LAPT) 
  AU>ARH(LAPT) 
  AU>SCSW(LAPT) 
  SCSW>AU(LAPT)   
  509.0     509.0     243.2 
  243.2 
  142.8 
  142.8   
  2025-07-18 06:00 
  2025-07-18 06:00 
  2025-07-18 06:00 
  2025-07-18 06:00   
  2025-07-20 17:00 
  2025-07-20 17:00 
  2025-07-20 17:00 
  2025-07-20 17:00   
  Scheduled     Transmission     Planned      OnPath     BEPW,CRCM,LAPT,WACM     INFO-25-1311; C-25-1228; Series 20     2025-05-14 00:06     WACM19523      2025-05-14 00:06  
  NYUM-SCSW     63818     LAPT     NYUM-SCSW          NYUM>SCSW(LAPT) 
  SCSW>NYUM(LAPT)   
  198.0 
  198.0   
  198.0 
  198.0   
  0.0 
  0.0   
  2025-07-18 06:30 
  2025-07-18 06:30   
  2025-07-20 17:00 
  2025-07-20 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     LAPT,WACM     INFO-25-1311; C-25-1228     2025-05-14 00:20     LAPT19525      2025-05-14 00:20  
  System Conditions     63737     WACM     YT-South     YT-SOUTH     YTW>DJ(LAPT)      225.0     225.0     212.0      2025-07-21 07:00      2025-07-24 16:00      Scheduled     Transmission     Planned      OffPath     LAPT,WACM     C-25-1169 / INFO-25-1196; YT-S to Series 11.     2025-05-03 01:35     WACM19500      2025-05-14 17:28  
  System Conditions     63017     WACM     TOT-4B     TOT-4B          230.0     230.0     0.0      2025-07-28 06:00      2025-06-06 09:00      Completed     Transmission     Planned      OffPath     LAPT,WACM     INFO-25-0727; TOT-4B to Curve 117; PPW Outage ID 17720     2025-03-03 21:45     WACM19300      2025-06-06 08:18  
  System Conditions     64018     WACM     TOT-4B     TOT-4B     DJ>YTW(LAPT)      230.0     230.0     235.0      2025-07-28 06:00      2025-07-30 10:00      Scheduled     Transmission     Planned      OffPath     LAPT,WACM     INFO-25-0727; TOT-4B to Curve 117; PPW Outage ID 17720     2025-06-06 08:17     WACM19596      2025-06-06 08:17  
  System Conditions     64017     WACM     TOT-4B     TOT-4B     DJ>YTW(LAPT)      230.0     230.0     235.0      2025-07-30 10:00      2025-08-01 17:00      Scheduled     Transmission     Planned      OffPath     LAPT,WACM     INFO-25-0727; TOT-4B to Curve 117; PPW Outage ID 17721     2025-06-06 08:14     WACM19595      2025-06-06 08:14  
  BC-BSAN     63912     LAPT               BC>BSAN(LAPT) 
  BSAN>BC(LAPT)   
  109.0 
  109.0   
  109.0 
  109.0   
  0.0 
  0.0   
  2025-08-08 08:00 
  2025-08-08 08:00   
  2025-08-11 15:00 
  2025-08-11 15:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     LAPT,WACM     INFO-25-1396     2025-05-22 01:01     LAPT19565      2025-05-22 01:01  
  ARH-SGW     63828     LAPT     TOT-3 (LAPT), ARH-SGW          ARH>SGW(LAPT) 
  SGW>ARH(LAPT)   
  253.0 
  431.0   
  253.0 
  431.0   
  0.0 
  0.0   
  2025-08-14 07:00 
  2025-08-14 07:00   
  2025-08-15 16:00 
  2025-08-15 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     LAPT,WACM     INFO-25-1316.      2025-05-14 16:45     LAPT19533      2025-05-14 16:45  
  System Conditions     63826     WACM     TOT-3     TOT-3     ARH>AU(LAPT) 
  AU>ARH(LAPT) 
  AU>SCSW(LAPT) 
  SCSW>AU(LAPT)   
  509.0     509.0     201.0 
  201.0 
  118.0 
  118.0   
  2025-08-14 07:00 
  2025-08-14 07:00 
  2025-08-14 07:00 
  2025-08-14 07:00   
  2025-08-15 16:00 
  2025-08-15 16:00 
  2025-08-15 16:00 
  2025-08-15 16:00   
  Scheduled     Transmission     Planned      OffPath     LAPT,WACM     INFO-25-1316. TOT-3 to series 6.     2025-05-14 16:40     WACM19531      2025-05-14 16:40  
LDWP Outages:
  MISC     139008     LDWP               PATH 41 (SYL Banks)(LDWP)      1600.0      1600.0      800.0      2024-11-14 08:00      2025-12-27 09:00      Active     TRANSMISSION     FORCED      ONPATH     LDWP     Path 41 limited due to SYL-SS BK-E forced outage     2024-11-14 08:05     LDWP52228      2025-03-03 14:43  
  NWOR     139077     LDWP               NWOR (E-W)(LDWP) 
  NWOR (W-E)(LDWP) 

  NWOR (E-W)(LDWP) 
  NWOR (W-E)(LDWP)   
  0.0 
  0.0 

  0.0 
  0.0   
  0.0 
  0.0 

  0.0 
  0.0   
  2578.0 
  2648.0 

  2578.0 
  2648.0   
  2024-12-04 00:00 
  2024-12-04 00:00 

  2026-04-01 15:00 
  2026-04-01 15:00   
  2026-04-01 15:00 
  2026-04-01 15:00 

  2026-04-08 18:00 
  2026-04-08 18:00   
  Active     TRANSMISSION     PLANNED      ONPATH     LDWP     NWOR 2024/12/03 08:31 MCCULLOUGH-VICTORVILLE LINE 1 SERIES COMPENSATION OUT. FS PER INTERCHANGE DESK.      2024-12-03 07:45     LDWP52244      2024-12-03 08:36  
  PDCI (PATH 65)     139239     LDWP               PNDC (N-S)(LDWP) 
  PNDC (S-N)(LDWP)   
  3100.0 
  1125.0   
  3100.0 
  975.0   
  0.0 
  0.0   
  2025-01-02 06:00 
  2025-01-02 06:00   
  2025-12-02 07:00 
  2025-12-02 07:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     LDWP     PNDC 2024/12/19 14:56 OUTAGE ID: 83318 SYLMAR CS / TRANSMISSION PATROL: CELILO-SYLMAR POLE 4 500KV DC LINE (-OFF-) [ISOLATION SWITCHING ON SYL-KEN 1 FOR RIN-TAR 1 & 2 RECONDUCTORING PROJECT]. FS      2024-12-19 15:17     LDWP52281      2024-12-19 15:18  
  VIC-LA     139356     LDWP               LA-VIC(LDWP) 
  VIC-LA(LDWP)   
  4500.0 
  4500.0   
  4300.0 
  4300.0   
  2800.0 
  2800.0   
  2025-01-26 08:00 
  2025-01-26 08:00   
  2025-12-26 09:00 
  2025-12-26 09:00   
  Cancelled     TRANSMISSION     FORCED      ONPATH     LDWP     VIC-LA 2024/12/27 12:33 OUTAGE ID: 79358 PATROL / RS-E / ESC: ADELANTO-TOLUCA 500-KV LINE 1 / BANK G / BANK H (-OUT/CLEARED-); [CBS & DISCS OPEN]; {VIC-LA & PDCI DE-RATES}[PATROL TO PERFORM LINE MAINTENANCE & ESC TO INSTALL LINE DROPS FOR FUTURE SURGE ARRESTORS] {CONTINUOUS OUTAGE}. FS -6072     2024-12-27 14:39     LDWP52316      2024-12-27 14:42  
  NWOR     137938     LDWP               NWOR (E-W)(LDWP)      2592.0      3067.0      2592.0      2025-02-07 15:00      2026-01-01 00:00      Cancelled     TRANSMISSION     PLANNED      ONPATH     LDWP     Enter default values. F.S.      2024-05-29 13:31     LDWP51932      2024-05-29 13:33  
  NWOR     137941     LDWP               NWOR (E-W)(LDWP)      2592.0      3067.0      2592.0      2025-02-07 15:00      2026-01-01 00:00      Cancelled     TRANSMISSION     PLANNED      ONPATH     LDWP     Enter default values. F.S.      2024-05-29 13:42     LDWP51933      2024-05-29 13:42  
  NWOR     140231     LDWP               NWOR (E-W)(LDWP) 
  NWOR (W-E)(LDWP)   
  0.0 
  0.0   
  0.0 
  0.0   
  2565.0 
  2635.0   
  2025-02-07 19:00 
  2025-02-07 19:00   
  2026-04-01 15:00 
  2026-04-01 15:00   
  Active     TRANSMISSION     PLANNED      ONPATH     LDWP     NWOR 2024/12/03 08:00 MCCULLOUGH-VICTORVILLE LINE 1 SERIES COMPENSATION OUT AND LINE 2 SERIES COMPENSATION OUT. FS PER INTERCHANGE DESK.     2025-02-07 19:10     LDWP52494      2025-02-07 19:10  
  NWOR     137935     LDWP               NWOR (W-E)(LDWP)      2662.0      2662.0      2662.0      2025-02-07 20:00      2031-01-01 00:00      Cancelled     TRANSMISSION     PLANNED      ONPATH     LDWP     Enter Default values. F.S.      2024-05-29 13:22     LDWP51931      2024-05-29 13:25  
  INT-DC (PATH 27)     141929     LDWP               INT DC (NE-SW)(LDWP) 
  INT DC (SW-NE)(LDWP)   
  2400.0 
  1400.0   
  2400.0 
  1400.0   
  1250.0 
  1250.0   
  2025-06-06 00:00 
  2025-06-06 00:00   
  2025-07-01 00:00 
  2025-07-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     LDWP     INT DC 2025/06/04 17:43 OUTAGE ID 87079 INTERMOUNTAIN DC: (-REMAINS IN BIPOLE OPERATION-) [PATH LIMITATION DUE TO ONE GENERATING UNIT ONLINE]. FS.      2025-06-05 07:44     LDWP52992      2025-06-05 23:22  
  INT-DC (PATH 27)     141708     LDWP               INT DC (NE-SW)(LDWP) 
  INT DC (SW-NE)(LDWP)   
  2400.0 
  1400.0   
  2400.0 
  1400.0   
  1250.0 
  1250.0   
  2025-06-11 20:00 
  2025-06-11 20:00   
  2027-01-01 00:00 
  2027-01-01 00:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     LDWP     1 unit INT-DC value - AP     2025-05-16 10:32     LDWP52933      2025-06-11 18:33  
  NWOR     142015     LDWP               NWOR (E-W)(LDWP) 
  NWOR (W-E)(LDWP)   
  2592.0 
  2662.0   
  2592.0 
  2662.0   
  1992.0 
  2062.0   
  2025-06-16 05:00 
  2025-06-16 05:00   
  2025-06-19 05:00 
  2025-06-19 05:00   
  Active     TRANSMISSION     PLANNED      ONPATH     LDWP     NWOR 2025/06/11 08:15 OUTAGE ID 87177 SCE: ELDORADO-LUGO 500KV LINE (-OUT / CLEARED-) [CONTRACTOR (WILSON) TO FINISH OPGW INSTALL ON EL DORADO-LUGO 500 KV LINE] {SCE #25-018625} (PATH 46 DERATE). FS.      2025-06-11 08:32     LDWP53004      2025-06-11 08:32  
  NWOR     142018     LDWP               NWOR (E-W)(LDWP) 
  NWOR (W-E)(LDWP)   
  0.0 
  0.0   
  0.0 
  0.0   
  1900.0 
  1970.0   
  2025-06-19 05:00 
  2025-06-19 05:00   
  2025-06-27 21:00 
  2025-06-27 21:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     LDWP     NWOR 2025/06/11 08:15 OUTAGE ID 87177 SCE: ELDORADO-LUGO 500KV LINE (-OUT / CLEARED-) [CONTRACTOR (WILSON) TO FINISH OPGW INSTALL ON EL DORADO-LUGO 500 KV LINE] {SCE #25-018625} (PATH 46 DERATE). FS.      2025-06-11 08:35     LDWP53005      2025-06-11 08:35  
  NWOR     141944     LDWP               NWOR (E-W)(LDWP) 
  NWOR (W-E)(LDWP) 

  NWOR (E-W)(LDWP) 
  NWOR (W-E)(LDWP)   
  0.0 
  0.0 

  0.0 
  0.0   
  0.0 
  0.0 

  0.0 
  0.0   
  2472.0 
  2542.0 

  2472.0 
  2542.0   
  2025-06-19 05:00 
  2025-06-19 05:00 

  2025-06-27 20:00 
  2025-06-27 20:00   
  2025-06-27 20:00 
  2025-06-27 20:00 

  2025-06-27 21:00 
  2025-06-27 21:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     LDWP     NWOR 2025/06/05 08:32 OUTAGE 86159 SCE: CIMA-ELDORADO-PISGAH 1 220KV LINE (-OUT / CLEARED-) [CONTRACTOR TO FINISH OPGW INSTALL ON EL DORADO-LUGO 500KV LINE] {SCE #25-018626} (PATH 46 DERATE). AH     2025-06-05 15:57     LDWP52997      2025-06-06 07:47  
  PDCI (PATH 65)     141326     LDWP               PNDC (N-S)(LDWP) 
  PNDC (S-N)(LDWP)   
  3100.0 
  975.0   
  3100.0 
  975.0   
  0.0 
  0.0   
  2025-06-21 03:00 
  2025-06-21 03:00   
  2025-06-22 21:00 
  2025-06-22 21:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     LDWP     PNDC 2025/04/18 11:006 OUTAGE 86130 BPA/LADWP/SYLMAR-CS/PATROL: CELILO-SYLMAR POLE 3 (-OUT/CLEARED-); {PATH 65: PDCI NOT AVAILABLE} [ANNUAL SYLMAR-CS STATION WASH & PERFORM MISCELLANEOUS MAINTENANCE.]. AH     2025-04-18 11:28     LDWP52826      2025-04-18 11:28  
  VIC-LA     141981     LDWP               LA-VIC(LDWP) 
  VIC-LA(LDWP)   
  4500.0 
  4500.0   
  4500.0 
  4500.0   
  3050.0 
  3050.0   
  2025-06-22 05:00 
  2025-06-22 05:00   
  2025-06-22 19:00 
  2025-06-22 19:00   
  Scheduled     TRANSMISSION     FORCED      ONPATH     LDWP     VIC-LA 2025/06/09 08:36 OUTAGE 86991 ADL-RIN 500KV LINE 1 (-OUT-); RINALDI-RS: BANK H (-OUT-) REPAIR A-PHASE LTC MOTOR. AH     2025-06-09 08:40     LDWP53001      2025-06-09 08:40  
  PDCI (PATH 65)     141984     LDWP               PNDC (S-N)(LDWP)      975.0      975.0      0.0      2025-06-22 05:00      2025-06-22 19:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     LDWP     PNDC 2025/06/09 08:36 OUTAGE 86991 ADL-RIN 500KV LINE 1 (-OUT-); RINALDI-RS: BANK H (-OUT-) REPAIR A-PHASE LTC MOTOR. AH     2025-06-09 08:41     LDWP53002      2025-06-09 08:41  
  PDCI (PATH 65)     141934     LDWP               PNDC (S-N)(LDWP)      975.0      975.0      630.0      2025-06-23 07:00      2025-06-27 17:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     LDWP     PNDC 2025/06/05 11:33 OUTAGE 86855 RS-B; VICTORVILLE-CENTURY 287-KV LINE 1/BANK F (OUT/CLEARED-); [CBS & DISCONNECTS OPENED][AT RS-B: TO INSPECT AND REPAIR BANK F BLADDER ALARM]. AH     2025-06-05 12:09     LDWP52993      2025-06-05 12:09  
  VIC-LA     141936     LDWP               LA-VIC(LDWP) 
  VIC-LA(LDWP)   
  4500.0 
  4500.0   
  4500.0 
  4500.0   
  4250.0 
  4250.0   
  2025-06-23 07:00 
  2025-06-23 07:00   
  2025-06-27 17:00 
  2025-06-27 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     LDWP     VIC-LA 2025/06/05 11:33 OUTAGE 86855 RS-B; VICTORVILLE-CENTURY 287-KV LINE 1/BANK F (OUT/CLEARED-); [CBS & DISCONNECTS OPENED][AT RS-B: TO INSPECT AND REPAIR BANK F BLADDER ALARM]. AH     2025-06-05 12:11     LDWP52994      2025-06-05 12:11  
  VIC-LA     142021     LDWP               LA-VIC(LDWP) 
  VIC-LA(LDWP)   
  4500.0 
  4500.0   
  4500.0 
  4500.0   
  4250.0 
  4250.0   
  2025-06-30 06:00 
  2025-06-30 06:00   
  2025-08-08 21:00 
  2025-08-08 21:00   
  Scheduled     TRANSMISSION     FORCED      ONPATH     LDWP     VIC-LA 2025/06/11 09:21 OUTAGE ID 86806 SCE / VINCENT / SCE-PATROL: EAGLE ROCK - SYLMAR 220-KV LINE 1 (-OUT/CLEARED-); [SCE# 25-032570] {HALO/PATROL CREWS TO REPLACE INSULATORS AND HARDWARE ON MULTIPLE STRUCTURES} NOTE: IN CONJUNCTION WITH GOULD-SYLMAR 220-KV LINE 1 OUTAGE - SCE (25-032355). FS.      2025-06-11 09:28     LDWP53006      2025-06-11 09:28  
  VIC-LA     142024     LDWP               LA-VIC(LDWP) 
  VIC-LA(LDWP)   
  4500.0 
  4500.0   
  4500.0 
  4500.0   
  4250.0 
  4250.0   
  2025-06-30 06:00 
  2025-06-30 06:00   
  2025-08-08 18:00 
  2025-08-08 18:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     LDWP     VIC-LA 2025/06/11 09:24 OUTAGE 86807 SCE / VINCENT / SCE-PATROL: GOULD-SYLMAR 220-KV LINE 1 (-OUT/CLEARED-); [SCE# 25-032355] | {HALO/PATROL CREWS TO REPLACE INSULATORS AND HARDWARE ON MULTIPLE STRUCTURES} | NOTE: IN CONJUNCTION WITH EAGLE ROCK-SYLMAR 220-KV LINE 1 OUTAGE - SEE (SCE# 25-032570) AH     2025-06-11 10:27     LDWP53007      2025-06-11 10:29  
  PDCI (PATH 65)     142035     LDWP               PNDC (N-S)(LDWP)      3100.0      3100.0      2041.0      2025-06-30 06:00      2025-08-08 21:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     LDWP     PNDC 2025/06/12 09:06 OUTAGE ID 87210 PATH 65 (PDCI): NORTH TO SOUTH SCHEDULING LIMITATION WITH ER-SYL & GOU-SYL OUT AND N-1 CONTINGENCY FOR LOSS OF SYLMAR BANK G. FS.      2025-06-13 08:12     LDWP53009      2025-06-13 08:12  
  PDCI (PATH 65)     141939     LDWP               PNDC (S-N)(LDWP)      975.0      975.0      630.0      2025-07-07 07:00      2025-07-11 17:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     LDWP     PNDC 2025/06/05 11:33 OUTAGE 86857 RS-B; VICTORVILLE-CENTURY 287-KV LINE 2/BANK G (OUT/CLEARED-); [CBS & DISCONNECTS OPENED][AT RS-B: TO INSPECT AND REPAIR BANK G BLADDER ALARM]. AH     2025-06-05 12:19     LDWP52995      2025-06-05 12:21  
  VIC-LA     141941     LDWP               LA-VIC(LDWP) 
  VIC-LA(LDWP)   
  4500.0 
  4500.0   
  4500.0 
  4500.0   
  4250.0 
  4250.0   
  2025-07-07 07:00 
  2025-07-07 07:00   
  2025-07-11 17:00 
  2025-07-11 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     LDWP     VIC-LA 2025/06/05 11:33 OUTAGE 86857 RS-B; VICTORVILLE-CENTURY 287-KV LINE 2/BANK G (OUT/CLEARED-); [CBS & DISCONNECTS OPENED][AT RS-B: TO INSPECT AND REPAIR BANK G BLADDER ALARM]. AH     2025-06-05 12:20     LDWP52996      2025-06-05 12:20  
MATL Outages:
NEVP Outages:
  MEAD KT2A 500/230 kv     503214     NEVP     Path 81          MD230-MD500(NEVP) 
  MD500-MD230(NEVP) 

  MD230-MD500(NEVP) 
  MD500-MD230(NEVP)   
  1500.0 
  1500.0 

  1500.0 
  1500.0   
  1500.0 
  1500.0 

  1500.0 
  1500.0   
  0.0 
  0.0 

  0.0 
  0.0   
  2024-09-16 07:45 
  2024-09-16 07:45 

  2024-12-31 23:00 
  2024-12-31 23:00   
  2024-12-31 23:00 
  2024-12-31 23:00 

  2025-12-31 17:00 
  2025-12-31 17:00   
  Active     TRANSMISSION     FORCED      ONPATH     NEVP     Mead KT2A 500/230 kV Transformer OOS     2024-09-16 07:48     NEVP185991      2024-12-18 07:35  
  MARBLE 619     541349     NEVP               MARBLE60-WEST.NVEN(NEVP) 
  WEST.NVEN-MARBLE60(NEVP)   
  18.0 
  18.0   
  18.0 
  18.0   
  0.0 
  0.0   
  2025-05-29 07:20 
  2025-05-29 07:20   
  2025-06-18 17:00 
  2025-06-18 17:00   
  Active     TRANSMISSION     FORCED      ONPATH     NEVP     Marble 619 OOS     2025-05-29 07:20     NEVP198835      2025-06-14 17:35  
  DRUM-SUMMIT #1     541512     NEVP     Path 24          NIE-NORTHSYS(NEVP) 
  SUMMIT120-WEST.NVEN(NEVP) 
  WEST.NVEN-SUMMIT120(NEVP)   
  1275.0 
  72.0 
  72.0   
  1275.0 
  72.0 
  72.0   
  1275.0 
  72.0 
  72.0   
  2025-06-02 07:10 
  2025-06-02 07:10 
  2025-06-02 07:10   
  2025-06-18 17:00 
  2025-06-18 17:00 
  2025-06-18 17:00   
  Active     TRANSMISSION     FORCED      ONPATH     NEVP     iTOA #25-02258 - #133 LINE OOS.     2025-05-30 14:20     NEVP198902      2025-06-02 07:08  
  PATH 24     542237     NEVP     PATH 24          SUMMIT120-WEST.NVEN(NEVP) 
  WEST.NVEN-SUMMIT120(NEVP)   
  72.0 
  72.0   
  72.0 
  72.0   
  50.0 
  72.0   
  2025-06-02 16:30 
  2025-06-02 16:30   
  2025-06-18 18:00 
  2025-06-18 18:00   
  Active     TRANSMISSION     FORCED      ONPATH     NEVP     TO informs Derate to 50 MW     2025-06-02 16:37     NEVP199109      2025-06-02 16:37  
  MARBLE 619     541516     NEVP     Path 24          MARBLE60-WEST.NVEN(NEVP) 
  WEST.NVEN-MARBLE60(NEVP)   
  18.0 
  18.0   
  18.0 
  18.0   
  0.0 
  0.0   
  2025-06-06 05:00 
  2025-06-06 05:00   
  2025-06-14 20:00 
  2025-06-14 20:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     NEVP     iTOA #25-03377 - MARBLE 619 LINE OOS     2025-05-30 14:28     NEVP198903      2025-05-30 14:28  
  HILLTOP/MALIN 230KV LN     543197     NEVP     Path 76          HILLTOP345-NVEN(NEVP) 
  NVEN-HILLTOP345(NEVP)   
  300.0 
  200.0   
  300.0 
  200.0   
  0.0 
  0.0   
  2025-06-10 14:00 
  2025-06-10 14:00   
  2025-06-10 18:00 
  2025-06-10 18:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     NEVP     NVE to de-engerize Hilltop for BPA work. Path 76 derated to */- 0 MW.     2025-06-10 05:28     NEVP199550      2025-06-10 08:08  
  HILLTOP     543175     NEVP     Path 76          HILLTOP345-NVEN(NEVP) 
  NVEN-HILLTOP345(NEVP) 
  NVEN-NIE(NEVP)   
  300.0 
  200.0 
  1000.0   
  300.0 
  200.0 
  1000.0   
  0.0 
  0.0 
  908.0   
  2025-06-10 15:00 
  2025-06-10 15:00 
  2025-06-10 15:00   
  2025-06-10 18:00 
  2025-06-10 18:00 
  2025-06-10 18:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     NEVP     NVE to de-engerize Hilltop for BPA work. Path 76 derated to */- 0 MW.     2025-06-10 01:31     NEVP199541      2025-06-10 05:26  
  MCCULLOUGH BANKS #H #I     543226     NEVP     MCCULLOUGH BANKS #H #I OOS          MC230-MC500(NEVP) 
  MC500-MC230(NEVP) 
  SIE-NVES1(NEVP) 

  MC230-MC500(NEVP) 
  MC500-MC230(NEVP) 
  SIE-NVES1(NEVP)   
  400.0 
  736.0 
  2710.0 

  400.0 
  736.0 
  2710.0   
  400.0 
  736.0 
  2710.0 

  400.0 
  736.0 
  2710.0   
  0.0 
  336.0 
  2710.0 

  0.0 
  336.0 
  2710.0   
  2025-06-10 16:00 
  2025-06-10 16:00 
  2025-06-10 16:00 

  2025-06-10 18:00 
  2025-06-10 18:00 
  2025-06-10 18:00   
  2025-06-10 18:00 
  2025-06-10 18:00 
  2025-06-10 18:00 

  2025-06-10 18:35 
  2025-06-10 18:35 
  2025-06-10 18:35   
  Terminated     TRANSMISSION     PLANNED      ONPATH     NEVP     MCCULLOUGH BANKS #H #I OOS     2025-06-10 10:14     NEVP199558      2025-06-10 18:35  
  HUMBOLDT/ROGERSON 3419     543624     NEVP     PATH 16          M345-NVEN(NEVP) 
  NIE-NORTHSYS(NEVP) 
  NIE-NVEN(NEVP) 
  NORTHSYS-NIE(NEVP) 
  NVEN-M345(NEVP) 
  NVEN-NIE(NEVP)   
  500.0 
  1275.0 
  775.0 
  1330.0 
  360.0 
  1000.0   
  500.0 
  1275.0 
  775.0 
  1330.0 
  360.0 
  1000.0   
  0.0 
  975.0 
  700.0 
  765.0 
  0.0 
  700.0   
  2025-06-17 05:00 
  2025-06-17 05:00 
  2025-06-17 05:00 
  2025-06-17 05:00 
  2025-06-17 05:00 
  2025-06-17 05:00   
  2025-06-17 14:00 
  2025-06-17 14:00 
  2025-06-17 14:00 
  2025-06-17 14:00 
  2025-06-17 14:00 
  2025-06-17 14:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     NEVP     iTOA #25-03735 - LINE OOS for P1 CONDUCTOR WORK     2025-06-12 13:14     NEVP199704      2025-06-12 13:14  
NWMT Outages:
  230KV CROSSOVER-YTP     13603     NWMT     230 CROSSOVER YTP          CROSSOVER-MTSE(NWMT) 
  MTSE-CROSSOVER(NWMT) 
  MTSE-NWMT.SYSTEM(NWMT) 
  NWMT.SYSTEM-MTSE(NWMT)   
  478.0 
  450.0 
  600.0 
  600.0   
  478.0 
  450.0 
  600.0 
  600.0   
  178.0 
  150.0 
  178.0 
  550.0   
  2025-02-28 23:00 
  2025-02-28 23:00 
  2025-02-28 23:00 
  2025-02-28 23:00   
  2026-12-31 23:00 
  2026-12-31 23:00 
  2026-12-31 23:00 
  2026-12-31 23:00   
  Active     TRANSMISSION     FORCED      ONPATH     NWMT     230 CROSSOVER YTP     2025-02-05 13:34     NWMT3043      2025-02-05 13:34  
  TAFT-GARRISON 1     14047     NWMT     BPA TAFT-GARRISON 1          NW-MT-BPAT.NWMT(NWMT) 
  NWMT.SYSTEM-TOWNSEND(NWMT)   
  492.0 
  469.0   
  492.0 
  469.0   
  345.0 
  454.0   
  2025-06-09 08:00 
  2025-06-09 08:00   
  2025-06-26 15:00 
  2025-06-26 15:00   
  Active     TRANSMISSION     PLANNED      ONPATH     NWMT     BPA REQUEST FOR WORK     2025-05-29 11:47     NWMT3149      2025-05-29 11:47  
  24-0005-TR     14092     NWMT     BROADVIEW-GARRISON 1          NW-MT-BPAT.NWMT(NWMT) 
  NWMT.SYSTEM-TOWNSEND(NWMT)   
  492.0 
  469.0   
  492.0 
  469.0   
  345.0 
  454.0   
  2025-06-16 07:00 
  2025-06-16 07:00   
  2025-06-19 17:00 
  2025-06-19 17:00   
  Active     TRANSMISSION     PLANNED      ONPATH     NWMT     NWMT REQUEST FOR WORK     2025-06-06 09:58     NWMT3161      2025-06-06 09:58  
  GREAT FALLS 115/100 BANK     14111     NWMT     GREAT FALLS 115/100 BANK          GLWND1-GTFALLSNWMT(NWMT) 
  GTFALLSNWMT-GLWND1(NWMT) 

  GLWND1-GTFALLSNWMT(NWMT) 
  GTFALLSNWMT-GLWND1(NWMT)   
  130.0 
  100.0 

  130.0 
  100.0   
  130.0 
  100.0 

  130.0 
  100.0   
  0.0 
  0.0 

  0.0 
  0.0   
  2025-06-16 20:14 
  2025-06-16 20:14 

  2025-06-16 22:00 
  2025-06-16 22:00   
  2025-06-16 22:00 
  2025-06-16 22:00 

  2025-06-17 00:00 
  2025-06-17 00:00   
  Active     TRANSMISSION     FORCED      ONPATH     NWMT          2025-06-16 20:13     NWMT3166      2025-06-16 20:47  
  25-1668-TR     14099     NWMT     GLACIER WIND 1-GLACIER WIND SWYD          GLWND1-GTFALLSNWMT(NWMT) 
  GLWND1-SCUTBANK(NWMT)   
  130.0 
  130.0   
  130.0 
  130.0   
  0.0 
  0.0   
  2025-06-17 06:00 
  2025-06-17 06:00   
  2025-06-19 16:00 
  2025-06-19 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     NWMT     BHE MT REQUEST FOR MAINTENANCE     2025-06-10 12:37     NWMT3162      2025-06-10 12:37  
  25-1230-TR     14105     NWMT     GREAT FALLS 230-OVANDO          GTFALLSNWMT-NWMT.SYSTEM(NWMT)      0.0      0.0      175.0      2025-06-17 07:00      2025-06-17 14:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     NWMT     NWMT REQUEST FOR WORK     2025-06-13 09:43     NWMT3164      2025-06-13 09:43  
  25-1682-TR     14107     NWMT     BILLINGS STEAM-YELLOWTAIL          MTSE-YTP(NWMT) 
  NWMT.SYSTEM-MTSE(NWMT) 
  YTP-MTSE(NWMT)   
  400.0 
  600.0 
  400.0   
  400.0 
  600.0 
  400.0   
  100.0 
  250.0 
  100.0   
  2025-06-19 08:00 
  2025-06-19 08:00 
  2025-06-19 08:00   
  2025-06-19 14:00 
  2025-06-19 14:00 
  2025-06-19 14:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     NWMT     PAC REQUEST FOR WORK     2025-06-13 10:03     NWMT3165      2025-06-13 10:03  
PGE Outages:
  COLSTRIP TRANS PROJECT     217751     PGE     BPA Garrison-Taft 1 500kV Line          BROADVIEW-TOWNSEND(PGE) 
  COLSTRIP-BROADVIEW(PGE) 
  COLSTRIP-TOWNSEND(PGE)   
  312.0 
  307.0 
  307.0   
  312.0 
  307.0 
  307.0   
  218.0 
  218.0 
  218.0   
  2025-06-09 08:00 
  2025-06-09 08:00 
  2025-06-09 08:00   
  2025-06-26 15:00 
  2025-06-26 15:00 
  2025-06-26 15:00   
  Active     TRANSMISSION     PLANNED      ONPATH     PGE     Reduction of TTC on CTP by path operator: NWMT     2025-05-29 13:03     PGE70821      2025-05-29 13:03  
  COLSTRIP TRANS PROJECT     217910     PGE     Broadview-Garrison 1 500kV Line          BROADVIEW-TOWNSEND(PGE) 
  COLSTRIP-BROADVIEW(PGE) 
  COLSTRIP-TOWNSEND(PGE)   
  312.0 
  307.0 
  307.0   
  312.0 
  307.0 
  307.0   
  218.0 
  218.0 
  218.0   
  2025-06-16 07:00 
  2025-06-16 07:00 
  2025-06-16 07:00   
  2025-06-19 17:00 
  2025-06-19 17:00 
  2025-06-19 17:00   
  Active     TRANSMISSION     PLANNED      ONPATH     PGE     Reduction of TTC on CTP by path operator: NWMT     2025-06-06 11:20     PGE70865      2025-06-06 11:20  
PNM Outages:
  EDDY230-AMRAD345     372915     PNM     EDDY230-AMRAD345          AMRAD345-EDDY230(PNM) 
  EDDY230-AMRAD345(PNM) 

  AMRAD345-EDDY230(PNM) 
  EDDY230-AMRAD345(PNM) 

  AMRAD345-EDDY230(PNM) 
  EDDY230-AMRAD345(PNM) 

  AMRAD345-EDDY230(PNM) 
  EDDY230-AMRAD345(PNM)   
  67.0 
  67.0 

  67.0 
  67.0 

  67.0 
  67.0 

  67.0 
  67.0   
  67.0 
  67.0 

  67.0 
  67.0 

  67.0 
  67.0 

  67.0 
  67.0   
  44.0 
  44.0 

  44.0 
  44.0 

  44.0 
  44.0 

  44.0 
  44.0   
  2022-08-01 14:00 
  2022-08-01 14:00 

  2022-12-31 23:59 
  2022-12-31 23:59 

  2023-12-31 23:59 
  2023-12-31 23:59 

  2025-01-01 00:00 
  2025-01-01 00:00   
  2022-12-31 23:59 
  2022-12-31 23:59 

  2023-12-31 23:59 
  2023-12-31 23:59 

  2025-01-01 00:00 
  2025-01-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00   
  Active     TRANSMISSION     FORCED      ONPATH     PNM     Eddy230-Amrd345 line reduction due to Reliability Constraints     2022-08-01 13:57     PNM147096      2024-08-27 10:37  
  BW230 IMP/EXP RESTRICTION     482892     PNM     BW345-BW230          BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW345-BW230(PNM) 

  BW345-BW230(PNM) 

  BW345-BW230(PNM) 

  BW345-BW230(PNM) 

  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM) 

  BW230-BW345(PNM) 
  BW345-BW230(PNM)   
  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0   
  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0   
  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0   
  2024-06-21 16:00 
  2024-06-21 16:00 

  2024-06-21 17:00 
  2024-06-21 17:00 

  2024-06-21 18:00 
  2024-06-21 18:00 

  2024-06-21 19:00 
  2024-06-21 19:00 

  2024-06-21 20:00 
  2024-06-21 20:00 

  2024-06-21 21:00 
  2024-06-21 21:00 

  2024-06-21 22:00 
  2024-06-21 22:00 

  2024-06-21 23:00 
  2024-06-21 23:00 

  2024-06-22 12:00 
  2024-06-22 12:00 

  2024-06-22 13:00 
  2024-06-22 13:00 

  2024-06-22 14:00 
  2024-06-22 14:00 

  2024-06-22 15:00 
  2024-06-22 15:00 

  2024-06-22 16:00 
  2024-06-22 16:00 

  2024-06-22 17:00 
  2024-06-22 17:00 

  2024-06-22 18:00 
  2024-06-22 18:00 

  2024-06-22 19:00 
  2024-06-22 19:00 

  2024-06-22 20:00 
  2024-06-22 20:00 

  2024-06-22 21:00 
  2024-06-22 21:00 

  2024-06-22 22:00 
  2024-06-22 22:00 

  2024-06-22 23:00 
  2024-06-22 23:00 

  2024-06-23 12:00 
  2024-06-23 12:00 

  2024-06-23 13:00 
  2024-06-23 13:00 

  2024-06-23 14:00 
  2024-06-23 14:00 

  2024-06-23 15:00 
  2024-06-23 15:00 

  2024-06-23 16:00 
  2024-06-23 16:00 

  2024-06-23 17:00 
  2024-06-23 17:00 

  2024-06-23 18:00 
  2024-06-23 18:00 

  2024-06-23 19:00 
  2024-06-23 19:00 

  2024-06-23 20:00 
  2024-06-23 20:00 

  2024-06-23 21:00 
  2024-06-23 21:00 

  2024-06-23 22:00 
  2024-06-23 22:00 

  2024-06-23 23:00 
  2024-06-23 23:00 

  2024-06-24 08:00 

  2024-06-24 12:00 
  2024-06-24 12:00 

  2024-06-24 13:00 
  2024-06-24 13:00 

  2024-06-24 14:00 
  2024-06-24 14:00 

  2024-06-24 15:00 
  2024-06-24 15:00 

  2024-06-24 16:00 
  2024-06-24 16:00 

  2024-06-24 17:00 
  2024-06-24 17:00 

  2024-06-24 18:00 
  2024-06-24 18:00 

  2024-06-24 19:00 
  2024-06-24 19:00 

  2024-06-24 20:00 
  2024-06-24 20:00 

  2024-06-24 21:00 
  2024-06-24 21:00 

  2024-06-24 22:00 
  2024-06-24 22:00 

  2024-06-24 23:00 
  2024-06-24 23:00 

  2024-06-25 07:00 

  2024-06-25 08:00 

  2024-06-25 09:00 

  2024-06-25 10:00 

  2024-06-25 11:00 

  2024-06-25 12:00 
  2024-06-25 12:00 

  2024-06-25 13:00 
  2024-06-25 13:00 

  2024-06-25 14:00 
  2024-06-25 14:00 

  2024-06-25 15:00 

  2024-06-25 16:00 

  2024-06-25 17:00 

  2024-06-25 18:00 

  2024-06-25 19:00 

  2024-06-25 20:00 

  2024-06-25 21:00 

  2024-06-25 22:00 

  2024-06-25 23:00 

  2024-06-26 12:00 

  2024-06-26 13:00 

  2024-06-26 14:00 

  2024-06-26 15:00 

  2024-06-26 16:00 

  2024-06-26 17:00 

  2024-06-26 18:00 

  2024-06-26 19:00 

  2024-06-26 20:00 

  2024-06-26 21:00 

  2024-06-26 22:00 

  2024-06-26 23:00 

  2024-06-27 05:00 

  2024-06-27 06:00 

  2024-06-27 07:00 

  2024-06-27 08:00 

  2024-06-27 09:00 

  2024-06-27 10:00 

  2024-06-27 11:00 

  2024-06-27 12:00 

  2024-06-27 13:00 

  2024-06-27 14:00 

  2024-07-26 17:00 
  2024-07-26 17:00 

  2024-07-27 08:43 
  2024-07-27 08:43 

  2024-11-30 17:00 
  2024-11-30 17:00 

  2025-07-01 17:00 
  2025-07-01 17:00   
  2024-06-21 17:00 
  2024-06-21 17:00 

  2024-06-21 18:00 
  2024-06-21 18:00 

  2024-06-21 19:00 
  2024-06-21 19:00 

  2024-06-21 20:00 
  2024-06-21 20:00 

  2024-06-21 21:00 
  2024-06-21 21:00 

  2024-06-21 22:00 
  2024-06-21 22:00 

  2024-06-21 23:00 
  2024-06-21 23:00 

  2024-06-22 12:00 
  2024-06-22 12:00 

  2024-06-22 13:00 
  2024-06-22 13:00 

  2024-06-22 14:00 
  2024-06-22 14:00 

  2024-06-22 15:00 
  2024-06-22 15:00 

  2024-06-22 16:00 
  2024-06-22 16:00 

  2024-06-22 17:00 
  2024-06-22 17:00 

  2024-06-22 18:00 
  2024-06-22 18:00 

  2024-06-22 19:00 
  2024-06-22 19:00 

  2024-06-22 20:00 
  2024-06-22 20:00 

  2024-06-22 21:00 
  2024-06-22 21:00 

  2024-06-22 22:00 
  2024-06-22 22:00 

  2024-06-22 23:00 
  2024-06-22 23:00 

  2024-06-23 12:00 
  2024-06-23 12:00 

  2024-06-23 13:00 
  2024-06-23 13:00 

  2024-06-23 14:00 
  2024-06-23 14:00 

  2024-06-23 15:00 
  2024-06-23 15:00 

  2024-06-23 16:00 
  2024-06-23 16:00 

  2024-06-23 17:00 
  2024-06-23 17:00 

  2024-06-23 18:00 
  2024-06-23 18:00 

  2024-06-23 19:00 
  2024-06-23 19:00 

  2024-06-23 20:00 
  2024-06-23 20:00 

  2024-06-23 21:00 
  2024-06-23 21:00 

  2024-06-23 22:00 
  2024-06-23 22:00 

  2024-06-23 23:00 
  2024-06-23 23:00 

  2024-06-24 08:00 
  2024-06-24 12:00 

  2024-06-24 12:00 

  2024-06-24 13:00 
  2024-06-24 13:00 

  2024-06-24 14:00 
  2024-06-24 14:00 

  2024-06-24 15:00 
  2024-06-24 15:00 

  2024-06-24 16:00 
  2024-06-24 16:00 

  2024-06-24 17:00 
  2024-06-24 17:00 

  2024-06-24 18:00 
  2024-06-24 18:00 

  2024-06-24 19:00 
  2024-06-24 19:00 

  2024-06-24 20:00 
  2024-06-24 20:00 

  2024-06-24 21:00 
  2024-06-24 21:00 

  2024-06-24 22:00 
  2024-06-24 22:00 

  2024-06-24 23:00 
  2024-06-24 23:00 

  2024-06-25 12:00 
  2024-06-25 07:00 

  2024-06-25 08:00 

  2024-06-25 09:00 

  2024-06-25 10:00 

  2024-06-25 11:00 

  2024-06-25 12:00 

  2024-06-25 13:00 
  2024-06-25 13:00 

  2024-06-25 14:00 
  2024-06-25 14:00 

  2024-06-25 15:00 
  2024-07-26 17:00 

  2024-06-25 16:00 

  2024-06-25 17:00 

  2024-06-25 18:00 

  2024-06-25 19:00 

  2024-06-25 20:00 

  2024-06-25 21:00 

  2024-06-25 22:00 

  2024-06-25 23:00 

  2024-06-26 12:00 

  2024-06-26 13:00 

  2024-06-26 14:00 

  2024-06-26 15:00 

  2024-06-26 16:00 

  2024-06-26 17:00 

  2024-06-26 18:00 

  2024-06-26 19:00 

  2024-06-26 20:00 

  2024-06-26 21:00 

  2024-06-26 22:00 

  2024-06-26 23:00 

  2024-06-27 05:00 

  2024-06-27 06:00 

  2024-06-27 07:00 

  2024-06-27 08:00 

  2024-06-27 09:00 

  2024-06-27 10:00 

  2024-06-27 11:00 

  2024-06-27 12:00 

  2024-06-27 13:00 

  2024-06-27 14:00 

  2024-07-26 17:00 

  2024-07-27 08:43 
  2024-07-27 08:43 

  2024-11-30 17:00 
  2024-11-30 17:00 

  2025-07-01 17:00 
  2025-07-01 17:00 

  2025-12-31 17:00 
  2025-12-31 17:00   
  Active     TRANSMISSION     FORCED      ONPATH     PNM     HVDC OOS until further notice      2024-06-21 11:48     PNM181501      2025-04-29 08:32  
  EDDY DC CONVERTER OUTAGE     518013     PNM     EDDY DC Converter          AMRAD345-EDDY230(PNM) 
  EDDY230-AMRAD345(PNM) 

  AMRAD345-EDDY230(PNM) 
  EDDY230-AMRAD345(PNM)   
  67.0 
  67.0 

  67.0 
  67.0   
  67.0 
  67.0 

  67.0 
  67.0   
  0.0 
  0.0 

  0.0 
  0.0   
  2025-02-01 00:00 
  2025-02-01 00:00 

  2025-03-01 00:00 
  2025-03-01 00:00   
  2025-03-01 00:00 
  2025-03-01 00:00 

  2025-05-30 06:16 
  2025-05-30 06:16   
  Completed     DC CONVERTER     PLANNED      ONPATH     PNM      Performing maintenance.      2025-01-29 14:28     PNM191378      2025-05-30 06:15  
  ABO SC BYPASS     508113     PNM     ABO SC          ABQ-WESTSPRTS345(PNM) 
  WESTSPRTS345-ABQ(PNM)   
  235.0 
  800.0   
  235.0 
  800.0   
  235.0 
  800.0   
  2025-04-04 00:00 
  2025-04-04 00:00   
  2025-05-27 00:00 
  2025-05-27 00:00   
  Cancelled     TRANSMISSION     FORCED      ONPATH     PNM     ABO SC Bypass for repairs - No Transmission Line Reduction     2024-10-21 17:27     PNM187461      2025-03-27 14:17  
  ABO SC BYPASS/LINE IN     529940     PNM     ABO SC          WESTSPRTS345-WM345(PNM)      800.0      800.0      475.0      2025-04-24 00:00      2025-06-11 00:00      Cancelled     TRANSMISSION     FORCED      ONPATH     PNM     ABO SC is Bypassed Line is IN Service. Abo Series Compensator will be in bypass mode for repair work. WS345-WM345 Line reduction     2025-03-27 14:07     PNM195235      2025-03-27 14:18  
  ABO SC BYPASS/LINE IN     529942     PNM     ABO SC          WESTSPRTS345-WM345(PNM)      800.0      800.0      475.0      2025-04-24 00:00      2025-06-11 00:00      Cancelled     TRANSMISSION     FORCED      ONPATH     PNM     ABO SC is Bypassed Line is IN Service. Abo Series Compensator will be in bypass mode for repair work. WS345-WM345 Line Reduction     2025-03-27 14:09     PNM195236      2025-03-27 14:19  
  ABO SC BYPASS/LINE IN     529944     PNM     ABO SC          WESTSPRTS345-WM345(PNM)      800.0      800.0      475.0      2025-04-24 07:00      2025-06-10 09:43      Terminated     TRANSMISSION     FORCED      ONPATH     PNM     ABO SC is Bypassed Line is IN Service. Abo Series Compensator will be in bypass mode for repair work. WS345-WM345 Line Reduction     2025-03-27 14:11     PNM195237      2025-06-10 09:43  
  NOMO PATH48 REDUCTION     536909     PNM     Rio Puerco - Pintado 245kv Series Comp          ABQ-FOURCORNE345(PNM) 
  ABQ-PINTADO345(PNM) 
  FOURCORNE345-ABQ(PNM) 
  FOURCORNE345-PINTADO345(PNM) 
  PINTADO345-ABQ(PNM) 
  PINTADO345-FOURCORNE345(PNM) 

  ABQ-FOURCORNE345(PNM) 
  ABQ-PINTADO345(PNM) 
  FOURCORNE345-ABQ(PNM) 
  FOURCORNE345-PINTADO345(PNM) 
  PINTADO345-ABQ(PNM) 
  PINTADO345-FOURCORNE345(PNM) 

  ABQ-FOURCORNE345(PNM) 
  ABQ-PINTADO345(PNM) 
  FOURCORNE345-ABQ(PNM) 
  FOURCORNE345-PINTADO345(PNM) 
  PINTADO345-ABQ(PNM) 
  PINTADO345-FOURCORNE345(PNM)   
  1901.0 
  1900.0 
  1100.0 
  1100.0 
  1100.0 
  1901.0 

  1901.0 
  1900.0 
  1100.0 
  1100.0 
  1100.0 
  1901.0 

  1901.0 
  1900.0 
  1100.0 
  1100.0 
  1100.0 
  1901.0   
  1901.0 
  1900.0 
  1100.0 
  1100.0 
  1100.0 
  1901.0 

  1901.0 
  1900.0 
  1100.0 
  1100.0 
  1100.0 
  1901.0 

  1901.0 
  1900.0 
  1100.0 
  1100.0 
  1100.0 
  1901.0   
  550.0 
  550.0 
  550.0 
  550.0 
  550.0 
  550.0 

  550.0 
  550.0 
  550.0 
  550.0 
  550.0 
  550.0 

  1150.0 
  1150.0 
  1150.0 
  1150.0 
  1150.0 
  1150.0   
  2025-05-07 09:00 
  2025-05-07 09:00 
  2025-05-07 09:00 
  2025-05-07 09:00 
  2025-05-07 09:00 
  2025-05-07 09:00 

  2025-05-07 10:00 
  2025-05-07 10:00 
  2025-05-07 10:00 
  2025-05-07 10:00 
  2025-05-07 10:00 
  2025-05-07 10:00 

  2025-05-28 07:49 
  2025-05-28 07:49 
  2025-05-28 07:49 
  2025-05-28 07:49 
  2025-05-28 07:49 
  2025-05-28 07:49   
  2025-05-07 10:00 
  2025-05-07 10:00 
  2025-05-07 10:00 
  2025-05-07 10:00 
  2025-05-07 10:00 
  2025-05-07 10:00 

  2025-05-28 07:49 
  2025-05-28 07:49 
  2025-05-28 07:49 
  2025-05-28 07:49 
  2025-05-28 07:49 
  2025-05-28 07:49 

  2025-08-01 10:00 
  2025-08-01 10:00 
  2025-08-01 10:00 
  2025-08-01 10:00 
  2025-08-01 10:00 
  2025-08-01 10:00   
  Active     TRANSMISSION     FORCED      ONPATH     PNM     NOMO Path48 NNMI Line Reduction due to NOMO Path48 NNMI Line Reduction due to: Rio Puerco - Pintado 245kv Series Comp bypassed.     2025-05-07 08:34     PNM197474      2025-05-28 07:51  
  SJ345-JICARILLA345     538824     PNM     SJ345-JICARILLA345          FOURCORNER345-WM345(PNM) 
  JICARILLA345-OJO345(PNM) 
  JICARILLA345-SJ345(PNM) 
  OJO345-JICARILLA345(PNM) 
  SJ345-JICARILLA345(PNM) 

  JICARILLA345-OJO345(PNM) 
  JICARILLA345-SJ345(PNM) 
  OJO345-JICARILLA345(PNM) 
  SJ345-JICARILLA345(PNM) 

  FOURCORNER345-WM345(PNM) 
  JICARILLA345-OJO345(PNM) 
  JICARILLA345-SJ345(PNM) 
  OJO345-JICARILLA345(PNM) 
  SJ345-JICARILLA345(PNM) 

  FOURCORNER345-WM345(PNM) 
  JICARILLA345-OJO345(PNM) 
  JICARILLA345-SJ345(PNM) 
  OJO345-JICARILLA345(PNM) 
  SJ345-JICARILLA345(PNM) 

  FOURCORNER345-WM345(PNM) 
  JICARILLA345-OJO345(PNM) 
  JICARILLA345-SJ345(PNM) 
  OJO345-JICARILLA345(PNM) 
  SJ345-JICARILLA345(PNM) 

  FOURCORNER345-WM345(PNM) 
  JICARILLA345-OJO345(PNM) 
  JICARILLA345-SJ345(PNM) 
  OJO345-JICARILLA345(PNM) 
  SJ345-JICARILLA345(PNM) 

  FOURCORNER345-WM345(PNM) 
  JICARILLA345-OJO345(PNM) 
  JICARILLA345-SJ345(PNM) 
  OJO345-JICARILLA345(PNM) 
  SJ345-JICARILLA345(PNM)   
  2018.0 
  2031.0 
  203.0 
  203.0 
  1100.0 

  2031.0 
  203.0 
  203.0 
  1100.0 

  2018.0 
  2031.0 
  203.0 
  203.0 
  1100.0 

  2018.0 
  2031.0 
  203.0 
  203.0 
  1100.0 

  2018.0 
  2031.0 
  203.0 
  203.0 
  1100.0 

  2018.0 
  2031.0 
  203.0 
  203.0 
  1100.0 

  2018.0 
  2031.0 
  203.0 
  203.0 
  1100.0   
  2018.0 
  2031.0 
  203.0 
  203.0 
  1100.0 

  2031.0 
  203.0 
  203.0 
  1100.0 

  2018.0 
  2031.0 
  203.0 
  203.0 
  1100.0 

  2018.0 
  2031.0 
  203.0 
  203.0 
  1100.0 

  2018.0 
  2031.0 
  203.0 
  203.0 
  1100.0 

  2018.0 
  2031.0 
  203.0 
  203.0 
  1100.0 

  2018.0 
  2031.0 
  203.0 
  203.0 
  1100.0   
  2018.0 
  203.0 
  0.0 
  203.0 
  0.0 

  0.0 
  0.0 
  0.0 
  0.0 

  2018.0 
  0.0 
  0.0 
  0.0 
  0.0 

  2018.0 
  0.0 
  0.0 
  0.0 
  0.0 

  2018.0 
  5.0 
  0.0 
  5.0 
  0.0 

  2018.0 
  80.0 
  0.0 
  5.0 
  0.0 

  2018.0 
  0.0 
  0.0 
  0.0 
  0.0   
  2025-05-18 23:05 
  2025-05-18 23:05 
  2025-05-18 23:05 
  2025-05-18 23:05 
  2025-05-18 23:05 

  2025-05-19 05:10 
  2025-05-19 05:10 
  2025-05-19 05:10 
  2025-05-19 05:10 

  2025-05-19 18:00 
  2025-05-19 18:00 
  2025-05-19 18:00 
  2025-05-19 18:00 
  2025-05-19 18:00 

  2025-05-19 23:59 
  2025-05-19 23:59 
  2025-05-19 23:59 
  2025-05-19 23:59 
  2025-05-19 23:59 

  2025-05-20 05:52 
  2025-05-20 05:52 
  2025-05-20 05:52 
  2025-05-20 05:52 
  2025-05-20 05:52 

  2025-05-20 07:31 
  2025-05-20 07:31 
  2025-05-20 07:31 
  2025-05-20 07:31 
  2025-05-20 07:31 

  2025-05-20 08:43 
  2025-05-20 08:43 
  2025-05-20 08:43 
  2025-05-20 08:43 
  2025-05-20 08:43   
  2025-05-19 18:00 
  2025-05-19 05:10 
  2025-05-19 05:10 
  2025-05-19 05:10 
  2025-05-19 05:10 

  2025-05-19 18:00 
  2025-05-19 18:00 
  2025-05-19 18:00 
  2025-05-19 18:00 

  2025-05-19 23:59 
  2025-05-19 23:59 
  2025-05-19 23:59 
  2025-05-19 23:59 
  2025-05-19 23:59 

  2025-05-20 05:52 
  2025-05-20 05:52 
  2025-05-20 05:52 
  2025-05-20 05:52 
  2025-05-20 05:52 

  2025-05-20 07:31 
  2025-05-20 07:31 
  2025-05-20 07:31 
  2025-05-20 07:31 
  2025-05-20 07:31 

  2025-05-20 08:43 
  2025-05-20 08:43 
  2025-05-20 08:43 
  2025-05-20 08:43 
  2025-05-20 08:43 

  2025-05-20 12:18 
  2025-05-20 12:18 
  2025-05-20 12:18 
  2025-05-20 12:18 
  2025-05-20 12:18   
  Completed     TRANSMISSION     FORCED      ONPATH     PNM     San Juan345-JICARILLA345 (OC) LINE OOS due to Tripped offline repairs underway, may be finished by midnight tonight MST.     2025-05-18 23:04     PNM198174      2025-05-20 12:18  
  BLACKWATER SYNCHRO OOS     540783     PNM     BW345-TAIBAN          BW230-BW345(PNM) 
  BW345-BW230(PNM) 
  BW345-TAIBAN(PNM) 
  TAIBAN-BW345(PNM)   
  200.0 
  200.0 
  572.0 
  202.0   
  200.0 
  200.0 
  572.0 
  202.0   
  0.0 
  0.0 
  0.0 
  0.0   
  2025-05-25 04:05 
  2025-05-25 04:05 
  2025-05-25 04:05 
  2025-05-25 04:05   
  2025-05-25 16:00 
  2025-05-25 16:00 
  2025-05-25 16:00 
  2025-05-25 16:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     PNM     BW345-TAIBAN CURTAILMENT DUE TO BLACKWATER SYNCRONOUS CONDENSER PLANNED OOS     2025-05-25 04:02     PNM198649      2025-05-25 04:02  
  NOMO PATH48 REDUCTION     522870     PNM     Arroyo345-WM345           FOURCORNER345-WM345(PNM)      2018.0      2018.0      2018.0      2025-05-25 07:00      2025-05-31 15:00      Cancelled     TRANSMISSION     FORCED      ONPATH     PNM     NOMO Path48 NNMI Line Reduction due to Arroyo345-WM345. Contractor to build new line over existing transmission line. SNMIC=520 (EPE= 357, PNM= 102, TSGT=61). EPIC=555. EPE Outage #521860     2025-02-18 12:40     PNM192787      2025-04-02 07:49  
  NOMO PATH48 REDUCTION     531834     PNM     WM345-Arroyo          FOURCORNER345-WM345(PNM)      2018.0      2018.0      2018.0      2025-05-25 21:00      2025-05-26 06:00      Cancelled     TRANSMISSION     PLANNED      ONPATH     PNM     NOMO Path48 NNMI Line Reduction due to West Mesa - Arroyo 345 KV (EP-Line) Outage     2025-04-03 07:24     PNM195738      2025-04-17 11:25  
  NOMO PATH48 REDUCTION     531840     PNM     WM345-Arroyo          FOURCORNER345-WM345(PNM)      2018.0      2018.0      2018.0      2025-05-26 21:00      2025-05-27 06:00      Cancelled     TRANSMISSION     PLANNED      ONPATH     PNM     NOMO Path48 NNMI Line Reduction due to (WM345-Arroyo- EP Line) outage.     2025-04-03 08:04     PNM195740      2025-04-17 11:26  
  NOMO PATH48 REDUCTION     531842     PNM     WM345-Arroyo          FOURCORNER345-WM345(PNM)      2018.0      2018.0      2018.0      2025-05-27 21:00      2025-05-28 06:00      Cancelled     TRANSMISSION     PLANNED      ONPATH     PNM     NOMO Path48 NNMI Line Reduction due to (WM345-Arroyo- EP Line) outage.     2025-04-03 08:15     PNM195741      2025-04-17 11:27  
  NOMO PATH48 REDUCTION     531844     PNM     WM345-Arroyo          FOURCORNER345-WM345(PNM)      2018.0      2018.0      2018.0      2025-05-28 21:00      2025-05-29 06:00      Completed     TRANSMISSION     PLANNED      ONPATH     PNM     NOMO Path48 NNMI Line Reduction due to (WM345-Arroyo- EP Line) outage. SNMIC=520 (EPE=357, PNM=102, TSGT=61). EPIC=555.     2025-04-03 08:18     PNM195742      2025-05-05 09:05  
  NOMO PATH48 REDUCTION     531846     PNM     WM345-Arroyo          FOURCORNER345-WM345(PNM)      2018.0      2018.0      2018.0      2025-05-29 21:00      2025-05-30 06:00      Completed     TRANSMISSION     PLANNED      ONPATH     PNM     NOMO Path48 NNMI Line Reduction due to (WM345-Arroyo- EP Line) outage. SNMIC=520 (EPE=357, PNM=102, TSGT=61). EPIC=555.     2025-04-03 08:21     PNM195743      2025-05-05 09:05  
  NOMO PATH48 REDUCTION     531848     PNM     WM345-Arroyo          FOURCORNER345-WM345(PNM)      2018.0      2018.0      2018.0      2025-05-30 21:00      2025-05-31 06:00      Completed     TRANSMISSION     PLANNED      ONPATH     PNM     NOMO Path48 NNMI Line Reduction due to (WM345-Arroyo- EP Line) outage. SNMIC=520 (EPE=357, PNM=102, TSGT=61). EPIC=555.     2025-04-03 08:42     PNM195744      2025-05-05 09:06  
  NOMO PATH48 REDUCTION     533976     PNM     WM345-Arroyo          FOURCORNER345-WM345(PNM)      2018.0      2018.0      2018.0      2025-05-31 21:00      2025-06-01 06:00      Completed     TRANSMISSION     FORCED      ONPATH     PNM     NOMO Path48 NNMI Line Reduction due to (WM345-Arroyo- EP Line) outage. SNMIC=520 (EPE=357, PNM=102, TSGT=61). EPIC=555.     2025-04-17 11:34     PNM196430      2025-05-05 09:06  
  TAIBAN-GUADALUPE345     542674     PNM     TAIBAN-GUADALUPE345          BW230-BW345(PNM) 
  BW345-BW230(PNM) 
  BW345-TAIBAN(PNM) 
  GUADALUPE345-TAIBAN(PNM) 
  TAIBAN-BW345(PNM) 
  TAIBAN-GUADALUPE345(PNM)   
  200.0 
  200.0 
  572.0 
  204.0 
  202.0 
  772.0   
  200.0 
  200.0 
  572.0 
  204.0 
  202.0 
  772.0   
  0.0 
  0.0 
  0.0 
  0.0 
  0.0 
  0.0   
  2025-06-06 01:00 
  2025-06-06 01:00 
  2025-06-06 01:00 
  2025-06-06 01:00 
  2025-06-06 01:00 
  2025-06-06 01:00   
  2025-06-06 11:00 
  2025-06-06 11:00 
  2025-06-06 11:00 
  2025-06-06 11:00 
  2025-06-06 11:00 
  2025-06-06 11:00   
  Completed     TRANSMISSION     FORCED      ONPATH     PNM     TAIBAN-GUADALUPE34 REDUCTIONS DUE TO Reliability.      2025-06-06 00:14     PNM199311      2025-06-06 10:56  
  ABO SC BYPASS/LINE IN     543482     PNM     ABO SC          WESTSPRTS345-WM345(PNM) 

  WESTSPRTS345-WM345(PNM)   
  800.0 

  800.0   
  800.0 

  800.0   
  475.0 

  475.0   
  2025-06-11 17:35 

  2025-06-12 18:00   
  2025-06-12 18:00 

  2025-06-13 18:00   
  Completed     TRANSMISSION     FORCED      ONPATH     PNM     ABO SC is Bypassed Line is IN Service.     2025-06-11 17:33     PNM199656      2025-06-12 09:04  
  ABO SC BYPASS/LINE IN     543484     PNM     ABO SC          WESTSPRTS345-WM345(PNM)      800.0      800.0      475.0      2025-06-11 17:40      2025-06-12 19:00      Cancelled     TRANSMISSION     FORCED      ONPATH     PNM     ABO SC is Bypassed Line is IN Service.     2025-06-11 17:34     PNM199657      2025-06-11 17:35  
  WESTSPRTS345-ABQ     508086     PNM     WESTSPRTS345-ABQ          ABQ-WESTSPRTS345(PNM) 
  WESTSPRTS345-ABQ(PNM)   
  235.0 
  800.0   
  235.0 
  800.0   
  0.0 
  0.0   
  2025-09-01 00:00 
  2025-09-01 00:00   
  2025-10-01 00:00 
  2025-10-01 00:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     PNM     WESTSPRTS345-ABQ LIMITATION DUE TO Western Spirit – Pajarito 345kV Line OOS      2024-10-21 11:35     PNM187449      2024-10-21 11:35  
  HIDALGO345-HIDALGO115     535022     PNM     Hidalgo345-Hidalgo115 T1X          HIDALGO115-HIDALGO345(PNM) 
  HIDALGO345-HIDALGO115(PNM)   
  448.0 
  448.0   
  448.0 
  448.0   
  100.0 
  100.0   
  2025-11-03 08:00 
  2025-11-03 08:00   
  2025-11-14 16:00 
  2025-11-14 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     PNM     Hidalgo345-Hidalgo115 line reduction due to: Hidalgo 345/115kV T1 Transformer OOS - Maintenance/Testing     2025-04-24 08:19     PNM196816      2025-04-24 08:19  
PPW Outages:
  PPW 171983     10361     PPW     Riverton: 230 kV Cap Bank S/C 472               0.0      0.0      0.0      2021-02-18 09:03      2025-06-30 17:00      ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Riverton: 230 kV Cap Bank S/C 472:     2022-11-14 00:32     75797     2025-06-10 08:55  
  PPW 175805     9275     PPW     Hemingway-Summer Lake 500 kV line (Path 75 Schedule Limitation)          H500-SMLK(PPW) 

  H500-SMLK(PPW)   
  1500.0 

  1500.0   
  1500.0 

  1500.0   
  1386.0 

  1386.0   
  2021-06-02 12:00 

  2024-12-04 12:00   
  2024-12-04 12:00 

  2025-12-31 12:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Hemingway-Summer Lake 500 kV line (Path 75 Schedule Limitation)..:Path Restriction Notes: Path 75 Westbound = 1386.:     2021-12-21 14:06     80760     2024-12-04 08:04  
  PPW 24-00488     15058     PPW     Burns: Series Cap Segment #1 & 2          BORA-M500(PPW) 
  PACW-SMLK(PPW) 
  SMLK-H500(PPW) 

  BORA-M500(PPW) 
  PACW-SMLK(PPW) 
  SMLK-H500(PPW)   
  1090.0 
  550.0 
  100.0 

  1090.0 
  550.0 
  100.0   
  1090.0 
  550.0 
  100.0 

  1090.0 
  550.0 
  100.0   
  1090.0 
  550.0 
  100.0 

  1070.0 
  535.0 
  96.0   
  2024-01-09 03:48 
  2024-01-09 03:48 
  2024-01-09 03:48 

  2024-01-09 03:48 
  2024-01-09 03:48 
  2024-01-09 03:48   
  2024-01-09 03:48 
  2024-01-09 03:48 
  2024-01-09 03:48 

  2025-06-30 23:59 
  2025-06-30 23:59 
  2025-06-30 23:59   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Investigating a possible failure of relay voltage sensing component.:Path 75 limited to 507 (Midpoint Series Caps bypassed for maint). SMLK-H500 = 96; BORA-M500 = 959;:     2024-01-03 10:34     138306     2025-06-10 09:15  
  PPW 24-06062     16750     PPW     Path 25 Schedule Limitation (Cascade 115 kV Tie)          CRAGVIEW-PACW(PPW) 

  CRAGVIEW-PACW(PPW)   
  108.0 

  108.0   
  108.0 

  108.0   
  0.0 

  0.0   
  2024-04-09 00:00 

  2024-04-09 02:35   
  2024-04-09 02:35 

  2026-04-09 00:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:CRAGVIEW-PACW TTC = 0 PER PLANNING.:CRAGVIEW-PACW = 0 INDEFINITELY:     2024-04-09 09:34     143888     2025-04-07 18:15  
  PPW 24-06351     17531     PPW     Threemile Knoll: TIE CB 335               0.0      0.0      0.0      2024-04-12 22:23      2025-06-26 17:00      ACTIVE     TRANSMISSION     FORCED      ONPATH     PPW     continuous:***Commissioning Required*** Investigate failure of CB 335. :     2024-12-02 14:23     144180     2025-05-26 05:25  
  PPW 24-15751     17530     PPW     Threemile Knoll: Series Cap C2,Threemile Knoll: Series Cap C1          JBSN-JB345(PPW) 
  NUT-PATHC(PPW) 
  PATHC-NUT(PPW) 

  NUT-PATHC(PPW) 

  NUT-PATHC(PPW) 

  JBSN-JB345(PPW) 
  PATHC-NUT(PPW)   
  1600.0 
  0.0 
  1600.0 

  1172.0 

  1060.0 

  1600.0 
  1600.0   
  1600.0 
  0.0 
  1600.0 

  1172.0 

  1060.0 

  1600.0 
  1600.0   
  1417.0 
  0.0 
  1600.0 

  1172.0 

  1060.0 

  1433.0 
  1480.0   
  2024-09-18 00:30 
  2024-09-18 00:30 
  2024-09-18 00:30 

  2024-11-01 00:00 

  2025-04-01 00:00 

  2025-06-09 19:09 
  2025-06-09 19:09   
  2025-06-09 19:09 
  2024-11-01 00:00 
  2025-06-09 19:09 

  2025-04-01 00:00 

  2025-06-09 19:09 

  2025-12-31 17:30 
  2025-12-31 17:30   
  ACTIVE     TRANSMISSION     FORCED      ONPATH     PPW     continuous:Computer/controller for Series caps needs to be repaired/replaced. Tech support needed from Hitachi.:JBSN-JB345 = 2150. PacifiCorp = 1433. IPCo = 717   2024-11-30 22:07     153619     2025-06-09 19:12  
  PPW 24-16609     17387     PPW     Oquirrh-Terminal #1 345 kV line               0.0      0.0      0.0      2024-10-25 07:52      2025-06-25 14:00      ACTIVE     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Relocate the Oquirrh-Terminal #1 345 kV line:No impact under normal conditions.:     2024-10-10 12:23     154477     2025-03-26 11:43  
  PPW 25-00820     17929     PPW     Calapooya: T-3240 230/69 kV          PACW-NTLOAD(PPW) 

  PACW-NTLOAD(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2025-03-06 06:00 

  2025-03-06 06:21   
  2025-03-06 06:21 

  2025-07-31 15:30   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace wire, jumpers and circuit switcher.:Network Load Service must be arranged for Calapooya, Diamond Hill & EWEB McKenzie.   2025-05-20 09:10     159895     2025-05-28 12:50  
  PPW 25-01798     17623     PPW     Klamath Co-Gen: GSU 301          THERMALGEN-PACW(PPW) 

  THERMALGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2025-04-01 10:00 

  2025-04-01 10:42   
  2025-04-01 10:42 

  2025-06-19 10:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:GSU 301 bladder replacement and buckholtz replacement.:Klamath Co-Gen Unit 301 unavailable.:     2025-01-24 14:02     160874     2025-05-30 09:27  
  PPW 25-00095     17940     PPW     Bonanza-TSGT Craig 345 kV line               0.0      0.0      0.0      2025-05-27 09:04      2025-06-15 15:00      Completed     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Change out polymer dead ends that are beginning to fail. :     2025-05-27 12:07     158223     2025-05-27 12:07  
  PPW 25-09445     17943     PPW     Cold Springs: XFMR 1 T-3169          PACW-NTLOAD(PPW) 
  WINDGEN-PACW(PPW) 

  PACW-NTLOAD(PPW) 
  WINDGEN-PACW(PPW)   
  9999.0 
  9999.0 

  9999.0 
  9999.0   
  9999.0 
  9999.0 

  9999.0 
  9999.0   
  0.0 
  0.0 

  0.0 
  0.0   
  2025-05-29 09:33 
  2025-05-29 09:33 

  2025-05-29 10:00 
  2025-05-29 10:00   
  2025-05-29 10:00 
  2025-05-29 10:00 

  2025-06-28 14:10 
  2025-06-28 14:10   
  ACTIVE     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Replace T-3169:Umatilla, Hermiston & Hinkle will be radial from BPA McNary. Network Load Service Arrangements may be required.   2025-05-28 14:07     168552     2025-05-29 09:33  
  PPW 25-07334     17895     PPW     Goshen-Fish Creek 161 kV line          GSHN-PATHC(PPW) 
  NUT-PATHC(PPW) 
  PATHC-GSHN(PPW) 

  GSHN-PATHC(PPW) 
  NUT-PATHC(PPW) 
  PATHC-GSHN(PPW)   
  348.0 
  1060.0 
  148.0 

  348.0 
  1060.0 
  148.0   
  348.0 
  1060.0 
  148.0 

  348.0 
  1060.0 
  148.0   
  348.0 
  1060.0 
  148.0 

  200.0 
  900.0 
  0.0   
  2025-06-02 08:00 
  2025-06-02 08:00 
  2025-06-02 08:00 

  2025-06-02 08:13 
  2025-06-02 08:13 
  2025-06-02 08:13   
  2025-06-02 08:13 
  2025-06-02 08:13 
  2025-06-02 08:13 

  2025-06-13 16:00 
  2025-06-13 16:00 
  2025-06-13 16:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace 161kv STR 106, 162, 164, 170, 410, 411:NUT-PATHC = 900   2025-05-03 11:45     166439     2025-06-02 08:17  
  PPW 25-09902     17960     PPW     {Mkt Affiliate} Hermiston 3: {Mkt Affiliate} Hermiston 3 Hermiston Unit 3          ANTE-BRDY(PPW) 
  BRDY-ANTE(PPW)   
  90.0 
  90.0   
  90.0 
  90.0   
  90.0 
  90.0   
  2021-11-20 15:31 
  2021-11-20 15:31   
  2021-11-20 19:31 
  2021-11-20 19:31   
  ACTIVE     GENERATION     FORCED      ONPATH     PPW     continuous:Water Outages Pump 2   2025-06-03 12:11     169014     2025-06-03 12:11  
  PPW 25-07407     17932     PPW     Cherry Lane: T-4970 BK1               0.0      0.0      0.0      2025-06-04 22:55      2025-06-19 21:00      ACTIVE     DISTRIBUTION     PLANNED      ONPATH     PPW     continuous:LTC Maintenance and retrofit with new parts. Line crew to Bird Guard pole outside substation with Raptor Protection.:Adams Solar generation off-line for duration of the outage.:     2025-05-21 12:02     166512     2025-06-04 22:55  
  PPW 25-09961     17966     PPW     Crag View-PG&E Cascade section of the PG&E Cascade-Weed Junction 115 kV line          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW) 

  CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  75.0 

  45.0 
  75.0   
  45.0 
  75.0 

  45.0 
  75.0   
  45.0 
  75.0 

  0.0 
  0.0   
  2025-06-07 07:00 
  2025-06-07 07:00 

  2025-06-07 07:36 
  2025-06-07 07:36   
  2025-06-07 07:36 
  2025-06-07 07:36 

  2025-07-15 11:00 
  2025-07-15 11:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Technicians testing program for Cottonwood 230/115kV transformer #4 and Cottonwood CBs 542 & 192.:CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0.:     2025-06-04 10:36     169073     2025-06-07 07:44  
  PPW 25-09573     17945     PPW     Scheduling Limitation: Path 8 Schedule Limitation (MT-NW)          ANTE-MLCK(PPW) 
  COLSTRIP-TOWNSEND(PPW) 
  MLCK-ANTE(PPW)   
  66.0 
  157.0 
  90.0   
  66.0 
  157.0 
  90.0   
  46.0 
  109.0 
  46.0   
  2025-06-09 08:00 
  2025-06-09 08:00 
  2025-06-09 08:00   
  2025-06-26 15:00 
  2025-06-26 15:00 
  2025-06-26 15:00   
  Active     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:CCVT replacement:COLSTRIP-TOWNSEND = 109; ANTE-MLCK = 46:     2025-05-29 13:09     168682     2025-05-29 13:09  
  PPW 25-09577     17946     PPW     Scheduling Limitation: Path 8 Schedule Limitation (MT-NW)          ANTE-MLCK(PPW) 
  COLSTRIP-TOWNSEND(PPW) 
  MLCK-ANTE(PPW)   
  66.0 
  157.0 
  90.0   
  66.0 
  157.0 
  90.0   
  46.0 
  109.0 
  46.0   
  2025-06-09 08:00 
  2025-06-09 08:00 
  2025-06-09 08:00   
  2025-06-13 15:00 
  2025-06-13 15:00 
  2025-06-13 15:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace traditional glass insulators at towers 55-11 through 55-13 with silicon coated units.:COLSTRIP-TOWNSEND = 109; ANTE-MLCK = 46:     2025-05-29 13:16     168686     2025-05-29 13:17  
  PPW 25-10679     17991     PPW     Wallula-Nine Mile 230 kV line          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-06-12 08:30      2025-06-13 17:00      Completed     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Line de-energized due to Hatchet Road Fire:Nine Mile and Campbell Wind will be offline.:     2025-06-12 09:15     169804     2025-06-12 09:15  
  PPW 25-08492     17916     PPW     Dixonville-Soda Springs 115 kV line          HYDROGEN-PACW(PPW) 

  HYDROGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  0.0 

  0.0   
  2025-06-13 05:52 

  2025-06-13 06:00   
  2025-06-13 06:00 

  2025-06-13 18:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Replace multiple structures on this section of line.:Umpqua River Hydro Project Restriction = 112 Summer /154 Winter.:     2025-05-13 15:14     167598     2025-06-13 05:56  
  PPW 25-02335     17647     PPW     Big Charlie (TB Flats 2): 230/34.5 kV XFMR T2,Big Charlie (TB Flats 2): 34.5kV Bus 2          OTHERGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  2025-05-13 06:00 

  2025-06-13 06:00   
  2025-05-13 18:00 

  2025-06-13 18:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian guarding.:TB Flats 2/Big Charlie Circuits 21, 22, 23, and 24 unavailable (91 MW).:     2025-01-31 14:15     161414     2025-05-01 10:16  
  PPW 25-09914     17996     PPW     Oak Knoll: RC-432_FP 305900_CB 5R55               0.0      0.0      0.0      2025-06-13 10:12      2025-06-13 17:06      COMPLETED     DISTRIBUTION     PLANNED      ONPATH     PPW     1234567 Daily:POLE CHANGEOUT FP-317901. 5920 HWY 66:     2025-06-13 10:12     169026     2025-06-13 17:08  
  PPW 25-10840     17998     PPW     Alternate Control Center               0.0      0.0      0.0      2025-06-14 07:00      2025-06-14 15:00      Completed     TELECOM     URGENT      ONPATH     PPW     continuous:Full replacement of the alternate control center. Primary control system fully functional, back up control center is also staffed and ready for operation should ability to operate at primary control center becomes unavailable. No impact to any operations or any other equipment. :     2025-06-14 06:19     169965     2025-06-14 06:19  
  PPW 25-10868     17999     PPW     Latigo-Three Buttes 230 kV line          WINDGEN-PACE(PPW) 

  WINDGEN-PACE(PPW) 

  WINDGEN-PACE(PPW)   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  0.0 

  9999.0   
  2025-06-14 18:01 

  2025-06-14 18:31 

  2025-06-15 09:01   
  2025-06-14 18:31 

  2025-06-15 09:01 

  2025-06-15 12:00   
  COMPLETED     TRANSMISSION     FORCED      ONPATH     PPW     continuous:Line tripped out of service. Three Buttes Generation unavailable.:     2025-06-14 19:17     169993     2025-06-15 09:06  
  PPW 25-08493     17917     PPW     Dixonville-Soda Springs 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-06-16 06:00      2025-06-16 18:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Replace multiple structures on this section of line.:Umpqua River Hydro Project Restriction = 112 Summer /154 Winter.:     2025-05-13 15:14     167599     2025-06-13 08:26  
  PPW 25-10259     17983     PPW     Pomona-BPA Vantage 230 kV line          MIDC-YAKIMA(PPW) 
  PACW-NTLOAD(PPW) 
  YAKIMA-MIDC(PPW) 

  PACW-NTLOAD(PPW)   
  402.0 
  9999.0 
  402.0 

  9999.0   
  402.0 
  9999.0 
  402.0 

  9999.0   
  402.0 
  0.0 
  402.0 

  0.0   
  2025-06-16 06:19 
  2025-06-16 06:19 
  2025-06-16 06:19 

  2025-06-16 07:00   
  2025-06-19 17:00 
  2025-06-16 07:00 
  2025-06-19 17:00 

  2025-06-19 17:00   
  ACTIVE     TRANSMISSION     URGENT      ONPATH     PPW     continuous:replacing poles at 5/40, 3B/41, 3A/41:No impact to Yakima load service with two 230 kV lines in service.   2025-06-09 14:02     169383     2025-06-16 06:21  
  PPW 25-10132     17975     PPW     Scheduling Limitation: Path 8 Schedule Limitation (MT-NW)          ANTE-MLCK(PPW) 
  COLSTRIP-TOWNSEND(PPW) 
  MLCK-ANTE(PPW)   
  66.0 
  157.0 
  90.0   
  66.0 
  157.0 
  90.0   
  46.0 
  109.0 
  46.0   
  2025-06-16 07:00 
  2025-06-16 07:00 
  2025-06-16 07:00   
  2025-06-19 17:00 
  2025-06-19 17:00 
  2025-06-19 17:00   
  Active     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:TBD:COLSTRIP-TOWNSEND = 109; ANTE-MLCK = 46:     2025-06-06 10:17     169246     2025-06-06 10:17  
  PPW 25-08494     17918     PPW     Dixonville-Soda Springs 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-06-17 06:00      2025-06-17 18:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Replace multiple structures on this section of line.:Umpqua River Hydro Project Restriction = 112 Summer /154 Winter.:     2025-05-13 15:14     167600     2025-06-13 08:26  
  PPW 25-09057     17955     PPW     Naughton: 9745 Tone Relaying Equipment,Canyon Compression-Muddy Creek-Naughton 138 kV line          THERMALGEN-PACE(PPW)      9999.0      9999.0      0.0      2025-06-17 14:30      2025-06-19 18:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Tone testing:Naughton site generation limited to 330MW maximum.:     2025-06-02 10:24     168164     2025-06-02 10:24  
  PPW 25-08495     17919     PPW     Dixonville-Soda Springs 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-06-18 06:00      2025-06-18 18:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Replace multiple structures on this section of line.:Umpqua River Hydro Project Restriction = 112 Summer /154 Winter.:     2025-05-13 15:15     167601     2025-06-13 08:26  
  PPW 25-09474     17993     PPW     Glenrock Wind Collector: 34 kV Circuit #3          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-06-18 07:00      2025-06-18 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:GR1-302 pad mount transformer vault replacement:Glenrock Wind feeder #3 unavailable (19.5MW).:     2025-06-12 11:09     168581     2025-06-12 11:10  
  PPW 25-08675     17926     PPW     Pinto: CIRCUIT SWITCHER 332I,Pinto: PST #4,Pinto: 345 kV PST East Bus,Pinto: PST #5,Pinto: PST #6          FOURCORNE345-PINTO(PPW) 
  PINTO-FOURCORNE345(PPW) 

  FOURCORNE345-PINTO(PPW) 
  PINTO-FOURCORNE345(PPW)   
  660.0 
  625.0 

  660.0 
  625.0   
  660.0 
  625.0 

  660.0 
  625.0   
  660.0 
  625.0 

  578.0 
  578.0   
  2025-06-09 08:59 
  2025-06-09 08:59 

  2025-06-18 08:59 
  2025-06-18 08:59   
  2025-06-12 17:59 
  2025-06-12 17:59 

  2025-06-21 17:59 
  2025-06-21 17:59   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Circuit switcher 332I maintenance.:PINTO-FOURCORNE345 = 625. FOURCORNE345-PINTO (TOT 2B1) = 650. PINTO-FOURCORNE345 = 625. FOURCORNE345-PINTO (TOT 2B1) = 650. PINTO-FOURCORNE345 and FOURCORNE345-PINTO (TOT 2B1) = 578.:     2025-05-16 11:14     167781     2025-06-06 09:32  
  PPW 25-06525     17985     PPW     Mounds: ABS 114A,Mounds: ABS 115A,Mounds: ABS 116A,Mathington-Mounds section of the Mathington-Tamar          THERMALGEN-PACE(PPW)      9999.0      9999.0      9999.0      2025-06-19 07:00      2025-06-19 13:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Reattach Jumpers off of new CB 115A to T Line:Sunnyside Co-Gen unavailable during switching only. Sunnyside Co-Gen limited to 30MW maximum during the work.:     2025-06-10 09:20     165625     2025-06-13 09:06  
  PPW 25-09662     17956     PPW     Millican Solar-Stearns Butte 115 kV line               0.0      0.0      0.0      2025-06-20 10:00      2025-06-20 14:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:AGC Meter Testing; AGC will need to be put on backup while the primary meter is under test.:Millican Solar restricted to 0 MW with site de-energized.:     2025-06-02 13:48     168771     2025-06-02 13:48  
  PPW 25-09570     17957     PPW     Carbon-Spanish Fork #2 138 kV line          OTHERGEN-PACE(PPW) 
  PACE-VNL(PPW) 
  VNL-PACE(PPW) 

  OTHERGEN-PACE(PPW) 
  PACE-VNL(PPW) 
  VNL-PACE(PPW)   
  9999.0 
  140.0 
  138.0 

  9999.0 
  140.0 
  138.0   
  9999.0 
  140.0 
  138.0 

  9999.0 
  140.0 
  138.0   
  0.0 
  75.0 
  75.0 

  0.0 
  75.0 
  75.0   
  2025-06-23 07:30 
  2025-06-23 07:30 
  2025-06-23 07:30 

  2025-06-23 08:00 
  2025-06-23 08:00 
  2025-06-23 08:00   
  2025-06-23 08:00 
  2025-06-23 08:00 
  2025-06-23 08:00 

  2025-07-02 14:00 
  2025-07-02 14:00 
  2025-07-02 14:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:A-condition str replacements:PACE-VNL & VNL-PACE = 75 Summer, 112 Winter. Graphite Solar limited to 10 MW. If both Carbon - Spanish Fork 138 kV lines are out-of-service, PACE-VNL = 0; VNL-PACE = Carbon area load:     2025-06-02 14:29     168679     2025-06-13 09:12  
  PPW 25-09785     17972     PPW     Gala Solar-Ponderosa 115 kV line               0.0      0.0      0.0      2025-06-23 10:00      2025-06-23 14:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:AGC Meter Testing; AGC will need to be put on backup while the primary meter is under test.:     2025-06-05 10:46     168894     2025-06-05 10:46  
  PPW 25-10028     17970     PPW     Ariel-Lewis River section of the Merwin-Cowlitz PUD Lewis River 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-06-24 07:00      2025-06-27 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Fire mitigation monitoring system installation.:Possible real time restriction of Merwin and Yale generation.:     2025-06-05 09:41     169140     2025-06-05 09:41  
  PPW 25-04514     17747     PPW     Crag View-PG&E Cascade section of the PG&E Cascade-Weed Junction 115 kV line          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW) 

  CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW) 

  CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW) 

  CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  80.0 

  45.0 
  80.0 

  45.0 
  80.0 

  45.0 
  80.0   
  45.0 
  80.0 

  45.0 
  80.0 

  45.0 
  80.0 

  45.0 
  80.0   
  45.0 
  80.0 

  45.0 
  80.0 

  0.0 
  0.0 

  45.0 
  80.0   
  2025-04-10 07:00 
  2025-04-10 07:00 

  2025-06-23 07:00 
  2025-06-23 07:00 

  2025-06-24 07:00 
  2025-06-24 07:00 

  2025-06-24 18:30 
  2025-06-24 18:30   
  2025-04-11 16:30 
  2025-04-11 16:30 

  2025-06-24 07:00 
  2025-06-24 07:00 

  2025-06-24 18:30 
  2025-06-24 18:30 

  2025-06-27 16:30 
  2025-06-27 16:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:change b/o bells 2/58,1/63:CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0.:     2025-03-11 11:13     163602     2025-06-03 10:11  
  PPW 25-09789     17973     PPW     Goshen (Idaho): 345/161 kV Bank #5          JBSN-JB345(PPW)      1600.0      1600.0      1600.0      2025-06-25 08:30      2025-06-25 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Switch out XFMR #5 to gain access to Sudden Pressure Device for testing. Personal grounds will be installed if needed:No Path 19 de-rate for one Goshen 345 kV/161 kV transformer out of service.   2025-06-05 11:10     168898     2025-06-05 11:13  
  PPW 25-09353     17981     PPW     Foote Creek-Rock Creek I Collector 230kV Line          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-06-26 05:00      2025-06-26 19:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Punch list work at the Rock Creek I Collector sub .:Rock Creek 1 wind unavailable:     2025-06-09 12:54     168460     2025-06-09 12:54  
  PPW 25-09791     17974     PPW     Goshen (Idaho): 345/161 kV Bank #6          JBSN-JB345(PPW)      1600.0      1600.0      1600.0      2025-06-26 08:30      2025-06-26 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Sudden pressure relay testing.:No Path 19 de-rate for one Goshen 345 kV/161 kV transformer out of service.   2025-06-05 11:16     168900     2025-06-05 11:33  
  PPW 25-10117     17982     PPW     Aeolus-Freezeout #2 230 kV line               0.0      0.0      0.0      2025-06-27 07:00      2025-06-27 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install spacers on the line side jumpers of SW 9D83:     2025-06-09 13:32     169230     2025-06-09 13:32  
  PPW 25-02017     17629     PPW     Crag View-PG&E Cascade section of the PG&E Cascade-Weed Junction 115 kV line          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  75.0   
  45.0 
  75.0   
  45.0 
  75.0   
  2025-06-30 06:00 
  2025-06-30 06:00   
  2025-10-31 17:00 
  2025-10-31 17:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Line reconductoring. Replacing structures.:CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0. CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0.:     2025-01-28 13:43     161094     2025-06-09 11:17  
  PPW 25-07147     17872     PPW     BPA Salem-Dallas section of the BPA Salem-Monpac 115 kV line               0.0      0.0      0.0      2025-06-30 07:00      2025-06-30 17:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:POLE REPLACEMENT, STRUCTURE 17/11:Network Load Service may need to arranged for Dallas & Independence via Monpac. (Monpac Sw 2M88 will be closed & Dallas Sw 2M150 will be open)   2025-04-23 09:54     166249     2025-04-23 09:54  
  PPW 25-07861     17889     PPW     WAPA Thermopolis-Hilltop-WAPA Lovell 115 kV line          YTP-WYONORTH(PPW) 

  YTP-WYONORTH(PPW)   
  400.0 

  400.0   
  400.0 

  400.0   
  400.0 

  377.0   
  2025-06-24 08:30 

  2025-06-30 07:00   
  2025-06-25 11:00 

  2025-07-03 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace broken insulators.:YTP-WYONORTH = 377. YTS = Series #11: TTC of 589 (PACE = 377 & LAPT = 212).:     2025-05-02 13:19     166967     2025-05-14 13:18  
  PPW 25-03418     17689     PPW     Crag View-PG&E Cascade section of the PG&E Cascade-Weed Junction 115 kV line          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  80.0   
  45.0 
  80.0   
  45.0 
  80.0   
  2025-06-30 07:00 
  2025-06-30 07:00   
  2025-10-31 17:00 
  2025-10-31 17:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Reconductor between structures.:CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0.:     2025-02-18 12:38     162500     2025-05-27 09:55  
  PPW 25-08522     17928     PPW     Aeolus: XFMR2 525-230 kV               0.0      0.0      0.0      2025-06-30 07:00      2025-07-02 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace gearings in motor operators for switches; 11G52, 11G53, 11G51 at Aeolus. :     2025-05-19 10:16     167628     2025-05-19 10:16  
  PPW 25-10324     17986     PPW     Crag View-PG&E Cascade section of the PG&E Cascade-Weed Junction 115 kV line          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  75.0   
  45.0 
  75.0   
  0.0 
  0.0   
  2025-06-30 07:00 
  2025-06-30 07:00   
  2025-10-31 17:00 
  2025-10-31 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Line reconductoring. Replacing structures.:CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0. CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0.:     2025-06-10 10:10     169449     2025-06-10 10:15  
  PPW 24-09589     17009     PPW     PG&E Cascade: CB 122          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW) 
  PACW-CRAGVIEW(PPW) 

  CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW) 
  PACW-CRAGVIEW(PPW) 

  CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW) 
  PACW-CRAGVIEW(PPW)   
  45.0 
  80.0 
  115.0 

  45.0 
  80.0 
  150.0 

  45.0 
  80.0 
  115.0   
  45.0 
  80.0 
  115.0 

  45.0 
  80.0 
  150.0 

  45.0 
  80.0 
  115.0   
  45.0 
  80.0 
  115.0 

  45.0 
  80.0 
  150.0 

  0.0 
  0.0 
  0.0   
  2024-08-05 07:00 
  2024-08-05 07:00 
  2024-08-05 07:00 

  2024-12-25 07:00 
  2024-12-25 07:00 
  2024-12-25 07:00 

  2025-07-04 07:00 
  2025-07-04 07:00 
  2025-07-04 07:00   
  2024-08-09 16:00 
  2024-08-09 16:00 
  2024-08-09 16:00 

  2024-12-25 16:00 
  2024-12-25 16:00 
  2024-12-25 16:00 

  2025-07-04 16:00 
  2025-07-04 16:00 
  2025-07-04 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install pott relaying to the Crag View - Cascade 115kV line.:CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0.:     2024-06-06 13:30     147422     2024-12-02 07:13  
  PPW 25-02485     17693     PPW     Clausen (Cedar Springs 2): XFMR T2          WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  0.0 

  9999.0   
  2025-07-07 07:00 

  2025-07-11 23:55   
  2025-07-11 23:55 

  2025-08-07 23:55   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Avian Guarding Project 2025:Cedar Springs 2 Wind Farm unavailable.:     2025-02-20 14:34     161564     2025-02-25 12:58  
  PPW 25-10030     17971     PPW     Swift #2: Unit #22 Main Transformer - T2103,Swift #2: Unit #21 Main Transformer - T2102          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-07-07 07:00      2025-07-17 17:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Bushing replacement.:Swift 2 Unit 21 and 22 unavailable.:     2025-06-05 10:03     169142     2025-06-05 10:05  
  PPW 25-10784     17997     PPW     Swift #1: Unit #12 Main Transformer - T2100          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-07-07 07:00      2025-07-16 18:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Swift unit 12 annual maintenance and runner welding.:Swift 1 Unit 12 unavailable.:     2025-06-13 12:04     169909     2025-06-13 12:04  
  PPW 24-04189     16311     PPW     Cove (OR): 230/69 kV Bank #2 (T3398)          COVEPACW-ROUNDBUTTE(PPW) 
  ROUNDBUTTE-COVEPACW(PPW) 

  COVEPACW-ROUNDBUTTE(PPW) 
  ROUNDBUTTE-COVEPACW(PPW) 

  COVEPACW-ROUNDBUTTE(PPW) 
  ROUNDBUTTE-COVEPACW(PPW) 

  COVEPACW-ROUNDBUTTE(PPW) 
  ROUNDBUTTE-COVEPACW(PPW)   
  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0   
  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0   
  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0 

  60.0 
  60.0   
  2024-07-01 12:00 
  2024-07-01 12:00 

  2024-10-14 12:00 
  2024-10-14 12:00 

  2025-04-28 12:00 
  2025-04-28 12:00 

  2025-07-07 12:00 
  2025-07-07 12:00   
  2024-07-21 12:00 
  2024-07-21 12:00 

  2024-11-01 12:00 
  2024-11-01 12:00 

  2025-05-30 12:00 
  2025-05-30 12:00 

  2025-08-01 12:00 
  2025-08-01 12:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:T-3398 LTC Maintenance and Bushing Replacement:COVEPACW-ROUNDBUTTE & ROUNDBUTTE-COVEPACW = 60.:     2024-03-15 09:39     142013     2025-06-11 12:33  
  PPW 25-10712     17994     PPW     Pearson collector (Milford Solar): MOAB 345-1,Pearson collector (Milford Solar): XFMR 1 345/34.5kV 1          OTHERGEN-PACE(PPW) 

  OTHERGEN-PACE(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  0.0 

  9999.0   
  2025-07-07 21:30 

  2025-07-08 04:00   
  2025-07-08 04:00 

  2025-07-09 04:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Maintenance on high-side switch.:Pearson (Milford Solar) unavailable.:     2025-06-12 13:51     169837     2025-06-12 13:54  
  PPW 25-06480     17832     PPW     WAPA Flaming Gorge: 230/138 kV XFMR KY2A          FGE-WYOCENTRAL(PPW) 
  WYOCENTRAL-FGE(PPW)   
  200.0 
  200.0   
  200.0 
  200.0   
  0.0 
  200.0   
  2025-07-08 06:30 
  2025-07-08 06:30   
  2025-07-10 11:00 
  2025-07-10 11:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Transformer maintenance.:FGE-WYOCENTRAL = 0. WYOCENTRAL-FGE = Little Mtn load.:     2025-04-10 08:41     165579     2025-04-10 08:41  
  PPW 25-10714     17995     PPW     Pearson collector (Milford Solar): MOAB 345-1,Pearson collector (Milford Solar): XFMR 1 345/34.5kV 1          OTHERGEN-PACE(PPW)      9999.0      9999.0      0.0      2025-07-08 21:30      2025-07-09 04:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Maintenance on high-side switch.:Pearson (Milford Solar) unavailable.:     2025-06-12 13:54     169839     2025-06-12 13:54  
  PPW 25-06540     17869     PPW     Dunlap: 230/34 kV Bank #1          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-07-14 08:00      2025-07-17 13:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:WECC maintenance for T1, CB 1H2016 & 230kV Bus:Dunlap Wind restricted to 0 MW and de-energized.:     2025-04-22 13:57     165641     2025-06-16 11:28  
  PPW 25-07647     17941     PPW     Dunlap: 230/34 kV Bank #1          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-07-14 08:00      2025-07-17 13:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:WECC maintenance for T1, CB 1H2016 & 230kV Bus:Dunlap Wind unavailable.:     2025-05-27 14:21     166753     2025-05-27 14:21  
  PPW 25-08481     17938     PPW     Culver-Cove section of the Redmond-Cove 69 kV line               0.0      0.0      0.0      2025-07-14 10:00      2025-07-18 12:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace Failed MOAB SW 3D27 At Culver Sub:Crooked River & Culver will be switched over to BPA Redmond via Pacific Power Redmond. Opal Springs Generation will be tie to BPA Redmond. Network Load Service Arrangements may be required.:     2025-05-24 09:43     167587     2025-05-24 09:43  
  PPW 25-07718     17884     PPW     Sunbeam-Moonshine 230 kV line          WINDGEN-PACE(PPW)      9999.0      9999.0      9999.0      2025-07-15 05:00      2025-07-15 21:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Substation offline maintenance.:Moonshine Generation unavailable (45 mw).:     2025-04-30 10:00     166824     2025-04-30 10:03  
  PPW 25-06448     17825     PPW     Moonshine: 230/34.5 kV Bank T-1          WINDGEN-PACE(PPW)      9999.0      9999.0      0.0      2025-07-15 06:00      2025-07-15 21:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Site outage for substation offline maintenance.:Moonshine generation unavailable.:     2025-04-09 13:28     165547     2025-04-09 13:31  
  PPW 25-09700     17950     PPW     Foote Creek: 34.5 kV Bus #1,Foote Creek: 34.5 kV Bus #2,Foote Creek: 34.5 kV Bus #3,Foote Creek: 34.          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-07-15 06:30      2025-07-15 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian guarding.:Foote Creek Wind unavailable.:     2025-05-30 13:42     168809     2025-06-02 08:52  
  PPW 25-09891     17969     PPW     Crag View-Weed Junction section of the PG&E Cascade-Weed Junction 115 kV line          CRAGVIEW-CRAG(PPW) 
  CRAGVIEW-PACW(PPW) 
  PACW-NTLOAD(PPW) 

  CRAGVIEW-CRAG(PPW) 
  CRAGVIEW-PACW(PPW) 
  PACW-NTLOAD(PPW)   
  75.0 
  108.0 
  9999.0 

  75.0 
  108.0 
  9999.0   
  75.0 
  108.0 
  9999.0 

  75.0 
  108.0 
  9999.0   
  75.0 
  108.0 
  9999.0 

  75.0 
  108.0 
  9999.0   
  2025-06-25 06:00 
  2025-06-25 06:00 
  2025-06-25 06:00 

  2025-07-16 06:00 
  2025-07-16 06:00 
  2025-07-16 06:00   
  2025-06-27 18:30 
  2025-06-27 18:30 
  2025-06-27 18:30 

  2025-07-18 18:30 
  2025-07-18 18:30 
  2025-07-18 18:30   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Change structures 2/48-2/55:CRAGVIEW-PACW & PACW-CRAGVIEW = 0;   2025-06-05 08:53     169003     2025-06-06 12:55  
  PPW 25-09447     17987     PPW     Jim Bridger-Mustang 230 kV line,Mustang-WAPA Spence 230 kV line          JBSN-WYOCENTRAL(PPW) 
  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-JBSN(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  600.0 
  631.0 
  249.0 
  600.0 
  574.0 
  0.0 
  574.0   
  600.0 
  631.0 
  249.0 
  600.0 
  574.0 
  0.0 
  574.0   
  400.0 
  631.0 
  243.0 
  400.0 
  287.0 
  0.0 
  287.0   
  2025-07-16 07:00 
  2025-07-16 07:00 
  2025-07-16 07:00 
  2025-07-16 07:00 
  2025-07-16 07:00 
  2025-07-16 07:00 
  2025-07-16 07:00   
  2025-07-18 14:00 
  2025-07-18 14:00 
  2025-07-18 14:00 
  2025-07-18 14:00 
  2025-07-18 14:00 
  2025-07-18 14:00 
  2025-07-18 14:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install 230 kV shoo fly at Mustang sub:AW/4B Curve 121. WAPAEAST-WAPANORTH = 243. WYOEAST-AEOW (Aeolus West) = 1627. TOT4B-WYONORTH = 631. TOT 4B = 874.   2025-06-10 11:51     168554     2025-06-10 11:56  
  PPW 25-10623     17989     PPW     Merwin: MERWIN GR.UNIT1          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-07-20 07:00      2025-07-25 18:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Unit 1 annual maintenance.:Merwin Unit #1 unavailable.:     2025-06-11 14:28     169748     2025-06-11 14:28  
  PPW 25-07978     17897     PPW     WAPA Thermopolis-Hilltop-WAPA Lovell 115 kV line          YTP-WYONORTH(PPW) 

  YTP-WYONORTH(PPW) 

  YTP-WYONORTH(PPW) 

  YTP-WYONORTH(PPW)   
  400.0 

  400.0 

  400.0 

  400.0   
  400.0 

  400.0 

  400.0 

  400.0   
  400.0 

  377.0 

  377.0 

  400.0   
  2025-06-25 11:01 

  2025-07-21 07:00 

  2025-07-21 11:01 

  2025-07-24 15:00   
  2025-06-27 16:00 

  2025-07-21 11:01 

  2025-07-24 15:00 

  2025-07-24 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace broken insulators:YTP-WYONORTH = 377. YTS = Series #11: TTC of 589 (PACE = 377 & LAPT = 212).:     2025-05-05 09:53     167084     2025-05-14 13:59  
  PPW 25-03490     17720     PPW     Atlantic City: CB 1H120,Atlantic City-Rock Springs 230 kV line          TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW) 

  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  571.0 
  235.0 
  287.0 
  0.0 
  287.0   
  2025-06-02 07:00 
  2025-06-02 07:00 
  2025-06-02 07:00 
  2025-06-02 07:00 
  2025-06-02 07:00 

  2025-07-28 07:00 
  2025-07-28 07:00 
  2025-07-28 07:00 
  2025-07-28 07:00 
  2025-07-28 07:00   
  2025-06-04 10:00 
  2025-06-04 10:00 
  2025-06-04 10:00 
  2025-06-04 10:00 
  2025-06-04 10:00 

  2025-07-30 10:00 
  2025-07-30 10:00 
  2025-07-30 10:00 
  2025-07-30 10:00 
  2025-07-30 10:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Breaker Minor Maintenance:AW/4B Curve 117. WAPAEAST-WAPANORTH = 235. WYOEAST-AEOW (Aeolus West) = 1632. TOT4B-WYONORTH = 571. TOT 4B = 806.   2025-02-27 14:05     162572     2025-05-30 14:54  
  PPW 25-03491     17721     PPW     Atlantic City: LINE CB 1H116,Wyopo-Atlantic City section of the Riverton-Atlantic City 230 kV line          TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW) 

  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  571.0 
  235.0 
  287.0 
  0.0 
  287.0   
  2025-06-04 11:00 
  2025-06-04 11:00 
  2025-06-04 11:00 
  2025-06-04 11:00 
  2025-06-04 11:00 

  2025-07-30 11:00 
  2025-07-30 11:00 
  2025-07-30 11:00 
  2025-07-30 11:00 
  2025-07-30 11:00   
  2025-06-06 16:30 
  2025-06-06 16:30 
  2025-06-06 16:30 
  2025-06-06 16:30 
  2025-06-06 16:30 

  2025-08-01 16:30 
  2025-08-01 16:30 
  2025-08-01 16:30 
  2025-08-01 16:30 
  2025-08-01 16:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Breaker Minor Maintenance 1H116:AW/4B Curve 117. WAPAEAST-WAPANORTH = 235. WYOEAST-AEOW (Aeolus West) = 1632. TOT4B-WYONORTH = 571. TOT 4B = 806.   2025-02-27 14:17     162573     2025-05-30 14:59  
  PPW 25-09173     17952     PPW     Hopland-Union Gap section of the BPA Moxee-Union Gap 115 kV line,Hopland: Bank #1,Hopland: CB 5Y440               0.0      0.0      0.0      2025-07-31 12:00      2025-08-19 23:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install Conduit and Panel 4R. Replace SW 2Y52, 2Y531 and MO, 115kV Bus Tie SW and XFMR BK #1 Relay upgrade. :Hopland will be fed from BPA Moxee. Network Load Service Arrangements may be required.:     2025-05-31 21:25     168280     2025-06-16 13:48  
  PPW 25-03422     17860     PPW     Ekola Flats: 230/34.5 kV T1,Ekola Flats: 230/34.5 kV T2,Ekola Flats: 34.5kV Bus 1,Ekola Flats: 34.5k          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-08-04 07:30      2025-08-08 13:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install bird guarding.:Ekola Flats Feeders 11, 12, 13, 14, 15, 21, 22, 23, 24, and 25 unavailable (250MW total).:     2025-04-18 14:29     162504     2025-05-01 10:21  
  PPW 25-03420     17859     PPW     Ekola Flats: 230/34.5 kV T1,Ekola Flats: 34.5kV Bus 1          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-08-04 09:00      2025-08-04 18:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install bird guarding.:Ekola Flats Feeder 11, 12, 13, 14, and 15 unavailable (125MW).:     2025-04-18 14:26     162502     2025-05-01 10:21  
  PPW 25-03929     17736     PPW     Alturas-Cedarville Tap section of the Alturas-Bullard 115 kV line          OTHERGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-08-05 07:00      2025-08-08 13:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:REPLACE POLES 6/49 8/49 5/50 8/50 :Airport Solar and Garrett Solar restricted to 0 MW during switching.:     2025-03-06 13:59     163011     2025-03-06 13:59  
  PPW 25-03423     17861     PPW     Ekola Flats: 230/34.5 kV T2,Ekola Flats: 34.5kV Bus 2          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-08-06 09:00      2025-08-06 18:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install bird guarding.:Ekola Flats Feeders 21, 22, 23, 24, and 25 unavailable (125MW):     2025-04-18 14:35     162505     2025-05-01 10:21  
  PPW 25-03424     17862     PPW     Ekola Flats: 230/34.5 kV T1,Ekola Flats: 34.5kV Bus 1          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-08-07 09:00      2025-08-07 18:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install bird guarding.:Ekola Flats Feeder 11, 12, 13, 14, and 15 unavailable (125MW).:     2025-04-18 14:39     162506     2025-05-01 10:21  
  PPW 25-03426     17863     PPW     Ekola Flats: 230/34.5 kV T2,Ekola Flats: 34.5kV Bus 2          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-08-08 09:00      2025-08-08 18:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install bird guarding.:Ekola Flats Feeders 21, 22, 23, 24, and 25 unavailable (125MW).:     2025-04-18 14:50     162508     2025-05-01 10:21  
  PPW 25-09174     18000     PPW     Hopland-Union Gap section of the BPA Moxee-Union Gap 115 kV line,Hopland: Bank #1,Hopland: Bank #2               0.0      0.0      0.0      2025-08-19 23:00      2025-08-20 05:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install Bus between SW 2Y51, 2Y61 and 115kV Bus Tie SW:Hopland will be fed from BPA Moxee. Network Load Service Arrangements may be required.:     2025-06-16 08:07     168281     2025-06-16 13:48  
  PPW 25-07188     17870     PPW     Fry-Parrish Gap 230 kV line          PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW)   
  325.0 
  325.0 

  325.0 
  325.0   
  325.0 
  325.0 

  325.0 
  325.0   
  325.0 
  325.0 

  325.0 
  325.0   
  2025-08-04 22:00 
  2025-08-04 22:00 

  2025-09-01 22:00 
  2025-09-01 22:00   
  2025-08-05 08:00 
  2025-08-05 08:00 

  2025-09-02 08:00 
  2025-09-02 08:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace arm at structure 4/1:PACW-PGE.PACW & PACW.PGE-PACW = 159 Summer/149 Winter   2025-04-22 14:03     166290     2025-06-13 11:00  
  PPW 25-03360     17687     PPW     Dave Johnston-TSGT Laramie River Station 230 kV line          DJ-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-DJ(PPW)   
  790.0 
  0.0 
  790.0   
  790.0 
  0.0 
  790.0   
  442.0 
  0.0 
  442.0   
  2025-09-02 07:00 
  2025-09-02 07:00 
  2025-09-02 07:00   
  2025-09-19 15:00 
  2025-09-19 15:00 
  2025-09-19 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:2025 structure replacements.:DJ-WYOEAST & WYOEAST-DJ = 442 (Dave Johnston-WAPA Stegall 230 kV line rating):     2025-02-17 14:22     162442     2025-02-17 14:28  
  PPW 25-07196     17896     PPW     PGE Bethel-Parrish Gap 230 kV line          PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW)   
  325.0 
  325.0   
  325.0 
  325.0   
  159.0 
  159.0   
  2025-09-02 07:00 
  2025-09-02 07:00   
  2025-09-05 18:00 
  2025-09-05 18:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace structures, 1/21, 1/23, 1/25.:PACW-PGE.PACW & PACW.PGE-PACW = 159 Summer/149 Winter   2025-05-05 08:36     166298     2025-05-05 08:37  
  PPW 25-07192     17871     PPW     Fry-Calapooya section of the Diamond Hill-Fry 230 kV line          PACW-NTLOAD(PPW) 

  PACW-NTLOAD(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  2025-08-05 22:00 

  2025-09-03 22:00   
  2025-08-06 08:00 

  2025-09-04 08:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace arms at structure 4/14:Network Load Service must be arranged for Calapooya, Diamond Hill & EWEB McKenzie.   2025-04-22 14:06     166294     2025-06-13 11:03  
  PPW 25-03417     17688     PPW     Malin-PG&E Round Mountain #1 500 kV line          MALIN500-RDM500(PPW) 
  RDM500-MALIN500(PPW) 

  MALIN500-RDM500(PPW) 
  RDM500-MALIN500(PPW)   
  800.0 
  612.0 

  800.0 
  612.0   
  800.0 
  612.0 

  800.0 
  612.0   
  625.0 
  416.0 

  800.0 
  612.0   
  2025-09-08 06:00 
  2025-09-08 06:00 

  2025-09-29 06:00 
  2025-09-29 06:00   
  2025-09-12 17:00 
  2025-09-12 17:00 

  2025-10-03 17:00 
  2025-10-03 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install lab measurement and fault initiating test equipment on primary conductors (Grounded).:MALIN500-RDM500 = 625. RDM500-MALIN500 = 416.:     2025-02-18 12:23     162499     2025-04-10 08:52  
  PPW 25-05028     17750     PPW     Pryor Mountain Wind: 34.5kV Bus 2,Pryor Mountain Wind: 34.5kV Bus 1          WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2025-07-07 08:00 

  2025-09-08 08:00   
  2025-07-09 11:00 

  2025-09-10 11:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian protection.:Pryor Mountain Wind unavailable.:     2025-03-14 11:07     164124     2025-03-17 12:01  
  PPW 25-05029     17751     PPW     Circuit 1,Circuit 2,Circuit 3,Circuit 4,Circuit 5,Circuit 6,Pryor Mountain Wind: 34.5kV Bus 1          WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  0.0 

  9999.0   
  2025-07-09 11:00 

  2025-09-08 08:00   
  2025-07-11 16:00 

  2025-09-12 16:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian protection.:Pryor Mountain Wind circuits 1-6 (120.6MW) unavailable.:     2025-03-14 11:21     164125     2025-03-17 12:03  
  PPW 25-03879     17708     PPW     Sweet Home: Main Bus Disc CB 4M94,Sweet Home: Bypass Bus Disc CB 4M94,Sweet Home: Line Disc CB 4M94          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-09-15 08:00      2025-09-19 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Breaker maintenance.:Fall Creek Hydro Units 1, 2, and 3 unavailable.:     2025-02-25 10:20     162961     2025-02-25 10:20  
  PPW 25-06481     17833     PPW     Malin-PG&E Round Mountain #1 500 kV line          MALIN500-RDM500(PPW) 
  RDM500-MALIN500(PPW)   
  800.0 
  612.0   
  800.0 
  612.0   
  625.0 
  416.0   
  2025-09-17 06:00 
  2025-09-17 06:00   
  2025-09-19 17:00 
  2025-09-19 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install lab measurement and fault initiating test equipment on primary conductors (Grounded).:MALIN500-RDM500 = 625. RDM500-MALIN500 = 416.:     2025-04-10 08:55     165580     2025-04-10 08:55  
  PPW 26-00002     17627     PPW     IPC Midpoint-Hemingway 500 kV line,IPCo Midpoint: 500/345 kV Bank T-501          H500-M500(PPW) 
  M500-H500(PPW) 
  PACW-NTLOAD(PPW) 

  H500-M500(PPW) 
  M500-H500(PPW) 
  PACW-NTLOAD(PPW)   
  800.0 
  1090.0 
  9999.0 

  800.0 
  1090.0 
  9999.0   
  800.0 
  1090.0 
  9999.0 

  800.0 
  1090.0 
  9999.0   
  350.0 
  350.0 
  0.0 

  800.0 
  1090.0 
  9999.0   
  2025-09-22 06:00 
  2025-09-22 06:00 
  2025-09-22 06:00 

  2026-02-23 08:00 
  2026-02-23 08:00 
  2026-02-23 08:00   
  2025-11-07 16:00 
  2025-11-07 16:00 
  2025-11-07 16:00 

  2026-05-29 15:00 
  2026-05-29 15:00 
  2026-05-29 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:This outage is for relocating the existing Midpoint T501 345kV/500kV transformer to a new 345kV station bay.:M500-H500 & H500-M500= 350.   2025-01-28 09:16     161059     2025-05-05 13:54  
  PPW 25-07860     17890     PPW     WAPA Thermopolis-Hilltop-WAPA Lovell 115 kV line          YTP-WYONORTH(PPW)      400.0      400.0      377.0      2025-10-14 07:00      2025-10-20 11:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace Nahne Jensen Line switches NJ-5761 and NJ-5765.:YTP-WYONORTH = 377. YTS = Series #11: TTC of 589 (PACE = 377 & LAPT = 212).:     2025-05-02 13:30     166966     2025-05-02 13:30  
  PPW 25-09054     17933     PPW     Gala Solar: Xfmr T1          OTHERGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-10-14 07:00      2025-10-15 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Three-year substation preventative maintenance.:Gala Solar offline.:     2025-05-21 14:37     168161     2025-05-21 14:37  
  PPW 25-00010     16953     PPW     Hemingway-Summer Lake 500 kV line          H500-SMLK(PPW) 
  PACW-NTLOAD(PPW) 
  SMLK-H500(PPW) 

  H500-SMLK(PPW) 
  PACW-NTLOAD(PPW) 
  SMLK-H500(PPW)   
  1500.0 
  9999.0 
  100.0 

  1500.0 
  9999.0 
  100.0   
  1500.0 
  9999.0 
  100.0 

  1500.0 
  9999.0 
  100.0   
  1500.0 
  9999.0 
  100.0 

  0.0 
  0.0 
  0.0   
  2025-04-01 08:00 
  2025-04-01 08:00 
  2025-04-01 08:00 

  2025-10-17 08:00 
  2025-10-17 08:00 
  2025-10-17 08:00   
  2025-09-14 18:00 
  2025-09-14 18:00 
  2025-09-14 18:00 

  2025-10-31 18:00 
  2025-10-31 18:00 
  2025-10-31 18:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Spacer Replacements:H500-SMLK & SMLK-H500 = 0; BORA-M500 = 959;   2024-04-30 09:25     144659     2024-12-20 09:45  
  PPW 25-08635     17922     PPW     BPA Captain Jack-Grizzly-Ponderosa #1 500 kV line          BPAT.PACW-PONDEROSA230(PPW)      267.0      267.0      267.0      2025-10-21 08:00      2025-10-21 09:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:DE-ENERGIZE LINE FOR DEADLINE SWITCHING AT POND:BPAT.PACW-PONDEROSA230 = 555 Summer/ 700 Winter:     2025-05-15 11:16     167741     2025-05-15 11:16  
  PPW 25-08632     17921     PPW     BPA Captain Jack-Grizzly-Ponderosa #1 500 kV line          BPAT.PACW-PONDEROSA230(PPW)      267.0      267.0      267.0      2025-10-31 14:00      2025-10-31 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:DE-ENERGIZE LINE FOR DEADLINE SWITCHING AT POND:BPAT.PACW-PONDEROSA230 = 555 Summer/ 700 Winter:     2025-05-15 11:14     167738     2025-05-15 11:14  
  PPW 25-10042     17988     PPW     Jim Bridger-Mustang 230 kV line,Mustang-WAPA Spence 230 kV line          JBSN-WYOCENTRAL(PPW) 
  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-JBSN(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  600.0 
  631.0 
  249.0 
  600.0 
  574.0 
  0.0 
  574.0   
  600.0 
  631.0 
  249.0 
  600.0 
  574.0 
  0.0 
  574.0   
  400.0 
  631.0 
  243.0 
  400.0 
  287.0 
  0.0 
  287.0   
  2025-11-19 07:15 
  2025-11-19 07:15 
  2025-11-19 07:15 
  2025-11-19 07:15 
  2025-11-19 07:15 
  2025-11-19 07:15 
  2025-11-19 07:15   
  2025-11-21 14:00 
  2025-11-21 14:00 
  2025-11-21 14:00 
  2025-11-21 14:00 
  2025-11-21 14:00 
  2025-11-21 14:00 
  2025-11-21 14:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Mustang: Remove 230 kV Shoo Fly:AW/4B Curve 121. WAPAEAST-WAPANORTH = 243. WYOEAST-AEOW (Aeolus West) = 1627. TOT4B-WYONORTH = 631. TOT 4B = 874. JBSN-WYOC & WYOC-JBSN = 400. Potential Real Time Impact to Wyoming Generation Great Divide will be radial from WAPA Spence via Mustang. Network Load Service Arrangements may be required.:     2025-06-10 12:20     169155     2025-06-10 12:50  
  PPW 26-00007     17980     PPW     Hemingway-Summer Lake 500 kV line          BORA-M500(PPW) 
  H500-SMLK(PPW) 
  PACW-NTLOAD(PPW) 
  SMLK-H500(PPW)   
  1090.0 
  1500.0 
  9999.0 
  100.0   
  1090.0 
  1500.0 
  9999.0 
  100.0   
  959.0 
  0.0 
  0.0 
  0.0   
  2026-05-11 08:00 
  2026-05-11 08:00 
  2026-05-11 08:00 
  2026-05-11 08:00   
  2026-05-22 18:00 
  2026-05-22 18:00 
  2026-05-22 18:00 
  2026-05-22 18:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Spacer Replacements:H500-SMLK & SMLK-H500 = 0; BORA-M500 = 959;   2025-06-09 09:44     168591     2025-06-09 09:46  
PRPA Outages:
  TOT-7 OUTAGE (PLANNED)     131509     PRPA     Fort Saint Vrain - Windsor 230kV Line          AU-STVRN(PRPA) 
  STVRN-AU(PRPA) 

  AU-STVRN(PRPA) 
  STVRN-AU(PRPA)   
  282.0 
  282.0 

  282.0 
  282.0   
  282.0 
  282.0 

  282.0 
  282.0   
  165.0 
  165.0 

  165.0 
  165.0   
  2025-02-15 08:00 
  2025-02-15 08:00 

  2025-02-28 16:00 
  2025-02-28 16:00   
  2025-02-28 16:00 
  2025-02-28 16:00 

  2025-02-28 17:54 
  2025-02-28 17:54   
  Completed     TRANSMISSION     PLANNED      TOT 7     PRPA     Fort Saint Vrain - Windsor 230kV Line OOS, per PSCO     2025-02-07 08:03     PRPA54421      2025-02-28 17:53  
  TOT-7 OUTAGE (PLANNED)     132770     PRPA     Harmony-Fossil Creek Tap-Portner 230kV line          AU-STVRN(PRPA) 
  STVRN-AU(PRPA)   
  282.0 
  282.0   
  282.0 
  282.0   
  93.0 
  93.0   
  2025-03-03 08:00 
  2025-03-03 08:00   
  2025-03-07 09:13 
  2025-03-07 09:13   
  Completed     TRANSMISSION     PLANNED      TOT 7     PRPA     Harmony-Fossil Creek Tap-Portner 230kV line OOS     2025-02-18 08:00     PRPA54669      2025-03-07 09:14  
  TOT-1A OUTAGE (PLANNED)     132989     PRPA     Flaming Gorge-Vernal #1 138KV Line           BOZ-CRG(PRPA) 
  CRG-BOZ(PRPA) 

  BOZ-CRG(PRPA) 
  CRG-BOZ(PRPA)   
  28.0 
  28.0 

  28.0 
  28.0   
  28.0 
  28.0 

  28.0 
  28.0   
  24.0 
  24.0 

  24.0 
  24.0   
  2025-03-04 09:00 
  2025-03-04 09:00 

  2025-03-04 13:00 
  2025-03-04 13:00   
  2025-03-04 13:00 
  2025-03-04 13:00 

  2025-03-04 14:00 
  2025-03-04 14:00   
  Completed     TRANSMISSION     PLANNED      TOT 1A     PRPA     Flaming Gorge-Vernal #1 138KV Line OOS per WAPA     2025-02-21 08:42     PRPA54717      2025-03-04 14:01  
  TOT-1A OUTAGE (PLANNED)     134308     PRPA     Bonanza Unit-1 OOS          BOZ-CRG(PRPA) 
  CRG-BOZ(PRPA)   
  28.0 
  28.0   
  28.0 
  28.0   
  26.0 
  26.0   
  2025-03-31 00:01 
  2025-03-31 00:01   
  2025-05-29 23:59 
  2025-05-29 23:59   
  Completed     TRANSMISSION     PLANNED      TOT 1A     PRPA     Bonanza Unit-1 OOS per WAPA     2025-03-28 07:30     PRPA55177      2025-03-28 07:30  
  TOT-7 OUTAGE     134902     PRPA     Harmony-Fossil Creek Tap-Portner 230kV line          AU-STVRN(PRPA) 
  STVRN-AU(PRPA) 
  STVRN-TP(PRPA) 
  TP-STVRN(PRPA)   
  155.0 
  155.0 
  127.0 
  127.0   
  155.0 
  155.0 
  127.0 
  127.0   
  93.0 
  93.0 
  0.0 
  0.0   
  2025-04-14 08:00 
  2025-04-14 08:00 
  2025-04-14 08:00 
  2025-04-14 08:00   
  2025-04-18 16:00 
  2025-04-18 16:00 
  2025-04-18 16:00 
  2025-04-18 16:00   
  Cancelled     TRANSMISSION     PLANNED      TOT 7     PRPA     Harmony-Fossil Creek Tap-Portner 230kV line OOS     2025-04-02 10:07     PRPA55331      2025-04-02 10:20  
  TOT-7 OUTAGE     134911     PRPA     Harmony-Fossil Creek Tap-Portner 230kV line          AU-STVRN(PRPA) 
  STVRN-AU(PRPA) 
  STVRN-TP(PRPA) 
  TP-STVRN(PRPA)   
  155.0 
  155.0 
  127.0 
  127.0   
  155.0 
  155.0 
  127.0 
  127.0   
  93.0 
  93.0 
  0.0 
  0.0   
  2025-04-14 08:00 
  2025-04-14 08:00 
  2025-04-14 08:00 
  2025-04-14 08:00   
  2025-04-17 17:51 
  2025-04-17 17:51 
  2025-04-17 17:51 
  2025-04-17 17:51   
  Completed     TRANSMISSION     PLANNED      TOT 7     PRPA     Harmony-Fossil Creek Tap-Portner 230kV line OOS     2025-04-02 10:22     PRPA55332      2025-04-17 17:51  
  TOT-7 OUTAGE (PLANNED)     133063     PRPA     Harmony-Fossil Creek Tap-Portner 230kV line          AU-STVRN(PRPA) 
  STVRN-AU(PRPA)   
  282.0 
  282.0   
  282.0 
  282.0   
  93.0 
  93.0   
  2025-04-14 08:00 
  2025-04-14 08:00   
  2025-04-18 16:00 
  2025-04-18 16:00   
  Cancelled     TRANSMISSION     PLANNED      TOT 7     PRPA     Harmony-Fossil Creek Tap-Portner 230kV line OOS     2025-02-24 13:08     PRPA54759      2025-04-02 10:05  
  TOT-7 OUTAGE (PLANNED)     133906     PRPA     Fort Saint Vrain - Weld 230kV Line          AU-STVRN(PRPA) 
  STVRN-AU(PRPA)   
  282.0 
  282.0   
  282.0 
  282.0   
  189.0 
  189.0   
  2025-04-28 08:00 
  2025-04-28 08:00   
  2025-05-09 16:00 
  2025-05-09 16:00   
  Cancelled     TRANSMISSION     PLANNED      TOT 7     PRPA     Fort Saint Vrain - Weld 230kV LineOOS     2025-03-18 16:48     PRPA55046      2025-04-02 10:25  
  TOT-1A OUTAGE (PLANNED)     135112     PRPA     Flaming Gorge-Vernal #1 3 138KV Line           BOZ-CRG(PRPA) 
  CRG-BOZ(PRPA)   
  28.0 
  28.0   
  28.0 
  28.0   
  23.0 
  23.0   
  2025-04-29 08:00 
  2025-04-29 08:00   
  2025-04-29 17:00 
  2025-04-29 17:00   
  Completed     TRANSMISSION     PLANNED      TOT 1A     PRPA     Flaming Gorge-Vernal #1 & 3 138KV Line OOS per WAPA     2025-04-08 11:05     PRPA55402      2025-04-08 11:05  
  TOT-1A OUTAGE (PLANNED)     131060     PRPA     Bonanza-Mona 345KV Line           BOZ-CRG(PRPA) 
  CRG-BOZ(PRPA)   
  28.0 
  28.0   
  28.0 
  28.0   
  0.0 
  0.0   
  2025-05-01 07:00 
  2025-05-01 07:00   
  2025-05-23 16:30 
  2025-05-23 16:30   
  Completed     TRANSMISSION     PLANNED      TOT 1A     PRPA     Bonanza-Mona 345KV Line OOS     2025-01-30 09:45     PRPA54189      2025-01-30 09:45  
  RAWHIDE-TIMBERLINE PARK     136609     PRPA     Rawhide-Timberline Park 230kV line          RAW-TP(PRPA) 
  TP-RAW(PRPA)   
  234.0 
  234.0   
  234.0 
  234.0   
  0.0 
  0.0   
  2025-05-05 08:00 
  2025-05-05 08:00   
  2025-05-15 14:42 
  2025-05-15 14:42   
  Completed     TRANSMISSION     PLANNED      ONPATH     PRPA     Rawhide-Timberline Park 230kV line OOS     2025-04-21 08:59     PRPA55699      2025-05-15 14:41  
  TOT-5 OUTAGE (FORCED)     137248     PRPA     Malta-Alma 230 kV Line          AU-CRG(PRPA) 
  CRG-AU(PRPA) 

  AU-CRG(PRPA) 
  CRG-AU(PRPA) 

  AU-CRG(PRPA) 
  CRG-AU(PRPA)   
  153.0 
  190.0 

  153.0 
  190.0 

  153.0 
  190.0   
  153.0 
  190.0 

  153.0 
  190.0 

  153.0 
  190.0   
  154.0 
  184.0 

  153.0 
  184.0 

  153.0 
  184.0   
  2025-05-07 16:19 
  2025-05-07 16:19 

  2025-05-07 16:22 
  2025-05-07 16:22 

  2025-05-08 16:00 
  2025-05-08 16:00   
  2025-05-07 16:22 
  2025-05-07 16:22 

  2025-05-08 16:00 
  2025-05-08 16:00 

  2025-05-09 16:00 
  2025-05-09 16:00   
  Completed     TRANSMISSION     FORCED      TOT 5     PRPA     Outage extended per PSCO     2025-05-07 16:19     PRPA55940      2025-05-08 17:42  
  TOT-1A OUTAGE (PLANNED)     131054     PRPA     Meeker-White River City Section of the Meeker-SW R          BOZ-CRG(PRPA) 
  CRG-BOZ(PRPA)   
  28.0 
  28.0   
  28.0 
  28.0   
  23.0 
  23.0   
  2025-05-13 08:00 
  2025-05-13 08:00   
  2025-05-23 17:00 
  2025-05-23 17:00   
  Cancelled     TRANSMISSION     PLANNED      TOT 1A     PRPA     Meeker-White River City Section of the Meeker-SW Rangely 138KV Line OOS, per WAPA     2025-01-30 09:26     PRPA54187      2025-01-30 09:37  
  TOT-7 OUTAGE     136957     PRPA     Boyd - Fossil Creek Tap - Portner 230 kV Line          AU-STVRN(PRPA) 
  STVRN-AU(PRPA) 
  STVRN-TP(PRPA) 
  TP-STVRN(PRPA)   
  155.0 
  155.0 
  127.0 
  127.0   
  155.0 
  155.0 
  127.0 
  127.0   
  157.0 
  157.0 
  0.0 
  0.0   
  2025-05-16 08:00 
  2025-05-16 08:00 
  2025-05-16 08:00 
  2025-05-16 08:00   
  2025-05-24 02:39 
  2025-05-24 02:39 
  2025-05-24 02:39 
  2025-05-24 02:39   
  Terminated     TRANSMISSION     PLANNED      TOT 7     PRPA     Boyd - Fossil Creek Tap - Portner 230 kV Line     2025-04-29 09:42     PRPA55828      2025-05-24 02:39  
  TOT-7 OUTAGE (PLANNED)     133914     PRPA     Ault - Weld #2 230kV Line kV           AU-STVRN(PRPA) 
  STVRN-AU(PRPA)   
  282.0 
  282.0   
  282.0 
  282.0   
  173.0 
  173.0   
  2025-05-26 07:00 
  2025-05-26 07:00   
  2025-06-16 06:59 
  2025-06-16 06:59   
  Cancelled     TRANSMISSION     PLANNED      TOT 7     PRPA     Ault - Weld #2 230kV Line kV OOS     2025-03-18 16:59     PRPA55049      2025-04-02 10:44  
  TOT-7 OUTAGE     134920     PRPA     Ault-Weld#2 230kV lines          AU-STVRN(PRPA) 
  STVRN-AU(PRPA) 
  STVRN-TP(PRPA) 
  TP-STVRN(PRPA)   
  155.0 
  155.0 
  127.0 
  127.0   
  155.0 
  155.0 
  127.0 
  127.0   
  95.0 
  95.0 
  78.0 
  78.0   
  2025-05-27 07:00 
  2025-05-27 07:00 
  2025-05-27 07:00 
  2025-05-27 07:00   
  2025-06-16 06:59 
  2025-06-16 06:59 
  2025-06-16 06:59 
  2025-06-16 06:59   
  Completed     TRANSMISSION     PLANNED      TOT 7     PRPA     Ault-Weld#2 230kV lines OOS per WAPA     2025-04-02 11:04     PRPA55333      2025-05-06 13:46  
  TOT-1A OUTAGE (PLANNED)     131063     PRPA     Bonanza-Craig 345KV Line OOS          BOZ-CRG(PRPA) 
  CRG-BOZ(PRPA)   
  28.0 
  28.0   
  28.0 
  28.0   
  0.0 
  0.0   
  2025-05-27 10:00 
  2025-05-27 10:00   
  2025-06-15 16:00 
  2025-06-15 16:00   
  Completed     TRANSMISSION     PLANNED      TOT 1A     PRPA     Bonanza-Craig 345KV Line OOS     2025-01-30 09:50     PRPA54190      2025-05-13 07:29  
  TOT 1A OUTAGE (FORCED)     137886     PRPA     Flaming Gorge-Vernal OOS          BOZ-CRG(PRPA) 
  CRG-BOZ(PRPA)   
  28.0 
  28.0   
  28.0 
  28.0   
  28.0 
  23.0   
  2025-06-15 16:00 
  2025-06-15 16:00   
  2025-06-16 17:00 
  2025-06-16 17:00   
  Completed     TRANSMISSION     FORCED      TOT 1A     PRPA     Flaming Gorge-Vernal OOS (per WACM TSS Desk)     2025-06-15 15:44     PRPA56231      2025-06-15 15:44  
  SEVERANCE-AULT     134936     PRPA     Ault-Severance 230kV line          AU-SEV(PRPA) 
  AU-STVRN(PRPA) 
  SEV-AU(PRPA) 
  STVRN-AU(PRPA) 
  STVRN-TP(PRPA) 
  TP-STVRN(PRPA)   
  670.0 
  155.0 
  670.0 
  155.0 
  127.0 
  127.0   
  670.0 
  155.0 
  670.0 
  155.0 
  127.0 
  127.0   
  0.0 
  90.0 
  0.0 
  90.0 
  74.0 
  74.0   
  2025-06-16 07:00 
  2025-06-16 07:00 
  2025-06-16 07:00 
  2025-06-16 07:00 
  2025-06-16 07:00 
  2025-06-16 07:00   
  2025-07-07 16:00 
  2025-07-07 16:00 
  2025-07-07 16:00 
  2025-07-07 16:00 
  2025-07-07 16:00 
  2025-07-07 16:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     PRPA     Ault-Severance 230kV line, per WAPA     2025-04-02 13:03     PRPA55335      2025-06-12 07:40  
  TOT-7 OUTAGE     134927     PRPA     Ault-Severance 230kV line          AU-STVRN(PRPA) 
  STVRN-AU(PRPA) 
  STVRN-TP(PRPA) 
  TP-STVRN(PRPA)   
  155.0 
  155.0 
  127.0 
  127.0   
  155.0 
  155.0 
  127.0 
  127.0   
  90.0 
  90.0 
  74.0 
  74.0   
  2025-06-16 07:00 
  2025-06-16 07:00 
  2025-06-16 07:00 
  2025-06-16 07:00   
  2025-07-07 16:00 
  2025-07-07 16:00 
  2025-07-07 16:00 
  2025-07-07 16:00   
  Cancelled     TRANSMISSION     PLANNED      TOT 7     PRPA     Ault-Severance 230kV line OOS per WAPA     2025-04-02 11:10     PRPA55334      2025-04-02 13:01  
  TOT-7 OUTAGE (PLANNED)     133911     PRPA     Ault - Severance 230kV Line           AU-STVRN(PRPA) 
  STVRN-AU(PRPA)   
  282.0 
  282.0   
  282.0 
  282.0   
  164.0 
  164.0   
  2025-06-16 07:00 
  2025-06-16 07:00   
  2025-07-07 16:00 
  2025-07-07 16:00   
  Cancelled     TRANSMISSION     PLANNED      TOT 7     PRPA     Ault - Severance 230kV Line OOS     2025-03-18 16:56     PRPA55048      2025-04-02 11:07  
  CRAIG - AULT (PLANNED)     137296     PRPA     Craig-Ault 345kV line          AU-CRG(PRPA) 
  CRG-AU(PRPA) 
  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA)   
  153.0 
  190.0 
  0.0 
  0.0   
  153.0 
  190.0 
  0.0 
  0.0   
  0.0 
  0.0 
  61.0 
  61.0   
  2025-08-17 08:00 
  2025-08-17 08:00 
  2025-08-17 08:00 
  2025-08-17 08:00   
  2025-08-28 16:00 
  2025-08-28 16:00 
  2025-08-28 16:00 
  2025-08-28 16:00   
  Scheduled     TRANSMISSION     PLANNED      TOT 5     PRPA     Craig-Ault Planned Outage     2025-05-12 10:50     PRPA55958      2025-05-12 10:50  
  TOT-1A OUTAGE (PLANNED)     137243     PRPA     Hayden-Artesia Tap-Vernal 138KV Line           BOZ-CRG(PRPA) 
  CRG-BOZ(PRPA)   
  28.0 
  28.0   
  28.0 
  28.0   
  26.0 
  26.0   
  2025-08-18 10:00 
  2025-08-18 10:00   
  2025-08-28 16:00 
  2025-08-28 16:00   
  Scheduled     TRANSMISSION     PLANNED      TOT 1A     PRPA     Hayden-Artesia Tap-Vernal 138KV Line OOS per WAPA     2025-05-07 07:53     PRPA55939      2025-05-07 07:53  
PSCO Outages:
  NOMOGRAM     116019     PSCO     Nomogram          MSST-PSCO(PSCO) 
  PSCO.SOUTH-PSCO(PSCO) 

  MSST-PSCO(PSCO) 

  MSST-PSCO(PSCO) 
  PSCO.SOUTH-PSCO(PSCO) 

  MSST-PSCO(PSCO) 
  PSCO.SOUTH-PSCO(PSCO) 

  MSST-PSCO(PSCO) 
  PSCO.SOUTH-PSCO(PSCO)   
  4986.0 
  2529.0 

  4986.0 

  4986.0 
  2529.0 

  4986.0 
  2529.0 

  4986.0 
  2529.0   
  4986.0 
  2529.0 

  4986.0 

  4986.0 
  2529.0 

  4986.0 
  2529.0 

  4986.0 
  2529.0   
  2800.0 
  2000.0 

  3000.0 

  2650.0 
  2000.0 

  2500.0 
  2000.0 

  2500.0 
  2000.0   
  2024-01-31 13:00 
  2024-01-31 13:00 

  2024-07-17 15:10 

  2024-12-03 19:00 
  2024-12-03 19:00 

  2025-02-07 16:00 
  2025-02-07 16:00 

  2030-01-31 14:00 
  2030-01-31 14:00   
  2024-07-17 15:10 
  2024-12-03 19:00 

  2024-12-03 19:00 

  2025-02-07 16:00 
  2025-02-07 16:00 

  2030-01-31 14:00 
  2030-01-31 14:00 

  2035-12-31 22:00 
  2035-12-31 22:00   
  Active     TRANSMISSION     PLANNED      ONPATH     PSCO     TTC updates based on Nomogram studies.     2024-01-31 12:40     PSCO49317      2025-06-13 14:03  
  TOT 2A RESTRICTION     135099     PSCO               TOT2AN-TOT2AS(PSCO) 

  TOT2AN-TOT2AS(PSCO) 

  TOT2AN-TOT2AS(PSCO) 

  TOT2AN-TOT2AS(PSCO) 

  TOT2AN-TOT2AS(PSCO) 

  TOT2AN-TOT2AS(PSCO) 

  TOT2AN-TOT2AS(PSCO) 

  TOT2AN-TOT2AS(PSCO)   
  60.0 

  60.0 

  60.0 

  60.0 

  60.0 

  60.0 

  60.0 

  60.0   
  60.0 

  60.0 

  60.0 

  60.0 

  60.0 

  60.0 

  60.0 

  60.0   
  25.0 

  25.0 

  0.0 

  25.0 

  40.0 

  0.0 

  40.0 

  0.0   
  2025-04-07 18:00 

  2025-04-21 19:00 

  2025-04-28 22:19 

  2025-04-30 00:43 

  2025-05-03 12:56 

  2025-05-05 07:47 

  2025-05-05 16:12 

  2025-05-06 08:00   
  2025-04-21 19:00 

  2025-04-28 22:19 

  2025-04-30 00:43 

  2025-05-03 12:56 

  2025-05-05 07:47 

  2025-05-05 16:12 

  2025-05-06 08:00 

  2025-05-19 19:00   
  Completed     TRANSMISSION     FORCED      ONPATH     PSCO          2025-04-07 17:35     PSCO55396      2025-05-06 06:11  
  TOT 2A RESTRICTION     135229     PSCO               TOT2AS-TOT2AN(PSCO) 

  TOT2AS-TOT2AN(PSCO) 

  TOT2AS-TOT2AN(PSCO)   
  200.0 

  200.0 

  200.0   
  200.0 

  200.0 

  200.0   
  188.0 

  100.0 

  188.0   
  2025-04-10 17:00 

  2025-04-19 07:40 

  2025-04-20 00:00   
  2025-04-19 07:40 

  2025-04-20 00:00 

  2026-01-31 18:00   
  Active     TRANSMISSION     FORCED      ONPATH     PSCO          2025-04-10 16:46     PSCO55445      2025-04-19 07:40  
  LAMAR DC TIE     137282     PSCO               LAMR230-LAMR345(PSCO) 
  LAMR345-LAMR230(PSCO) 

  LAMR230-LAMR345(PSCO) 
  LAMR345-LAMR230(PSCO) 

  LAMR230-LAMR345(PSCO) 
  LAMR345-LAMR230(PSCO) 

  LAMR230-LAMR345(PSCO) 
  LAMR345-LAMR230(PSCO) 

  LAMR230-LAMR345(PSCO) 

  LAMR230-LAMR345(PSCO) 

  LAMR230-LAMR345(PSCO) 
  LAMR345-LAMR230(PSCO) 

  LAMR230-LAMR345(PSCO) 
  LAMR345-LAMR230(PSCO) 

  LAMR230-LAMR345(PSCO) 
  LAMR345-LAMR230(PSCO)   
  210.0 
  210.0 

  210.0 
  210.0 

  210.0 
  210.0 

  210.0 
  210.0 

  210.0 

  210.0 

  210.0 
  210.0 

  210.0 
  210.0 

  210.0 
  210.0   
  210.0 
  210.0 

  210.0 
  210.0 

  210.0 
  210.0 

  210.0 
  210.0 

  210.0 

  210.0 

  210.0 
  210.0 

  210.0 
  210.0 

  210.0 
  210.0   
  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 

  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0   
  2025-05-09 19:52 
  2025-05-09 19:52 

  2025-05-10 01:00 
  2025-05-10 01:00 

  2025-05-10 09:00 
  2025-05-10 09:00 

  2025-05-10 23:00 
  2025-05-10 23:00 

  2025-05-12 10:00 

  2025-05-12 11:00 

  2025-05-12 17:00 
  2025-05-12 17:00 

  2025-05-13 17:00 
  2025-05-13 17:00 

  2025-05-20 17:00 
  2025-05-20 17:00   
  2025-05-10 01:00 
  2025-05-10 01:00 

  2025-05-10 09:00 
  2025-05-10 09:00 

  2025-05-10 23:00 
  2025-05-10 23:00 

  2025-05-12 10:00 
  2025-05-12 17:00 

  2025-05-12 11:00 

  2025-05-12 17:00 

  2025-05-13 17:00 
  2025-05-13 17:00 

  2025-05-20 17:00 
  2025-05-20 17:00 

  2025-05-27 17:00 
  2025-05-27 17:00   
  Completed     TRANSMISSION     FORCED      ONPATH     PSCO     DC tie tripped      2025-05-09 19:50     PSCO55950      2025-05-20 14:56  
  COMANCHE TO MIDWAY     134946     PSCO     Comanche to Midway 230kV line          COMA-MIDW(PSCO) 
  MIDW-COMA(PSCO)   
  1147.0 
  1147.0   
  1147.0 
  1147.0   
  654.0 
  654.0   
  2025-05-13 07:00 
  2025-05-13 07:00   
  2025-05-19 17:00 
  2025-05-19 17:00   
  Completed     TRANSMISSION     FORCED      ONPATH     PSCO     Comanche to Midway 230kV line work     2025-04-02 14:30     PSCO55336      2025-04-02 14:30  
  TOT 5 RESTRICTION     132550     PSCO     Cooley Mesa to Wolcott 230kV line          TOT5W-TOT5E(PSCO)      480.0      480.0      255.0      2025-05-13 08:00      2025-05-18 14:15      Completed     TRANSMISSION     PLANNED      ONPATH     PSCO          2025-02-11 13:09     PSCO54595      2025-05-18 14:12  
  TOT7 RESTRICTION     137383     PSCO     Boyd to Fosil Creek 230KV line Section          TOT7N-TOT7S(PSCO)      525.0      525.0      406.0      2025-05-16 08:00      2025-05-23 14:10      Completed     TRANSMISSION     PLANNED      ONPATH     PSCO     Boyd to Fossil Creek tap TOT 7 Limit 563 DynamicPSCO 406PRPA 157     2025-05-16 06:26     PSCO56009      2025-05-23 14:09  
  MALTA TO PSCO     137335     PSCO     Malta to Twin Lakes line outage          MALTA-PSCO(PSCO) 
  PSCO-MALTA(PSCO)   
  921.0 
  921.0   
  921.0 
  921.0   
  895.0 
  895.0   
  2025-05-19 06:00 
  2025-05-19 06:00   
  2025-05-19 16:00 
  2025-05-19 16:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     PSCO          2025-05-14 16:28     PSCO55979      2025-05-14 16:28  
  TOT 5 RESTRICTION     132552     PSCO     Dillon to Ptarmigan 230kV line          TOT5W-TOT5E(PSCO)      480.0      480.0      300.0      2025-05-19 08:00      2025-05-19 16:00      Cancelled     TRANSMISSION     PLANNED      ONPATH     PSCO          2025-02-11 13:21     PSCO54596      2025-05-16 17:32  
  TOT 2A RESTRICTION     137469     PSCO               TOT2AN-TOT2AS(PSCO) 

  TOT2AN-TOT2AS(PSCO) 

  TOT2AN-TOT2AS(PSCO)   
  60.0 

  60.0 

  60.0   
  60.0 

  60.0 

  60.0   
  40.0 

  40.0 

  40.0   
  2025-05-19 20:15 

  2025-06-02 22:00 

  2025-06-09 22:00   
  2025-06-02 22:00 

  2025-06-09 22:00 

  2025-06-23 22:00   
  Active     TRANSMISSION     FORCED      ONPATH     PSCO          2025-05-19 20:15     PSCO56046      2025-06-06 16:26  
  COMA TO MIDW PATH     135121     PSCO     Comanche to Mirasol 230kV line          COMA-MIDW(PSCO) 
  MIDW-COMA(PSCO)   
  1147.0 
  1147.0   
  1147.0 
  1147.0   
  654.0 
  654.0   
  2025-05-20 07:00 
  2025-05-20 07:00   
  2025-05-27 08:13 
  2025-05-27 08:13   
  Terminated     TRANSMISSION     FORCED      ONPATH     PSCO     MIDW - COMA path reduction from 1117 --> 654MW due to the Comanche - Mirasol 230kV line outage      2025-04-08 16:35     PSCO55406      2025-05-27 08:13  
  TOT 5 RESTRICTION     136079     PSCO     Black Start Path Cabin Creek to LOOK          TOT5W-TOT5E(PSCO)      480.0      480.0      180.0      2025-05-21 05:00      2025-05-21 09:30      Completed     TRANSMISSION     PLANNED      ONPATH     PSCO     TOT 5 Limited due to Black Start Testing Cabin Creek to Lookout      2025-04-16 19:34     PSCO55585      2025-04-16 19:34  
  TOT 5 RESTRICTION     136077     PSCO     Black Start Path Cabin Creek to LOOK          TOT5W-TOT5E(PSCO)      480.0      480.0      350.0      2025-05-21 08:30      2025-05-21 13:00      Completed     TRANSMISSION     PLANNED      ONPATH     PSCO     TOT 5 Limited due to Black Start Testing Cabin Creek To Lookout     2025-04-16 19:31     PSCO55584      2025-04-16 19:31  
  PSCO BLACK START PLAN A     136071     PSCO     Black Start Path PLEN to LOOK          GENERATOR-PSCO(PSCO)      9999.0      9999.0      9999.0      2025-05-22 06:00      2025-05-22 10:00      Cancelled     TRANSMISSION     PLANNED      ONPATH     PSCO     PCOG Generation unavailable for commercial dispatch due to Blackstart Testing     2025-04-16 19:20     PSCO55581      2025-05-21 14:04  
  TOT7 RESTRICTION     133917     PSCO     Ault to Weld 230kV line          TOT7N-TOT7S(PSCO)      525.0      525.0      249.0      2025-05-26 06:00      2025-06-16 07:00      Completed     TRANSMISSION     PLANNED      ONPATH     PSCO     TOT 7 Limit 422MW PSCo Share 249 PRPA Share 173     2025-03-18 17:01     PSCO55050      2025-03-18 17:01  
  LAMAR DC TIE     137631     PSCO               LAMR230-LAMR345(PSCO) 
  LAMR345-LAMR230(PSCO) 

  LAMR230-LAMR345(PSCO) 
  LAMR345-LAMR230(PSCO)   
  210.0 
  210.0 

  210.0 
  210.0   
  210.0 
  210.0 

  210.0 
  210.0   
  0.0 
  0.0 

  0.0 
  0.0   
  2025-05-27 17:00 
  2025-05-27 17:00 

  2025-05-29 00:00 
  2025-05-29 00:00   
  2025-05-29 00:00 
  2025-05-29 00:00 

  2025-05-29 12:00 
  2025-05-29 12:00   
  Completed     TRANSMISSION     FORCED      ONPATH     PSCO          2025-05-27 04:15     PSCO56125      2025-05-29 11:48  
  TOT 5 RESTRICTION     137648     PSCO     Cooley Mesa to Basalt 230kV Line          TOT5W-TOT5E(PSCO) 

  TOT5W-TOT5E(PSCO)   
  480.0 

  480.0   
  480.0 

  480.0   
  255.0 

  255.0   
  2025-05-27 19:30 

  2025-05-31 21:00   
  2025-05-31 21:00 

  2025-06-02 17:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     PSCO     Cooley Mesa to Baslt line     2025-05-27 19:28     PSCO56131      2025-05-31 16:06  
  COMANCHE TO BOONE     135135     PSCO     COMA-BOON 230kV line outage          BOON-COMA(PSCO) 
  COMA-BOON(PSCO)   
  510.0 
  510.0   
  510.0 
  510.0   
  191.0 
  191.0   
  2025-05-28 07:00 
  2025-05-28 07:00   
  2025-06-03 17:00 
  2025-06-03 17:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     PSCO     COMA-BOON 230kV line outage     2025-04-08 19:48     PSCO55412      2025-04-08 19:48  
  DENVER METRO GENERATION     137666     PSCO     Metro Generation          GENERATOR-PSCO(PSCO)      9999.0      9999.0      9999.0      2025-05-28 17:00      2025-06-07 18:00      Completed     TRANSMISSION     FORCED      ONPATH     PSCO     Spindle Hill, Arapaho 5,6,7 Plains End, Cabin Creek & Valmont Units may be a Must Run at times based on real time flows due to Cherokee 4,5,6,7 being offline. Also Cabin Creek Pump may be unavailable at times.     2025-05-28 16:12     PSCO56138      2025-05-28 16:12  
  LAMAR DC TIE     137737     PSCO     Lamar DC Tie          LAMR230-LAMR345(PSCO) 
  LAMR345-LAMR230(PSCO) 

  LAMR230-LAMR345(PSCO) 
  LAMR345-LAMR230(PSCO) 

  LAMR230-LAMR345(PSCO) 
  LAMR345-LAMR230(PSCO) 

  LAMR230-LAMR345(PSCO) 
  LAMR345-LAMR230(PSCO) 

  LAMR230-LAMR345(PSCO) 
  LAMR345-LAMR230(PSCO)   
  210.0 
  210.0 

  210.0 
  210.0 

  210.0 
  210.0 

  210.0 
  210.0 

  210.0 
  210.0   
  210.0 
  210.0 

  210.0 
  210.0 

  210.0 
  210.0 

  210.0 
  210.0 

  210.0 
  210.0   
  0.0 
  0.0 

  50.0 
  50.0 

  100.0 
  100.0 

  150.0 
  150.0 

  185.0 
  185.0   
  2025-06-02 20:21 
  2025-06-02 20:21 

  2025-06-02 23:00 
  2025-06-02 23:00 

  2025-06-03 01:00 
  2025-06-03 01:00 

  2025-06-03 02:00 
  2025-06-03 02:00 

  2025-06-03 03:00 
  2025-06-03 03:00   
  2025-06-02 23:00 
  2025-06-02 23:00 

  2025-06-03 01:00 
  2025-06-03 01:00 

  2025-06-03 02:00 
  2025-06-03 02:00 

  2025-06-03 03:00 
  2025-06-03 03:00 

  2025-06-03 04:00 
  2025-06-03 04:00   
  Completed     TRANSMISSION     FORCED      ONPATH     PSCO          2025-06-02 20:23     PSCO56161      2025-06-03 02:01  
  COMA TO MIDW PATH     135094     PSCO     Midway to Mirasol line          COMA-MIDW(PSCO) 
  MIDW-COMA(PSCO) 

  COMA-MIDW(PSCO) 
  MIDW-COMA(PSCO)   
  1147.0 
  1147.0 

  1147.0 
  1147.0   
  1147.0 
  1147.0 

  1147.0 
  1147.0   
  654.0 
  654.0 

  654.0 
  654.0   
  2025-06-04 07:00 
  2025-06-04 07:00 

  2025-06-08 17:00 
  2025-06-08 17:00   
  2025-06-08 17:00 
  2025-06-08 17:00 

  2025-06-09 17:00 
  2025-06-09 17:00   
  Completed     TRANSMISSION     FORCED      ONPATH     PSCO     TTC reduction (MIDW - COMA TTC reduced 1117->654)      2025-04-07 15:54     PSCO55394      2025-06-03 11:40  
  GEN TIE WIND     137715     PSCO     Pronghorn Substation          GENERATOR-PSCO(PSCO)      9999.0      9999.0      9999.0      2025-06-04 07:00      2025-06-04 17:00      Completed     TRANSMISSION     FORCED      ONPATH     PSCO     Planned Relay work at Pronghorn Substation that may possibly but, unlikely impact generation at Bronco Plains I and II, Rush Creek II and Cheyenne Ridge East and West.     2025-05-30 12:30     PSCO56151      2025-05-30 12:30  
  COMANCHE TO MIDWAY     137763     PSCO     Comanche to Midway 230kV          COMA-MIDW(PSCO) 
  MIDW-COMA(PSCO)   
  1147.0 
  1147.0   
  1147.0 
  1147.0   
  654.0 
  654.0   
  2025-06-10 07:00 
  2025-06-10 07:00   
  2025-06-10 17:00 
  2025-06-10 17:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     PSCO     Due to Comanche to Midway 230 kV Line planned outage     2025-06-04 13:05     PSCO56166      2025-06-04 13:05  
  LAMAR DC TIE     137877     PSCO     Lamar DC Tie          LAMR230-LAMR345(PSCO) 
  LAMR345-LAMR230(PSCO)   
  210.0 
  210.0   
  210.0 
  210.0   
  0.0 
  0.0   
  2025-06-13 12:05 
  2025-06-13 12:05   
  2025-06-13 16:20 
  2025-06-13 16:20   
  Completed     TRANSMISSION     FORCED      ONPATH     PSCO     Lamar DC tie tripped     2025-06-13 12:02     PSCO56229      2025-06-13 16:17  
  TOT7 RESTRICTION     133919     PSCO     Ault to Severance 230 KV line          TOT7N-TOT7S(PSCO)      525.0      525.0      236.0      2025-06-16 07:00      2025-07-07 16:00      Cancelled     TRANSMISSION     PLANNED      ONPATH     PSCO     TOT 7 Limit to 400 MW PSCo Share 236MW and PRPA Share 164MW     2025-03-18 17:06     PSCO55051      2025-06-12 16:38  
  TOT 5 RESTRICTION     137904     PSCO     Tarryall to Hartsel 230kV Line          TOT5W-TOT5E(PSCO)      480.0      480.0      367.0      2025-06-17 07:30      2025-06-17 16:00      Cancelled     TRANSMISSION     FORCED      ONPATH     PSCO          2025-06-16 12:28     PSCO56234      2025-06-16 14:43  
  COMANCHE AREA GENERATION     137676     PSCO     Commanche Start up bank           GENERATOR-PSCO(PSCO)      9999.0      9999.0      9999.0      2025-06-23 07:00      2025-06-24 16:00      Scheduled     TRANSMISSION     FORCED      ONPATH     PSCO     Comanche Unit 2 must be offline due to work in proximity to S/U Bank     2025-05-29 03:38     PSCO56143      2025-06-12 16:40  
  TOT3 RESTRICTION     137387     PSCO     Spring Canyon to Sidney line outage          TOT3N-TOT3S(PSCO)      60.0      60.0      0.0      2025-07-15 07:00      2025-07-17 16:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     PSCO     5925 Spring Canyon to Sidney 230KV line outage     2025-05-16 06:45     PSCO56011      2025-05-16 06:45  
  SPRING CANYON WIND FARM     137390     PSCO     Spring Canyon to North Yuma outage          GENERATOR-PSCO(PSCO)      9999.0      9999.0      0.0      2025-07-18 07:00      2025-07-20 17:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     PSCO     Spring Canyon generation curtailed to 0MW due to contract path out of service     2025-05-16 06:50     PSCO56012      2025-05-16 06:50  
  TOT 5 RESTRICTION     132595     PSCO     Foid Creek to Wolcott 230kV line          TOT5W-TOT5E(PSCO)      480.0      480.0      255.0      2025-08-11 08:00      2025-08-19 16:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     PSCO          2025-02-12 14:08     PSCO54608      2025-02-12 14:08  
  TOT 5 RESTRICTION     137324     PSCO     Malta to Hopkins 230kV Line          TOT5E-TOT5W(PSCO) 
  TOT5W-TOT5E(PSCO)   
  388.0 
  480.0   
  388.0 
  480.0   
  250.0 
  250.0   
  2025-08-20 08:00 
  2025-08-20 08:00   
  2025-08-29 16:00 
  2025-08-29 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     PSCO     Malta to Hopkins 230kV Line outage     2025-05-13 16:42     PSCO55970      2025-05-13 16:42  
  ATER UNITS     132912     PSCO     Alamosa Terminal must run          GENERATOR-PSCO(PSCO)      9999.0      9999.0      9999.0      2025-09-15 08:00      2025-11-16 16:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     PSCO     Alamosa CTs must run, 1 unit minimum 5MW with 2nd unit available as needed for voltage support due to PONC-SARG & ATER-HOME outages     2025-02-19 15:46     PSCO54699      2025-02-19 15:46  
  FT. ST. VRAIN GEN     133562     PSCO     FT. Lupton to Ft. St. Vrain 230kV Lines          GENERATOR-PSCO(PSCO)      9999.0      9999.0      9999.0      2025-10-01 08:00      2025-10-08 16:00      Scheduled     TRANSMISSION     FORCED      ONPATH     PSCO     Ft. St. Vrain, Spindle Hill and TOT7 Imports limited to a combined total of 1,100MW due to both Ft. St. Vrain - Ft. Lupton 230kV Lines being out at the same time for the dates and times below.      2025-03-07 16:16     PSCO54919      2025-04-02 14:05  
  FSVR TO PSCO     133585     PSCO     Fort St Vrain to Keenesburg 230kV line          STVRN-PSCO(PSCO)      2028.0      2028.0      1716.0      2025-10-09 08:00      2025-10-30 16:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     PSCO          2025-03-09 18:54     PSCO54927      2025-04-02 14:02  
PSEI Outages:
  TPWR-PSEI limitation     83901     PSEI     Breaker 825 CT rating limitation          PSEI.SYSTEM-TPWR.STAR(PSEI) 
  TPWR.STAR-PSEI.SYSTEM(PSEI)   
  240.0 
  240.0   
  240.0 
  240.0   
  228.0 
  228.0   
  2010-11-01 15:00 
  2010-11-01 15:00   
  2030-11-01 00:00 
  2030-11-01 00:00   
  Active     TRANSMISSION     FORCED      ONPATH     PSEI     Breaker 825 has CT rating limiting transfers both directions to 228 MWs     2010-11-01 14:52     PSEI38337      2010-11-01 14:52  
  NewRevised CENT-PSEI     84264     PSEI     Centralia-Tono path          CENTRALIA-PSEI.SYSTEM(PSEI)      400.0      400.0      398.0      2010-11-08 16:00      2030-01-01 00:00      Active     TRANSMISSION     FORCED      ONPATH     PSEI     CT's in the Tono transformer have a rating factor of 1.0 so should be limited to 398 MVA on the Tono banks (2000:5 CT ratio) with the current metering.     2010-11-08 15:44     PSEI38514      2010-11-08 15:44  
  JD-COB Uprate 2011     98437     PSEI     Pacific AC Intertie          JOHNDAY-COB(PSEI)      400.0      0.0      350.0      2011-08-01 00:00      2040-01-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     PSEI     BPAT is path operator - determines OTC and PSEIs share - uprate project complete, posting 350 MW year round for forward sales     2011-07-27 17:06     PSEI44671      2011-07-27 17:06  
  JD-COB Upgrade     100195     PSEI     Pacific AC Intertie          JOHNDAY-COB(PSEI)      400.0      0.0      400.0      2011-10-01 00:00      2041-10-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     PSEI     BPAT completed upgrade project - PSEI management determined PSEIs share 400 year around     2011-08-30 14:22     PSEI45364      2011-08-30 14:22  
  New PSEI-SUMAS TTC     106292     PSEI     City of Sumas          PSEI.SYSTEM-SUMAS(PSEI)      7.0      0.0      10.0      2012-01-01 00:00      2028-10-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     PSEI     Studies associated with Network Service to this load show increased capacity to serve load     2011-11-18 14:04     PSEI47219      2011-11-18 14:04  
  CENTRALIA-PSEI.SYSTEM     170800     PSEI     Tono          CENTRALIA-PSEI.SYSTEM(PSEI)      400.0      0.0      400.0      2014-11-26 12:00      2040-11-26 00:00      Active     TRANSMISSION     PLANNED      ONPATH     PSEI     contract limit     2014-11-26 10:47     PSEI70549      2014-11-26 10:47  
  TPWR.STAR-PSEI.SYSTEM     541223     PSEI               PSEI.SYSTEM-TPWR.STAR(PSEI) 
  TPWR.STAR-PSEI.SYSTEM(PSEI)   
  239.0 
  239.0   
  239.0 
  239.0   
  110.0 
  110.0   
  2025-06-02 07:30 
  2025-06-02 07:30   
  2025-06-20 16:00 
  2025-06-20 16:00   
  Active     TRANSMISSION     PLANNED      ONPATH     PSEI          2025-05-27 20:38     PSEI198786      2025-05-27 20:38  
  COB - JD     542489     PSEI               COB-JOHNDAY(PSEI)      306.0      306.0      308.0      2025-06-06 15:00      2025-11-01 00:00      Active     TRANSMISSION     FORCED      ONPATH     PSEI     Reduction of TTC on COI by path operator, BPAT as Path Operator establishes the path rating.     2025-06-04 14:45     PSEI199228      2025-06-04 14:45  
  JD - COB     542491     PSEI               JOHNDAY-COB(PSEI)      400.0      400.0      233.0      2025-06-06 15:00      2025-06-18 08:00      Active     TRANSMISSION     FORCED      ONPATH     PSEI     Reduction of TTC on COI by path operator, BPAT as Path Operator establishes the path rating. **TTC 233 MW**     2025-06-04 14:50     PSEI199229      2025-06-04 14:50  
  TONO-PRINE     541507     PSEI               PSEI.SYSTEM-TONO(PSEI) 
  TONO-PSEI.SYSTEM(PSEI)   
  537.0 
  537.0   
  537.0 
  537.0   
  281.0 
  281.0   
  2025-06-09 07:00 
  2025-06-09 07:00   
  2025-06-20 16:00 
  2025-06-20 16:00   
  Active     TRANSMISSION     PLANNED      ONPATH     PSEI          2025-05-30 13:14     PSEI198899      2025-05-30 13:14  
  COLSTRIP-PSEI (PATH 8)     541501     PSEI               BROADVIEW-TOWNSEND(PSEI) 
  COLSTRIP-BROADVIEW(PSEI)   
  758.0 
  746.0   
  758.0 
  746.0   
  532.0 
  532.0   
  2025-06-09 08:00 
  2025-06-09 08:00   
  2025-06-26 15:00 
  2025-06-26 15:00   
  Active     TRANSMISSION     PLANNED      ONPATH     PSEI     Reduction of TTC on CTS by path operator, NWMT as Path Operator establishes the path rating.     2025-05-30 12:56     PSEI198897      2025-05-30 12:56  
  JD - COB     542608     PSEI               JOHNDAY-COB(PSEI)      400.0      400.0      250.0      2025-06-17 06:00      2025-06-18 18:00      Scheduled     TRANSMISSION     FORCED      ONPATH     PSEI     Reduction of TTC on COI by path operator. BPAT as Path Operator establishes the path rating. **TTC = 250 MWs.**     2025-06-05 14:01     PSEI199290      2025-06-05 14:01  
  COB - JD     542610     PSEI               COB-JOHNDAY(PSEI)      306.0      306.0      223.0      2025-06-17 06:00      2025-06-18 08:00      Scheduled     TRANSMISSION     FORCED      ONPATH     PSEI     Reduction of TTC on COI by path operator. BPAT as Path Operator establishes the path rating. **TTC = 223 MWs.**     2025-06-05 14:03     PSEI199291      2025-06-05 14:03  
  COB - JD     542612     PSEI               COB-JOHNDAY(PSEI)      306.0      306.0      200.0      2025-06-18 08:00      2025-06-18 18:00      Scheduled     TRANSMISSION     FORCED      ONPATH     PSEI     Reduction of TTC on COI by path operator. BPAT as Path Operator establishes the path rating. **TTC = 200 MWs.**     2025-06-05 14:04     PSEI199292      2025-06-05 14:04  
  SCL - PSEI     543525     PSEI               PSEI.SYSTEM-SCL.SYSTEM(PSEI) 
  SCL.SYSTEM-PSEI.SYSTEM(PSEI)   
  1772.0 
  1772.0   
  1772.0 
  1772.0   
  1088.0 
  1088.0   
  2025-06-25 07:00 
  2025-06-25 07:00   
  2025-06-25 17:00 
  2025-06-25 17:00   
  Scheduled     TRANSMISSION     FORCED      ONPATH     PSEI     SEDROWOOLLEY-SCLBOTHELL 230VK LINE OOS FOR WORK ON POLE STRUCTURE. **SEATTLE.SYSTEM-PSEI PATH REDUCED TO 1088MW**     2025-06-11 21:15     PSEI199668      2025-06-11 21:15  
  PSEI.SYSTEM-SNOH.PUD     543542     PSEI               PSEI.SYSTEM-SNOH.PUD(PSEI) 
  SNOH.PUD-PSEI.SYSTEM(PSEI)   
  200.0 
  150.0   
  200.0 
  150.0   
  68.0 
  68.0   
  2025-06-25 07:00 
  2025-06-25 07:00   
  2025-06-25 17:00 
  2025-06-25 17:00   
  Scheduled     TRANSMISSION     FORCED      ONPATH     PSEI     **TTC REDUCED TO 68MW**IF SKY-BEVPK & BEVPK-SKY ALSO OOS -> 0MW. FOR POLE REPLACEMENT     2025-06-11 22:25     PSEI199674      2025-06-11 22:25  
  PSEI.SYSTEM-SNOH.PUD     543545     PSEI               PSEI.SYSTEM-SNOH.PUD(PSEI) 
  SNOH.PUD-PSEI.SYSTEM(PSEI)   
  200.0 
  150.0   
  200.0 
  150.0   
  0.0 
  0.0   
  2025-06-25 07:00 
  2025-06-25 07:00   
  2025-06-25 16:00 
  2025-06-25 16:00   
  Scheduled     TRANSMISSION     FORCED      ONPATH     PSEI     **TTC REDUCED TO 0MW** SKY-BEVPK OOS. SKY-BEVPK & BEVPK-COTTBROOK BOTH OOS FOR SAME POLE REPLACEMENT -> 0MW.     2025-06-11 22:37     PSEI199675      2025-06-11 22:37  
SMD1 Outages:
  COI DERATE (N-S AND S-N)     154856     BANC     COI DERATE          COTP N-S(BANC) 
  COTP S-N(BANC)   
  5100.0 
  3675.0   
  5100.0 
  3675.0   
  4600.0 
  2800.0   
  2025-06-01 00:00 
  2025-06-01 00:00   
  2025-11-01 00:00 
  2025-11-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     SMD1     COI DERATE: N>S 4600MW, S>N 2800 Seasonal Limit     2025-04-24 22:11     BANC54721      2025-04-24 22:11  
  COI DERATE (N-S AND S-N)     155200     BANC               COTP N-S(BANC) 
  COTP S-N(BANC)   
  5100.0 
  3675.0   
  5100.0 
  3675.0   
  3700.0 
  3575.0   
  2025-06-13 15:00 
  2025-06-13 15:00   
  2025-11-01 00:00 
  2025-11-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     SMD1     DERATE: N>S 3700; S>N 3575 due to TBM-RDM 1 and 2 Series caps     2025-06-04 22:25     BANC54786      2025-06-05 21:10  
  COI DERATE (N-S AND S-N)     155168     BANC     NWACI 4500 MW N-S, 2800 MW S-N          COTP N-S(BANC) 
  COTP S-N(BANC)   
  5100.0 
  3675.0   
  5100.0 
  3675.0   
  4500.0 
  2800.0   
  2025-06-16 00:00 
  2025-06-16 00:00   
  2025-06-23 00:00 
  2025-06-23 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     SMD1     BPA - Various equipment     2025-05-29 19:24     BANC54782      2025-05-29 19:24  
  COI DERATE (N-S AND S-N)     155217     BANC               COTP N-S(BANC) 
  COTP S-N(BANC)   
  5100.0 
  3675.0   
  5100.0 
  3675.0   
  3000.0 
  2675.0   
  2025-06-17 06:00 
  2025-06-17 06:00   
  2025-06-18 18:00 
  2025-06-18 18:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     SMD1     DERATE: 3000 N>S, 2675 S>N. RDM-TBM 1 & 2 Ser Caps, RDM-TBM #2 Line.      2025-06-05 21:27     BANC54787      2025-06-05 21:27  
  COI DERATE (N-S AND S-N)     155165     BANC     NWACI 4000 MW N-S, 2400 MW S-N          COTP N-S(BANC) 
  COTP S-N(BANC)   
  5100.0 
  3675.0   
  5100.0 
  3675.0   
  4000.0 
  2400.0   
  2025-06-18 08:00 
  2025-06-18 08:00   
  2025-06-23 00:00 
  2025-06-23 00:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     SMD1     PGE - GRZ-MLN 2 500kV line NWACI: 4000 MW N-S, 2400 MW S-N     2025-05-29 19:21     BANC54781      2025-05-29 19:21  
  COI DERATE (N-S AND S-N)     155162     BANC     NWACI 4000 MW N-S, 2400 MW S-N          COTP N-S(BANC) 
  COTP S-N(BANC)   
  5100.0 
  3675.0   
  5100.0 
  3675.0   
  4000.0 
  2400.0   
  2025-06-21 03:00 
  2025-06-21 03:00   
  2025-06-22 20:00 
  2025-06-22 20:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     SMD1     PGE - GRZ-MLN 2 500kV line BPA - Celilo-Sylmar 1000kV line, Big Eddy-Celilo 1 & 2 500 kV lines NWACI: 4000 MW N-S, 2400 MW S-N     2025-05-29 19:16     BANC54780      2025-05-29 19:16  
  COI DERATE (N-S AND S-N)     155195     BANC     COI Derate          COTP N-S(BANC) 
  COTP S-N(BANC)   
  5100.0 
  3675.0   
  5100.0 
  3675.0   
  4000.0 
  2400.0   
  2025-06-23 00:00 
  2025-06-23 00:00   
  2025-06-30 00:00 
  2025-06-30 00:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     SMD1     DERATE: 4000 MW N>S, 2400 MW S>N. Gizzly-Malin #2 OOS     2025-06-04 04:38     BANC54785      2025-06-04 04:38  
  COI DERATE (N-S AND S-N)     155225     BANC               COTP N-S(BANC) 
  COTP S-N(BANC)   
  5100.0 
  3675.0   
  5100.0 
  3675.0   
  4000.0 
  2400.0   
  2025-06-30 00:00 
  2025-06-30 00:00   
  2025-07-02 16:00 
  2025-07-02 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     SMD1     DERATE: 4000 N>S, 2400 S>N. GRZ-MLN #2 Line OOS.      2025-06-06 21:24     BANC54790      2025-06-06 21:24  
SPPC Outages:
SRP Outages:
  WW-MEAD OUTAGE     423438     SRP     Perkins 500kV Srs Cap          MEAD500-WESTWING500(SRP) 
  WESTWING500-MEAD500(SRP) 

  MEAD500-WESTWING500(SRP) 
  WESTWING500-MEAD500(SRP) 

  MEAD500-WESTWING500(SRP) 
  WESTWING500-MEAD500(SRP) 

  MEAD500-WESTWING500(SRP) 
  WESTWING500-MEAD500(SRP) 

  MEAD500-WESTWING500(SRP) 
  WESTWING500-MEAD500(SRP) 

  MEAD500-WESTWING500(SRP) 
  WESTWING500-MEAD500(SRP) 

  MEAD500-WESTWING500(SRP) 
  WESTWING500-MEAD500(SRP)   
  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0   
  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0   
  158.0 
  158.0 

  290.0 
  290.0 

  290.0 
  290.0 

  158.0 
  158.0 

  290.0 
  290.0 

  290.0 
  290.0 

  290.0 
  290.0   
  2025-04-28 06:00 
  2025-04-28 06:00 

  2025-04-28 14:29 
  2025-04-28 14:29 

  2025-05-02 18:00 
  2025-05-02 18:00 

  2025-05-05 08:00 
  2025-05-05 08:00 

  2025-05-07 14:00 
  2025-05-07 14:00 

  2025-05-07 17:00 
  2025-05-07 17:00 

  2025-05-09 15:00 
  2025-05-09 15:00   
  2025-04-28 14:29 
  2025-04-28 14:29 

  2025-05-02 18:00 
  2025-05-02 18:00 

  2025-05-05 08:00 
  2025-05-05 08:00 

  2025-05-07 14:00 
  2025-05-07 14:00 

  2025-05-07 17:00 
  2025-05-07 17:00 

  2025-05-09 15:00 
  2025-05-09 15:00 

  2025-05-18 15:00 
  2025-05-18 15:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     SRP     Per OASIS, extended to 5/18 now     2025-03-26 13:07     SRP162808      2025-05-08 12:00  
  WW-MEAD OUTAGE     423464     SRP     Perkins Mead 500kV Line Srs Cap          MEAD500-WESTWING500(SRP) 
  WESTWING500-MEAD500(SRP) 

  MEAD500-WESTWING500(SRP) 
  WESTWING500-MEAD500(SRP) 

  MEAD500-WESTWING500(SRP) 
  WESTWING500-MEAD500(SRP)   
  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0   
  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0   
  224.0 
  224.0 

  158.0 
  158.0 

  224.0 
  224.0   
  2025-05-05 07:00 
  2025-05-05 07:00 

  2025-05-05 07:03 
  2025-05-05 07:03 

  2025-05-05 08:00 
  2025-05-05 08:00   
  2025-05-05 07:03 
  2025-05-05 07:03 

  2025-05-05 08:00 
  2025-05-05 08:00 

  2025-05-07 14:00 
  2025-05-07 14:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     SRP     Perform repairs to Series Cap B System PL with GE field representative.     2025-04-29 06:49     SRP162812      2025-05-07 13:22  
  Mead-Mktplc 500kV Line     423441     SRP     Mead-Marketplace 500kV Line           MARKETPLACE-MEAD500(SRP) 
  MEAD500-MARKETPLACE(SRP)   
  0.0 
  0.0   
  0.0 
  0.0   
  0.0 
  0.0   
  2025-05-05 09:00 
  2025-05-05 09:00   
  2025-05-16 07:12 
  2025-05-16 07:12   
  Terminated     TRANSMISSION     PLANNED      ONPATH     SRP     Scheduled Maintenance     2025-03-26 13:27     SRP162809      2025-05-16 07:12  
  PV EAST LINE OUTAGE     423467     SRP     Palo Verde - Rudd 500kV Line           PV EAST TOTAL(SRP)      0.0      0.0      11158.0      2025-05-19 12:00      2025-05-23 17:00      Completed     TRANSMISSION     PLANNED      ONPATH     SRP     Scheduled Maintenance     2025-04-30 10:39     SRP162813      2025-04-30 10:39  
  PV EAST LINE OUTAGE     423483     SRP     PALOVERDE500-WESTWING500 LINE #1           PV EAST TOTAL(SRP) 

  PV EAST TOTAL(SRP)   
  0.0 

  0.0   
  0.0 

  0.0   
  11306.0 

  11306.0   
  2025-05-28 16:00 

  2025-05-28 23:00   
  2025-05-28 23:00 

  2025-05-29 00:00   
  Active     TRANSMISSION     FORCED      ONPATH     SRP     EMERGENCY OUTAGE     2025-05-28 15:20     SRP162815      2025-05-28 22:38  
  Desert Basin-Pinal Cntrl     423479     SRP     Desert Basin - Pinal Central 230kV Line           DESERTBASIN-PINALCENT230(SRP)      0.0      0.0      0.0      2025-06-03 07:00      2025-06-03 15:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     SRP          2025-05-15 15:43     SRP162814      2025-05-15 15:43  
SWTC Outages:
  APACHE WINCHESTER 230     542601     SWTC     Apache-Winchester 230kV          APACHE230-WINCHESTR345(SWTC) 
  WINCHESTR345-APACHE230(SWTC)   
  420.0 
  420.0   
  420.0 
  420.0   
  0.0 
  0.0   
  2025-06-25 07:00 
  2025-06-25 07:00   
  2025-06-28 17:00 
  2025-06-28 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     SWTC          2025-06-05 12:34     SWTC199287      2025-06-05 12:34  
  JOJOBA-PINAL WEST     543102     SWTC     JOJOBA500-Pinal West500          JOJOBA500-PINALWEST500(SWTC) 
  PINALWEST500-JOJOBA500(SWTC)   
  135.0 
  135.0   
  135.0 
  135.0   
  0.0 
  0.0   
  2025-07-09 14:00 
  2025-07-09 14:00   
  2025-07-09 15:00 
  2025-07-09 15:00   
  Scheduled     TRANSMISSION     FORCED      ONPATH     SWTC          2025-06-09 13:47     SWTC199507      2025-06-09 13:47  
TANC Outages:
TEPC Outages:
  SANJUAN-MCKINLEY #1     542503     TEPC               MCKINLEY345-SJ345(TEPC) 
  SJ345-MCKINLEY345(TEPC) 

  MCKINLEY345-SJ345(TEPC) 
  SJ345-MCKINLEY345(TEPC)   
  1770.0 
  1770.0 

  1770.0 
  1770.0   
  1770.0 
  1770.0 

  1770.0 
  1770.0   
  0.0 
  0.0 

  805.0 
  805.0   
  2025-06-04 16:58 
  2025-06-04 16:58 

  2025-06-04 17:13 
  2025-06-04 17:13   
  2025-06-04 17:13 
  2025-06-04 17:13 

  2025-06-04 17:58 
  2025-06-04 17:58   
  Completed     TRANSMISSION     FORCED      ONPATH     TEPC          2025-06-04 17:04     TEPC199237      2025-06-04 17:14  
  JOJO-PW     543095     TEPC               JOJOBA500-PINALWEST500(TEPC) 
  PINALWEST500-JOJOBA500(TEPC)   
  952.0 
  952.0   
  952.0 
  952.0   
  0.0 
  0.0   
  2025-07-09 14:00 
  2025-07-09 14:00   
  2025-07-09 15:00 
  2025-07-09 15:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     TEPC          2025-06-09 13:37     TEPC199505      2025-06-09 13:52  
  SAG500-TORT500     534875     TEPC               SAGUARO500-TORTOLITA500(TEPC) 
  TORTOLITA500-SAGUARO500(TEPC)   
  692.0 
  692.0   
  692.0 
  692.0   
  0.0 
  0.0   
  2025-10-13 08:00 
  2025-10-13 08:00   
  2025-11-21 16:00 
  2025-11-21 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     TEPC          2025-04-23 12:26     TEPC196767      2025-04-23 12:26  
TPWT Outages:
TSGT Outages:
  PATH TTC IMPACT     537066     TSGT     FRASER - WINDY GAP 138KV LINE          TSGTWEST-TSGTWEST(TSGT)      0.0      0.0      0.0      2025-05-23 08:00      2025-06-04 16:00      Completed     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage limits path TTC. Mountain Park's Fraser load affected.     2025-05-08 05:12     TSGT197516      2025-05-08 05:12  
  PATH TTC IMPACT     533120     TSGT     CRAIG - BONANZA 345KV LINE          BOZ-CRG(TSGT) 
  CALRIDGE-CRG(TSGT) 
  CRG-BOZ(TSGT) 
  CRG-CALRIDGE(TSGT)   
  29.0 
  105.0 
  29.0 
  105.0   
  29.0 
  105.0 
  29.0 
  105.0   
  0.0 
  58.0 
  0.0 
  58.0   
  2025-05-27 10:00 
  2025-05-27 10:00 
  2025-05-27 10:00 
  2025-05-27 10:00   
  2025-06-15 15:00 
  2025-06-15 15:00 
  2025-06-15 15:00 
  2025-06-15 15:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage limits path TTC. MEEKER - SW RANGELY 138 KV LINE IMPACTED.     2025-04-10 12:37     TSGT196139      2025-06-15 14:41  
  TOT 1 RESTRICTION     537796     TSGT     MEEKER - SOUTHWEST RANGELY 138KV LINE          BOZ-CRG(TSGT) 
  CALRIDGE-CRG(TSGT) 
  CRG-BOZ(TSGT) 
  CRG-CALRIDGE(TSGT)   
  29.0 
  105.0 
  29.0 
  105.0   
  29.0 
  105.0 
  29.0 
  105.0   
  26.0 
  0.0 
  26.0 
  0.0   
  2025-06-02 07:00 
  2025-06-02 07:00 
  2025-06-02 07:00 
  2025-06-02 07:00   
  2025-06-05 17:00 
  2025-06-05 17:00 
  2025-06-05 17:00 
  2025-06-05 17:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage limits TOT 1 path TTC.     2025-05-13 10:39     TSGT197807      2025-05-21 06:10  
  GENERATION RESTRICTION     540572     TSGT     North Yuma 230 kV CB 986          TSGTEAST-TSGTEAST(TSGT)      0.0      0.0      155.0      2025-06-04 08:00      2025-06-04 12:16      Completed     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage does not impact TTC. GENERATION RESTRICTION     2025-05-23 12:11     TSGT198563      2025-06-04 12:15  
  PATH TTC IMPACT     539652     TSGT     DEL CAMINO - RINN VALLEY 115KV LINE          TSGTNORTH-TSGTNORTH(TSGT) 

  TSGTNORTH-TSGTNORTH(TSGT)   
  0.0 

  0.0   
  0.0 

  0.0   
  0.0 

  0.0   
  2025-06-05 07:00 

  2025-06-18 18:00   
  2025-06-18 18:00 

  2025-06-20 18:00   
  Active     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage does not impact TTC. United Power load affected.     2025-05-20 10:51     TSGT198335      2025-06-16 05:19  
  GENERATION RESTRICTION     542588     TSGT     LARAMIE RIVER 345KV CB 2996          TOT3INFO-TOT3INFO(TSGT)      400.0      400.0      400.0      2025-06-05 12:00      2025-06-05 13:00      Completed     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage limits TOT 3 path TTC. Limit may change based upon system conditions.LRS will be derated to 600 MW and TOT3 Series 10 active     2025-06-05 11:11     TSGT199282      2025-06-05 11:11  
  GENERATION RESTRICTION     541633     TSGT     Niyol Wind          TSGTEAST-TSGTEAST(TSGT)      0.0      0.0      100.0      2025-06-09 11:00      2025-06-09 13:00      Completed     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage does not impact TTC. GENERATION RESTRICTION     2025-05-31 17:03     TSGT198946      2025-06-09 12:36  
  PATH TTC IMPACT     540354     TSGT     North Yuma XFMR T1          NYUM-WRAY(TSGT) 
  WRAY-NYUM(TSGT)   
  360.0 
  360.0   
  360.0 
  360.0   
  292.0 
  292.0   
  2025-06-09 11:00 
  2025-06-09 11:00   
  2025-06-09 13:00 
  2025-06-09 13:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage impacts path TTC. Member load affected.     2025-05-22 14:48     TSGT198484      2025-06-09 12:36  
  PATH TTC IMPACT     543412     TSGT     WAUNETA - WRAY 115KV          NYUM-WRAY(TSGT) 
  WRAY-NYUM(TSGT)   
  360.0 
  360.0   
  360.0 
  360.0   
  292.0 
  292.0   
  2025-06-11 09:00 
  2025-06-11 09:00   
  2025-06-11 18:00 
  2025-06-11 18:00   
  Completed     TRANSMISSION     FORCED      ONPATH     TSGT     Outages limit path TTC.     2025-06-11 08:21     TSGT199624      2025-06-11 17:23  
  TOT 2 RESTRICTION     543457     TSGT     NORTH FORK - RIFLE 230KV LINE          TOT2INFO-TOT2INFO(TSGT)      15.0      15.0      15.0      2025-06-11 16:12      2025-06-11 23:00      Completed     TRANSMISSION     FORCED      ONPATH     TSGT     Outage limits TOT 2 path TTC. Limit may change based upon system conditions.     2025-06-11 16:14     TSGT199647      2025-06-11 22:30  
  GENERATION RESTRICTION     543087     TSGT     Niyol Wind          TSGTEAST-TSGTEAST(TSGT)      0.0      0.0      100.0      2025-06-12 08:00      2025-06-12 10:00      Completed     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage does not impact TTC. GENERATION RESTRICTION     2025-06-09 12:54     TSGT199501      2025-06-12 09:57  
  PATH TTC IMPACT     540140     TSGT     CASCADE - BURRO BRIDGE 115KV LINE          AMES-CASCADE(TSGT) 
  CASCADE-AMES(TSGT)   
  79.0 
  79.0   
  79.0 
  79.0   
  0.0 
  0.0   
  2025-06-12 08:00 
  2025-06-12 08:00   
  2025-06-23 16:00 
  2025-06-23 16:00   
  Active     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage limits path TTC. Member load affected.     2025-05-21 14:28     TSGT198425      2025-05-21 14:28  
  PATH TTC IMPACT     543089     TSGT     North Yuma XFMR T1          NYUM-WRAY(TSGT) 
  WRAY-NYUM(TSGT)   
  360.0 
  360.0   
  360.0 
  360.0   
  292.0 
  292.0   
  2025-06-12 08:00 
  2025-06-12 08:00   
  2025-06-12 10:00 
  2025-06-12 10:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage impacts TTC. Member load affected     2025-06-09 13:04     TSGT199502      2025-06-12 09:58  
  TOT 2 RESTRICTION     544350     TSGT     NORTH FORK - RIFLE 230KV LINE          TOT2INFO-TOT2INFO(TSGT)      15.0      15.0      15.0      2025-06-18 10:00      2025-06-18 14:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage limits TOT 2 path TTC. Limit may change based upon system conditions.     2025-06-16 14:16     TSGT199923      2025-06-16 14:20  
  GENERATION RESTRICTION     542590     TSGT     LARAMIE RIVER 345KV CB 2996          TOT3INFO-TOT3INFO(TSGT)      400.0      400.0      400.0      2025-06-19 09:00      2025-06-19 17:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage limits TOT 3 path TTC. Limit may change based upon system conditions.LRS will be derated to 600 MW and TOT3 Series 10 active     2025-06-05 11:14     TSGT199283      2025-06-05 11:14  
  GENERATION RESTRICTION     544334     TSGT     COMANCHE - WALSENBURG 230KV LINE          TSGTEAST-TSGTEAST(TSGT) 

  TSGTEAST-TSGTEAST(TSGT) 

  TSGTEAST-TSGTEAST(TSGT)   
  0.0 

  0.0 

  0.0   
  0.0 

  0.0 

  0.0   
  0.0 

  0.0 

  0.0   
  2025-06-23 07:30 

  2025-06-24 07:30 

  2025-06-25 07:30   
  2025-06-23 17:00 

  2025-06-24 17:00 

  2025-06-25 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage does not impact TTC. GENERATION RESTRICTION     2025-06-16 08:59     TSGT199914      2025-06-16 08:59  
  PATH TTC IMPACT     538128     TSGT     COMANCHE - WALSENBURG 230KV LINE          COMA-WALT(TSGT) 
  WALT-COMA(TSGT) 

  COMA-WALT(TSGT) 
  WALT-COMA(TSGT) 

  COMA-WALT(TSGT) 
  WALT-COMA(TSGT)   
  358.0 
  358.0 

  358.0 
  358.0 

  358.0 
  358.0   
  358.0 
  358.0 

  358.0 
  358.0 

  358.0 
  358.0   
  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0   
  2025-06-23 07:30 
  2025-06-23 07:30 

  2025-06-24 07:30 
  2025-06-24 07:30 

  2025-06-25 07:30 
  2025-06-25 07:30   
  2025-06-23 17:00 
  2025-06-23 17:00 

  2025-06-24 17:00 
  2025-06-24 17:00 

  2025-06-25 17:00 
  2025-06-25 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     TSGT     Outage limits path TTC.     2025-05-14 08:06     TSGT197882      2025-05-14 08:06  
WALC Outages:
  test     63997     WALC               MEAD500-WESTWING500(WALC) 
  WESTWING500-MEAD500(WALC)   
  1967.0 
  1967.0   
  1967.0 
  1967.0   
  1967.0 
  1967.0   
  2025-06-05 13:00 
  2025-06-05 13:00   
  2025-06-05 13:01 
  2025-06-05 13:01   
  Completed     TRANSMISSION     FORCED      ONPATH     WALC     test     2025-06-05 13:00     WALC19591      2025-06-05 13:04  
  MCCULLOUGH 230-500     64002     WALC               MCCULLOUG230-MCCULLOUG500(WALC) 
  MCCULLOUG500-MCCULLOUG230(WALC)   
  400.0 
  400.0   
  400.0 
  400.0   
  0.0 
  0.0   
  2025-06-06 13:00 
  2025-06-06 13:00   
  2025-06-06 15:00 
  2025-06-06 15:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     WALC     LDWP OUTAGE ID 86134     2025-06-05 13:57     WALC19592      2025-06-05 15:32  
  MCCULLOUGH 230-500 BNK I     64009     WALC               MCCULLOUG230-MCCULLOUG500(WALC) 
  MCCULLOUG500-MCCULLOUG230(WALC) 

  MCCULLOUG230-MCCULLOUG500(WALC) 
  MCCULLOUG500-MCCULLOUG230(WALC)   
  400.0 
  400.0 

  400.0 
  400.0   
  400.0 
  400.0 

  400.0 
  400.0   
  0.0 
  0.0 

  0.0 
  0.0   
  2025-06-06 13:00 
  2025-06-06 13:00 

  2025-06-10 15:00 
  2025-06-10 15:00   
  2025-06-10 15:00 
  2025-06-10 15:00 

  2025-06-10 17:00 
  2025-06-10 17:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     WALC     LDWP OUTAGE 86134/OUTAGE ID 141881      2025-06-05 15:44     WALC19593      2025-06-10 07:52  
  MCC Xfmr Bank 500/230kV     64038     WALC     McCullough xfmr bank H and I Forced Outage          MCCULLOUG230-MCCULLOUG500(WALC) 
  MCCULLOUG500-MCCULLOUG230(WALC)   
  400.0 
  400.0   
  400.0 
  400.0   
  0.0 
  0.0   
  2025-06-11 12:20 
  2025-06-11 12:20   
  2025-06-11 13:00 
  2025-06-11 13:00   
  Completed     TRANSMISSION     FORCED      ONPATH     WALC          2025-06-11 12:21     WALC19612      2025-06-11 12:49  
  Westwing-Raceway 230KV     64095     WALC               RACEWAY230-WESTWING230(WALC) 
  WESTWING230-RACEWAY230(WALC)   
  45.0 
  366.0   
  45.0 
  366.0   
  0.0 
  0.0   
  2025-06-15 15:00 
  2025-06-15 15:00   
  2025-06-15 18:00 
  2025-06-15 18:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     WALC          2025-06-15 14:59     WALC19635      2025-06-15 14:59  
  LIB - WESTWING 230kV Line     63862     WALC     Liberty-WestWing 230kV Line          LIBERTY230-WESTWING230(WALC) 
  WESTWING230-LIBERTY230(WALC)   
  560.0 
  560.0   
  560.0 
  560.0   
  0.0 
  0.0   
  2025-06-16 06:00 
  2025-06-16 06:00   
  2025-06-18 16:00 
  2025-06-18 16:00   
  Active     TRANSMISSION     PLANNED      ONPATH     WALC          2025-05-15 14:36     WALC19542      2025-05-15 14:36  
WASN Outages:
WITP Outages: