PPW Outages 
Apr 15, 2024 - Apr 19, 2025
Report created on Apr 19, 2024 at 07:41 (PPT)
Outage
Name
Outage
Id
Company Facility Flow
Gate
Segment/
JOTSFacility
Original
TTC In
Original
TTC Out
New
TTC
Start Time (PPT) Stop Time (PPT) Status Outage
Category
Outage
Type
Path
Impact
Report
TPs
Annotation Creation Time (PPT) EventId Last Updated (PPT)
  PPW 171983     10361     PPW     Riverton: 230 kV Cap Bank S/C 472               0.0      0.0      0.0      2021-02-18 09:03      2024-06-03 17:00      ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Riverton: 230 kV Cap Bank S/C 472:     2022-11-14 00:32     75797     2024-01-02 07:37  
  PPW 175805     9275     PPW     Hemingway-Summer Lake 500 kV line (Path 75 Schedule Limitation)          H500-SMLK(PPW) 

  H500-SMLK(PPW) 

  H500-SMLK(PPW)   
  1500.0 

  1500.0 

  1500.0   
  1500.0 

  1500.0 

  1500.0   
  1386.0 

  1386.0 

  1386.0   
  2021-06-02 12:00 

  2022-10-04 04:21 

  2023-12-01 23:59   
  2022-10-04 04:21 

  2023-12-01 23:59 

  2024-12-04 12:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Hemingway-Summer Lake 500 kV line (Path 75 Schedule Limitation):Path Restriction Notes: Path 75 Westbound = 1386.:     2021-12-21 14:06     80760     2023-11-27 09:28  
  PPW 23-17390     13038     PPW     Sigurd: 345/230 kV Bank #6          OTHERGEN-PACE(PPW) 

  OTHERGEN-PACE(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2023-09-21 15:33 

  2023-09-21 16:52   
  2023-09-21 16:52 

  2024-07-01 19:33   
  ACTIVE     TRANSMISSION     URGENT      ONPATH     PPW     continuous: Commissioning required transformer is being replaced Updated 11/02/2023 Take #6 XFMR out of service and replace. Based on oil sample :Possible real-time restrictions to Sigurd Solar.:     2023-09-21 15:06     131763     2023-12-07 14:01  
  PPW 23-19875     13744     PPW     Scheduling Limitation: Path 19 (Bridger West) Scheduling Limitation          JBSN-JB345(PPW) 

  JBSN-JB345(PPW)   
  1600.0 

  1600.0   
  1600.0 

  1600.0   
  1600.0 

  1433.0   
  2023-10-27 05:23 

  2023-10-27 12:13   
  2023-10-27 12:13 

  2024-06-19 17:00   
  ACTIVE     TRANSMISSION     FORCED      ONPATH     PPW     continuous:Return series caps to normal.:Bridger West 2150 PAC 1433 IPCO 717:     2023-10-27 12:22     134271     2024-02-15 19:32  
  PPW 23-19877     14565     PPW     Populus: 345 kV Series Capacitor #1 (C2)          JBSN-JB345(PPW) 

  JBSN-JB345(PPW) 

  JBSN-JB345(PPW)   
  1600.0 

  1600.0 

  1600.0   
  1600.0 

  1600.0 

  1600.0   
  1600.0 

  1433.0 

  1433.0   
  2023-10-27 05:26 

  2023-10-27 05:26 

  2024-03-25 17:00   
  2023-10-27 05:26 

  2024-03-25 17:00 

  2024-12-31 17:00   
  ACTIVE     TRANSMISSION     FORCED      ONPATH     PPW     continuous:Segment two controller not working properly:JBSN-JB345 = 2150. PacifiCorp = 1433. IPCo = 717.:     2023-12-04 13:10     134273     2024-03-24 16:52  
  PPW 23-19878     15670     PPW     Populus: 345 kV Series Capacitor #2 (C2)          JBSN-JB345(PPW) 

  JBSN-JB345(PPW) 

  JBSN-JB345(PPW)   
  1600.0 

  1600.0 

  1600.0   
  1600.0 

  1600.0 

  1600.0   
  1600.0 

  1427.0 

  1427.0   
  2023-10-27 05:29 

  2023-10-27 05:29 

  2024-03-25 17:00   
  2023-10-27 05:29 

  2024-03-25 17:00 

  2024-12-31 17:00   
  ACTIVE     TRANSMISSION     FORCED      ONPATH     PPW     continuous:Segment two controller not working properly:JBSN-JB345 = 2150. PacifiCorp = 1433. IPCo = 717.:     2024-02-12 09:57     134274     2024-03-24 16:52  
  PPW 23-21675     14822     PPW     Threemile Knoll: THREEMLE 360A 345KV CAP DIS,Threemile Knoll: Series Cap C1,Threemile Knoll: Series          JBSN-JB345(PPW) 
  NUT-PATHC(PPW) 
  PATHC-NUT(PPW) 

  NUT-PATHC(PPW)   
  1600.0 
  1172.0 
  1600.0 

  1060.0   
  1600.0 
  1172.0 
  1600.0 

  1060.0   
  1433.0 
  730.0 
  1480.0 

  618.0   
  2023-11-24 02:21 
  2023-11-24 02:21 
  2023-11-24 02:21 

  2024-04-01 00:00   
  2024-05-01 16:00 
  2024-04-01 00:00 
  2024-05-01 16:00 

  2024-05-01 16:00   
  ACTIVE     TRANSMISSION     FORCED      ONPATH     PPW     continuous:repair switch 360A:JBSN-JB345 = 2150. PacifiCorp = 1433. IPCo = 717 NUT-PATHC = 730 Summer/730 Winter. PATHC-NUT = 1480 Summer/1560 Winter.:     2023-12-14 12:21     136090     2024-04-02 12:33  
  PPW 23-20576     13993     PPW     Dave Johnston: TIE CB 1H216,Dave Johnston: LINE CB 1H218          WYOEAST-AEOW(PPW)      1800.0      1800.0      1800.0      2023-12-13 08:35      2024-07-18 14:00      ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Rebuild the Amasa Bay to a higher amperage:No de-rate to AW/4B with Amasa-Windstar 230 kV termporary line in service.:     2023-11-06 14:38     134976     2024-03-13 13:09  
  PPW 24-00097     14597     PPW     Jim Bridger: 345/20 kV Unit #1 Main Bank (T3485)          JBSN-JB345(PPW) 

  JBSN-JB345(PPW)   
  1600.0 

  1600.0   
  1600.0 

  1600.0   
  1600.0 

  1400.0   
  2023-12-31 06:13 

  2023-12-31 06:45   
  2023-12-31 06:45 

  2024-04-30 00:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Natural Gas Conversion:JBSN-JB345 = 2100. PacifiCorp = 1400. IPCo = 700.:     2023-12-06 13:32     136892     2023-12-31 14:46  
  PPW 24-00488     15058     PPW     Burns: Series Cap Segment #1 & 2          BORA-M500(PPW) 
  SMLK-H500(PPW) 

  BORA-M500(PPW) 
  SMLK-H500(PPW) 

  BORA-M500(PPW) 
  SMLK-H500(PPW)   
  1090.0 
  100.0 

  1090.0 
  100.0 

  1090.0 
  100.0   
  1090.0 
  100.0 

  1090.0 
  100.0 

  1090.0 
  100.0   
  1090.0 
  100.0 

  959.0 
  96.0 

  959.0 
  96.0   
  2024-01-09 03:48 
  2024-01-09 03:48 

  2024-01-09 03:48 
  2024-01-09 03:48 

  2024-03-29 16:00 
  2024-03-29 16:00   
  2024-01-09 03:48 
  2024-01-09 03:48 

  2024-03-29 16:00 
  2024-03-29 16:00 

  2024-04-30 16:00 
  2024-04-30 16:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Investigating a possible failure of relay voltage sensing component.:Path 75 limited to 507 (Midpoint Series Caps bypassed for maint). SMLK-H500 = 96; BORA-M500 = 959;:     2024-01-03 10:34     138306     2024-03-28 10:09  
  PPW 24-00351     15028     PPW     Iron Gate: T-3135          OTHERGEN-PACW(PPW) 

  OTHERGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2024-01-09 08:00 

  2024-01-09 08:54   
  2024-01-09 08:54 

  2024-12-31 15:30   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Plant decommissioning:     2023-12-29 12:31     138153     2024-01-09 08:54  
  PPW 24-00908     15202     PPW     Sigurd: 345/230 kV Bank #6          OTHERGEN-PACE(PPW) 

  OTHERGEN-PACE(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2024-01-09 09:15 

  2024-01-09 12:30   
  2024-01-09 12:30 

  2024-07-01 19:33   
  ACTIVE     TRANSMISSION     URGENT      ONPATH     PPW     continuous: Commissioning required transformer is being replaced Updated 11/02/2023 Take #6 XFMR out of service and replace. Based on oil sample :Possible real-time restrictions to Sigurd Solar.:     2024-01-09 09:18     138727     2024-01-09 12:34  
  PPW 24-00950     15630     PPW     COPCO #2-Iron Gate 69 kV line          OTHERGEN-PACW(PPW) 

  OTHERGEN-PACW(PPW) 

  OTHERGEN-PACW(PPW)   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  0.0 

  0.0   
  2024-01-15 01:43 

  2024-01-15 01:43 

  2024-01-15 17:00   
  2024-01-15 01:43 

  2024-01-15 17:00 

  2024-12-31 17:00   
  ACTIVE     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Wreck out Line-62 SCOTT WHITAKER / KEYLINE 541 430-4526 :Iron Gate Generation will not be available.:     2024-02-09 12:14     138769     2024-02-09 12:14  
  PPW 24-00123     15065     PPW     Lake Park: XFMR 2,Lake Park-Terminal 138kV line          PACE-WESTVALLEY(PPW) 
  WESTVALLEY-PACE(PPW) 

  PACE-WESTVALLEY(PPW) 
  WESTVALLEY-PACE(PPW)   
  210.0 
  210.0 

  210.0 
  210.0   
  210.0 
  210.0 

  210.0 
  210.0   
  210.0 
  210.0 

  210.0 
  210.0   
  2024-01-31 14:00 
  2024-01-31 14:00 

  2024-02-23 01:48 
  2024-02-23 01:48   
  2024-02-23 01:48 
  2024-02-23 01:48 

  2024-04-16 11:20 
  2024-04-16 11:20   
  COMPLETED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:**Commissioning required** Install CB 135:Potential Impact to PACE-WSTV & WSTVY-PACE (West Valley Generation):     2024-01-04 09:56     137341     2024-04-16 11:22  
  PPW 24-05215     16611     PPW     PG&E Cascade: CB 122          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW) 
  PACW-CRAGVIEW(PPW) 

  CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW) 
  PACW-CRAGVIEW(PPW) 

  PACW-CRAGVIEW(PPW)   
  45.0 
  80.0 
  150.0 

  45.0 
  80.0 
  150.0 

  115.0   
  45.0 
  80.0 
  150.0 

  45.0 
  80.0 
  150.0 

  115.0   
  45.0 
  80.0 
  150.0 

  0.0 
  0.0 
  0.0 

  0.0   
  2024-03-24 09:00 
  2024-03-24 09:00 
  2024-03-24 09:00 

  2024-03-24 09:32 
  2024-03-24 09:32 
  2024-03-24 09:32 

  2024-04-01 00:00   
  2024-03-24 09:32 
  2024-03-24 09:32 
  2024-03-24 09:32 

  2024-04-30 15:00 
  2024-04-30 15:00 
  2024-04-01 00:00 

  2024-04-30 15:00   
  ACTIVE     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Path 25 open ended for voltage stability for a PG&E Cottonwood Bank outage. Scheduling Limitation to 0MW bi-directionally. External #24-006973.:CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0.:     2024-03-31 18:03     143040     2024-04-04 15:12  
  PPW 24-04204     16150     PPW     Castella-Nutglade Tap section of the Castella-Crag View-Mount Shasta 69 kV line          CRAGVIEW-DOGCREEK(PPW) 
  HYDROGEN-PACW(PPW) 
  PACW-NTLOAD(PPW) 

  CRAGVIEW-DOGCREEK(PPW) 
  HYDROGEN-PACW(PPW) 
  PACW-NTLOAD(PPW) 

  CRAGVIEW-DOGCREEK(PPW) 
  HYDROGEN-PACW(PPW) 
  PACW-NTLOAD(PPW)   
  18.0 
  9999.0 
  9999.0 

  18.0 
  9999.0 
  9999.0 

  18.0 
  9999.0 
  9999.0   
  18.0 
  9999.0 
  9999.0 

  18.0 
  9999.0 
  9999.0 

  18.0 
  9999.0 
  9999.0   
  18.0 
  9999.0 
  9999.0 

  0.0 
  0.0 
  0.0 

  0.0 
  0.0 
  0.0   
  2024-04-01 00:09 
  2024-04-01 00:09 
  2024-04-01 00:09 

  2024-04-01 00:09 
  2024-04-01 00:09 
  2024-04-01 00:09 

  2024-04-15 18:00 
  2024-04-15 18:00 
  2024-04-15 18:00   
  2024-04-01 00:09 
  2024-04-01 00:09 
  2024-04-01 00:09 

  2024-04-15 18:00 
  2024-04-15 18:00 
  2024-04-15 18:00 

  2024-04-26 18:00 
  2024-04-26 18:00 
  2024-04-26 18:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace Transmision under build poles for continued fire mitigation work. this will be between Nutglade sub, and castella sub.:CRAGVIEW-DOGCREEK = 0 Castella, Shotgun Creek, Slate Creek & Dog Creek will be radial from PG&E Cascade via Dog Creek (Max 3 mw). Network Load Service Arrangements may be required. Slate Creek Generation must be off line.:     2024-03-07 08:48     142028     2024-04-02 11:27  
  PPW 24-06062     16750     PPW     Path 25 Schedule Limitation (Cascade 115 kV Tie)          CRAGVIEW-PACW(PPW) 

  CRAGVIEW-PACW(PPW)   
  108.0 

  108.0   
  108.0 

  108.0   
  108.0 

  0.0   
  2024-04-09 00:00 

  2024-04-09 02:35   
  2024-04-09 02:35 

  2025-04-09 00:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:CRAGVIEW-PACW TTC = 0 PER PLANNING.:CRAGVIEW-PACW = 0 INDEFINITELY:     2024-04-09 09:34     143888     2024-04-09 09:35  
  PPW 24-02583     15606     PPW     Path 25 Schedule Limitation (Cascade 115 kV Tie)          CRAG-CRAGVIEW(PPW) 

  CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 

  45.0 
  80.0   
  45.0 

  45.0 
  80.0   
  45.0 

  0.0 
  80.0   
  2024-04-11 06:00 

  2024-04-12 06:00 
  2024-04-12 06:00   
  2024-04-12 06:00 

  2024-05-08 18:00 
  2024-05-08 18:00   
  Active     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Keswick-Trinity 60kV Line (HFRA) (French Gulch-Trinity SECT) Cleared T-Line Contract to complete tag work at structures to replace poles 015/190, 015/191, 015/192, 016/214, 016/216, 017/227, 026/424, 026/436, 026/438, 027/447, 027/456, replace/repair guywire 014/174, 015/193, replace insulators 016/216, 029/494, 029/501, 029/510, replace/repair conductor 029/501, 030/520, tiewire 025/408 cotter key 029/506:CRAG-CRAGVIEW = 0; CRAGVIEW-CRAG = 80:     2024-02-08 10:05     140404     2024-03-28 09:59  
  PPW 24-03013     15751     PPW     Path 25 Schedule Limitation (Cascade 115 kV Tie)          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  80.0   
  45.0 
  80.0   
  45.0 
  80.0   
  2024-04-15 06:00 
  2024-04-15 06:00   
  2024-04-18 18:00 
  2024-04-18 18:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Volta-Deschutes 60kV Line (HFRA) (Deschutes SECT) AND Kilarc-Volta 60kV Tie Line Cleared T-Line to replace poles 016/354, 016/355, 017/382, 018/393, 018/404, 018/409, 019/421, 019/429, 019/432, repair conductor 017/373, 017/383, 018/416, reframe poles 019/439, 019/440, replace insulators 017/376, 019/435, 019/438:CRAG-CRAGVIEW = 0; CRAGVIEW-CRAG = 80:     2024-02-15 09:46     140835     2024-03-21 14:19  
  PPW 24-05085     16428     PPW     Path 25 Schedule Limitation (Cascade 115 kV Tie)          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  80.0   
  45.0 
  80.0   
  45.0 
  80.0   
  2024-04-15 06:00 
  2024-04-15 06:00   
  2024-04-19 18:00 
  2024-04-19 18:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:T-Line to replace poles 016/354, 016/355, 017/382, 018/393, 018/404, 018/409, 019/421, 019/429, 019/432, repair conductor 017/373, 017/383, 018/416, reframe poles 019/439, 019/440, replace insulators 017/376, 019/435, 019/438:CRAG-CRAGVIEW = 5; CRAGVIEW-CRAG = 80:     2024-03-21 14:12     142910     2024-03-21 14:15  
  PPW 24-06088     16759     PPW     Nutglade: CB 8G95               0.0      0.0      0.0      2024-04-15 07:00      2024-04-15 17:00      CANCELLED     DISTRIBUTION     PLANNED      ONPATH     PPW     1234567 Daily:EDGAR RICO/ WILSON 630-688-5238 Hendricks Spacer Cable installation at various locations Austin Yanke /WILSON Hendricks Spacer Cable installation at various locations 1:     2024-04-09 13:05     143914     2024-04-15 13:40  
  PPW 24-06061     16751     PPW     Umatilla: RC_5W682_171403_5W658               0.0      0.0      0.0      2024-04-15 07:30      2024-04-15 17:30      CANCELLED     DISTRIBUTION     URGENT      ONPATH     PPW     1234567 Daily:WIRE PULLING JOB. UEC TO MCNARY ROCKPILE JOB.:     2024-04-09 09:54     143887     2024-04-15 06:36  
  PPW 24-05960     16722     PPW     Campbell: FR-5814 on a portion of 5R312 on pole 056360               0.0      0.0      0.0      2024-04-15 07:30      2024-04-17 15:00      CANCELLED     DISTRIBUTION     URGENT      ONPATH     PPW     weekly:HOLD FOR MARCUS WYATT 541 591 0799:     2024-04-08 06:17     143786     2024-04-08 06:17  
  PPW 24-05965     16727     PPW     Campbell: FR-5814 on a portion of 5R312 on pole 056360               0.0      0.0      0.0      2024-04-15 07:30      2024-04-15 15:00      CANCELLED     DISTRIBUTION     URGENT      ONPATH     PPW     1234567 Daily:HOLD FOR MARCUS WYATT 541 591 0799:     2024-04-08 06:18     143791     2024-04-15 08:47  
  PPW 24-04321     16185     PPW     Grant Street: CB 4M266               0.0      0.0      0.0      2024-04-15 07:30      2024-04-15 16:00      CANCELLED     DISTRIBUTION     PLANNED      ONPATH     PPW     1234567 Daily:Brett Lulay will be replacing X-Arms on Pole#346403 2550 NW Monroe, Corvallis:     2024-03-07 12:34     142145     2024-04-15 16:05  
  PPW 24-03421     15894     PPW     Path 25 Schedule Limitation (Cascade 115 kV Tie)          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  80.0   
  45.0 
  80.0   
  5.0 
  80.0   
  2024-04-15 08:00 
  2024-04-15 08:00   
  2024-04-19 15:00 
  2024-04-19 15:00   
  Active     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:T-Line to replace poles 016/354, 016/355, 017/382, 018/393, 018/404, 018/409, 019/421, 019/429, 019/432, repair conductor 017/373, 017/383, 018/416, reframe poles 019/439, 019/440, replace insulators 017/376, 019/435, 019/438:CRAG-CRAGVIEW = 5; CRAGVIEW-CRAG = 80:     2024-02-22 13:26     141243     2024-03-21 14:17  
  PPW 24-05076     16455     PPW     Clearwater 2: GSU T-3026, 7, 8          HYDROGEN-PACW(PPW) 

  HYDROGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  2024-04-15 08:00 

  2024-05-07 08:00   
  2024-04-19 15:30 

  2024-05-10 15:30   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Clearwater 2 GSU Transformer Maintenance:Clearwater Unit 2 unavailable.:     2024-03-22 12:38     142901     2024-04-01 11:06  
  PPW 24-05624     16637     PPW     Voelker: CB 5Y631               0.0      0.0      0.0      2024-04-15 08:05      2024-04-15 17:27      COMPLETED     DISTRIBUTION     URGENT      ONPATH     PPW     1234567 Daily:Interset Poles and move wire :     2024-04-02 15:23     143449     2024-04-15 17:30  
  PPW 24-04916     16370     PPW     Big Muddy-Platte Line Jct section of Dave Johnston-Platte line Jct 69kV line               0.0      0.0      0.0      2024-04-15 08:06      2024-04-15 14:45      COMPLETED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:retro fitting existing poles to meet avian specifications. :     2024-03-19 12:59     142741     2024-04-15 14:50  
  PPW 24-02119     15494     PPW     BPA Jones Canyon: Cap Group 1/Section 1          WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  0.0 

  0.0   
  2024-04-15 07:00 

  2024-04-15 08:07 

  2024-04-18 16:00   
  2024-04-15 08:07 

  2024-04-18 16:00 

  2024-04-25 16:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Maintenance:Possible restriction to Leaning Juniper Wind.:     2024-02-01 08:23     139938     2024-04-18 10:39  
  PPW 24-05605     16626     PPW     Casper-Riverton 230 kV line          TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-AEOW(PPW) 

  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-AEOW(PPW)   
  631.0 
  249.0 
  1800.0 

  631.0 
  249.0 
  1800.0   
  631.0 
  249.0 
  1800.0 

  631.0 
  249.0 
  1800.0   
  540.0 
  198.0 
  1675.0 

  540.0 
  198.0 
  1675.0   
  2024-04-15 08:08 
  2024-04-15 08:08 
  2024-04-15 08:08 

  2024-04-15 08:31 
  2024-04-15 08:31 
  2024-04-15 08:31   
  2024-04-15 08:31 
  2024-04-15 08:31 
  2024-04-15 08:31 

  2024-04-26 12:31 
  2024-04-26 12:31 
  2024-04-26 12:31   
  ACTIVE     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Replace 4 strs and 6 arms with other "A" conditions:AW/4B Curve 118. WAPAEAST-WAPANORTH = 198. WYOEAST-AEOW (Aeolus West) = 1675. TOT4B-WYONORTH = 540. TOT 4B = 738. Potential Real Time Impact to Wyoming Generation AW/4B Curve 118. WAPAEAST-WAPANORTH = 198. WYOEAST-AEOW (Aeolus West) = 1675. TOT4B-WYONORTH = 540. TOT 4B = 738. Potential Real Time Impact to Wyoming Generation:     2024-04-01 11:39     143430     2024-04-15 08:11  
  PPW 24-05613     16624     PPW     Raven-Rock Springs 230 kV line          TRONA-WYOCENTRAL(PPW) 
  WYOCENTRAL-TRONA(PPW)   
  640.0 
  640.0   
  640.0 
  640.0   
  404.0 
  404.0   
  2024-04-15 09:16 
  2024-04-15 09:16   
  2024-04-17 14:07 
  2024-04-17 14:07   
  COMPLETED     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Replace str and arms on 230 on Rock Springs to Raven:TRONA-WYOCENTRAL & WYOCENTRAL-TRONA = 404 Summer/560 Winter.:     2024-04-01 11:26     143438     2024-04-17 14:10  
  PPW 24-00416     15050     PPW     Huntington-Pinto 345 kV line          PACE-PINTO(PPW) 
  PINTO-PACE(PPW) 

  PACE-PINTO(PPW) 
  PINTO-PACE(PPW) 

  PACE-PINTO(PPW) 
  PINTO-PACE(PPW) 

  PACE-PINTO(PPW) 
  PINTO-PACE(PPW) 

  PACE-PINTO(PPW) 
  PINTO-PACE(PPW) 

  PACE-PINTO(PPW) 
  PINTO-PACE(PPW) 

  PACE-PINTO(PPW) 
  PINTO-PACE(PPW) 

  PACE-PINTO(PPW) 
  PINTO-PACE(PPW) 

  PACE-PINTO(PPW) 
  PINTO-PACE(PPW) 

  FOURCORNE345-PINTO(PPW) 
  PACE-PINTO(PPW) 
  PINTO-PACE(PPW)   
  740.0 
  700.0 

  740.0 
  700.0 

  740.0 
  700.0 

  740.0 
  700.0 

  740.0 
  700.0 

  740.0 
  700.0 

  740.0 
  700.0 

  740.0 
  700.0 

  740.0 
  700.0 

  660.0 
  740.0 
  700.0   
  740.0 
  700.0 

  740.0 
  700.0 

  740.0 
  700.0 

  740.0 
  700.0 

  740.0 
  700.0 

  740.0 
  700.0 

  740.0 
  700.0 

  740.0 
  700.0 

  740.0 
  700.0 

  660.0 
  740.0 
  700.0   
  740.0 
  700.0 

  740.0 
  700.0 

  740.0 
  700.0 

  740.0 
  700.0 

  740.0 
  700.0 

  740.0 
  700.0 

  740.0 
  700.0 

  740.0 
  700.0 

  740.0 
  700.0 

  660.0 
  0.0 
  0.0   
  2024-01-16 08:00 
  2024-01-16 08:00 

  2024-01-17 08:00 
  2024-01-17 08:00 

  2024-02-13 08:00 
  2024-02-13 08:00 

  2024-02-19 08:00 
  2024-02-19 08:00 

  2024-03-01 08:00 
  2024-03-01 08:00 

  2024-03-13 08:00 
  2024-03-13 08:00 

  2024-04-15 08:00 
  2024-04-15 08:00 

  2024-04-15 09:00 
  2024-04-15 09:00 

  2024-04-15 09:37 
  2024-04-15 09:37 

  2024-04-15 10:00 
  2024-04-15 10:00 
  2024-04-15 10:00   
  2024-01-17 08:00 
  2024-01-17 08:00 

  2024-01-20 15:00 
  2024-01-20 15:00 

  2024-02-15 15:00 
  2024-02-15 15:00 

  2024-02-21 15:00 
  2024-02-21 15:00 

  2024-03-03 15:00 
  2024-03-03 15:00 

  2024-03-15 15:00 
  2024-03-15 15:00 

  2024-04-15 09:00 
  2024-04-15 09:00 

  2024-04-15 09:37 
  2024-04-15 09:37 

  2024-04-15 10:00 
  2024-04-15 10:00 

  2024-04-29 15:00 
  2024-04-29 15:00 
  2024-04-29 15:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:PINTO - Huntington 345KV LINE REPLACE "JUMPER" INSULATORS REPLACE "JUMPER" INSULATORS :PACE-PINTO & PINTO-PACE = 0. FOURCORNE345-PINTO (TOT 2B1 S>N) = Pinto load:     2024-01-02 12:02     138234     2024-04-17 17:37  
  PPW 24-05332     16670     PPW     Carbon-Helper 138kV line          OTHERGEN-PACE(PPW) 

  OTHERGEN-PACE(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  0.0 

  0.0   
  2024-04-15 12:50 

  2024-04-16 14:00   
  2024-04-16 14:00 

  2024-04-17 16:41   
  COMPLETED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Reframing structure 14 on Helper - Moab 138 kV Line:Graphite Solar restricted to < 20MW:     2024-04-04 11:30     143157     2024-04-17 16:46  
  PPW 24-06096     16760     PPW     Nutglade: CB 8G95               0.0      0.0      0.0      2024-04-16 07:00      2024-04-16 17:00      CANCELLED     DISTRIBUTION     PLANNED      ONPATH     PPW     1234567 Daily:EDGAR RICO/ WILSON 630-688-5238 Hendricks Spacer Cable installation at various locations DUSTIN JONES/WILSON 815-980-8555 Hendricks Spacer Cable installation at various locations :     2024-04-09 13:05     143922     2024-04-15 11:48  
  PPW 24-04917     16371     PPW     Big Muddy-Platte Line Jct section of Dave Johnston-Platte line Jct 69kV line               0.0      0.0      0.0      2024-04-16 07:11      2024-04-16 09:01      COMPLETED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:retro fitting existing poles to meet avian specifications. :     2024-03-19 12:59     142742     2024-04-16 09:02  
  PPW 24-05966     16728     PPW     Campbell: FR-5814 on a portion of 5R312 on pole 056360               0.0      0.0      0.0      2024-04-16 07:30      2024-04-16 15:00      CANCELLED     DISTRIBUTION     URGENT      ONPATH     PPW     1234567 Daily:HOLD FOR MARCUS WYATT 541 591 0799:     2024-04-08 06:18     143792     2024-04-15 08:47  
  PPW 24-06066     16752     PPW     Umatilla: RC_5W682_171403_5W658               0.0      0.0      0.0      2024-04-16 07:30      2024-04-16 17:30      CANCELLED     DISTRIBUTION     URGENT      ONPATH     PPW     1234567 Daily:WIRE PULLING JOB. UEC TO MCNARY ROCKPILE JOB.:     2024-04-09 09:54     143892     2024-04-15 12:50  
  PPW 24-06362     16778     PPW     Donkey Creek-Wyodak #2 230 kV line          ANTELOPE-WYOEAST(PPW) 
  WYOEAST-ANTELOPE(PPW) 

  ANTELOPE-WYOEAST(PPW) 
  WYOEAST-ANTELOPE(PPW)   
  376.0 
  376.0 

  376.0 
  376.0   
  376.0 
  376.0 

  376.0 
  376.0   
  376.0 
  376.0 

  376.0 
  376.0   
  2024-04-16 07:00 
  2024-04-16 07:00 

  2024-04-16 07:55 
  2024-04-16 07:55   
  2024-04-16 07:55 
  2024-04-16 07:55 

  2024-04-16 16:22 
  2024-04-16 16:22   
  COMPLETED     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Oil cleanup at Wyodak Baghouse. Need to clean SW 1H7144, breaker 1H1000, and 230kV metering CT/PTs that are between the two.:No impact to ANTE-WYOE or ANTE--WYOE as long as Donkey Creek-WyoDak #1 230 kV line is in service.:     2024-04-15 08:57     144191     2024-04-16 16:23  
  PPW 24-05354     16534     PPW     Hazelwood: CB 4M335               0.0      0.0      0.0      2024-04-16 08:00      2024-04-16 15:00      CANCELLED     DISTRIBUTION     PLANNED      ONPATH     PPW     1234567 Daily:Andy Johnson Will be working on pole #122169 1880 16th Ave. SW:     2024-03-26 20:46     143179     2024-04-16 18:08  
  PPW 24-00025     11808     PPW     BPA Jones Canyon-BPA Santiam 230 kV line          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2024-04-16 08:00      2024-04-16 16:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:BPA work on Tumble Creek-Santiam section.:COI and PDCI restrictions to be determined by BPA. Leaning Juniper restricted to 0 MW during switching, and 40 MW for duration of outage.:     2023-07-28 09:59     126718     2024-04-04 09:02  
  PPW 24-04658     16293     PPW     DG&T Bonanza-Upalco 138 kV line               0.0      0.0      0.0      2024-04-16 08:03      2024-04-16 15:38      COMPLETED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Changing insulators:     2024-03-14 09:53     142483     2024-04-16 15:42  
  PPW 24-05145     16512     PPW     IPCO Borah-Populus #1 345 kV line          EIMPACE-EIMIPCO(PPW) 
  JBSN-JB345(PPW) 
  NUT-PATHC(PPW) 

  EIMPACE-EIMIPCO(PPW) 
  NUT-PATHC(PPW)   
  2350.0 
  1600.0 
  1060.0 

  2350.0 
  1060.0   
  2350.0 
  1600.0 
  1060.0 

  2350.0 
  1060.0   
  2125.0 
  1600.0 
  360.0 

  2350.0 
  1060.0   
  2024-04-16 08:30 
  2024-04-16 08:30 
  2024-04-16 08:30 

  2024-04-16 12:36 
  2024-04-16 12:36   
  2024-04-16 12:36 
  2024-04-16 12:36 
  2024-04-16 12:36 

  2024-04-16 16:00 
  2024-04-16 16:00   
  COMPLETED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Re-attach static on structure # 3/195:NUT-PATHC = 360 Summer/700 Winter. EIMPACE-EIMIPCO (ETSR Transfers) = 2125 No BORA-PATHC de-rate if the Borah-Populus #2 345 kV line is in service. Use NUT-PATHC & JBSN-JB345 restrictions only. JBSN-JB345 = 2400. PacifiCorp = 1600. IPCo = 800. Potential Real Time Generation Restriction.:     2024-03-25 14:21     142970     2024-04-16 12:37  
  PPW 24-05697     16638     PPW     Voelker: CB 5Y631               0.0      0.0      0.0      2024-04-16 09:54      2024-04-16 17:50      COMPLETED     DISTRIBUTION     URGENT      ONPATH     PPW     1234567 Daily:Interset Poles and move wire :     2024-04-02 15:23     143522     2024-04-16 17:53  
  PPW 24-06001     16747     PPW     Wapato: CB 5Y682               0.0      0.0      0.0      2024-04-16 10:06      2024-04-16 17:33      COMPLETED     DISTRIBUTION     PLANNED      ONPATH     PPW     1234567 Daily:R/R Poles, 420 S Naches, Wapato, WA :     2024-04-08 18:43     143827     2024-04-16 17:38  
  PPW 24-04918     16372     PPW     Big Muddy-Platte Line Jct section of Dave Johnston-Platte line Jct 69kV line               0.0      0.0      0.0      2024-04-17 06:30      2024-04-17 16:00      Completed     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:retro fitting existing poles to meet avian specifications. :     2024-03-19 12:59     142743     2024-03-19 12:59  
  PPW 24-06097     16761     PPW     Nutglade: CB 8G95               0.0      0.0      0.0      2024-04-17 07:00      2024-04-17 17:00      CANCELLED     DISTRIBUTION     PLANNED      ONPATH     PPW     1234567 Daily:EDGAR RICO/ WILSON 630-688-5238 Hendricks Spacer Cable installation at various locations DUSTIN JONES/WILSON 815-980-8555 Hendricks Spacer Cable installation at various locations :     2024-04-09 13:06     143923     2024-04-15 11:48  
  PPW 24-04660     16294     PPW     DG&T Bonanza-Upalco 138 kV line               0.0      0.0      0.0      2024-04-17 07:00      2024-04-17 16:00      Completed     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Changing insulators:     2024-03-14 09:53     142485     2024-03-14 09:53  
  PPW 24-06067     16753     PPW     Umatilla: RC_5W682_171403_5W658               0.0      0.0      0.0      2024-04-17 07:26      2024-04-17 16:51      COMPLETED     DISTRIBUTION     URGENT      ONPATH     PPW     1234567 Daily:WIRE PULLING JOB. UEC TO MCNARY ROCKPILE JOB.:     2024-04-09 09:54     143893     2024-04-17 16:56  
  PPW 24-05967     16729     PPW     Campbell: FR-5814 on a portion of 5R312 on pole 056360               0.0      0.0      0.0      2024-04-17 07:30      2024-04-17 15:00      CANCELLED     DISTRIBUTION     URGENT      ONPATH     PPW     1234567 Daily:HOLD FOR MARCUS WYATT 541 591 0799:     2024-04-08 06:18     143793     2024-04-15 08:47  
  PPW 24-05369     16535     PPW     Hazelwood: CB 4M335               0.0      0.0      0.0      2024-04-17 08:00      2024-04-17 15:00      Completed     DISTRIBUTION     PLANNED      ONPATH     PPW     1234567 Daily:Andy Johnson Will be working on pole #122169 1880 16th Ave. SW:     2024-03-26 20:46     143194     2024-03-26 20:46  
  PPW 24-06044     16748     PPW     Wapato: CB 5Y682               0.0      0.0      0.0      2024-04-17 08:29      2024-04-17 16:42      COMPLETED     DISTRIBUTION     PLANNED      ONPATH     PPW     1234567 Daily:R/R Poles, 420 S Naches, Wapato, WA :     2024-04-08 18:43     143870     2024-04-17 16:46  
  PPW 24-05698     16639     PPW     Voelker: CB 5Y631               0.0      0.0      0.0      2024-04-17 09:12      2024-04-17 19:06      COMPLETED     DISTRIBUTION     URGENT      ONPATH     PPW     1234567 Daily:Interset Poles and move wire :     2024-04-02 15:23     143523     2024-04-17 19:07  
  PPW 24-06565     16785     PPW     Emery: 345/6.9 kV Unit 2 Xfmrs 2-1 & 2-2          THERMALGEN-PACE(PPW) 

  THERMALGEN-PACE(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2024-04-17 09:00 

  2024-04-17 09:23   
  2024-04-17 09:23 

  2024-04-20 09:00   
  ACTIVE     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Tube leak repairs.:Hunter (Emery) Unit #2 unavailable.:     2024-04-16 14:24     144394     2024-04-17 09:23  
  PPW 24-05257     16513     PPW     Huntington-Pinto 345 kV line          FOURCORNE345-PINTO(PPW) 
  PACE-PINTO(PPW) 
  PINTO-PACE(PPW) 

  PACE-PINTO(PPW) 
  PINTO-PACE(PPW)   
  660.0 
  740.0 
  700.0 

  740.0 
  700.0   
  660.0 
  740.0 
  700.0 

  740.0 
  700.0   
  660.0 
  740.0 
  700.0 

  740.0 
  700.0   
  2024-04-17 15:00 
  2024-04-17 15:00 
  2024-04-17 15:00 

  2024-04-29 15:00 
  2024-04-29 15:00   
  2024-04-29 15:00 
  2024-04-29 15:00 
  2024-04-29 15:00 

  2024-05-02 15:00 
  2024-05-02 15:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace structures.:PACE-PINTO & PINTO-PACE = 0. FOURCORNE345-PINTO (TOT 2B1 S>N) = Pinto load:     2024-03-25 14:23     143082     2024-04-15 12:40  
  PPW 24-04919     16373     PPW     Big Muddy-Platte Line Jct section of Dave Johnston-Platte line Jct 69kV line               0.0      0.0      0.0      2024-04-18 06:30      2024-04-18 16:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:retro fitting existing poles to meet avian specifications. :     2024-03-19 12:59     142744     2024-04-18 18:10  
  PPW 24-04942     16575     PPW     Hale-Spanish Fork 138kV line          THERMALGEN-PACE(PPW) 

  THERMALGEN-PACE(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  0.0 

  0.0   
  2024-04-18 06:42 

  2024-04-18 08:00   
  2024-04-18 08:00 

  2024-04-19 14:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:FHCA a-condition x-arm replacement str 81 :Possible real-time restriction to Lakeside 1 (Dynamo) generation.:     2024-03-28 12:49     142767     2024-04-18 06:44  
  PPW 24-06068     16754     PPW     Umatilla: RC_5W682_171403_5W658               0.0      0.0      0.0      2024-04-18 07:25      2024-04-18 17:26      COMPLETED     DISTRIBUTION     URGENT      ONPATH     PPW     1234567 Daily:WIRE PULLING JOB. UEC TO MCNARY ROCKPILE JOB.:     2024-04-09 09:54     143894     2024-04-18 17:30  
  PPW 24-06098     16762     PPW     Nutglade: CB 8G95               0.0      0.0      0.0      2024-04-18 07:47      2024-04-18 17:36      COMPLETED     DISTRIBUTION     PLANNED      ONPATH     PPW     1234567 Daily:EDGAR RICO/ WILSON 630-688-5238 Hendricks Spacer Cable installation at various locations DUSTIN JONES/WILSON 815-980-8555 Hendricks Spacer Cable installation at various locations :     2024-04-09 13:06     143924     2024-04-18 17:40  
  PPW 24-06464     16782     PPW     Path 17 Schedule Limitation (IPCo Borah West)          BORA-M500(PPW)      1090.0      1090.0      1029.0      2024-04-18 08:00      2024-04-19 14:30      Active     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Six-year circuit breaker maintenance.:BORA-M500 =1029:     2024-04-16 09:42     144293     2024-04-16 09:46  
  PPW 24-05699     16640     PPW     Voelker: CB 5Y631               0.0      0.0      0.0      2024-04-18 08:04      2024-04-18 14:49      COMPLETED     DISTRIBUTION     URGENT      ONPATH     PPW     1234567 Daily:Interset Poles and move wire :     2024-04-02 15:23     143524     2024-04-18 14:55  
  PPW 24-06045     16749     PPW     Wapato: CB 5Y682               0.0      0.0      0.0      2024-04-18 08:21      2024-04-18 12:19      COMPLETED     DISTRIBUTION     PLANNED      ONPATH     PPW     1234567 Daily:R/R Poles, 420 S Naches, Wapato, WA :     2024-04-08 18:43     143871     2024-04-18 12:29  
  PPW 24-02596     15620     PPW     Copco #2 115 kV Yard-Copco #2 Plant 115 kV line          HYDROGEN-PACW(PPW) 

  HYDROGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2024-03-18 10:00 

  2024-04-18 10:00   
  2024-03-20 15:41 

  2024-04-23 15:00   
  Active     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Relay work. Each circuit breaker to be isolated prior to cycling.:GEN: Copco 2 generation must be off and remain off line for the duration of this outage.:     2024-02-09 09:01     140417     2024-03-12 10:03  
  PPW 24-05468     16719     PPW     Swift #1: Unit #12 Main Transformer - T2100          HYDROGEN-PACW(PPW)      9999.0      9999.0      9999.0      2024-04-18 10:39      2024-04-22 14:39      CANCELLED     TRANSMISSION     URGENT      ONPATH     PPW     continuous:TBD:Swift Unit #12 offline.:     2024-04-05 15:23     143293     2024-04-15 15:10  
  PPW 24-05719     16674     PPW     Vilas: T-3877          OTHERGEN-PACW(PPW) 

  OTHERGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  0.0 

  0.0   
  2024-04-18 20:49 

  2024-04-19 04:00   
  2024-04-19 04:00 

  2024-04-19 05:27   
  COMPLETED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Add oil to LTC :Eagle Point Solar off-line for duration of outage.:     2024-04-04 14:12     143544     2024-04-19 05:29  
  PPW 24-06729     16792     PPW     Columbia (UT): CB 132               0.0      0.0      0.0      2024-04-19 06:06      2024-04-19 10:00      ACTIVE     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Reframe Structure #6 Columbia-Sunnyside 138kV Line:SUNNYSIDE UNAVAILABLE:     2024-04-18 13:15     144559     2024-04-19 06:09  
  PPW 24-04920     16374     PPW     Big Muddy-Platte Line Jct section of Dave Johnston-Platte line Jct 69kV line               0.0      0.0      0.0      2024-04-19 06:30      2024-04-19 16:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:retro fitting existing poles to meet avian specifications. :     2024-03-19 12:59     142745     2024-04-19 07:14  
  PPW 24-06099     16763     PPW     Nutglade: CB 8G95               0.0      0.0      0.0      2024-04-19 07:24      2024-04-19 17:00      ACTIVE     DISTRIBUTION     PLANNED      ONPATH     PPW     1234567 Daily:EDGAR RICO/ WILSON 630-688-5238 Hendricks Spacer Cable installation at various locations Austin Yanke Hendricks Spacer Cable installation at various locations :     2024-04-09 13:06     143925     2024-04-19 07:24  
  PPW 24-06069     16755     PPW     Umatilla: RC_5W682_171403_5W658               0.0      0.0      0.0      2024-04-19 07:30      2024-04-19 17:30      Active     DISTRIBUTION     URGENT      ONPATH     PPW     1234567 Daily:WIRE PULLING JOB. UEC TO MCNARY ROCKPILE JOB.:     2024-04-09 09:54     143895     2024-04-09 09:54  
  PPW 24-05614     16625     PPW     Westvaco-Blacks Fork section of the Blacks Fork-Raven 230 kV line          TRONA-WYOCENTRAL(PPW) 
  WYOCENTRAL-TRONA(PPW)   
  640.0 
  640.0   
  640.0 
  640.0   
  404.0 
  404.0   
  2024-04-19 09:34 
  2024-04-19 09:34   
  2024-04-26 13:34 
  2024-04-26 13:34   
  SCHEDULED     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Replace arms and complete overdue "A" conditions on the Westvaco to Blacksfork 230 section.:TRONA-WYOCENTRAL & WYOCENTRAL-TRONA = 404 Summer/560 Winter.:     2024-04-01 11:34     143439     2024-04-01 11:34  
  PPW 24-06727     16790     PPW     Dave Johnston: #4 Main Bank 357302               0.0      0.0      0.0      2024-04-20 00:00      2024-04-30 00:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Annual Maintenance Outage:     2024-04-18 12:43     144557     2024-04-18 12:43  
  PPW 24-04921     16375     PPW     Big Muddy-Platte Line Jct section of Dave Johnston-Platte line Jct 69kV line               0.0      0.0      0.0      2024-04-20 06:30      2024-04-20 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:retro fitting existing poles to meet avian specifications. :     2024-03-19 12:59     142746     2024-03-19 12:59  
  PPW 24-06100     16764     PPW     Nutglade: CB 8G95               0.0      0.0      0.0      2024-04-20 07:00      2024-04-20 17:00      SCHEDULED     DISTRIBUTION     PLANNED      ONPATH     PPW     1234567 Daily:EDGAR RICO/ WILSON 630-688-5238 Hendricks Spacer Cable installation at various locations DUSTIN JONES/WILSON 815-980-8555 Hendricks Spacer Cable installation at various locations :     2024-04-09 13:06     143926     2024-04-09 13:06  
  PPW 24-05473     16574     PPW     Swift #1: Unit #13 Main Transformer - T30          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2024-04-21 07:00      2024-04-26 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:TBD:Swift unit #13 offline.:     2024-03-28 12:33     143298     2024-03-28 12:33  
  PPW 24-04922     16376     PPW     Big Muddy-Platte Line Jct section of Dave Johnston-Platte line Jct 69kV line               0.0      0.0      0.0      2024-04-22 06:30      2024-04-22 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:retro fitting existing poles to meet avian specifications. :     2024-03-19 12:59     142747     2024-03-19 12:59  
  PPW 24-06240     16776     PPW     IPCo Midpoint: 500 kV Series Cap C506          BORA-M500(PPW)      1090.0      1090.0      1090.0      2024-04-22 06:30      2024-04-26 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Place gravel in capacitor bank yard.:BORA-M500 = 1090;:     2024-04-12 10:23     144069     2024-04-12 10:27  
  PPW 24-03787     16003     PPW     Path 25 Schedule Limitation (Cascade 115 kV Tie)          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  80.0   
  45.0 
  80.0   
  5.0 
  80.0   
  2024-04-22 07:00 
  2024-04-22 07:00   
  2024-04-26 09:00 
  2024-04-26 09:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Remove temp poles, install new jack bus and make main bus connections.:CRAG-CRAGVIEW = 5; CRAGVIEW-CRAG = 80:     2024-02-28 12:15     141611     2024-03-21 14:21  
  PPW 24-06562     16786     PPW     Parowan-Sigurd-West Cedar 230 kV line          OTHERGEN-PACE(PPW)      9999.0      9999.0      0.0      2024-04-22 07:30      2024-04-22 16:00      SCHEDULED     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Remove Debris over center phase Insulators/ Parowan Valley:Granite Mountain Solar West (50MW) restricted to 0 MW.:     2024-04-16 15:11     144391     2024-04-16 15:11  
  PPW 24-04934     16576     PPW     Hale-Tanner 138 kV line          THERMALGEN-PACE(PPW)      9999.0      9999.0      0.0      2024-04-22 08:00      2024-04-24 14:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:FHCA a-condition str replacement str #4:Possible real-time restriction to Lakeside 1 (Dynamo) generation.:     2024-03-28 13:21     142759     2024-03-28 13:21  
  PPW 24-02144     15521     PPW     Clearwater Switching Station: CB 2U157          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2024-04-22 10:00      2024-04-26 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Breaker minor maint.:Clearwater 1 Hydro unavailable.:     2024-02-02 13:07     139963     2024-02-02 13:07  
  PPW 24-06522     16783     PPW     Naughton: Unit #1 Main Bank          THERMALGEN-PACE(PPW)      9999.0      9999.0      0.0      2024-04-22 21:00      2024-04-23 12:00      SCHEDULED     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Circulation water line repair.:Naughton Unit #1 unavailable.:     2024-04-16 09:54     144351     2024-04-16 09:54  
  PPW 24-05263     16505     PPW     Path 17 Schedule Limitation (IPCo Borah West)          BORA-M500(PPW) 
  EIMPACE-EIMIPCO(PPW) 

  BORA-M500(PPW) 
  EIMPACE-EIMIPCO(PPW)   
  1090.0 
  2350.0 

  1090.0 
  2350.0   
  1090.0 
  2350.0 

  1090.0 
  2350.0   
  797.0 
  2125.0 

  1090.0 
  2350.0   
  2024-04-23 06:00 
  2024-04-23 06:00 

  2024-05-31 16:00 
  2024-05-31 16:00   
  2024-05-31 16:00 
  2024-05-31 16:00 

  2024-07-26 16:00 
  2024-07-26 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Build out 345kV bay:BORA-M500 = No Bridger West Impact. EIMPACE-EIMIPCO (ETSR Transfers) = 2125:     2024-03-25 10:35     143088     2024-04-05 09:19  
  PPW 24-04923     16377     PPW     Big Muddy-Platte Line Jct section of Dave Johnston-Platte line Jct 69kV line               0.0      0.0      0.0      2024-04-23 06:30      2024-04-23 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:retro fitting existing poles to meet avian specifications. :     2024-03-19 12:59     142748     2024-03-19 12:59  
  PPW 24-02031     15479     PPW     BPA McNary: 230 kV Main Bus Section #3,BPA McNary: 230/115 kV Bank #9          MCNARY-WALLULA(PPW) 
  WALLULA-MCNARY(PPW) 

  MCNARY-WALLULA(PPW) 
  WALLULA-MCNARY(PPW) 

  MCNARY-WALLULA(PPW) 
  WALLULA-MCNARY(PPW)   
  480.0 
  480.0 

  480.0 
  480.0 

  480.0 
  480.0   
  480.0 
  480.0 

  480.0 
  480.0 

  480.0 
  480.0   
  402.0 
  402.0 

  402.0 
  402.0 

  402.0 
  402.0   
  2024-04-23 08:00 
  2024-04-23 08:00 

  2024-04-24 07:00 
  2024-04-24 07:00 

  2024-04-24 16:00 
  2024-04-24 16:00   
  2024-04-24 07:00 
  2024-04-24 07:00 

  2024-04-24 16:00 
  2024-04-24 16:00 

  2024-04-24 17:00 
  2024-04-24 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Attach the main bus to the A-437 disconnect.:     2024-01-31 10:56     139850     2024-03-26 13:04  
  PPW 24-04924     16378     PPW     Big Muddy-Platte Line Jct section of Dave Johnston-Platte line Jct 69kV line               0.0      0.0      0.0      2024-04-24 06:30      2024-04-24 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:retro fitting existing poles to meet avian specifications. :     2024-03-19 12:59     142749     2024-03-19 12:59  
  PPW 24-05736     16675     PPW     Crowfoot-Weirich section of the Fry-Weirich 115 kV line          PACW-NTLOAD(PPW)      9999.0      9999.0      0.0      2024-04-24 07:00      2024-04-24 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Inter set distribution pole. 38089 Weirich Dr., Lebanon:Sweet Home & Weirich will be radial from BPA Albany. Network Load Service Arrangements may be required.:     2024-04-04 14:23     143561     2024-04-04 14:25  
  PPW 24-05733     16784     PPW     Communications Sites: Scipio Pass (UT) Communications Site          OTHERGEN-PACE(PPW)      9999.0      9999.0      0.0      2024-04-24 09:30      2024-04-24 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace microwave communications equipment.:BLUNDELL AND SULPURDALE GEOTHERMAL REQUIRED OFFLINE.:     2024-04-16 13:47     143558     2024-04-16 14:02  
  PPW 24-04925     16379     PPW     Big Muddy-Platte Line Jct section of Dave Johnston-Platte line Jct 69kV line               0.0      0.0      0.0      2024-04-25 06:30      2024-04-25 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:retro fitting existing poles to meet avian specifications. :     2024-03-19 12:59     142750     2024-03-19 12:59  
  PPW 24-06318     16775     PPW     Mile Hi: CB 5L104,Mile Hi: CB 5L105          OTHERGEN-PACW(PPW)      9999.0      9999.0      0.0      2024-04-25 10:00      2024-04-25 17:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Feeder Tie with 5L104 and 5L105 to energize new 1000mcm copper Get-A-Way on 5L104. move load from 5L104 to 5L105 . :Metzker (Lakeview) Solar unavailable.:     2024-04-12 09:16     144147     2024-04-15 10:46  
  PPW 24-04926     16380     PPW     Big Muddy-Platte Line Jct section of Dave Johnston-Platte line Jct 69kV line               0.0      0.0      0.0      2024-04-26 06:30      2024-04-26 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:retro fitting existing poles to meet avian specifications. :     2024-03-19 12:59     142751     2024-03-19 12:59  
  PPW 24-06016     16788     PPW     Emery: GEN CB 302               0.0      0.0      0.0      2024-04-29 06:30      2024-07-29 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace CB302 at Emery:     2024-04-18 10:29     143842     2024-04-18 10:29  
  PPW 24-04565     16281     PPW     Populus-Terminal 345 kV line          NUT-PACE(PPW) 
  NUT-PATHC(PPW) 
  PACE-NUT(PPW) 
  PATHC-NUT(PPW)   
  2563.0 
  1060.0 
  2563.0 
  1600.0   
  2563.0 
  1060.0 
  2563.0 
  1600.0   
  1398.0 
  788.0 
  1398.0 
  1600.0   
  2024-04-29 07:00 
  2024-04-29 07:00 
  2024-04-29 07:00 
  2024-04-29 07:00   
  2024-05-09 14:00 
  2024-05-09 14:00 
  2024-05-09 14:00 
  2024-05-09 14:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Bridgerland: Commission CBs 10C4, 10C7, 10D20, SWs 10C1, 10C2(GRD), 10C3, 10C5, 10C6, 10C11, 10D18, 10D19, 10D21, 10D22, 10C23 (GRD), 10F25, PTs 6, 7,8. Leave SW 10F25 open and tagged.:NUT-PACE & PACE-NUT = 1398. NUT-PATHC = 800 Summer/900 Winter. PATHC-NUT = 1410 Summer/No restriction Winter:     2024-03-13 15:08     142390     2024-03-15 10:22  
  PPW 24-04119     16149     PPW     Diamond Hill-EWEB McKenzie section of the BPA Alvey-Diamond Hill 230 kV line          PACW-NTLOAD(PPW) 

  PACW-NTLOAD(PPW) 

  PACW-NTLOAD(PPW)   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  0.0   
  2024-03-26 08:00 

  2024-04-03 08:00 

  2024-04-29 08:00   
  2024-04-03 08:00 

  2024-04-10 13:00 

  2024-05-08 13:00   
  SCHEDULED     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Install Coyote Splice Box on pole 5/35 pulling fiber to 2/36.:Network Load Service must be arranged for EWEB McKenzie. Eliminates ability to move Network Load Service from Alvey to Gresham. Eliminates C&T Point to Point Service from Troutdale to Summer Lake.:     2024-03-07 08:40     141943     2024-03-13 14:31  
  PPW 24-02594     15629     PPW     BPA Malin-Summer Lake 500 kV line          PACW-SMLK(PPW) 
  SMLK-PACW(PPW)   
  550.0 
  1187.0   
  550.0 
  1187.0   
  0.0 
  0.0   
  2024-04-29 08:00 
  2024-04-29 08:00   
  2024-05-24 15:00 
  2024-05-24 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Major/Control Relay Maintenance on the BPA Summer Lake - Malin Line Relays at BPA Summer Lake. Line can remain in-service. Relays will be removed one-at-a-time with redundant relaying.:PACW-SMLK & SMLK-PACW = 0. Eliminates ESM Point to Point Service from Troutdale to Summer Lake. Eliminates Ability to Transfer Bridger Generation for Network Load Service to Southern Oregon.:     2024-02-09 11:53     140415     2024-02-09 11:53  
  PPW 24-05026     16427     PPW     Dixonville: 115 kV Main Bus,Dixonville-Glide Tap section of the Dixonville-Toketee Switch Station 11          HYDROGEN-PACW(PPW) 

  HYDROGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2024-04-15 08:00 

  2024-04-29 08:00   
  2024-04-29 08:00 

  2024-05-16 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:This work will replace SW 2U2A, SW 2U23 and 2U21. Reconductor from SW 2U2A to SW 2U23 and 2U22 to SW 2U21.:Umpqua River Hydro Project Restriction = 174 Summer/199 Winter.:     2024-03-21 10:37     142851     2024-04-09 08:22  
  PPW 24-02145     15520     PPW     Clearwater Switching Station: CB 2U155          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2024-04-29 10:00      2024-05-03 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Breaker minor maint.:Lemolo 2 and Clearwater 2 Hydro unavailable.:     2024-02-02 13:00     139964     2024-02-02 13:00  
  PPW 24-01180     15261     PPW     COPCO No. 2-Ager section of COPCO No. 2-Yreka 115 kV line          CRAGVIEW-CRAG(PPW) 

  CRAGVIEW-CRAG(PPW) 

  CRAGVIEW-CRAG(PPW) 

  CRAGVIEW-CRAG(PPW)   
  80.0 

  80.0 

  80.0 

  80.0   
  80.0 

  80.0 

  80.0 

  80.0   
  80.0 

  80.0 

  80.0 

  60.0   
  2024-01-31 15:00 

  2024-03-20 15:00 

  2024-04-08 15:00 

  2024-04-29 15:00   
  2024-01-31 18:00 

  2024-03-20 18:00 

  2024-04-08 18:00 

  2024-04-29 18:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:REPLACE JUMPER CONNECTOR ON SWITCH 2G75:CRAGVIEW-CRAG = 60 summer/ 80 winter.:     2024-01-16 09:49     138999     2024-04-05 11:00  
  PPW 24-06189     16770     PPW     Sigurd-Sigurd Solar 230 kV,Sigurd Solar: SW 89-H          OTHERGEN-PACE(PPW)      9999.0      9999.0      0.0      2024-04-29 19:00      2024-04-30 04:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Annual maintenance on Sigurd Solar switch 89-H1.:Sigurd Solar generation unavailable.:     2024-04-10 15:05     144018     2024-04-10 15:13  
  PPW 24-06728     16791     PPW     Yellowtail-NWE Rimrock 161 kV line               0.0      0.0      0.0      2024-04-30 07:30      2024-04-30 15:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:HOLD YELLOWTAIL - RIMROCK OPEN FOR NWE WORK. NO CLEARANCE.:No Impact to WYON-YTP or YTP-WYON. The Yellowtail-Rimrock 161 kV line is not a component of the Yellowtail-South Path.:     2024-04-18 12:54     144558     2024-04-18 12:54  
  PPW 24-04376     16194     PPW     Red Butte-Harry Allen 345 kV line          REDB-REDBL(PPW) 
  REDBL-REDB(PPW) 

  REDB-REDBL(PPW) 
  REDBL-REDB(PPW)   
  515.0 
  515.0 

  515.0 
  515.0   
  515.0 
  515.0 

  515.0 
  515.0   
  515.0 
  515.0 

  0.0 
  0.0   
  2024-04-16 08:00 
  2024-04-16 08:00 

  2024-04-30 08:00 
  2024-04-30 08:00   
  2024-04-16 13:00 
  2024-04-16 13:00 

  2024-04-30 13:00 
  2024-04-30 13:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Clear Bird nest at STR 1:REDBL-REDB & REDB-REDBL (TOT 2C) = 0.:     2024-03-08 12:33     142200     2024-04-16 14:47  
  PPW 24-06131     16766     PPW     Blacks Fork-Monument 230 kV line          TRONA-WYOCENTRAL(PPW) 
  WYOCENTRAL-TRONA(PPW)   
  640.0 
  640.0   
  640.0 
  640.0   
  404.0 
  404.0   
  2024-04-30 08:18 
  2024-04-30 08:18   
  2024-05-04 12:18 
  2024-05-04 12:18   
  SCHEDULED     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Change out rotten arms on Blacks fork to Monument 230 line.:TRONA-WYOCENTRAL & WYOCENTRAL-TRONA = 404 Summer/560 Winter.:     2024-04-10 10:06     143957     2024-04-11 10:11  
  PPW 24-01895     15984     PPW     Roberts Creek: CB 3U66          THERMALGEN-PACW(PPW) 

  THERMALGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2024-04-10 10:00 

  2024-04-30 10:00   
  2024-04-12 16:30 

  2024-05-03 16:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:BMMO, Breaker minor maint.:Roseburg Forest Products Plant Net generation or load curtailed to 20 MW or less:     2024-02-26 13:44     139714     2024-03-22 12:15  
  PPW 24-02363     15563     PPW     Path 25 Schedule Limitation (Cascade 115 kV Tie)          CRAG-CRAGVIEW(PPW) 

  CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 

  45.0 
  80.0   
  45.0 

  45.0 
  80.0   
  45.0 

  0.0 
  80.0   
  2024-04-01 05:00 

  2024-05-01 05:00 
  2024-05-01 05:00   
  2024-04-01 05:05 

  2024-05-01 05:05 
  2024-05-01 05:05   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Benton 60kV CB 42 Breaker Maintenance:CRAG-CRAGVIEW = 0; CRAGVIEW-CRAG = 80:     2024-02-05 10:46     140182     2024-03-28 13:05  
  PPW 24-04647     16282     PPW     Path 25 Schedule Limitation (Cascade 115 kV Tie)          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  80.0   
  45.0 
  80.0   
  5.0 
  80.0   
  2024-05-01 06:00 
  2024-05-01 06:00   
  2024-05-01 18:00 
  2024-05-01 18:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:PAINT STRUCTURE 016/353 DESCHUTES SW 59 (HWY 44).:CRAG-CRAGVIEW = 5; CRAGVIEW-CRAG = 80:     2024-03-14 09:28     142472     2024-03-21 14:29  
  PPW 24-02138     15495     PPW     BPA McNary: CB B997          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2024-02-05 07:00      2024-02-06 16:00      CANCELLED     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Diagnostic Service.:     2024-02-01 10:13     139957     2024-02-02 10:47  
  PPW 24-02188     15519     PPW     Upalco-Emma Park 138 kV line          PACE-NTLOAD(PPW) 
  PACE-VNL(PPW) 
  VNL-PACE(PPW) 

  PACE-NTLOAD(PPW) 
  PACE-VNL(PPW) 
  VNL-PACE(PPW)   
  9999.0 
  140.0 
  138.0 

  9999.0 
  140.0 
  138.0   
  9999.0 
  140.0 
  138.0 

  9999.0 
  140.0 
  138.0   
  9999.0 
  140.0 
  138.0 

  0.0 
  0.0 
  0.0   
  2024-02-26 08:00 
  2024-02-26 08:00 
  2024-02-26 08:00 

  2024-05-01 08:00 
  2024-05-01 08:00 
  2024-05-01 08:00   
  2024-02-28 17:00 
  2024-02-28 17:00 
  2024-02-28 17:00 

  2024-05-03 17:00 
  2024-05-03 17:00 
  2024-05-03 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace structures 349, 375:PACE-VNL = 0. VNL-PACE = Ashley load. Network Load Service Arrangements may be required for Ashley. Impact to TOT-1A & CRSP Schedules. Bonanza West (Path 33) = 645.:     2024-02-02 12:40     140007     2024-02-21 09:28  
  PPW 24-03806     16012     PPW     BPA McNary: CB A400          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2024-05-02 06:30      2024-05-02 11:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:BPA CB maintenance. CB bypassed.:Orchard Wind Farm restricted to 0 MW. Limit Orchard Wind Farm to 0 MW.:     2024-02-28 14:49     141630     2024-02-28 14:49  
  PPW 24-06018     16769     PPW     BPA Salem-Dallas section of the BPA Salem-Monpac 115 kV line          PACW-NTLOAD(PPW)      9999.0      9999.0      0.0      2024-05-02 10:10      2024-07-03 14:10      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Road widening for round about Hwy 99 and Clow Corner. :Network Load Service may need to arranged for Dallas & Independence via Monpac. (Monpac Sw 2M88 will be closed & Dallas Sw 2M150 will be open) BPA to Stay Normal at Salem on CB B52 & Albany CB B518.:     2024-04-10 14:40     143844     2024-04-10 14:48  
  PPW 24-05086     16429     PPW     Path 25 Schedule Limitation (Cascade 115 kV Tie)          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  80.0   
  45.0 
  80.0   
  5.0 
  80.0   
  2024-05-03 06:00 
  2024-05-03 06:00   
  2024-05-03 18:00 
  2024-05-03 18:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:T-Line to replace poles 000/004, 006/129 & replace/repair hardware 005/104:CRAG-CRAGVIEW = 5; CRAGVIEW-CRAG = 80:     2024-03-21 14:47     142911     2024-03-21 14:47  
  PPW 24-06132     16767     PPW     Firehole-Little Mtn section of the Firehole-WAPA Flaming Gorge 230 kV line          FGE-WYOCENTRAL(PPW) 
  PACW-NTLOAD(PPW) 
  WYOCENTRAL-FGE(PPW) 

  FGE-WYOCENTRAL(PPW) 
  PACW-NTLOAD(PPW) 
  WYOCENTRAL-FGE(PPW)   
  200.0 
  9999.0 
  200.0 

  200.0 
  9999.0 
  200.0   
  200.0 
  9999.0 
  200.0 

  200.0 
  9999.0 
  200.0   
  20.0 
  0.0 
  0.0 

  200.0 
  9999.0 
  200.0   
  2024-05-03 08:40 
  2024-05-03 08:40 
  2024-05-03 08:40 

  2024-05-07 12:40 
  2024-05-07 12:40 
  2024-05-07 12:40   
  2024-05-07 12:40 
  2024-05-07 12:40 
  2024-05-07 12:40 

  2024-06-07 12:40 
  2024-06-07 12:40 
  2024-06-07 12:40   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Change out rotten arms on multiple strs on the Firehole to Little mtn section 230kv line.:WYOCENTRAL-FGE = 0. FGE-WYOCENTRAL = Little Mtn Load. Network Load Service Arrangements may be required. WYOCENTRAL-FGE = 0. FGE-WYOCENTRAL = Little Mtn Load. Network Load Service Arrangements may be required.:     2024-04-10 10:27     143958     2024-04-17 10:24  
  PPW 24-03530     15944     PPW     Klamath Co-Gen: GSU 301          THERMALGEN-PACW(PPW)      9999.0      9999.0      0.0      2024-05-03 10:00      2024-05-24 14:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:High Side grounding on GSU 301:Klamath Co-Gen GSU301 unavailable.:     2024-02-23 16:17     141352     2024-02-23 16:17  
  PPW 24-03528     15942     PPW     Klamath Co-Gen: GSU 101          THERMALGEN-PACW(PPW)      9999.0      9999.0      0.0      2024-05-03 15:56      2024-05-10 19:56      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:GSU101 Testing:Klamath Co-Gen GSU101 unavailable.:     2024-02-23 15:59     141350     2024-02-23 15:59  
  PPW 24-06324     16779     PPW     Emery-Spanish Fork 345 kV line          THERMALGEN-PACE(PPW)      9999.0      9999.0      0.0      2024-05-06 07:00      2024-05-12 14:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Gateway South OL360A, 360b line crossing -Emery - Spanish Fork and Huntington to Spanish Fork 345kV:Hunter Unit #2 unavailable.:     2024-04-15 10:06     144153     2024-04-15 10:06  
  PPW 24-01664     15352     PPW     Captain Jack-Olinda 500 kV line          MALIN500-RDM500(PPW) 
  RDM500-MALIN500(PPW)   
  800.0 
  612.0   
  800.0 
  612.0   
  475.0 
  416.0   
  2024-05-06 08:00 
  2024-05-06 08:00   
  2024-05-10 15:00 
  2024-05-10 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:WAPA to replace river crossing spacers:MALIN500-RDM500 = 475. RDM500-MALIN500 = 416.:     2024-01-24 09:56     139483     2024-01-24 09:56  
  PPW 24-00664     15092     PPW     Fry: 230/115 kV Bank #1 T2254          PACW-NTLOAD(PPW)      9999.0      9999.0      0.0      2024-05-06 08:01      2024-05-17 14:01      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:LTC Maint.:Murder Creek and Oremet substations fed from BPA Albany-BPA Salem 115 kV line. Network load service may be needed.:     2024-01-05 12:52     138482     2024-01-05 12:52  
  PPW 24-05827     16671     PPW     IPCO Borah: C341 Series Cap (Populus #1)          JBSN-JB345(PPW) 
  NUT-PATHC(PPW)   
  1600.0 
  1060.0   
  1600.0 
  1060.0   
  1600.0 
  800.0   
  2024-05-06 09:00 
  2024-05-06 09:00   
  2024-05-10 15:00 
  2024-05-10 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Yearly inspection:NUT-PATHC = 800 Summer/900 Winter.:     2024-04-04 12:05     143653     2024-04-04 12:05  
  PPW 24-06198     16773     PPW     Hale-Midway 138 kV line          DEER_CREEK-PACE(PPW) 
  HYDROGEN-PACE(PPW)   
  5.0 
  9999.0   
  5.0 
  9999.0   
  0.0 
  0.0   
  2024-05-07 07:00 
  2024-05-07 07:00   
  2024-05-16 16:00 
  2024-05-16 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install new relaying :DRCRK-PACE = 0. Deer Creek Hydro unavailable.:     2024-04-11 10:32     144027     2024-04-11 10:32  
  PPW 24-06070     16756     PPW     BPA Foster Tap-BPA Lebanon Section of the Foster-BPA Lebanon 115 kV Line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2024-05-08 08:00      2024-05-08 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Trip checks to Foster CB 2M38 and USACOE CBs XP1, XP2, and XP02.:Foster Hydro USCE Unit #1 and #2 unavailable.:     2024-04-09 10:02     143896     2024-04-09 10:02  
  PPW 24-02531     15595     PPW     BPA McNary: 115/69 kV Bank #10          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2024-05-09 07:00      2024-05-09 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Differential relay test trip checks.:Orchard Wind required offline.:     2024-02-07 14:32     140352     2024-02-07 14:32  
  PPW 24-05527     16631     PPW     Bridgerland: 345/138 kV XFMR          NUT-PACE(PPW) 
  NUT-PATHC(PPW) 
  PACE-NUT(PPW) 
  PATHC-NUT(PPW)   
  2563.0 
  1060.0 
  2563.0 
  1600.0   
  2563.0 
  1060.0 
  2563.0 
  1600.0   
  1398.0 
  688.0 
  1398.0 
  1410.0   
  2024-05-10 07:00 
  2024-05-10 07:00 
  2024-05-10 07:00 
  2024-05-10 07:00   
  2024-05-10 14:00 
  2024-05-10 14:00 
  2024-05-10 14:00 
  2024-05-10 14:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:**Commissioning REQ** Bridgerland Commission CBs 7H43, 7H46 SWs 7H44, 7H45, 7F26, 3P27 Station Service PTs 9, 10 XFMR 1:NUT-PACE & PACE-NUT = 1398. NUT-PATHC = 800 Summer/900 Winter. PATHC-NUT = 1410 Summer/No restriction Winter:     2024-04-02 14:54     143352     2024-04-02 14:54  
  PPW 24-03529     15943     PPW     Klamath Co-Gen: GSU 201          THERMALGEN-PACW(PPW)      9999.0      9999.0      0.0      2024-05-10 14:00      2024-05-24 14:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:GSU 201 Testing:Klamath Co-Gen GSU201 unavailable.:     2024-02-23 16:11     141351     2024-02-23 16:11  
  PPW 24-03753     16001     PPW     Klamath Co-Gen: 11L20 ABC SW          THERMALGEN-PACW(PPW) 

  THERMALGEN-PACW(PPW) 

  THERMALGEN-PACW(PPW)   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  0.0 

  9999.0   
  2024-05-10 14:00 

  2024-05-10 14:30 

  2024-05-24 13:30   
  2024-05-10 14:30 

  2024-05-24 13:30 

  2024-05-24 14:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace SW blades and operators on 11L20:Klamath Co-Generation #201 unavailable.:     2024-02-28 10:10     141577     2024-02-29 13:40  
  PPW 24-03435     15930     PPW     BPA Summer Lake: CB 4957,BPA Summer Lake: CB 4958,Hemingway-Summer Lake 500 kV line          BORA-M500(PPW) 
  H500-SMLK(PPW) 
  PACW-NTLOAD(PPW) 
  SMLK-H500(PPW)   
  1090.0 
  1500.0 
  9999.0 
  100.0   
  1090.0 
  1500.0 
  9999.0 
  100.0   
  1090.0 
  1500.0 
  9999.0 
  100.0   
  2024-05-11 08:00 
  2024-05-11 08:00 
  2024-05-11 08:00 
  2024-05-11 08:00   
  2024-05-24 17:00 
  2024-05-24 17:00 
  2024-05-24 17:00 
  2024-05-24 17:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:BPA Summer Lake CB 4957 Maintenance, CB 4958 Repairs:H500-SMLK & SMLK-H500 = 0; BORA-M500 = 959; Network Load Service Arrangements may be required for Southern Oregon Load.:     2024-02-23 14:40     141257     2024-04-08 10:38  
  PPW 24-02591     15631     PPW     BPA Summer Lake: CB 4957,BPA Summer Lake: CB 4958,Hemingway-Summer Lake 500 kV line          H500-SMLK(PPW) 
  PACW-NTLOAD(PPW) 
  SMLK-H500(PPW)   
  1500.0 
  9999.0 
  100.0   
  1500.0 
  9999.0 
  100.0   
  0.0 
  0.0 
  0.0   
  2024-05-11 08:00 
  2024-05-11 08:00 
  2024-05-11 08:00   
  2024-05-24 17:00 
  2024-05-24 17:00 
  2024-05-24 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Major/Control Relay Maintenance:H500-SMLK & SMLK-H500 = 0; BORA-M500 = 959; Network Load Service Arrangements may be required for Southern Oregon Load.:     2024-02-09 12:21     140412     2024-02-09 12:21  
  PPW 24-00011     10513     PPW     Hemingway-Summer Lake 500 kV line          H500-SMLK(PPW) 
  JBSN-JB345(PPW) 
  PACW-NTLOAD(PPW) 
  SMLK-H500(PPW)   
  1500.0 
  1600.0 
  9999.0 
  100.0   
  1500.0 
  1600.0 
  9999.0 
  100.0   
  0.0 
  1600.0 
  0.0 
  0.0   
  2024-05-11 08:00 
  2024-05-11 08:00 
  2024-05-11 08:00 
  2024-05-11 08:00   
  2024-05-24 17:00 
  2024-05-24 17:00 
  2024-05-24 17:00 
  2024-05-24 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Spacer replacement :H500-SMLK & SMLK-H500 = 0; Network Load Service Arrangements may be required for Southern Oregon Load.:     2023-02-10 12:28     114287     2023-02-14 13:50  
  PPW 24-04733     16312     PPW     Latigo-Three Buttes 230 kV line          WINDGEN-PACE(PPW)      9999.0      9999.0      0.0      2024-05-13 06:00      2024-05-16 18:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Annual outage.:Three Buttes Wind unavailable.:     2024-03-15 10:03     142558     2024-03-15 10:03  
  PPW 24-06268     16781     PPW     CCPD River Road Plant: PCB 1          THERMALGEN-PACW(PPW)      9999.0      9999.0      0.0      2024-05-13 07:30      2024-05-31 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Overhaul River Road PCB-1 and Install new disconnects.:CCPD River Road unavailable.:     2024-04-16 08:56     144097     2024-04-16 08:56  
  PPW 24-06077     16757     PPW     Moonshine: 230/34.5 kV Bank T-1          WINDGEN-PACE(PPW)      9999.0      9999.0      0.0      2024-05-14 06:00      2024-05-14 18:00      SCHEDULED     TRANSMISSION     URGENT      ONPATH     PPW     continuous:1-Year substation offline maintenance.:Power County Wind Units #1 and #2 unavailable.:     2024-04-09 10:44     143903     2024-04-09 10:44  
  PPW 24-04626     16346     PPW     Carbon-Spanish Fork #1 138 kV line,Carbon-Spanish Fork #2 138 kV line          OTHERGEN-PACE(PPW) 
  PACE-VNL(PPW) 
  VNL-PACE(PPW)   
  9999.0 
  140.0 
  138.0   
  9999.0 
  140.0 
  138.0   
  0.0 
  75.0 
  75.0   
  2024-05-15 07:00 
  2024-05-15 07:00 
  2024-05-15 07:00   
  2024-05-23 14:00 
  2024-05-23 14:00 
  2024-05-23 14:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:GWS Line Crossing:No de-rate. Use normal scheduling limits: PACE-VNL = 140 & VNL-PACE = 138 PACE-VNL & VNL-PACE = 75 Summer, 112 Winter. Graphite Solar limited to 10 MW.:     2024-03-18 10:16     142451     2024-03-18 10:16  
  PPW 24-04827     16345     PPW     Top of the World (Duke Energy): 230/34 kV T1,Top of the World (Duke Energy): 230/34 kV T2          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2024-05-20 06:00      2024-05-23 18:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Annual outage maintenance.:Top of the world wind farm unavailable.:     2024-03-18 09:10     142652     2024-03-18 09:10  
  PPW 24-06426     16787     PPW     BPA McNary-Cold Springs section of the BPA McNary-Wallula 230 kV line               0.0      0.0      0.0      2024-05-20 08:00      2024-05-20 17:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replacing wood cross arm with steel truss:     2024-04-17 09:58     144255     2024-04-17 09:58  
  PPW 24-05657     16632     PPW     Sunbeam-Treasureton 230 kV line          NUT-PATHC(PPW) 
  NUT-SUNBEAM(PPW) 
  SUNBEAM-NUT(PPW)   
  1060.0 
  1.0 
  45.0   
  1060.0 
  1.0 
  45.0   
  500.0 
  0.0 
  0.0   
  2024-05-20 09:00 
  2024-05-20 09:00 
  2024-05-20 09:00   
  2024-05-31 16:00 
  2024-05-31 16:00 
  2024-05-31 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace 2 A-Condition structures:NUT-PATHC = 500 Summer/900 Winter. NUT-SUNBEAM & SUNBEAM-NUT = 0. Network Resource Transmission Service arrangements must be made for Moonbeam generation (Power County Wind at Sunbeam) through Idaho Power.:     2024-04-02 15:12     143482     2024-04-02 15:12  
  PPW 24-05857     16768     PPW     Merwin: CB 2P50,Merwin: CB 2P51               0.0      0.0      0.0      2024-05-21 08:00      2024-05-22 16:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Relay maintenance. I will be disabling the trip from the breaker failure relay. Relay maintenance requires that we roll the breaker failure lockout. I would like to take one breaker at a time out of service to preform testing. :     2024-04-10 14:38     143683     2024-04-10 14:38  
  PPW 24-02769     15981     PPW     Antelope: CB 167          ANTE-GSHN(PPW) 
  GSHN-ANTE(PPW)   
  170.0 
  90.0   
  170.0 
  90.0   
  10.0 
  0.0   
  2024-05-27 10:00 
  2024-05-27 10:00   
  2024-05-31 14:00 
  2024-05-31 14:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:BMMO on CB167:ANTE-GSHN & GSHN-ANTE = 0.:     2024-02-26 12:35     140590     2024-02-26 12:35  
  PPW 24-03295     15846     PPW     Swift #2-Woodland Tap 230 kV line,BPA Ross-BPA Woodland Tap-BPA Lexington 230kV Line          HYDROGEN-PACW(PPW) 
  PACW-WOODLANDTAP(PPW) 
  WOODLANDTAP-PACW(PPW)   
  9999.0 
  370.0 
  370.0   
  9999.0 
  370.0 
  370.0   
  0.0 
  0.0 
  0.0   
  2024-05-28 08:00 
  2024-05-28 08:00 
  2024-05-28 08:00   
  2024-05-31 16:00 
  2024-05-31 16:00 
  2024-05-31 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace line drops at Woodland Tap.:Swift #1 & #2 Generation unavailable (333 mw). PACW-WOODLANDTAP & WOODLANDTAP-PACW = 0.:     2024-02-21 09:55     141117     2024-02-21 09:55  
  PPW 24-00186     14928     PPW     Malin: 500 kV CAP Group #1,Malin-PG&E Round Mountain #1 500 kV line          MALIN500-RDM500(PPW) 
  RDM500-MALIN500(PPW)   
  800.0 
  612.0   
  800.0 
  612.0   
  625.0 
  416.0   
  2024-05-28 08:00 
  2024-05-28 08:00   
  2024-05-30 15:00 
  2024-05-30 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous: PCB Routine Services on 4188 and 4189:MALIN500-RDM500 = 625. RDM500-MALIN500 = 416.:     2023-12-20 11:26     137782     2023-12-20 11:26  
  PPW 24-05727     16656     PPW     Hermiston: CB 3W90,Hermiston: Line Side Disc CB 3W90          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2024-05-28 10:00      2024-05-31 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Hermiston CB 3W90 BMMO & Line Side Disc Repairs:Orchard Wind required offline.:     2024-04-03 14:13     143552     2024-04-03 14:13  
  PPW 24-06081     16758     PPW     BPA Ponderosa: 230 kV Non-GIS Interconnect Bus          PONDEROSA115-PONDEROSAPAC(PPW)      182.0      182.0      182.0      2024-06-03 08:00      2024-06-06 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Relay maintenance. Non-redundant PJC differential relay.:PONDEROSA115-PONDEROSAPAC =182 Summer/270 Winter.:     2024-04-09 11:07     143907     2024-04-09 11:07  
  PPW 24-05350     16573     PPW     Leaning Juniper Wind: 230/34 kV Bank #1,Leaning Juniper Wind: 34.5 kV Main Bus          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2024-06-12 10:00      2024-06-13 14:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Perform control circuitry checks and protective device testing:Leaning Juniper Wind restricted to 0 MW.:     2024-03-28 12:18     143175     2024-03-28 12:18  
  PPW 24-04189     16311     PPW     Cove (OR): 230/69 kV Bank #2 (T3398)          COVEPACW-ROUNDBUTTE(PPW) 
  ROUNDBUTTE-COVEPACW(PPW)   
  123.0 
  123.0   
  123.0 
  123.0   
  60.0 
  60.0   
  2024-07-01 12:00 
  2024-07-01 12:00   
  2024-07-21 12:00 
  2024-07-21 12:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:T-3398 LTC Maintenance and Bushing Replacement:COVEPACW-ROUNDBUTTE & ROUNDBUTTE-COVEPACW = 60.:     2024-03-15 09:39     142013     2024-03-15 09:39  
  PPW 24-04663     16295     PPW     Bonanza-Mona 345 kV line               0.0      0.0      0.0      2024-07-09 06:00      2024-07-09 16:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Replacing dead end insulators.:     2024-03-14 09:58     142488     2024-03-14 09:58  
  PPW 24-03078     16263     PPW     Newell-Tulelake Tap section of Hornet-Newell 69 kV line 5          PACW-NTLOAD(PPW)      9999.0      9999.0      0.0      2024-07-09 06:30      2024-07-10 18:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace 2 Poles. 4/33 and 14/33. Hwy 139:BPA Canby to provide Network Service for Perez, Clear Lake, and SVEC Austin load Approx 5 Me. Network load service agreements may be needed.:     2024-03-12 13:33     140900     2024-03-12 13:33  
  PPW 24-04665     16296     PPW     Bonanza-Mona 345 kV line               0.0      0.0      0.0      2024-07-10 06:00      2024-07-10 16:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Replacing dead end insulators.:     2024-03-14 09:58     142490     2024-03-14 09:58  
  PPW 24-04666     16297     PPW     Bonanza-Mona 345 kV line               0.0      0.0      0.0      2024-07-11 06:00      2024-07-11 16:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Replacing dead end insulators.:     2024-03-14 09:58     142491     2024-03-14 09:58  
  PPW 24-02598     15607     PPW     Dog Creek-PG&E Cascade 60 kV line          CRAG-DOGCREEK(PPW)      10.0      10.0      0.0      2024-07-15 07:00      2024-07-16 18:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Delta-Mountain Gate JCT 60kV Line (PACW) (HFRA) (Delta-Antler SECT) Cleared : T-Line to complete enhanced inspection tags to replace structures at 00/19, 01/27, 02/67, 03/70, Repair guy wire at 03/74A, 03/74B, 03/74C, Replace insulators at 02/66, Repair structures at 00/01, 00/03, 00/11, 01/23, 01/42:CRAG-DOGCREEK = 0;:     2024-02-08 12:33     140419     2024-02-08 12:46  
  PPW 24-02600     15608     PPW     Dog Creek-PG&E Cascade 60 kV line          CRAG-DOGCREEK(PPW)      10.0      10.0      0.0      2024-07-17 07:00      2024-07-19 18:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Delta-Mountain Gate JCT 60kV Line (EPSS) (HFRA) (Antler-Mountain Gate SECT) Cleared T-Line to complete enhanced inspection tags to repair guy wire at 08/124, 09/134, 14/179B, Replace structures at 10/142, 10/145, 12/163, 14/177, Repair structures at 08/121, 08/125, 08/126, 09/128, 09/131, 14/179, 14/183, Replace splices at 11/99, Repair splices at 11/149A:CRAG-DOGCREEK = 0;:     2024-02-08 12:44     140421     2024-02-08 12:46  
  PPW 24-02950     15722     PPW     Path 25 Schedule Limitation (Cascade 115 kV Tie)          CRAG-CRAGVIEW(PPW) 

  CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 

  45.0 
  80.0   
  45.0 

  45.0 
  80.0   
  45.0 

  0.0 
  80.0   
  2024-04-11 05:15 

  2024-07-21 05:15 
  2024-07-21 05:15   
  2024-04-11 05:20 

  2024-07-21 05:20 
  2024-07-21 05:20   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Cascade 60kV CB 72 Breaker Exercise Exercise CB 72 for annual maintenance. (BFD 6/24/2024):CRAG-CRAGVIEW = 0; CRAGVIEW-CRAG = 80:     2024-02-14 12:54     140771     2024-04-02 08:32  
  PPW 24-03478     15929     PPW     Cove (OR): 230/69 kV Bank #1 (T3886)          COVEPACW-ROUNDBUTTE(PPW) 
  ROUNDBUTTE-COVEPACW(PPW)   
  123.0 
  123.0   
  123.0 
  123.0   
  60.0 
  60.0   
  2024-07-22 10:00 
  2024-07-22 10:00   
  2024-07-26 15:00 
  2024-07-26 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Transformer Relay Maintenance and Trip Checking:COVEPACW-ROUNDBUTTE & ROUNDBUTTE-COVEPACW = 60.:     2024-02-23 14:27     141300     2024-02-23 14:27  
  PPW 24-01403     15269     PPW     Dave Johnston-TSGT Laramie River Station 230 kV line          DJ-WYOEAST(PPW) 
  WYOEAST-DJ(PPW)   
  790.0 
  790.0   
  790.0 
  790.0   
  478.0 
  478.0   
  2024-09-03 08:00 
  2024-09-03 08:00   
  2024-09-13 16:00 
  2024-09-13 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:TSGT 2024 structure replacements.:DJ-WYOEAST & WYOEAST-DJ = 442 (Dave Johnston-WAPA Stegall 230 kV line rating):     2024-01-18 10:59     139222     2024-01-18 11:14  
  PPW 24-03091     16240     PPW     Bullard-Davis Creek section of the Alturas-Bullard 115 kV line          OTHERGEN-PACW(PPW)      9999.0      9999.0      0.0      2024-09-10 07:00      2024-09-10 18:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:LINE WORK:Airport Solar and Garrett Solar restricted to 0 MW during switching.:     2024-03-11 09:47     140913     2024-03-11 09:47  
  PPW 24-03094     16789     PPW     Cedarville Tap-Davis Creek Tap section of the Alturas-Bullard 115 kV line          OTHERGEN-PACW(PPW)      9999.0      9999.0      0.0      2024-09-11 07:00      2024-09-11 18:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:LINE WORK:Airport Solar and Garrett Solar restricted to 0 MW during switching.:     2024-04-18 10:52     140916     2024-04-18 10:52  
  PPW 24-00012     10515     PPW     Hemingway-Summer Lake 500 kV line          H500-SMLK(PPW) 
  JBSN-JB345(PPW) 
  PACW-NTLOAD(PPW) 
  SMLK-H500(PPW)   
  1500.0 
  1600.0 
  9999.0 
  100.0   
  1500.0 
  1600.0 
  9999.0 
  100.0   
  0.0 
  1467.0 
  0.0 
  0.0   
  2024-09-14 08:00 
  2024-09-14 08:00 
  2024-09-14 08:00 
  2024-09-14 08:00   
  2024-09-27 17:00 
  2024-09-27 17:00 
  2024-09-27 17:00 
  2024-09-27 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Spacer replacement :H500-SMLK & SMLK-H500 = 0; Network Load Service Arrangements may be required for Southern Oregon Load.:     2023-02-10 12:39     114288     2023-02-10 12:39  
  PPW 24-00086     15593     PPW     Populus: 345 kV Series Capacitor #2 (C2),Populus: 345 kV Series Capacitor #2 (C1)          JBSN-JB345(PPW)      1600.0      1600.0      1433.0      2024-09-16 07:30      2024-09-20 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:CT Work and Trigger Circuit. Maintenance:JBSN-JB345 = 2150. PacifiCorp = 1433. IPCo = 717.:     2024-02-06 14:24     136707     2024-02-06 14:24  
  PPW 24-00085     15594     PPW     Populus: 345 kV Series Capacitor #1 (C2),Populus: 345 kV Series Capacitor #1 (C1)          JBSN-JB345(PPW)      1600.0      1600.0      1433.0      2024-09-23 07:30      2024-09-27 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:CT work and Control circuits. Cap Bank Maintenance and addition of new relays. :JBSN-JB345 = 2150. PacifiCorp = 1433. IPCo = 717.:     2024-02-06 14:26     136706     2024-02-06 14:26  
  PPW 24-02033     15467     PPW     BPA Ponderosa: 500/230 kV Bank #1,BPA Ponderosa: CB 4618          BPAT.PACW-PONDEROSA230(PPW)      267.0      267.0      267.0      2024-09-23 08:00      2024-10-03 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Transformer diagnostic service.:BPAT.PACW-PONDEROSA230 = 617 Summer/ 700 Winter:     2024-01-30 15:53     139852     2024-01-30 15:53  
  PPW 24-00049     13659     PPW     Echo-Hinkle 69kV line          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2024-10-07 08:00      2024-10-10 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Annual substation maintenance (oil sampling), Echo Hinkle 69kV Transmission Line maintenance:Echo and blacksmith generation limited to 0 MW. Both sites disconnected from the transmission system.:     2023-10-19 14:21     133780     2023-10-19 14:21  
  PPW 25-00004     16651     PPW     BPA Jones Canyon-BPA Santiam 230 kV line          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-01-09 08:00      2025-01-09 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Line maintenance:COI and PDCI restrictions to be determined by BPA. Leaning Juniper restricted to 0 MW during switching, and 40 MW for duration of outage.:     2024-04-03 11:19     143568     2024-04-03 11:19  