PPW Outages 
May 17, 2025 - May 21, 2026
Report created on May 21, 2025 at 21:03 (PPT)
Outage
Name
Outage
Id
Company Facility Flow
Gate
Segment/
JOTSFacility
Original
TTC In
Original
TTC Out
New
TTC
Start Time (PPT) Stop Time (PPT) Status Outage
Category
Outage
Type
Path
Impact
Report
TPs
Annotation Creation Time (PPT) EventId Last Updated (PPT)
  PPW 171983     10361     PPW     Riverton: 230 kV Cap Bank S/C 472               0.0      0.0      0.0      2021-02-18 09:03      2025-06-05 17:00      ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Riverton: 230 kV Cap Bank S/C 472:     2022-11-14 00:32     75797     2025-01-30 13:48  
  PPW 175805     9275     PPW     Hemingway-Summer Lake 500 kV line (Path 75 Schedule Limitation)          H500-SMLK(PPW) 

  H500-SMLK(PPW)   
  1500.0 

  1500.0   
  1500.0 

  1500.0   
  1386.0 

  1386.0   
  2021-06-02 12:00 

  2024-12-04 12:00   
  2024-12-04 12:00 

  2025-12-31 12:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Hemingway-Summer Lake 500 kV line (Path 75 Schedule Limitation)..:Path Restriction Notes: Path 75 Westbound = 1386.:     2021-12-21 14:06     80760     2024-12-04 08:04  
  PPW 24-00488     15058     PPW     Burns: Series Cap Segment #1 & 2          BORA-M500(PPW) 
  PACW-SMLK(PPW) 
  SMLK-H500(PPW) 

  BORA-M500(PPW) 
  PACW-SMLK(PPW) 
  SMLK-H500(PPW) 

  BORA-M500(PPW) 
  PACW-SMLK(PPW) 
  SMLK-H500(PPW)   
  1090.0 
  550.0 
  100.0 

  1090.0 
  550.0 
  100.0 

  1090.0 
  550.0 
  100.0   
  1090.0 
  550.0 
  100.0 

  1090.0 
  550.0 
  100.0 

  1090.0 
  550.0 
  100.0   
  1090.0 
  550.0 
  100.0 

  1070.0 
  535.0 
  96.0 

  1070.0 
  535.0 
  96.0   
  2024-01-09 03:48 
  2024-01-09 03:48 
  2024-01-09 03:48 

  2024-01-09 03:48 
  2024-01-09 03:48 
  2024-01-09 03:48 

  2025-05-30 23:59 
  2025-05-30 23:59 
  2025-05-30 23:59   
  2024-01-09 03:48 
  2024-01-09 03:48 
  2024-01-09 03:48 

  2025-05-30 23:59 
  2025-05-30 23:59 
  2025-05-30 23:59 

  2025-06-12 23:59 
  2025-06-12 23:59 
  2025-06-12 23:59   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Investigating a possible failure of relay voltage sensing component.:Path 75 limited to 507 (Midpoint Series Caps bypassed for maint). SMLK-H500 = 96; BORA-M500 = 959;:     2024-01-03 10:34     138306     2025-05-16 08:08  
  PPW 24-06062     16750     PPW     Path 25 Schedule Limitation (Cascade 115 kV Tie)          CRAGVIEW-PACW(PPW) 

  CRAGVIEW-PACW(PPW)   
  108.0 

  108.0   
  108.0 

  108.0   
  0.0 

  0.0   
  2024-04-09 00:00 

  2024-04-09 02:35   
  2024-04-09 02:35 

  2026-04-09 00:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:CRAGVIEW-PACW TTC = 0 PER PLANNING.:CRAGVIEW-PACW = 0 INDEFINITELY:     2024-04-09 09:34     143888     2025-04-07 18:15  
  PPW 24-06351     17531     PPW     Threemile Knoll: TIE CB 335               0.0      0.0      0.0      2024-04-12 22:23      2025-05-26 17:00      ACTIVE     TRANSMISSION     FORCED      ONPATH     PPW     continuous:***Commissioning Required*** Investigate failure of CB 335. :     2024-12-02 14:23     144180     2025-04-25 12:27  
  PPW 24-15751     17530     PPW     Threemile Knoll: Series Cap C2,Threemile Knoll: Series Cap C1          JBSN-JB345(PPW) 
  NUT-PATHC(PPW) 
  PATHC-NUT(PPW) 

  NUT-PATHC(PPW) 

  JBSN-JB345(PPW) 
  NUT-PATHC(PPW) 
  PATHC-NUT(PPW) 

  NUT-PATHC(PPW) 

  NUT-PATHC(PPW)   
  1600.0 
  1060.0 
  1600.0 

  1172.0 

  1600.0 
  1172.0 
  1600.0 

  1060.0 

  1172.0   
  1600.0 
  1060.0 
  1600.0 

  1172.0 

  1600.0 
  1172.0 
  1600.0 

  1060.0 

  1172.0   
  1433.0 
  717.0 
  1560.0 

  829.0 

  1433.0 
  829.0 
  1560.0 

  717.0 

  829.0   
  2024-09-18 00:30 
  2024-09-18 00:30 
  2024-09-18 00:30 

  2024-11-01 00:00 

  2025-01-06 17:30 
  2025-01-06 17:30 
  2025-01-06 17:30 

  2025-04-01 00:00 

  2025-11-01 00:00   
  2025-01-06 17:30 
  2024-11-01 00:00 
  2025-01-06 17:30 

  2025-01-06 17:30 

  2025-12-31 17:30 
  2025-04-01 00:00 
  2025-12-31 17:30 

  2025-11-01 00:00 

  2025-12-31 17:30   
  ACTIVE     TRANSMISSION     FORCED      ONPATH     PPW     continuous:Computer/controller for Series caps needs to be repaired/replaced. Tech support needed from Hitachi.:JBSN-JB345 = 2150. PacifiCorp = 1433. IPCo = 717 NUT-PATHC = 730 Summer/730 Winter. PATHC-NUT = 1480 Summer/1560 Winter. JBSN-JB345 = 2150. PacifiCorp = 1433. IPCo = 717 NUT-PATHC = 950 Summer/951 Winter. PATHC-NUT = 1480 Summer/1580 Winter.:     2024-11-30 22:07     153619     2024-12-30 12:01  
  PPW 24-16609     17387     PPW     Oquirrh-Terminal #1 345 kV line               0.0      0.0      0.0      2024-10-25 07:52      2025-06-25 14:00      ACTIVE     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Relocate the Oquirrh-Terminal #1 345 kV line:No impact under normal conditions.:     2024-10-10 12:23     154477     2025-03-26 11:43  
  PPW 24-15258     17624     PPW     Clover: Sta Serv 2 Fuse          OTHERGEN-PACE(PPW)      9999.0      9999.0      9999.0      2024-11-05 15:21      2025-05-28 14:00      CANCELLED     TRANSMISSION     URGENT      ONPATH     PPW     continuous:XFMR #1 Tertiary station service fuse cutout to new SS XFMR #30 terminal clearance:No restriction:     2025-01-24 14:44     153126     2025-04-18 14:12  
  PPW 25-00820     17929     PPW     Calapooya: T-3240 230/69 kV          PACW-NTLOAD(PPW)      9999.0      9999.0      0.0      2025-03-06 06:00      2025-05-28 15:30      ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace wire, jumpers and circuit switcher.:Network Load Service must be arranged for Calapooya, Diamond Hill & EWEB McKenzie. Eliminates ability to move Network Load Service from Alvey to Gresham. Eliminates C&T Point to Point Service from Troutdale to Summer Lake.:     2025-05-20 09:10     159895     2025-05-20 09:44  
  PPW 25-00045     17422     PPW     DG&T Bonanza-Gen: DG&T Bonanza-Gen Unit #1          THERMALGEN-PACE(PPW)      9999.0      9999.0      0.0      2025-03-31 23:01      2025-05-29 22:59      Active     GENERATION     PLANNED      ONPATH     PPW     continuous:Unit outage.:Bonanza Unit #1 unavailable.:     2024-10-21 11:28     155619     2024-10-21 11:28  
  PPW 25-05688     17794     PPW     DG&T Bonanza: Unit #1 Main Bank          THERMALGEN-PACE(PPW) 

  THERMALGEN-PACE(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2025-03-31 23:01 

  2025-04-01 00:26   
  2025-04-01 00:26 

  2025-05-29 22:59   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Unit outage.:DG&T Bonanza Unit #1 unavailable.:     2025-03-27 08:53     164786     2025-04-01 00:29  
  PPW 25-05264     17778     PPW     Aeolus: 500/230 kV XFMR #1               0.0      0.0      0.0      2025-04-01 07:00      2025-06-03 14:00      Active     DISTRIBUTION     PLANNED      ONPATH     PPW     continuous:Remove SS on Aeolus XFMR #1:     2025-03-21 13:31     164361     2025-03-21 13:31  
  PPW 25-01795     17622     PPW     Klamath Co-Gen: GSU 201          THERMALGEN-PACW(PPW) 

  THERMALGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2025-04-01 10:00 

  2025-04-01 10:10   
  2025-04-01 10:10 

  2025-06-02 14:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Crane work at inlets:     2025-01-24 13:46     160871     2025-04-01 10:10  
  PPW 25-01798     17623     PPW     Klamath Co-Gen: GSU 301          THERMALGEN-PACW(PPW) 

  THERMALGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2025-04-01 10:00 

  2025-04-01 10:42   
  2025-04-01 10:42 

  2025-06-02 14:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:GSU 301 bladder replacement and buckholtz replacement.:Klamath Co-Gen Unit 301 unavailable.:     2025-01-24 14:02     160874     2025-04-01 10:46  
  PPW 25-06064     17804     PPW     Aeolus: 500/230 kV XFMR #1               0.0      0.0      0.0      2025-04-04 12:03      2025-06-03 15:00      ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:**Commissioning REQ**Relocate the spare single phase transformer into the position of the failed single phase transformer. Return Switching needs to be written on 25-06064SW-2:     2025-04-02 13:19     165162     2025-04-04 12:04  
  PPW 25-06166     17809     PPW     Jim Bridger: 345/20 kV Unit #4 Main Bank (T3654)          JBSN-JB345(PPW)      1600.0      1600.0      1600.0      2025-04-04 16:25      2025-05-27 23:59      ACTIVE     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Unit Overhaul:JBSN-JB345 = 2400. PacifiCorp = 1600. IPCo = 800.:     2025-04-04 06:43     165264     2025-05-19 01:28  
  PPW 25-06241     17814     PPW     Dynamo: ABS 113A,Dynamo: STB (Unit 10)          THERMALGEN-PACE(PPW)      9999.0      9999.0      0.0      2025-04-06 07:43      2025-06-16 23:00      ACTIVE     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Open switch 113A per plant request for scheduled outage:Dynamo Unit 10 unavailable.:     2025-04-07 08:22     165339     2025-04-07 08:22  
  PPW 25-02828     17662     PPW     Scheduling Limitation: Path 8 Schedule Limitation (MT-NW)          COLSTRIP-TOWNSEND(PPW)      157.0      157.0      157.0      2025-04-14 07:00      2025-05-22 16:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Remove Cap Bank 1.:COLSTRIP-TOWNSEND = 123:     2025-02-07 17:57     161907     2025-04-04 14:09  
  PPW 25-01590     17618     PPW     Bonanza-Mona 345 kV line,Mona: C/S 303I          THERMALGEN-PACE(PPW) 

  THERMALGEN-PACE(PPW) 

  THERMALGEN-PACE(PPW)   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  0.0 

  9999.0   
  2025-05-01 06:00 

  2025-05-01 06:24 

  2025-05-23 15:30   
  2025-05-01 06:24 

  2025-05-23 15:30 

  2025-05-29 15:30   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replacing insulators. Line Reactor Repairs:Bonanza West (Path 33) = 140. BOZ-MDGT & MDGT-BOZ = 0 Bonanza generation restricted to 300 MW for duration of this outage for reliability concerns:     2025-01-22 14:20     160666     2025-05-01 06:26  
  PPW 25-00559     17611     PPW     IPC Midpoint-Hemingway 500 kV line,IPCo Midpoint: 500/345 kV Bank T-501          H500-M500(PPW) 
  M500-H500(PPW) 
  PACW-NTLOAD(PPW) 

  H500-M500(PPW) 
  M500-H500(PPW) 
  PACW-NTLOAD(PPW) 

  H500-M500(PPW) 
  M500-H500(PPW) 
  PACW-NTLOAD(PPW) 

  BORA-M500(PPW) 
  H500-M500(PPW) 
  M500-H500(PPW) 
  PACW-NTLOAD(PPW)   
  800.0 
  1090.0 
  9999.0 

  800.0 
  1090.0 
  9999.0 

  800.0 
  1090.0 
  9999.0 

  1090.0 
  800.0 
  1090.0 
  9999.0   
  800.0 
  1090.0 
  9999.0 

  800.0 
  1090.0 
  9999.0 

  800.0 
  1090.0 
  9999.0 

  1090.0 
  800.0 
  1090.0 
  9999.0   
  800.0 
  1090.0 
  9999.0 

  800.0 
  1090.0 
  9999.0 

  800.0 
  1090.0 
  9999.0 

  959.0 
  0.0 
  0.0 
  0.0   
  2025-02-03 06:00 
  2025-02-03 06:00 
  2025-02-03 06:00 

  2025-02-24 06:00 
  2025-02-24 06:00 
  2025-02-24 06:00 

  2025-05-01 06:00 
  2025-05-01 06:00 
  2025-05-01 06:00 

  2025-05-05 06:00 
  2025-05-05 06:00 
  2025-05-05 06:00 
  2025-05-05 06:00   
  2025-02-24 06:00 
  2025-02-24 06:00 
  2025-02-24 06:00 

  2025-05-01 06:00 
  2025-05-01 06:00 
  2025-05-01 06:00 

  2025-05-05 06:00 
  2025-05-05 06:00 
  2025-05-05 06:00 

  2025-06-06 16:00 
  2025-06-06 16:00 
  2025-06-06 16:00 
  2025-06-06 16:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:This outage is for relocating the existing Midpoint T501 345kV/500kV transformer to a new 345kV station bay.:M500-H500 & H500-M500= 0. BORA-M500 = 959. No impact to Bridger West. Jim Bridger Generation may be restricted real time (as determined by Northwest Path Flow). Network Load Service Arrangements may be required for Southern Oregon Load. Note: TTC Schedules on Path 75 East & West are 0. However, the SOL is 350 West / 325 East (Limited by Bowmont Xfmrs). However, there is a potential of up to 300 mw of actual unscheduled inadvertent flow between Hemingway & Summer Lake. JBSN-JB345 = 2200. PacifiCorp = 1467. IPCo = 733. Jim Bridger Generation may be restricted real time (as determined by Northwest Path Flow).:     2025-01-17 09:01     159624     2025-05-06 06:28  
  PPW 25-07389     17873     PPW     Chiloquin: CB 5L57               0.0      0.0      0.0      2025-05-05 10:02      2025-05-23 15:00      ACTIVE     DISTRIBUTION     PLANNED      ONPATH     PPW     continuous:Replace 5L57 breaker relay with SEL-751 with high impedance fault detection. :Chiloquin Solar off-line for duration of the outage:     2025-04-23 19:35     166494     2025-05-12 15:48  
  PPW 25-04357     17731     PPW     Antelope-Amps-Peterson (NWE) 230 kV line          ANTE-MLCK(PPW) 
  MLCK-ANTE(PPW) 

  ANTE-MLCK(PPW) 
  MLCK-ANTE(PPW) 

  ANTE-MLCK(PPW) 
  MLCK-ANTE(PPW) 

  ANTE-MLCK(PPW) 
  MLCK-ANTE(PPW) 

  ANTE-MLCK(PPW) 
  MLCK-ANTE(PPW) 

  ANTE-MLCK(PPW) 
  MLCK-ANTE(PPW)   
  66.0 
  90.0 

  66.0 
  90.0 

  66.0 
  90.0 

  66.0 
  90.0 

  66.0 
  90.0 

  66.0 
  90.0   
  66.0 
  90.0 

  66.0 
  90.0 

  66.0 
  90.0 

  66.0 
  90.0 

  66.0 
  90.0 

  66.0 
  90.0   
  66.0 
  90.0 

  66.0 
  90.0 

  66.0 
  90.0 

  0.0 
  0.0 

  66.0 
  90.0 

  66.0 
  90.0   
  2025-04-02 10:00 
  2025-04-02 10:00 

  2025-04-14 10:00 
  2025-04-14 10:00 

  2025-05-05 10:00 
  2025-05-05 10:00 

  2025-05-05 10:43 
  2025-05-05 10:43 

  2025-05-21 10:38 
  2025-05-21 10:38 

  2025-05-22 10:00 
  2025-05-22 10:00   
  2025-04-03 10:00 
  2025-04-03 10:00 

  2025-04-27 10:00 
  2025-04-27 10:00 

  2025-05-05 10:43 
  2025-05-05 10:43 

  2025-05-21 10:38 
  2025-05-21 10:38 

  2025-05-22 10:00 
  2025-05-22 10:00 

  2025-06-04 10:00 
  2025-06-04 10:00   
  COMPLETED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Land new cables on PT from new control house and move panel from old building to the new control house. :MLCK-ANTE & ANTE-MLCK = 0.:     2025-03-05 09:13     163443     2025-05-21 10:38  
  PPW 25-08075     17899     PPW     Cold Springs: XFMR 1 T-3169          PACW-NTLOAD(PPW) 
  WINDGEN-PACW(PPW)   
  9999.0 
  9999.0   
  9999.0 
  9999.0   
  0.0 
  0.0   
  2025-05-06 16:29 
  2025-05-06 16:29   
  2025-07-06 16:29 
  2025-07-06 16:29   
  ACTIVE     DISTRIBUTION     EMERGENCY      ONPATH     PPW     continuous:Clearance due to loss of protection because of burnt up coil on 86-T:Umatilla, Hermiston & Hinkle will be radial from BPA McNary. Network Load Service Arrangements may be required. With Cold Springs XFMR #1 out of service, Echo Wind Generation will be tied to BPA McNary. Orchard Wind restricted to 8.5MW until further notice.:     2025-05-06 16:58     167181     2025-05-14 13:38  
  PPW 25-00009     16952     PPW     Hemingway-Summer Lake 500 kV line          H500-SMLK(PPW) 
  PACW-NTLOAD(PPW) 
  SMLK-H500(PPW) 

  H500-SMLK(PPW) 
  PACW-NTLOAD(PPW) 
  SMLK-H500(PPW)   
  1500.0 
  9999.0 
  100.0 

  1500.0 
  9999.0 
  100.0   
  1500.0 
  9999.0 
  100.0 

  1500.0 
  9999.0 
  100.0   
  1500.0 
  9999.0 
  100.0 

  0.0 
  0.0 
  0.0   
  2025-05-12 08:00 
  2025-05-12 08:00 
  2025-05-12 08:00 

  2025-05-12 08:55 
  2025-05-12 08:55 
  2025-05-12 08:55   
  2025-05-12 08:55 
  2025-05-12 08:55 
  2025-05-12 08:55 

  2025-05-23 18:00 
  2025-05-23 18:00 
  2025-05-23 18:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Spacer replacements:H500-SMLK & SMLK-H500 = 0; BORA-M500 = 959; Network Load Service Arrangements may be required for Southern Oregon Load.:     2024-04-30 09:20     144657     2025-05-12 08:55  
  PPW 25-06376     17819     PPW     Dynamo: XFMR 1          THERMALGEN-PACE(PPW) 

  THERMALGEN-PACE(PPW) 

  THERMALGEN-PACE(PPW) 

  THERMALGEN-PACE(PPW) 

  THERMALGEN-PACE(PPW) 

  THERMALGEN-PACE(PPW)   
  9999.0 

  9999.0 

  9999.0 

  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  9999.0 

  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  9999.0 

  0.0 

  0.0 

  9999.0   
  2025-04-13 12:00 

  2025-05-12 12:00 

  2025-05-12 16:00 

  2025-05-13 13:28 

  2025-05-19 12:00 

  2025-05-19 13:37   
  2025-05-10 12:00 

  2025-05-12 16:00 

  2025-05-13 13:28 

  2025-05-19 12:00 

  2025-05-19 13:37 

  2025-05-27 12:00   
  COMPLETED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Unit outage.:Lakeside #1 Unit #11 unavailable.:     2025-04-08 14:26     165474     2025-05-19 13:39  
  PPW 25-07005     17852     PPW     Path 25 Schedule Limitation (Cascade 115 kV Tie)          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW) 

  CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  80.0 

  45.0 
  80.0   
  45.0 
  80.0 

  45.0 
  80.0   
  45.0 
  80.0 

  0.0 
  28.0   
  2025-05-18 07:00 
  2025-05-18 07:00 

  2025-05-18 08:15 
  2025-05-18 08:15   
  2025-05-18 08:15 
  2025-05-18 08:15 

  2025-05-21 18:00 
  2025-05-21 18:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace poles and insulators:CRAG-CRAGVIEW = 0; CRAGVIEW-CRAG = 28:     2025-04-17 12:18     166107     2025-05-18 08:17  
  PPW 25-07501     17875     PPW     Mona-IPP #1 345 kV line          MDWP-MPAC(PPW) 
  MPAC-MDWP(PPW) 

  MDWP-MPAC(PPW) 
  MPAC-MDWP(PPW)   
  1400.0 
  1400.0 

  1400.0 
  1400.0   
  1400.0 
  1400.0 

  1400.0 
  1400.0   
  600.0 
  600.0 

  600.0 
  600.0   
  2025-05-19 04:47 
  2025-05-19 04:47 

  2025-05-19 05:00 
  2025-05-19 05:00   
  2025-05-19 05:00 
  2025-05-19 05:00 

  2025-05-26 18:00 
  2025-05-26 18:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Line patrol, repair conductor:MDWP-MPAC & MPAC-MDWP restricted to 600 mw.:     2025-04-25 10:41     166607     2025-05-19 04:48  
  PPW 25-02324     17638     PPW     Red Lake (TB Flats 1): 230/34.5 kV XFMR T1          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-05-19 06:00      2025-05-19 18:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian guarding.:Red Lake/TB Flats 1 circuits 11, 12, 13, and 14 (71 MW) unavailable.:     2025-01-31 13:17     161403     2025-04-18 11:11  
  PPW 25-07672     17881     PPW     Muddy Creek-Mountain Wind 138 kV line          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-05-19 07:00      2025-05-23 16:00      ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace poles.:Mountain Wind Collector offline.:     2025-04-29 10:11     166778     2025-05-19 07:03  
  PPW 25-08456     17912     PPW     Scheduling Limitation: Path 8 Schedule Limitation (MT-NW)          ANTE-MLCK(PPW) 
  COLSTRIP-TOWNSEND(PPW) 
  MLCK-ANTE(PPW)   
  66.0 
  157.0 
  90.0   
  66.0 
  157.0 
  90.0   
  56.0 
  133.0 
  66.0   
  2025-05-19 07:00 
  2025-05-19 07:00 
  2025-05-19 07:00   
  2025-05-22 14:00 
  2025-05-22 14:00 
  2025-05-22 14:00   
  Active     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:GARRISON: PCB 4421, PCB 4418, MOD 4420, MOD 4419, BROADVIEW 1 500KV LINE SERIES CAP GROUP 1, PCB 4469, 500KV REACTOR 1 CONTROL AND ALARM CIRCUITS (FORCES OUT BROADVIEW-GARRISON NO 1 500KV LINE) ALARM/ CONTROL WIRING FOR NEW SER SCADA BPA 25-00580 :COLSTRIP-TOWNSEND = 0; ANTE-MLCK = 0 COLSTRIP-TOWNSEND = 133. ANTE-MLCK = 56:     2025-05-13 09:10     167562     2025-05-13 09:14  
  PPW 25-08417     17910     PPW     Scheduling Limitation: Path 8 Schedule Limitation (MT-NW)          ANTE-MLCK(PPW) 
  COLSTRIP-TOWNSEND(PPW) 
  MLCK-ANTE(PPW)   
  66.0 
  157.0 
  90.0   
  66.0 
  157.0 
  90.0   
  46.0 
  109.0 
  46.0   
  2025-05-19 07:00 
  2025-05-19 07:00 
  2025-05-19 07:00   
  2025-05-22 14:00 
  2025-05-22 14:00 
  2025-05-22 14:00   
  Active     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:TBD:COLSTRIP-TOWNSEND = 109; ANTE-MLCK = 46:     2025-05-12 14:17     167523     2025-05-12 14:17  
  PPW 25-06357     17865     PPW     Windstar-Yellowcake section of the Windstar-Teckla 230 kV line          ANTELOPE-WYOEAST(PPW) 
  PACE-NTLOAD(PPW) 
  WYOEAST-ANTELOPE(PPW) 

  ANTELOPE-WYOEAST(PPW) 
  PACE-NTLOAD(PPW) 
  WYOEAST-ANTELOPE(PPW)   
  376.0 
  9999.0 
  376.0 

  376.0 
  9999.0 
  376.0   
  376.0 
  9999.0 
  376.0 

  376.0 
  9999.0 
  376.0   
  376.0 
  9999.0 
  376.0 

  36.0 
  0.0 
  0.0   
  2025-05-19 07:00 
  2025-05-19 07:00 
  2025-05-19 07:00 

  2025-05-19 07:05 
  2025-05-19 07:05 
  2025-05-19 07:05   
  2025-05-19 07:05 
  2025-05-19 07:05 
  2025-05-19 07:05 

  2025-05-23 14:00 
  2025-05-23 14:00 
  2025-05-23 14:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Make corrections for punch list items on the Windstar-Yellowcake 230 kV line.:WYOE-ANTE = 0. ANTE-WYOE = Antelope Mine & Yellowcake loads. Antelope Mine & Yellowcake radial from WyoDak. Network Load Service Arrangements may be required.:     2025-04-21 12:22     165455     2025-05-19 07:08  
  PPW 25-07061     17855     PPW     Red Lake (TB Flats 1): 230/34.5 kV XFMR T2,Red Lake (TB Flats 1): 34.5kV Bus 2          WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  0.0 

  9999.0   
  2025-05-19 07:00 

  2025-05-19 07:39 

  2025-05-21 13:24   
  2025-05-19 07:39 

  2025-05-21 13:24 

  2025-05-21 18:00   
  COMPLETED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian guarding.:TB Flats 1/Red Lakes circuits 21, 22, 23, 24, and 25 are unavailable (112 MW).:     2025-04-18 11:53     166163     2025-05-21 13:25  
  PPW 25-07327     17882     PPW     Fish Creek - Grace 161 kV line          GSHN-PATHC(PPW) 
  NUT-PATHC(PPW) 
  PATHC-GSHN(PPW) 

  GSHN-PATHC(PPW) 
  NUT-PATHC(PPW) 
  PATHC-GSHN(PPW)   
  348.0 
  1060.0 
  148.0 

  348.0 
  1060.0 
  148.0   
  348.0 
  1060.0 
  148.0 

  348.0 
  1060.0 
  148.0   
  200.0 
  900.0 
  0.0 

  200.0 
  900.0 
  0.0   
  2025-05-19 07:40 
  2025-05-19 07:40 
  2025-05-19 07:40 

  2025-05-19 08:00 
  2025-05-19 08:00 
  2025-05-19 08:00   
  2025-05-19 08:00 
  2025-05-19 08:00 
  2025-05-19 08:00 

  2025-05-30 15:00 
  2025-05-30 15:00 
  2025-05-30 15:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:WO# 7351640 Replace 161kv STR 8, 39, 77, 79, 103:NUT-PATHC = 900 GSHN-PATHC = 200. PATHC-GSHN = 0:     2025-04-29 11:50     166432     2025-05-19 07:43  
  PPW 25-07656     17879     PPW     IPCO Kinport: Series Cap C341          JBSN-JB345(PPW) 
  NUT-PATHC(PPW)   
  1600.0 
  1060.0   
  1600.0 
  1060.0   
  1467.0 
  600.0   
  2025-05-19 08:00 
  2025-05-19 08:00   
  2025-05-23 14:00 
  2025-05-23 14:00   
  Active     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Maintenance on capacitor bank.:NUT-PATHC = 600 Summer/900 Winter.:     2025-04-29 09:01     166762     2025-04-29 09:01  
  PPW 25-06823     17842     PPW     Seven Mile Hill: 230/34 kV Bank #1,Seven Mile Hill: 34 kV Main Bus          WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  9999.0   
  0.0 

  0.0 

  9999.0   
  2025-05-19 08:00 

  2025-05-19 10:55 

  2025-05-21 14:00   
  2025-05-19 10:55 

  2025-05-21 14:00 

  2025-05-21 15:11   
  COMPLETED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Isolate transformer and feeder breakers to install 34.5kV breaker.:Seven Mile Hill wind unavailable.:     2025-04-15 09:52     165925     2025-05-21 15:15  
  PPW 25-06374     17818     PPW     Dynamo: XFMR 2          THERMALGEN-PACE(PPW) 

  THERMALGEN-PACE(PPW) 

  THERMALGEN-PACE(PPW)   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  0.0   
  2025-05-10 12:00 

  2025-05-19 12:00 

  2025-05-19 13:37   
  2025-05-16 16:00 

  2025-05-19 13:37 

  2025-05-26 12:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Unit outage:Lakeside #1 Unit 12 unavailable.:     2025-04-08 13:55     165472     2025-05-19 13:39  
  PPW 25-08228     17906     PPW     Enterprise: CB 3W106,Enterprise-Wallowa section of the Enterprise-Elgin 69 kV line,Hurricane-Enterpr          HYDROGEN-PACW(PPW) 

  HYDROGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2025-05-19 22:00 

  2025-05-19 22:30   
  2025-05-19 22:30 

  2025-05-20 05:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Enterprise CB 3W106 Bus Side Disconnect and Distribution Pole FP024508 Replacement:Network Load Service may be needed. Wallowa and Minam to be served on BPAs system through Oregon Trails Co-op. Wallowa Falls Generation off-line for duration of the outage.:     2025-05-11 17:27     167334     2025-05-19 22:31  
  PPW 25-07871     17907     PPW     Enterprise-Wallowa section of the Enterprise-Elgin 69 kV line               0.0      0.0      0.0      2025-05-20 05:26      2025-06-12 02:00      ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Lambert will be replacing several structures between Enterprise and Wallow subs on the 69kv line. Pat Chase will be working on disconnects on CB 3W106 at Enterprise sub:Network Load Service may be needed. Wallowa and Minam to be served on BPAs system through Oregon Trails Co-op.:     2025-05-11 18:10     166977     2025-05-20 05:27  
  PPW 25-07059     17854     PPW     Red Lake (TB Flats 1): 230/34.5 kV XFMR T1,Red Lake (TB Flats 1): 230/34.5 kV XFMR T2,Red Lake (TB F          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-05-20 06:00      2025-05-20 18:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian guarding.:Red Lake/TB Flats 1 circuits 11, 12, 13, and 14 (71 MW) unavailable. TB Flats 1/Red Lakes circuits 21, 22, 23, 24, and 25 are unavailable (112 MW).:     2025-04-18 11:43     166161     2025-05-01 10:06  
  PPW 25-02325     17639     PPW     Red Lake (TB Flats 1): 230/34.5 kV XFMR T1,Red Lake (TB Flats 1): 230/34.5 kV XFMR T2          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-05-20 06:00      2025-05-20 18:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian guarding.:Red Lake/TB Flats 1 circuits 11, 12, 13, and 14 (71 MW) unavailable. TB Flats 1/Red Lakes circuits 21, 22, 23, 24, and 25 are unavailable (112 MW).:     2025-01-31 13:27     161404     2025-04-18 11:30  
  PPW 25-02077     17931     PPW     Abajo: XFMR 1          OTHERGEN-PACE(PPW) 

  OTHERGEN-PACE(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  0.0 

  0.0   
  2025-05-20 08:53 

  2025-05-21 08:53   
  2025-05-21 08:53 

  2025-05-22 12:53   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Relay & Sub ops maintenance on XFMR #1 & CBL65 :Red Mesa Solar must be offline.:     2025-05-20 11:12     161155     2025-05-21 10:22  
  PPW 25-08011     17901     PPW     Threemile Knoll: CAP BYPASS CB 380,Threemile Knoll: Series Cap C1,Threemile Knoll: Series Cap C2          JBSN-JB345(PPW) 
  NUT-PATHC(PPW) 
  PATHC-NUT(PPW) 

  JBSN-JB345(PPW) 
  NUT-PATHC(PPW) 
  PATHC-NUT(PPW) 

  JBSN-JB345(PPW) 
  NUT-PATHC(PPW) 
  PATHC-NUT(PPW)   
  1600.0 
  1060.0 
  1600.0 

  1600.0 
  1060.0 
  1600.0 

  1600.0 
  1060.0 
  1600.0   
  1600.0 
  1060.0 
  1600.0 

  1600.0 
  1060.0 
  1600.0 

  1600.0 
  1060.0 
  1600.0   
  1600.0 
  1060.0 
  1600.0 

  1433.0 
  950.0 
  1480.0 

  1600.0 
  1060.0 
  1600.0   
  2025-05-20 12:00 
  2025-05-20 12:00 
  2025-05-20 12:00 

  2025-05-20 12:42 
  2025-05-20 12:42 
  2025-05-20 12:42 

  2025-05-27 08:00 
  2025-05-27 08:00 
  2025-05-27 08:00   
  2025-05-20 12:42 
  2025-05-20 12:42 
  2025-05-20 12:42 

  2025-05-23 13:00 
  2025-05-23 13:00 
  2025-05-23 13:00 

  2025-05-30 13:00 
  2025-05-30 13:00 
  2025-05-30 13:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Threemile Knoll CB C380 BMMS scheduled maintenance.:JBSN-JB345 = 2150. PacifiCorp = 1433. IPCo = 717 NUT-PATHC = 950 Summer/951 Winter. PATHC-NUT = 1480 Summer/1580 Winter.:     2025-05-07 13:01     167117     2025-05-20 12:46  
  PPW 25-02326     17640     PPW     Red Lake (TB Flats 1): 230/34.5 kV XFMR T2          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-05-21 06:00      2025-05-21 18:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian guarding.:TB Flats 1/Red Lakes circuits 21, 22, 23, 24, and 25 are unavailable (112 MW).:     2025-01-31 13:30     161405     2025-04-18 11:45  
  PPW 25-08753     17927     PPW     Red Lake (TB Flats 1): 230/34.5 kV XFMR T2,Red Lake (TB Flats 1): 230/34.5 kV XFMR T3          OTHERGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-05-21 07:00      2025-05-21 18:00      CANCELLED     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Re-tapping T2 and T3:TB Flats 1/Red Lakes circuits 21, 22, 23, 24, and 25 are unavailable (112 MW). TB Flats 1/Red Lakes circuits 31, 32, 33, and 34 are unavailable (116 MW).:     2025-05-16 13:28     167859     2025-05-21 05:52  
  PPW 25-08604     17924     PPW     Red Lake (TB Flats 1): 230/34.5 kV XFMR T1          OTHERGEN-PACW(PPW) 

  OTHERGEN-PACW(PPW) 

  OTHERGEN-PACW(PPW)   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  0.0 

  9999.0   
  2025-05-21 07:00 

  2025-05-21 07:25 

  2025-05-21 13:26   
  2025-05-21 07:25 

  2025-05-21 13:26 

  2025-05-21 18:00   
  COMPLETED     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Contractor is Re-tapping T1:Red Lake/TB Flats 1 circuits 11, 12, 13, and 14 (71 MW) unavailable.:     2025-05-16 09:15     167710     2025-05-21 13:30  
  PPW 25-06053     17803     PPW     Walla Walla-AVA Saddle Mountain 230 kV line          MIDC-WALLAWALLA(PPW) 
  WALLAWALLA-MIDC(PPW) 

  MIDC-WALLAWALLA(PPW) 
  WALLAWALLA-MIDC(PPW)   
  240.0 
  240.0 

  240.0 
  240.0   
  240.0 
  240.0 

  240.0 
  240.0   
  0.0 
  0.0 

  0.0 
  0.0   
  2025-05-21 07:43 
  2025-05-21 07:43 

  2025-05-21 08:00 
  2025-05-21 08:00   
  2025-05-21 08:00 
  2025-05-21 08:00 

  2025-05-23 16:00 
  2025-05-23 16:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replacing cross-arms.:MIDC-WALLAWALLA & WALLAWALLA-MIDC = 0. Affects Stateline Wind deliveries to Wanapum & Avista Dry Creek. Affects Avistas Transfer Rights from Wanapum to Dry Creek. Affects ability to deliver Network Load Service from the Walla Walla Area to the Yakima Area. Affects ability to deliver Network Load Service from Mid-Columbia to the Walla Walla Area.:     2025-04-02 11:11     165151     2025-05-21 07:48  
  PPW 25-07066     17857     PPW     Red Lake (TB Flats 1): 230/34.5 kV XFMR T3,Red Lake (TB Flats 1): 34.5kV Bus 3          WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  0.0 

  9999.0   
  2025-05-21 07:00 

  2025-05-21 07:53 

  2025-05-23 13:00   
  2025-05-21 07:53 

  2025-05-23 13:00 

  2025-05-23 18:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian guarding.:TB Flats 1/Red Lakes circuits 31, 32, 33, and 34 are unavailable (116 MW).:     2025-04-18 12:18     166168     2025-05-21 07:53  
  PPW 25-07733     17894     PPW     Hale-Spanish Fork 138kV line          THERMALGEN-PACE(PPW)      9999.0      9999.0      9999.0      2025-05-21 08:00      2025-05-22 15:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:We will be tapping Hale line to new switch 7C28 going back to new Spanish Fork 138/13kv Distributiion Yard:Possible real-time restriction to Lakeside 1 (Dynamo) generation.:     2025-05-03 10:41     166839     2025-05-14 14:14  
  PPW 25-04089     17722     PPW     Spanish Fork: 138 kV West/Operating Bus          OTHERGEN-PACE(PPW) 
  PACE-NTLOAD(PPW) 
  THERMALGEN-PACE(PPW) 
  VNL-PACE(PPW) 

  OTHERGEN-PACE(PPW) 
  PACE-NTLOAD(PPW) 
  THERMALGEN-PACE(PPW) 
  VNL-PACE(PPW) 

  OTHERGEN-PACE(PPW) 
  PACE-NTLOAD(PPW) 
  THERMALGEN-PACE(PPW) 
  VNL-PACE(PPW) 

  OTHERGEN-PACE(PPW) 
  PACE-NTLOAD(PPW) 
  THERMALGEN-PACE(PPW) 
  VNL-PACE(PPW) 

  OTHERGEN-PACE(PPW) 
  PACE-NTLOAD(PPW) 
  PACE-VNL(PPW) 
  THERMALGEN-PACE(PPW) 
  VNL-PACE(PPW) 

  OTHERGEN-PACE(PPW) 
  PACE-NTLOAD(PPW) 
  PACE-VNL(PPW) 
  THERMALGEN-PACE(PPW) 
  VNL-PACE(PPW) 

  OTHERGEN-PACE(PPW) 
  PACE-NTLOAD(PPW) 
  THERMALGEN-PACE(PPW) 
  VNL-PACE(PPW)   
  9999.0 
  9999.0 
  9999.0 
  138.0 

  9999.0 
  9999.0 
  9999.0 
  138.0 

  9999.0 
  9999.0 
  9999.0 
  138.0 

  9999.0 
  9999.0 
  9999.0 
  138.0 

  9999.0 
  9999.0 
  140.0 
  9999.0 
  138.0 

  9999.0 
  9999.0 
  140.0 
  9999.0 
  138.0 

  9999.0 
  9999.0 
  9999.0 
  138.0   
  9999.0 
  9999.0 
  9999.0 
  138.0 

  9999.0 
  9999.0 
  9999.0 
  138.0 

  9999.0 
  9999.0 
  9999.0 
  138.0 

  9999.0 
  9999.0 
  9999.0 
  138.0 

  9999.0 
  9999.0 
  140.0 
  9999.0 
  138.0 

  9999.0 
  9999.0 
  140.0 
  9999.0 
  138.0 

  9999.0 
  9999.0 
  9999.0 
  138.0   
  9999.0 
  9999.0 
  9999.0 
  138.0 

  9999.0 
  9999.0 
  9999.0 
  138.0 

  9999.0 
  9999.0 
  9999.0 
  138.0 

  9999.0 
  9999.0 
  9999.0 
  138.0 

  0.0 
  0.0 
  0.0 
  0.0 
  0.0 

  9999.0 
  9999.0 
  140.0 
  9999.0 
  138.0 

  9999.0 
  9999.0 
  9999.0 
  138.0   
  2025-03-31 08:00 
  2025-03-31 08:00 
  2025-03-31 08:00 
  2025-03-31 08:00 

  2025-04-07 08:00 
  2025-04-07 08:00 
  2025-04-07 08:00 
  2025-04-07 08:00 

  2025-04-14 08:00 
  2025-04-14 08:00 
  2025-04-14 08:00 
  2025-04-14 08:00 

  2025-05-05 08:00 
  2025-05-05 08:00 
  2025-05-05 08:00 
  2025-05-05 08:00 

  2025-05-21 08:00 
  2025-05-21 08:00 
  2025-05-21 08:00 
  2025-05-21 08:00 
  2025-05-21 08:00 

  2025-05-23 16:00 
  2025-05-23 16:00 
  2025-05-23 16:00 
  2025-05-23 16:00 
  2025-05-23 16:00 

  2025-12-31 08:00 
  2025-12-31 08:00 
  2025-12-31 08:00 
  2025-12-31 08:00   
  2025-04-07 08:00 
  2025-04-07 08:00 
  2025-04-07 08:00 
  2025-04-07 08:00 

  2025-04-14 08:00 
  2025-04-14 08:00 
  2025-04-14 08:00 
  2025-04-14 08:00 

  2025-04-18 16:00 
  2025-04-18 16:00 
  2025-04-18 16:00 
  2025-04-18 16:00 

  2025-05-09 16:00 
  2025-05-09 16:00 
  2025-05-09 16:00 
  2025-05-09 16:00 

  2025-05-23 16:00 
  2025-05-23 16:00 
  2025-05-23 16:00 
  2025-05-23 16:00 
  2025-05-23 16:00 

  2025-05-26 16:00 
  2025-05-26 16:00 
  2025-05-26 16:00 
  2025-05-26 16:00 
  2025-05-26 16:00 

  2025-12-31 16:00 
  2025-12-31 16:00 
  2025-12-31 16:00 
  2025-12-31 16:00   
  Active     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Building/Welding bus extension to new distribution yard. Commissioning 7C21.:Graphite Solar limited to 10 MW maximum output. Possible real-time restriction to Lakeside 1 (Dynamo) generation. PACE-VNL = 0. VNL-PACE = 0. load. Network Load Service Arrangements are required for Ashley, Emma Park, Mounds, Mathington, Carbon, Helper, Columbia, Tamarisk . TOT-1A & CRSP Schedules are impacted by this outage.:     2025-02-28 13:36     163171     2025-05-07 08:45  
  PPW 25-07065     17856     PPW     Red Lake (TB Flats 1): 230/34.5 kV XFMR T2,Red Lake (TB Flats 1): 230/34.5 kV XFMR T3,Red Lake (TB F          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-05-22 06:00      2025-05-22 18:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian guarding.:TB Flats 1/Red Lakes circuits 21, 22, 23, 24, and 25 are unavailable (112 MW). TB Flats 1/Red Lakes circuits 31, 32, 33, and 34 are unavailable (116 MW).:     2025-04-18 12:00     166167     2025-05-01 10:06  
  PPW 25-02327     17641     PPW     Red Lake (TB Flats 1): 230/34.5 kV XFMR T2,Red Lake (TB Flats 1): 230/34.5 kV XFMR T3          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-05-22 06:00      2025-05-22 18:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian guarding.:TB Flats 1/Red Lakes circuits 21, 22, 23, 24, and 25 are unavailable (112 MW). TB Flats 1/Red Lakes circuits 31, 32, 33, and 34 are unavailable (116 MW).:     2025-01-31 13:36     161406     2025-04-18 12:00  
  PPW 25-03393     17754     PPW     BPA Tumble Creek-Jones Canyon section of Santiam-Jones Canyon 230kV Line          WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2025-05-19 08:00 

  2025-05-22 08:00   
  2025-05-22 08:00 

  2025-05-22 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Ungrounded clearance.:Leaning Juniper 1 unavailable. Leaning Juniper site restricted to 40MW total maximum generation.:     2025-03-14 14:51     162475     2025-03-20 10:21  
  PPW 25-06548     17843     PPW     Craner Flat: SCADA/RTU          THERMALGEN-PACE(PPW) 

  THERMALGEN-PACE(PPW) 

  THERMALGEN-PACE(PPW)   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  0.0   
  2025-05-01 09:00 

  2025-05-08 09:00 

  2025-05-22 09:00   
  2025-05-02 17:00 

  2025-05-09 17:00 

  2025-05-23 17:00   
  SCHEDULED     TELECOM     PLANNED      ONPATH     PPW     continuous:1) Movin three existing DS1 circuits from Coastcom channel bank to Loop channel bank 2) Re-route Black Mtn - UTB DS1 to Black Mtn - Horseshoe via the new MW path:US Mag generation unavailable.:     2025-04-15 10:36     165649     2025-05-06 14:56  
  PPW 25-02328     17642     PPW     Red Lake (TB Flats 1): 230/34.5 kV XFMR T3          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-05-23 06:00      2025-05-23 18:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian guarding.:TB Flats 1/Red Lakes circuits 31, 32, 33, and 34 are unavailable (116 MW).:     2025-01-31 13:40     161407     2025-04-18 12:05  
  PPW 25-06373     17867     PPW     Painter-Railroad 138kV line          WINDGEN-PACE(PPW)      9999.0      9999.0      0.0      2025-05-26 07:30      2025-05-28 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:NERC relay maintenance.:Longhollow and Mtn Wind are restricted to a total of 232 MW Potential impact to PACE-UINTA & UINTA-PACE.:     2025-04-22 12:31     165471     2025-04-23 12:30  
  PPW 25-07792     17887     PPW     Mona-IPP #2 345 kV line          MDWP-MPAC(PPW) 
  MPAC-MDWP(PPW)   
  1400.0 
  1400.0   
  1400.0 
  1400.0   
  600.0 
  600.0   
  2025-05-27 05:00 
  2025-05-27 05:00   
  2025-06-06 15:00 
  2025-06-06 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Test relays and trip circuit breakers. Conductor and hardware repair.:MDWP-MPAC & MPAC-MDWP restricted to 600 mw.:     2025-05-01 11:42     166898     2025-05-01 11:47  
  PPW 25-07900     17892     PPW     Albina-PGE Curtis 115 kV line          PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW)   
  325.0 
  325.0   
  325.0 
  325.0   
  201.0 
  201.0   
  2025-05-27 07:30 
  2025-05-27 07:30   
  2025-05-30 14:30 
  2025-05-30 14:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Fitness pole replacements.:PACW-PACW.PGE & PACW.PGE-PACW = 201 Summer/299 Winter:     2025-05-02 14:26     167006     2025-05-14 13:23  
  PPW 25-08137     17909     PPW     Fry-Calapooya section of the Diamond Hill-Fry 230 kV line,Calapooya-Diamond Hill section of the Diam          PACW-NTLOAD(PPW)      9999.0      9999.0      0.0      2025-05-27 08:00      2025-05-28 23:30      SCHEDULED     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Replace bad phase.:Network Load Service must be arranged for Calapooya, Diamond Hill & EWEB McKenzie. Eliminates ability to move Network Load Service from Alvey to Gresham. Eliminates C&T Point to Point Service from Troutdale to Summer Lake.:     2025-05-12 11:39     167243     2025-05-20 09:47  
  PPW 25-08226     17911     PPW     Weed Junction: CB 2G15          CRAG-CRAGVIEW(PPW) 
  PACW-CRAGVIEW(PPW)   
  45.0 
  115.0   
  45.0 
  115.0   
  0.0 
  0.0   
  2025-05-27 09:00 
  2025-05-27 09:00   
  2025-05-28 16:00 
  2025-05-28 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Major Relay Maintenance:CRAG-CRAGVIEW=0, PACW-CRAGVIEW=0:     2025-05-12 14:23     167332     2025-05-12 14:23  
  PPW 25-08154     17902     PPW     Path 25 Schedule Limitation (Cascade 115 kV Tie)          CRAG-CRAGVIEW(PPW) 

  CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 

  45.0 
  80.0   
  45.0 

  45.0 
  80.0   
  45.0 

  10.0 
  80.0   
  2025-05-22 09:00 

  2025-05-27 09:00 
  2025-05-27 09:00   
  2025-05-22 15:00 

  2025-05-27 15:00 
  2025-05-27 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Repair jumper.:CRAG-CRAGVIEW = 10; CRAGVIEW-CRAG = 80:     2025-05-07 16:18     167260     2025-05-13 12:55  
  PPW 25-00812     17597     PPW     Windstar-Top of the World 230 kV line,Top of the World (Duke Energy): 230/34 kV T1,Top of the World          WINDGEN-PACE(PPW) 
  WINDGEN-PACW(PPW)   
  9999.0 
  9999.0   
  9999.0 
  9999.0   
  9999.0 
  0.0   
  2025-05-28 07:00 
  2025-05-28 07:00   
  2025-05-30 17:00 
  2025-05-30 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Site annual maintenance.:Top of the World Wind Farm Generation unavailable (200.2 mw).:     2025-01-08 10:32     159887     2025-02-06 14:46  
  PPW 25-08061     17905     PPW     Talbot-AVA Dry Creek 230 kV line          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-05-28 10:00      2025-05-28 12:00      SCHEDULED     TELECOM     PLANNED      ONPATH     PPW     continuous:The line will remain in service, while we take the PLC equipment down for Maintenance.:Marengo Wind unavailable.:     2025-05-08 13:09     167167     2025-05-08 13:09  
  PPW 25-08920     17930     PPW     IT Systems: Monarch EMS               0.0      0.0      0.0      2025-05-28 10:00      2025-05-28 10:30      SCHEDULED     TELECOM     PLANNED      ONPATH     PPW     continuous:PacifiCorp is testing the Emergency Isolation Protocol resulting in the temporary separation of the EMS system from Corporate links.:PacifiCorp is testing the Emergency Isolation Protocol resulting in the temporary separation of the EMS system from Corporate links.:     2025-05-20 09:34     168027     2025-05-21 13:32  
  PPW 25-08111     17900     PPW     Riverton-Wyopo section of the Riverton-Atlantic City 230 kV line          TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0   
  2025-05-29 07:00 
  2025-05-29 07:00 
  2025-05-29 07:00 
  2025-05-29 07:00 
  2025-05-29 07:00   
  2025-06-05 15:00 
  2025-06-05 15:00 
  2025-06-05 15:00 
  2025-06-05 15:00 
  2025-06-05 15:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replacing cross braces and arms.:AW/4B Curve 117. WAPAEAST-WAPANORTH = 235. WYOEAST-AEOW (Aeolus West) = 1632. TOT4B-WYONORTH = 571. TOT 4B = 806. Potential Real Time Impact to Wyoming Generation:     2025-05-07 09:12     167217     2025-05-07 09:48  
  PPW 25-00090     17538     PPW     Ben Lomond-Populus #2 345 kV line,Ben Lomond: 345 kV East Bus,Ben Lomond: CB 366          JBSN-JB345(PPW) 
  NUT-PATHC(PPW) 
  PATHC-NUT(PPW)   
  1600.0 
  1060.0 
  1600.0   
  1600.0 
  1060.0 
  1600.0   
  1427.0 
  900.0 
  1600.0   
  2025-05-29 19:00 
  2025-05-29 19:00 
  2025-05-29 19:00   
  2025-05-30 17:00 
  2025-05-30 17:00 
  2025-05-30 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:To return CB366 a clearance boundary on the east bus, and Ben Lomond-Populus line, and CB 366 is required. :JBSN-JB345 = 2200. PacifiCorp = 1427. IPCo = 733. NUT-PATHC = 800 Summer/900 Winter. PATHC-NUT = 1410 Summer.:     2024-12-05 12:36     158140     2025-05-21 11:54  
  PPW 23-13404     17846     PPW     Pilot Butte: T-3949 Bank #4          OTHERGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-05-29 21:00      2025-05-30 21:00      SCHEDULED     DISTRIBUTION     PLANNED      ONPATH     PPW     continuous:Drop and Pick Dobbin, Klondike and Drake Feeders onto Mobile T-3830 to prepare for the 69kV Main Bus Outage. Remove Lowside Jumpers from Mobile on Go Back. :     2025-04-16 10:24     126774     2025-04-16 10:24  
  PPW 23-13403     17821     PPW     Pilot Butte: 69 kV West Bus,Pilot Butte-CEC Tap 69 kV line,China Hat-Pilot Butte 69 kV line          OTHERGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-05-29 23:30      2025-05-30 08:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Take outage on the 69kV West Bus to string SO Loop Line #2 conductor and 69kV CEC Line conductor from Substation dead-end to new deadend, including line jumpers and Jumpers to bus. Energize CEC Tap Line on the go back for this outage.:Bear Creek solar unavailable. Neff Solar unavailable. Collier Solar unavailable.:     2025-04-09 09:02     126773     2025-04-09 09:02  
  PPW 25-08176     17904     PPW     View Tap-Cherry Grove section of the Merwin-CCPD Cherry Grove 115 kV line,CCPD Cherry Grove: CCPD-PC               0.0      0.0      0.0      2025-05-30 08:00      2025-06-01 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:CCPUD work; Seismic upgrades.:May be Slight Impact on South of Allston Path. Eliminates Merwin/Yale Generation Delivery to the Portland Load Area.:     2025-05-08 08:33     167282     2025-05-08 14:09  
  PPW 25-02628     17748     PPW     Fish Creek Tap-Slide Creek Tap section of the Soda Springs-Toketee Switch Station 115 kV line,Slide          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-06-02 06:00      2025-06-08 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replacing structures 1/3, 2/3 and 7/3. Including replacing switches 2U345 and 2U344 at Slide Cr tap. :Soda Springs generation off-line for takeout switching only. Slide Creek generation off-line for duration of the outage. Toketee, Clearwater, Fish Creek, and Lemolo Plant combined generation 114 Summer/154 Winter MVA:     2025-03-11 14:23     161707     2025-05-12 10:03  
  PPW 25-03490     17720     PPW     Atlantic City: CB 1H120,Atlantic City-Rock Springs 230 kV line          TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0   
  571.0 
  235.0 
  287.0 
  0.0 
  287.0   
  2025-06-02 07:00 
  2025-06-02 07:00 
  2025-06-02 07:00 
  2025-06-02 07:00 
  2025-06-02 07:00   
  2025-06-04 10:00 
  2025-06-04 10:00 
  2025-06-04 10:00 
  2025-06-04 10:00 
  2025-06-04 10:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Breaker Minor Maintenance:AW/4B Curve 117. WAPAEAST-WAPANORTH = 235. WYOEAST-AEOW (Aeolus West) = 1632. TOT4B-WYONORTH = 571. TOT 4B = 806. Potential Real Time Impact to Wyoming Generation:     2025-02-27 14:05     162572     2025-02-27 14:05  
  PPW 25-08067     17903     PPW     Cherry Grove-Hazel Dell 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-06-02 07:00      2025-06-06 17:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:replace/ relocatw H structures:May be Slight Impact on South of Allston Path. Eliminates Merwin/Yale generation delivery to the Portland Load Area.:     2025-05-08 08:19     167173     2025-05-08 08:23  
  PPW 25-06418     17868     PPW     Clover: Transformer #3          CLOVER-PACE(PPW) 
  PACE-CLOVER(PPW)   
  1700.0 
  1000.0   
  1700.0 
  1000.0   
  1600.0 
  900.0   
  2025-06-02 07:00 
  2025-06-02 07:00   
  2025-06-06 14:00 
  2025-06-06 14:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Clover XFMR #3 Outage to Replace Tertiary Bushings:CLOVER-PACE=1600. PACE-CLOVER=900.:     2025-04-22 13:30     165516     2025-05-03 11:35  
  PPW 25-07901     17893     PPW     Albina-PGE Curtis 115 kV line          PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW)   
  325.0 
  325.0   
  325.0 
  325.0   
  201.0 
  201.0   
  2025-06-02 07:30 
  2025-06-02 07:30   
  2025-06-06 14:30 
  2025-06-06 14:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace 2 poles.:PACW-PACW.PGE & PACW.PGE-PACW = 201 Summer/299 Winter:     2025-05-02 14:32     167007     2025-05-08 14:24  
  PPW 25-07334     17895     PPW     Goshen-Fish Creek 161 kV line          GSHN-PATHC(PPW) 
  NUT-PATHC(PPW) 
  PATHC-GSHN(PPW)   
  348.0 
  1060.0 
  148.0   
  348.0 
  1060.0 
  148.0   
  200.0 
  900.0 
  0.0   
  2025-06-02 08:00 
  2025-06-02 08:00 
  2025-06-02 08:00   
  2025-06-13 16:00 
  2025-06-13 16:00 
  2025-06-13 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace 161kv STR 106, 162, 164, 170, 410, 411:NUT-PATHC = 900 GSHN-PATHC = 200. PATHC-GSHN = 0:     2025-05-03 11:45     166439     2025-05-05 08:17  
  PPW 23-13405     17822     PPW     Pilot Butte - Cleveland line 2 section of Pilot Butte - China Hat 69 kV line,Pilot Butte: Mobile T-3          OTHERGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-06-02 08:00      2025-06-02 17:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Remove High side Jumpers and remove Mobile T-3830 and Install Pilot Butte-Cleveland Line #2 Jumpers. Energize Pilot Butte - Cleveland Line #2:     2025-04-09 09:03     126775     2025-04-29 13:30  
  PPW 25-07791     17886     PPW     Mona-IPP #2 345 kV line          MDWP-MPAC(PPW) 
  MPAC-MDWP(PPW)   
  1400.0 
  1400.0   
  1400.0 
  1400.0   
  1400.0 
  1400.0   
  2025-06-03 06:00 
  2025-06-03 06:00   
  2025-06-06 18:00 
  2025-06-06 18:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Test relays and trip circuit breakers.:MDWP-MPAC & MPAC-MDWP restricted to 600 mw.:     2025-05-01 11:39     166897     2025-05-01 12:04  
  PPW 25-03491     17721     PPW     Atlantic City: LINE CB 1H116,Wyopo-Atlantic City section of the Riverton-Atlantic City 230 kV line          TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0   
  571.0 
  235.0 
  287.0 
  0.0 
  287.0   
  2025-06-04 11:00 
  2025-06-04 11:00 
  2025-06-04 11:00 
  2025-06-04 11:00 
  2025-06-04 11:00   
  2025-06-06 16:30 
  2025-06-06 16:30 
  2025-06-06 16:30 
  2025-06-06 16:30 
  2025-06-06 16:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Breaker Minor Maintenance 1H116:AW/4B Curve 117. WAPAEAST-WAPANORTH = 235. WYOEAST-AEOW (Aeolus West) = 1632. TOT4B-WYONORTH = 571. TOT 4B = 806. Potential Real Time Impact to Wyoming Generation:     2025-02-27 14:17     162573     2025-02-27 14:33  
  PPW 25-07407     17932     PPW     Cherry Lane: T-4970 BK1               0.0      0.0      0.0      2025-06-04 23:00      2025-06-19 21:00      SCHEDULED     DISTRIBUTION     PLANNED      ONPATH     PPW     continuous:LTC Maintenance and retrofit with new parts.:Adams Solar generation off-line for duration of the outage.:     2025-05-21 12:02     166512     2025-05-21 12:04  
  PPW 25-08601     17920     PPW     BPA Hood River: 115 kV Main Bus,BPA Hood River: CB B1678,BPA Hood River: CB B1680          PACW-NTLOAD(PPW)      9999.0      9999.0      9999.0      2025-06-07 23:00      2025-06-08 09:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Diagnostic service:Tucker area load will be served radially from BPA Bald Mountain. Network load arrangements may be required.:     2025-05-15 08:39     167707     2025-05-15 09:10  
  PPW 25-02001     17628     PPW     BPA Hood River: 115 kV Main Bus,BPA Hood River: CB B1680,BPA Hood River: SW B1690,BPA Hood River: CB          PACW-NTLOAD(PPW)      9999.0      9999.0      0.0      2025-06-07 23:00      2025-06-08 09:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:115K M/B PT DIAGNOSTIC SERVICE, 115KV M/B DISCONNECT SERVICE'S AND METERING CT DIAGNOSTIC SERVICE / HOOD RIVER:Tucker area load will be served radially from BPA Bald Mountain. Network load arrangements may be required.:     2025-01-28 11:51     161078     2025-05-13 11:32  
  PPW 25-02330     17643     PPW     Big Charlie (TB Flats 2): 230/34.5 kV XFMR T1,Big Charlie (TB Flats 2): 34.5kV Bus 1          OTHERGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  2025-05-09 06:00 

  2025-06-09 06:00   
  2025-05-09 18:00 

  2025-06-09 18:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian guarding.:TB Flats 2/Big Charlie Circuits 11, 12, 13, and 14 unavailable (106 MW).:     2025-01-31 13:52     161409     2025-05-01 10:12  
  PPW 25-03821     17759     PPW     Glide Tap-Steamboat section of the Dixonville-Toketee Switch Station 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-06-09 06:00      2025-06-09 18:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace 2 fly structures. 3/23, 6/23:Umpqua River Hydro Project Restriction = 174 Summer/199 Winter.:     2025-03-18 10:30     162903     2025-03-18 10:35  
  PPW 25-02331     17644     PPW     Big Charlie (TB Flats 2): 230/34.5 kV XFMR T1,Big Charlie (TB Flats 2): 230/34.5 kV XFMR T2,Big Char          OTHERGEN-PACW(PPW) 

  WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  9999.0 

  9999.0   
  9999.0 

  0.0 

  0.0 

  0.0   
  2025-05-10 06:00 

  2025-06-09 07:00 

  2025-06-10 06:00 

  2025-06-10 18:00   
  2025-05-10 18:00 

  2025-06-10 06:00 

  2025-06-10 18:00 

  2025-06-13 13:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian guarding.:TB Flats 2/Big Charlie Circuits 11, 12, 13, and 14 unavailable (106 MW). TB Flats 2/Big Charlie Circuits 21, 22, 23, and 24 unavailable (91 MW).:     2025-01-31 14:01     161410     2025-05-01 10:08  
  PPW 25-08675     17926     PPW     Pinto: CIRCUIT SWITCHER 332I,Pinto: PST #4,Pinto: 345 kV PST East Bus,Pinto: PST #5,Pinto: PST #6          FOURCORNE345-PINTO(PPW) 
  PINTO-FOURCORNE345(PPW)   
  660.0 
  625.0   
  660.0 
  625.0   
  578.0 
  578.0   
  2025-06-09 08:59 
  2025-06-09 08:59   
  2025-06-12 17:59 
  2025-06-12 17:59   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Circuit switcher 332I maintenance.:PINTO-FOURCORNE345 = 625. FOURCORNE345-PINTO (TOT 2B1) = 650. PINTO-FOURCORNE345 = 625. FOURCORNE345-PINTO (TOT 2B1) = 650. PINTO-FOURCORNE345 and FOURCORNE345-PINTO (TOT 2B1) = 578.:     2025-05-16 11:14     167781     2025-05-16 11:20  
  PPW 25-03826     17913     PPW     Dixonville-Soda Springs 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-06-10 06:00      2025-06-10 18:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Replace multiple structures on this section of line.:Umpqua River Hydro Project Restriction = 112 Summer /154 Winter.:     2025-05-13 15:14     162908     2025-05-13 15:15  
  PPW 25-08490     17914     PPW     Dixonville-Soda Springs 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-06-11 06:00      2025-06-11 18:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Replace multiple structures on this section of line.:Umpqua River Hydro Project Restriction = 112 Summer /154 Winter.:     2025-05-13 15:14     167596     2025-05-13 15:15  
  PPW 25-02333     17645     PPW     Big Charlie (TB Flats 2): 230/34.5 kV XFMR T2,Big Charlie (TB Flats 2): 34.5kV Bus 2          OTHERGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  2025-05-11 06:00 

  2025-06-11 06:00   
  2025-05-11 18:00 

  2025-06-11 18:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian guarding.:TB Flats 2/Big Charlie Circuits 21, 22, 23, and 24 unavailable (91 MW).:     2025-01-31 14:04     161412     2025-05-01 10:16  
  PPW 25-02334     17646     PPW     Big Charlie (TB Flats 2): 230/34.5 kV XFMR T1,Big Charlie (TB Flats 2): 34.5kV Bus 1          OTHERGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  2025-05-12 06:00 

  2025-06-12 06:00   
  2025-05-12 18:00 

  2025-06-12 18:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian guarding.:TB Flats 2/Big Charlie Circuits 11, 12, 13, and 14 unavailable (106 MW).:     2025-01-31 14:08     161413     2025-05-01 10:16  
  PPW 25-08491     17915     PPW     Dixonville-Soda Springs 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-06-12 06:00      2025-06-12 18:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Replace multiple structures on this section of line.:Umpqua River Hydro Project Restriction = 112 Summer /154 Winter.:     2025-05-13 15:14     167597     2025-05-13 15:15  
  PPW 25-08492     17916     PPW     Dixonville-Soda Springs 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-06-13 06:00      2025-06-13 18:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Replace multiple structures on this section of line.:Umpqua River Hydro Project Restriction = 112 Summer /154 Winter.:     2025-05-13 15:14     167598     2025-05-13 15:15  
  PPW 25-02335     17647     PPW     Big Charlie (TB Flats 2): 230/34.5 kV XFMR T2,Big Charlie (TB Flats 2): 34.5kV Bus 2          OTHERGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  2025-05-13 06:00 

  2025-06-13 06:00   
  2025-05-13 18:00 

  2025-06-13 18:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian guarding.:TB Flats 2/Big Charlie Circuits 21, 22, 23, and 24 unavailable (91 MW).:     2025-01-31 14:15     161414     2025-05-01 10:16  
  PPW 25-08493     17917     PPW     Dixonville-Soda Springs 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-06-16 06:00      2025-06-16 18:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Replace multiple structures on this section of line.:Umpqua River Hydro Project Restriction = 112 Summer /154 Winter.:     2025-05-13 15:14     167599     2025-05-13 15:15  
  PPW 25-08494     17918     PPW     Dixonville-Soda Springs 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-06-17 06:00      2025-06-17 18:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Replace multiple structures on this section of line.:Umpqua River Hydro Project Restriction = 112 Summer /154 Winter.:     2025-05-13 15:14     167600     2025-05-13 15:15  
  PPW 25-08495     17919     PPW     Dixonville-Soda Springs 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-06-18 06:00      2025-06-18 18:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Replace multiple structures on this section of line.:Umpqua River Hydro Project Restriction = 112 Summer /154 Winter.:     2025-05-13 15:15     167601     2025-05-13 15:15  
  PPW 25-04514     17747     PPW     Crag View-PG&E Cascade section of the PG&E Cascade-Weed Junction 115 kV line          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW) 

  CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  80.0 

  45.0 
  80.0   
  45.0 
  80.0 

  45.0 
  80.0   
  45.0 
  80.0 

  0.0 
  0.0   
  2025-04-10 07:00 
  2025-04-10 07:00 

  2025-06-23 07:00 
  2025-06-23 07:00   
  2025-04-11 16:30 
  2025-04-11 16:30 

  2025-06-27 16:30 
  2025-06-27 16:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:change b/o bells 2/58,1/63:CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0.:     2025-03-11 11:13     163602     2025-04-04 12:24  
  PPW 25-02017     17629     PPW     Crag View-PG&E Cascade section of the PG&E Cascade-Weed Junction 115 kV line          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  80.0   
  45.0 
  80.0   
  0.0 
  0.0   
  2025-06-30 06:00 
  2025-06-30 06:00   
  2025-10-31 17:00 
  2025-10-31 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Line reconductoring. Replacing structures.:CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0. CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0.:     2025-01-28 13:43     161094     2025-05-19 09:53  
  PPW 25-03418     17689     PPW     Crag View-PG&E Cascade section of the PG&E Cascade-Weed Junction 115 kV line          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  80.0   
  45.0 
  80.0   
  0.0 
  0.0   
  2025-06-30 07:00 
  2025-06-30 07:00   
  2025-10-31 17:00 
  2025-10-31 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Reconductor between structures.:CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0.:     2025-02-18 12:38     162500     2025-02-18 12:45  
  PPW 25-07861     17889     PPW     WAPA Thermopolis-Hilltop-WAPA Lovell 115 kV line          YTP-WYONORTH(PPW) 

  YTP-WYONORTH(PPW)   
  400.0 

  400.0   
  400.0 

  400.0   
  400.0 

  377.0   
  2025-06-24 08:30 

  2025-06-30 07:00   
  2025-06-25 11:00 

  2025-07-03 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace broken insulators.:YTP-WYONORTH = 377. YTS = Series #11: TTC of 589 (PACE = 377 & LAPT = 212).:     2025-05-02 13:19     166967     2025-05-14 13:18  
  PPW 25-07147     17872     PPW     BPA Salem-Dallas section of the BPA Salem-Monpac 115 kV line               0.0      0.0      0.0      2025-06-30 07:00      2025-06-30 17:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:POLE REPLACEMENT, STRUCTURE 17/11:Network Load Service may need to arranged for Dallas & Independence via Monpac. (Monpac Sw 2M88 will be closed & Dallas Sw 2M150 will be open) BPA to Stay Normal at Salem on CB B52 & Albany CB B518.:     2025-04-23 09:54     166249     2025-04-23 09:54  
  PPW 25-08522     17928     PPW     Aeolus: XFMR2 525-230 kV               0.0      0.0      0.0      2025-06-30 07:00      2025-07-02 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace gearings in motor operators for switches; 11G52, 11G53, 11G51 at Aeolus. :     2025-05-19 10:16     167628     2025-05-19 10:16  
  PPW 24-09589     17009     PPW     PG&E Cascade: CB 122          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW) 
  PACW-CRAGVIEW(PPW) 

  CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW) 
  PACW-CRAGVIEW(PPW) 

  CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW) 
  PACW-CRAGVIEW(PPW)   
  45.0 
  80.0 
  115.0 

  45.0 
  80.0 
  150.0 

  45.0 
  80.0 
  115.0   
  45.0 
  80.0 
  115.0 

  45.0 
  80.0 
  150.0 

  45.0 
  80.0 
  115.0   
  45.0 
  80.0 
  115.0 

  45.0 
  80.0 
  150.0 

  0.0 
  0.0 
  0.0   
  2024-08-05 07:00 
  2024-08-05 07:00 
  2024-08-05 07:00 

  2024-12-25 07:00 
  2024-12-25 07:00 
  2024-12-25 07:00 

  2025-07-04 07:00 
  2025-07-04 07:00 
  2025-07-04 07:00   
  2024-08-09 16:00 
  2024-08-09 16:00 
  2024-08-09 16:00 

  2024-12-25 16:00 
  2024-12-25 16:00 
  2024-12-25 16:00 

  2025-07-04 16:00 
  2025-07-04 16:00 
  2025-07-04 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install pott relaying to the Crag View - Cascade 115kV line.:CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0.:     2024-06-06 13:30     147422     2024-12-02 07:13  
  PPW 25-02485     17693     PPW     Clausen (Cedar Springs 2): XFMR T2          WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  0.0 

  9999.0   
  2025-07-07 07:00 

  2025-07-11 23:55   
  2025-07-11 23:55 

  2025-08-07 23:55   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Avian Guarding Project 2025:Cedar Springs 2 Wind Farm unavailable.:     2025-02-20 14:34     161564     2025-02-25 12:58  
  PPW 24-04189     16311     PPW     Cove (OR): 230/69 kV Bank #2 (T3398)          COVEPACW-ROUNDBUTTE(PPW) 
  ROUNDBUTTE-COVEPACW(PPW) 

  COVEPACW-ROUNDBUTTE(PPW) 
  ROUNDBUTTE-COVEPACW(PPW) 

  COVEPACW-ROUNDBUTTE(PPW) 
  ROUNDBUTTE-COVEPACW(PPW) 

  COVEPACW-ROUNDBUTTE(PPW) 
  ROUNDBUTTE-COVEPACW(PPW)   
  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0   
  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0   
  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0 

  60.0 
  60.0   
  2024-07-01 12:00 
  2024-07-01 12:00 

  2024-10-14 12:00 
  2024-10-14 12:00 

  2025-04-28 12:00 
  2025-04-28 12:00 

  2025-07-07 12:00 
  2025-07-07 12:00   
  2024-07-21 12:00 
  2024-07-21 12:00 

  2024-11-01 12:00 
  2024-11-01 12:00 

  2025-05-30 12:00 
  2025-05-30 12:00 

  2025-08-01 12:00 
  2025-08-01 12:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:T-3398 LTC Maintenance and Bushing Replacement:COVEPACW-ROUNDBUTTE & ROUNDBUTTE-COVEPACW = 60.:     2024-03-15 09:39     142013     2025-03-25 09:46  
  PPW 25-06480     17832     PPW     WAPA Flaming Gorge: 230/138 kV XFMR KY2A          FGE-WYOCENTRAL(PPW) 
  WYOCENTRAL-FGE(PPW)   
  200.0 
  200.0   
  200.0 
  200.0   
  0.0 
  200.0   
  2025-07-08 06:30 
  2025-07-08 06:30   
  2025-07-10 11:00 
  2025-07-10 11:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Transformer maintenance.:FGE-WYOCENTRAL = 0. WYOCENTRAL-FGE = Little Mtn load.:     2025-04-10 08:41     165579     2025-04-10 08:41  
  PPW 25-06540     17869     PPW     Dunlap: 230/34 kV Bank #1          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-07-14 08:00      2025-07-17 13:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:WECC maintenance for T1, CB 1H2016 & 230kV Bus:Dunlap Wind restricted to 0 MW and de-energized.:     2025-04-22 13:57     165641     2025-04-22 13:57  
  PPW 25-07718     17884     PPW     Sunbeam-Moonshine 230 kV line          WINDGEN-PACE(PPW)      9999.0      9999.0      9999.0      2025-07-15 05:00      2025-07-15 21:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Substation offline maintenance.:Moonshine Generation unavailable (45 mw).:     2025-04-30 10:00     166824     2025-04-30 10:03  
  PPW 25-06448     17825     PPW     Moonshine: 230/34.5 kV Bank T-1          WINDGEN-PACE(PPW)      9999.0      9999.0      0.0      2025-07-15 06:00      2025-07-15 21:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Site outage for substation offline maintenance.:Moonshine generation unavailable.:     2025-04-09 13:28     165547     2025-04-09 13:31  
  PPW 25-07978     17897     PPW     WAPA Thermopolis-Hilltop-WAPA Lovell 115 kV line          YTP-WYONORTH(PPW) 

  YTP-WYONORTH(PPW) 

  YTP-WYONORTH(PPW) 

  YTP-WYONORTH(PPW)   
  400.0 

  400.0 

  400.0 

  400.0   
  400.0 

  400.0 

  400.0 

  400.0   
  400.0 

  377.0 

  377.0 

  400.0   
  2025-06-25 11:01 

  2025-07-21 07:00 

  2025-07-21 11:01 

  2025-07-24 15:00   
  2025-06-27 16:00 

  2025-07-21 11:01 

  2025-07-24 15:00 

  2025-07-24 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace broken insulators:YTP-WYONORTH = 377. YTS = Series #11: TTC of 589 (PACE = 377 & LAPT = 212).:     2025-05-05 09:53     167084     2025-05-14 13:59  
  PPW 25-03422     17860     PPW     Ekola Flats: 230/34.5 kV T1,Ekola Flats: 230/34.5 kV T2,Ekola Flats: 34.5kV Bus 1,Ekola Flats: 34.5k          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-08-04 07:30      2025-08-08 13:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install bird guarding.:Ekola Flats Feeders 11, 12, 13, 14, 15, 21, 22, 23, 24, and 25 unavailable (250MW total).:     2025-04-18 14:29     162504     2025-05-01 10:21  
  PPW 25-03420     17859     PPW     Ekola Flats: 230/34.5 kV T1,Ekola Flats: 34.5kV Bus 1          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-08-04 09:00      2025-08-04 18:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install bird guarding.:Ekola Flats Feeder 11, 12, 13, 14, and 15 unavailable (125MW).:     2025-04-18 14:26     162502     2025-05-01 10:21  
  PPW 25-07188     17870     PPW     Fry-Parrish Gap 230 kV line          PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW)   
  325.0 
  325.0   
  325.0 
  325.0   
  159.0 
  159.0   
  2025-08-04 22:00 
  2025-08-04 22:00   
  2025-08-05 08:00 
  2025-08-05 08:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace arm at structure 4/1:PACW-PGE.PACW & PACW.PGE-PACW = 159 Summer/149 Winter Network Load Service Arrangements may be required.:     2025-04-22 14:03     166290     2025-04-22 14:06  
  PPW 25-03929     17736     PPW     Alturas-Cedarville Tap section of the Alturas-Bullard 115 kV line          OTHERGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-08-05 07:00      2025-08-08 13:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:REPLACE POLES 6/49 8/49 5/50 8/50 :Airport Solar and Garrett Solar restricted to 0 MW during switching.:     2025-03-06 13:59     163011     2025-03-06 13:59  
  PPW 25-07192     17871     PPW     Fry-Calapooya section of the Diamond Hill-Fry 230 kV line          PACW-NTLOAD(PPW)      9999.0      9999.0      0.0      2025-08-05 22:00      2025-08-06 08:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace arms at structure 4/14:Network Load Service must be arranged for Calapooya, Diamond Hill & EWEB McKenzie. Eliminates ability to move Network Load Service from Alvey to Gresham. Eliminates C&T Point to Point Service from Troutdale to Summer Lake.:     2025-04-22 14:06     166294     2025-04-22 14:11  
  PPW 25-03423     17861     PPW     Ekola Flats: 230/34.5 kV T2,Ekola Flats: 34.5kV Bus 2          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-08-06 09:00      2025-08-06 18:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install bird guarding.:Ekola Flats Feeders 21, 22, 23, 24, and 25 unavailable (125MW):     2025-04-18 14:35     162505     2025-05-01 10:21  
  PPW 25-03424     17862     PPW     Ekola Flats: 230/34.5 kV T1,Ekola Flats: 34.5kV Bus 1          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-08-07 09:00      2025-08-07 18:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install bird guarding.:Ekola Flats Feeder 11, 12, 13, 14, and 15 unavailable (125MW).:     2025-04-18 14:39     162506     2025-05-01 10:21  
  PPW 25-03426     17863     PPW     Ekola Flats: 230/34.5 kV T2,Ekola Flats: 34.5kV Bus 2          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-08-08 09:00      2025-08-08 18:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install bird guarding.:Ekola Flats Feeders 21, 22, 23, 24, and 25 unavailable (125MW).:     2025-04-18 14:50     162508     2025-05-01 10:21  
  PPW 25-03360     17687     PPW     Dave Johnston-TSGT Laramie River Station 230 kV line          DJ-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-DJ(PPW)   
  790.0 
  0.0 
  790.0   
  790.0 
  0.0 
  790.0   
  442.0 
  0.0 
  442.0   
  2025-09-02 07:00 
  2025-09-02 07:00 
  2025-09-02 07:00   
  2025-09-19 15:00 
  2025-09-19 15:00 
  2025-09-19 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:2025 structure replacements.:DJ-WYOEAST & WYOEAST-DJ = 442 (Dave Johnston-WAPA Stegall 230 kV line rating):     2025-02-17 14:22     162442     2025-02-17 14:28  
  PPW 25-07196     17896     PPW     PGE Bethel-Parrish Gap 230 kV line          PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW)   
  325.0 
  325.0   
  325.0 
  325.0   
  159.0 
  159.0   
  2025-09-02 07:00 
  2025-09-02 07:00   
  2025-09-05 18:00 
  2025-09-05 18:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace structures, 1/21, 1/23, 1/25.:PACW-PGE.PACW & PACW.PGE-PACW = 159 Summer/149 Winter Network load service arrangements may be required:     2025-05-05 08:36     166298     2025-05-05 08:37  
  PPW 25-03417     17688     PPW     Malin-PG&E Round Mountain #1 500 kV line          MALIN500-RDM500(PPW) 
  RDM500-MALIN500(PPW) 

  MALIN500-RDM500(PPW) 
  RDM500-MALIN500(PPW)   
  800.0 
  612.0 

  800.0 
  612.0   
  800.0 
  612.0 

  800.0 
  612.0   
  625.0 
  416.0 

  800.0 
  612.0   
  2025-09-08 06:00 
  2025-09-08 06:00 

  2025-09-29 06:00 
  2025-09-29 06:00   
  2025-09-12 17:00 
  2025-09-12 17:00 

  2025-10-03 17:00 
  2025-10-03 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install lab measurement and fault initiating test equipment on primary conductors (Grounded).:MALIN500-RDM500 = 625. RDM500-MALIN500 = 416.:     2025-02-18 12:23     162499     2025-04-10 08:52  
  PPW 25-05028     17750     PPW     Pryor Mountain Wind: 34.5kV Bus 2,Pryor Mountain Wind: 34.5kV Bus 1          WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2025-07-07 08:00 

  2025-09-08 08:00   
  2025-07-09 11:00 

  2025-09-10 11:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian protection.:Pryor Mountain Wind unavailable.:     2025-03-14 11:07     164124     2025-03-17 12:01  
  PPW 25-05029     17751     PPW     Circuit 1,Circuit 2,Circuit 3,Circuit 4,Circuit 5,Circuit 6,Pryor Mountain Wind: 34.5kV Bus 1          WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  0.0 

  9999.0   
  2025-07-09 11:00 

  2025-09-08 08:00   
  2025-07-11 16:00 

  2025-09-12 16:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian protection.:Pryor Mountain Wind circuits 1-6 (120.6MW) unavailable.:     2025-03-14 11:21     164125     2025-03-17 12:03  
  PPW 25-03879     17708     PPW     Sweet Home: Main Bus Disc CB 4M94,Sweet Home: Bypass Bus Disc CB 4M94,Sweet Home: Line Disc CB 4M94          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-09-15 08:00      2025-09-19 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Breaker maintenance.:Fall Creek Hydro Units 1, 2, and 3 unavailable.:     2025-02-25 10:20     162961     2025-02-25 10:20  
  PPW 25-06481     17833     PPW     Malin-PG&E Round Mountain #1 500 kV line          MALIN500-RDM500(PPW) 
  RDM500-MALIN500(PPW)   
  800.0 
  612.0   
  800.0 
  612.0   
  625.0 
  416.0   
  2025-09-17 06:00 
  2025-09-17 06:00   
  2025-09-19 17:00 
  2025-09-19 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install lab measurement and fault initiating test equipment on primary conductors (Grounded).:MALIN500-RDM500 = 625. RDM500-MALIN500 = 416.:     2025-04-10 08:55     165580     2025-04-10 08:55  
  PPW 26-00002     17627     PPW     IPC Midpoint-Hemingway 500 kV line,IPCo Midpoint: 500/345 kV Bank T-501          H500-M500(PPW) 
  M500-H500(PPW) 
  PACW-NTLOAD(PPW) 

  H500-M500(PPW) 
  M500-H500(PPW) 
  PACW-NTLOAD(PPW)   
  800.0 
  1090.0 
  9999.0 

  800.0 
  1090.0 
  9999.0   
  800.0 
  1090.0 
  9999.0 

  800.0 
  1090.0 
  9999.0   
  350.0 
  350.0 
  0.0 

  800.0 
  1090.0 
  9999.0   
  2025-09-22 06:00 
  2025-09-22 06:00 
  2025-09-22 06:00 

  2026-02-23 08:00 
  2026-02-23 08:00 
  2026-02-23 08:00   
  2025-11-07 16:00 
  2025-11-07 16:00 
  2025-11-07 16:00 

  2026-05-29 15:00 
  2026-05-29 15:00 
  2026-05-29 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:This outage is for relocating the existing Midpoint T501 345kV/500kV transformer to a new 345kV station bay.:M500-H500 & H500-M500= 350. BORA-M500 = 959. No impact to Bridger West. Jim Bridger Generation may be restricted real time (as determined by Northwest Path Flow). Network Load Service Arrangements may be required for Southern Oregon Load. Note: TTC Schedules on Path 75 East & West are 0. However, the SOL is 350 West / 325 East (Limited by Bowmont Xfmrs). However, there is a potential of up to 300 mw of actual unscheduled inadvertent flow between Hemingway & Summer Lake. JBSN-JB345 = 2200. PacifiCorp = 1467. IPCo = 733. Jim Bridger Generation may be restricted real time (as determined by Northwest Path Flow).:     2025-01-28 09:16     161059     2025-05-05 13:54  
  PPW 25-07860     17890     PPW     WAPA Thermopolis-Hilltop-WAPA Lovell 115 kV line          YTP-WYONORTH(PPW)      400.0      400.0      377.0      2025-10-14 07:00      2025-10-20 11:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace Nahne Jensen Line switches NJ-5761 and NJ-5765.:YTP-WYONORTH = 377. YTS = Series #11: TTC of 589 (PACE = 377 & LAPT = 212).:     2025-05-02 13:30     166966     2025-05-02 13:30  
  PPW 25-09054     17933     PPW     Gala Solar: Xfmr T1          OTHERGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-10-14 07:00      2025-10-15 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Three-year substation preventative maintenance.:Gala Solar offline.:     2025-05-21 14:37     168161     2025-05-21 14:37  
  PPW 25-00010     16953     PPW     Hemingway-Summer Lake 500 kV line          H500-SMLK(PPW) 
  PACW-NTLOAD(PPW) 
  SMLK-H500(PPW) 

  H500-SMLK(PPW) 
  PACW-NTLOAD(PPW) 
  SMLK-H500(PPW)   
  1500.0 
  9999.0 
  100.0 

  1500.0 
  9999.0 
  100.0   
  1500.0 
  9999.0 
  100.0 

  1500.0 
  9999.0 
  100.0   
  1500.0 
  9999.0 
  100.0 

  0.0 
  0.0 
  0.0   
  2025-04-01 08:00 
  2025-04-01 08:00 
  2025-04-01 08:00 

  2025-10-17 08:00 
  2025-10-17 08:00 
  2025-10-17 08:00   
  2025-09-14 18:00 
  2025-09-14 18:00 
  2025-09-14 18:00 

  2025-10-31 18:00 
  2025-10-31 18:00 
  2025-10-31 18:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Spacer Replacements:H500-SMLK & SMLK-H500 = 0; BORA-M500 = 959; Network Load Service Arrangements may be required for Southern Oregon Load.:     2024-04-30 09:25     144659     2024-12-20 09:45  
  PPW 25-08635     17922     PPW     BPA Captain Jack-Grizzly-Ponderosa #1 500 kV line          BPAT.PACW-PONDEROSA230(PPW)      267.0      267.0      267.0      2025-10-21 08:00      2025-10-21 09:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:DE-ENERGIZE LINE FOR DEADLINE SWITCHING AT POND:BPAT.PACW-PONDEROSA230 = 555 Summer/ 700 Winter:     2025-05-15 11:16     167741     2025-05-15 11:16  
  PPW 25-08632     17921     PPW     BPA Captain Jack-Grizzly-Ponderosa #1 500 kV line          BPAT.PACW-PONDEROSA230(PPW)      267.0      267.0      267.0      2025-10-31 14:00      2025-10-31 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:DE-ENERGIZE LINE FOR DEADLINE SWITCHING AT POND:BPAT.PACW-PONDEROSA230 = 555 Summer/ 700 Winter:     2025-05-15 11:14     167738     2025-05-15 11:14  








©2000 webTrans Version 7.4.00.2™ - Open Access Technology International, Inc. All Rights Reserved.