Outage
Name
Outage
Id
Company Facility Flow
Gate
Segment/
JOTSFacility
Original
TTC In
Original
TTC Out
New
TTC
Start Time (PPT) Stop Time (PPT) Status Outage
Category
Outage
Type
Path
Impact
Report
TPs
Annotation Creation Time (PPT) EventId Last Updated (PPT)
  PPW 171983     10361     PPW     Riverton: 230 kV Cap Bank S/C 472               0.0      0.0      0.0      2021-02-18 09:03      2025-12-23 17:00      ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Riverton: 230 kV Cap Bank S/C 472:     2022-11-14 00:32     75797     2025-06-30 15:01  
  PPW 175805     9275     PPW     Hemingway-Summer Lake 500 kV line (Path 75 Schedule Limitation)          H500-SMLK(PPW) 

  H500-SMLK(PPW)   
  1500.0 

  1500.0   
  1500.0 

  1500.0   
  1386.0 

  1386.0   
  2021-06-02 12:00 

  2024-12-04 12:00   
  2024-12-04 12:00 

  2025-12-31 12:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Hemingway-Summer Lake 500 kV line (Path 75 Schedule Limitation)..:Path Restriction Notes: Path 75 Westbound = 1386.:     2021-12-21 14:06     80760     2024-12-04 08:04  
  PPW 24-00488     15058     PPW     Burns: Series Cap Segment #1 & 2          BORA-M500(PPW) 
  PACW-SMLK(PPW) 
  SMLK-H500(PPW) 

  BORA-M500(PPW) 
  PACW-SMLK(PPW) 
  SMLK-H500(PPW)   
  1090.0 
  550.0 
  100.0 

  1090.0 
  550.0 
  100.0   
  1090.0 
  550.0 
  100.0 

  1090.0 
  550.0 
  100.0   
  1090.0 
  550.0 
  100.0 

  1070.0 
  535.0 
  96.0   
  2024-01-09 03:48 
  2024-01-09 03:48 
  2024-01-09 03:48 

  2024-01-09 12:00 
  2024-01-09 12:00 
  2024-01-09 12:00   
  2024-01-09 12:00 
  2024-01-09 12:00 
  2024-01-09 12:00 

  2025-10-31 23:59 
  2025-10-31 23:59 
  2025-10-31 23:59   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Investigating a possible failure of relay voltage sensing component.:Path 75 limited to 507 (Midpoint Series Caps bypassed for maint). SMLK-H500 = 96; BORA-M500 = 959;:     2024-01-03 10:34     138306     2025-06-25 08:49  
  PPW 24-06062     16750     PPW     Path 25 Schedule Limitation (Cascade 115 kV Tie)          CRAGVIEW-PACW(PPW) 

  CRAGVIEW-PACW(PPW)   
  108.0 

  108.0   
  108.0 

  108.0   
  0.0 

  0.0   
  2024-04-09 00:00 

  2024-04-09 02:35   
  2024-04-09 02:35 

  2026-04-09 00:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:CRAGVIEW-PACW TTC = 0 PER PLANNING.:CRAGVIEW-PACW = 0 INDEFINITELY:     2024-04-09 09:34     143888     2025-04-07 18:15  
  PPW 24-06351     17531     PPW     Threemile Knoll: TIE CB 335,Threemile Knoll: CB 335 W Bus Disc,Threemile Knoll: SWITCH 356A               0.0      0.0      0.0      2024-04-12 22:23      2025-07-25 17:00      ACTIVE     TRANSMISSION     FORCED      ONPATH     PPW     continuous:***Commissioning Required*** Investigate failure of CB 335. :     2024-12-02 14:23     144180     2025-07-11 14:52  
  PPW 24-10840     18116     PPW     Mercer: 345 kV Customer Tie-Line #6               0.0      0.0      0.0      2024-08-19 10:45      2025-07-17 17:00      ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous: **Commissioning required** Charging Authorization on relay package, Switch 10C5, Tie Line #6 Primary Metering, and Meta tie-line #6. Mercer: Add jumpers to load side of MOAB 10B86:     2025-07-09 09:54     148673     2025-07-09 09:54  
  PPW 24-10892     18118     PPW     Mercer: 10B94,Mercer: 10B83,Mercer: 345 kV Customer Tie-Line #7               0.0      0.0      0.0      2024-08-28 14:20      2025-07-17 14:00      ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Mercer: Clearance on new bay until new breaker and tie to Meta is ready to energize:     2025-07-09 09:56     148725     2025-07-09 09:56  
  PPW 24-15751     17530     PPW     Threemile Knoll: Series Cap C2,Threemile Knoll: Series Cap C1          JBSN-JB345(PPW) 
  NUT-PATHC(PPW) 
  PATHC-NUT(PPW) 

  NUT-PATHC(PPW) 

  NUT-PATHC(PPW) 

  JBSN-JB345(PPW) 
  PATHC-NUT(PPW)   
  1600.0 
  0.0 
  1600.0 

  1172.0 

  1060.0 

  1600.0 
  1600.0   
  1600.0 
  0.0 
  1600.0 

  1172.0 

  1060.0 

  1600.0 
  1600.0   
  1417.0 
  0.0 
  1600.0 

  1172.0 

  1060.0 

  1433.0 
  1480.0   
  2024-09-18 00:30 
  2024-09-18 00:30 
  2024-09-18 00:30 

  2024-11-01 00:00 

  2025-04-01 00:00 

  2025-06-09 19:09 
  2025-06-09 19:09   
  2025-06-09 19:09 
  2024-11-01 00:00 
  2025-06-09 19:09 

  2025-04-01 00:00 

  2025-06-09 19:09 

  2025-12-31 17:30 
  2025-12-31 17:30   
  ACTIVE     TRANSMISSION     FORCED      ONPATH     PPW     continuous:Computer/controller for Series caps needs to be repaired/replaced. Tech support needed from Hitachi.:JBSN-JB345 = 2150. PacifiCorp = 1433. IPCo = 717 NUT-PATHC = 730 Summer/730 Winter. PATHC-NUT = 1480 Summer/1560 Winter. JBSN-JB345 = 2150. PacifiCorp = 1433. IPCo = 717 NUT-PATHC = 950 Summer/951 Winter. PATHC-NUT = 1480 Summer/1580 Winter.:     2024-11-30 22:07     153619     2025-06-09 19:12  
  PPW 24-16609     17387     PPW     Oquirrh-Terminal #1 345 kV line               0.0      0.0      0.0      2024-10-25 07:52      2025-07-30 14:00      ACTIVE     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Relocate the Oquirrh-Terminal #1 345 kV line:No impact under normal conditions.:     2024-10-10 12:23     154477     2025-06-18 13:25  
  PPW 25-00820     17929     PPW     Calapooya: T-3240 230/69 kV          PACW-NTLOAD(PPW) 

  PACW-NTLOAD(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2025-03-06 06:00 

  2025-03-06 06:21   
  2025-03-06 06:21 

  2025-07-31 15:30   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace wire, jumpers and circuit switcher.:Network Load Service must be arranged for Calapooya, Diamond Hill & EWEB McKenzie. Eliminates ability to move Network Load Service from Alvey to Gresham. Eliminates C&T Point to Point Service from Troutdale to Summer Lake.:     2025-05-20 09:10     159895     2025-05-28 12:50  
  PPW 25-09303     18125     PPW     Mccornick: XFMR 1               0.0      0.0      0.0      2025-05-26 21:05      2025-07-15 09:00      Completed     DISTRIBUTION     EMERGENCY      ONPATH     PPW     continuous:Out of Service:     2025-07-09 10:40     168410     2025-07-14 08:46  
  PPW 25-09445     17943     PPW     Cold Springs: XFMR 1 T-3169          PACW-NTLOAD(PPW) 
  WINDGEN-PACW(PPW) 

  PACW-NTLOAD(PPW) 
  WINDGEN-PACW(PPW)   
  9999.0 
  9999.0 

  9999.0 
  9999.0   
  9999.0 
  9999.0 

  9999.0 
  9999.0   
  9999.0 
  9999.0 

  0.0 
  0.0   
  2025-05-29 09:33 
  2025-05-29 09:33 

  2025-05-29 10:00 
  2025-05-29 10:00   
  2025-05-29 10:00 
  2025-05-29 10:00 

  2025-12-19 14:10 
  2025-12-19 14:10   
  ACTIVE     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Replace T-3169:Umatilla, Hermiston & Hinkle will be radial from BPA McNary. Network Load Service Arrangements may be required. With Cold Springs XFMR #1 out of service, Echo Wind Generation will be tied to BPA McNary. Orchard Wind restricted to 8.5MW maximum output.:     2025-05-28 14:07     168552     2025-06-27 11:38  
  PPW 25-09144     18144     PPW     Fern Hill-Knappa Svensen section of the Astoria-BPA Driscoll 115 kV line,Knappa Svensen: KNAPPASV B1               0.0      0.0      0.0      2025-05-30 07:41      2025-08-11 15:00      ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Rebuild line section.:     2025-07-09 12:21     168251     2025-07-09 12:21  
  PPW 25-09961     17966     PPW     Crag View-PG&E Cascade section of the PG&E Cascade-Weed Junction 115 kV line          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW) 

  CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  75.0 

  45.0 
  75.0   
  45.0 
  75.0 

  45.0 
  75.0   
  45.0 
  75.0 

  0.0 
  0.0   
  2025-06-07 07:00 
  2025-06-07 07:00 

  2025-06-07 07:36 
  2025-06-07 07:36   
  2025-06-07 07:36 
  2025-06-07 07:36 

  2025-07-15 11:00 
  2025-07-15 11:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Technicians testing program for Cottonwood 230/115kV transformer #4 and Cottonwood CBs 542 & 192.:CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0.:     2025-06-04 10:36     169073     2025-06-07 07:44  
  PPW 25-10594     18136     PPW     Park City: CB11 BUS DISC,Park City: CB 11               0.0      0.0      0.0      2025-06-16 07:47      2025-07-21 07:00      ACTIVE     DISTRIBUTION     URGENT      ONPATH     PPW     continuous: Reason for Switching: 1) Isolate switchgear on PKC15 at FP# 11401003.0-365003 for replacement and 2) Isolate switchgear on PKC15 at FP# 11401003.0-366004 for replacement and relocation. :     2025-07-09 11:36     169719     2025-07-09 11:36  
  PPW 25-11064     18003     PPW     Alturas: CB 2L22               0.0      0.0      0.0      2025-06-16 19:19      2025-07-16 15:00      ACTIVE     TRANSMISSION     FORCED      ONPATH     PPW     continuous:Contractors pulled cables and wires to CT and PT relaying and metering. Will need to rewire.:     2025-06-17 18:11     170189     2025-06-17 18:53  
  PPW 25-11835     18024     PPW     Populus: 345 kV Series Capacitor #1          JBSN-JB345(PPW) 

  JBSN-JB345(PPW)   
  1600.0 

  1600.0   
  1600.0 

  1600.0   
  1600.0 

  1433.0   
  2025-06-26 12:17 

  2025-06-26 12:21   
  2025-06-26 12:21 

  2025-07-18 17:00   
  ACTIVE     TRANSMISSION     FORCED      ONPATH     PPW     continuous:investigate alarm "SERIES CAP 1 CRIT":JBSN-JB345 = 2150. PacifiCorp = 1433. IPCo = 717.:     2025-06-26 12:25     170964     2025-07-14 07:40  
  PPW 25-02017     17629     PPW     Crag View-PG&E Cascade section of the PG&E Cascade-Weed Junction 115 kV line          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  75.0   
  45.0 
  75.0   
  45.0 
  75.0   
  2025-06-30 06:00 
  2025-06-30 06:00   
  2025-10-31 17:00 
  2025-10-31 17:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Line reconductoring. Replacing structures.:CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0. CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0.:     2025-01-28 13:43     161094     2025-06-09 11:17  
  PPW 25-03418     17689     PPW     Crag View-PG&E Cascade section of the PG&E Cascade-Weed Junction 115 kV line          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  80.0   
  45.0 
  80.0   
  45.0 
  80.0   
  2025-06-30 07:00 
  2025-06-30 07:00   
  2025-10-31 17:00 
  2025-10-31 17:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Reconductor between structures.:CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0.:     2025-02-18 12:38     162500     2025-05-27 09:55  
  PPW 25-10324     17986     PPW     Crag View-PG&E Cascade section of the PG&E Cascade-Weed Junction 115 kV line          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW) 

  CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  75.0 

  45.0 
  75.0   
  45.0 
  75.0 

  45.0 
  75.0   
  45.0 
  75.0 

  0.0 
  0.0   
  2025-06-30 07:00 
  2025-06-30 07:00 

  2025-06-30 07:17 
  2025-06-30 07:17   
  2025-06-30 07:17 
  2025-06-30 07:17 

  2025-10-31 17:00 
  2025-10-31 17:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Line reconductoring. Replacing structures.:CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0. CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0.:     2025-06-10 10:10     169449     2025-06-30 07:18  
  PPW 25-05413     18115     PPW     Mercer: MOAB 10B86               0.0      0.0      0.0      2025-07-02 07:00      2025-07-17 14:00      Active     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Mercer: Energize Meta Tie-Line #7 **Commissioning Required**:     2025-07-09 09:54     164510     2025-07-09 09:54  
  PPW 25-12460     18095     PPW     Pinto: Cap #2               0.0      0.0      0.0      2025-07-03 13:13      2025-07-15 18:00      Completed     TRANSMISSION     FORCED      ONPATH     PPW     continuous:Replace burned cans on cap bank, investigate arcing:     2025-07-09 09:11     171592     2025-07-11 14:50  
  PPW 25-10030     17971     PPW     Swift #2: Unit #22 Main Transformer - T2103,Swift #2: Unit #21 Main Transformer - T2102          HYDROGEN-PACW(PPW) 

  HYDROGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2025-07-07 07:00 

  2025-07-07 08:29   
  2025-07-07 08:29 

  2025-07-17 17:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Bushing replacement.:Swift 2 Unit 21 and 22 unavailable.:     2025-06-05 10:03     169142     2025-07-07 08:31  
  PPW 25-10784     17997     PPW     Swift #1: Unit #12 Main Transformer - T2100          HYDROGEN-PACW(PPW) 

  HYDROGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2025-07-07 07:00 

  2025-07-07 13:24   
  2025-07-07 13:24 

  2025-07-16 18:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Swift unit 12 annual maintenance and runner welding.:Swift 1 Unit 12 unavailable.:     2025-06-13 12:04     169909     2025-07-07 13:27  
  PPW 25-12672     18160     PPW     Jacksonville-Sage Road section of the Ashland-Baldy Sw Station-Sage Road 115 kV line,Jacksonville-Ru               0.0      0.0      0.0      2025-07-07 23:22      2025-07-14 11:39      Completed     DISTRIBUTION     EMERGENCY      ONPATH     PPW     continuous:Clearance on Sage Road - Jacksonville 115kV line Clearance on Jacksonville - Ruch - Medford 69 kV line:     2025-07-09 15:54     171804     2025-07-14 11:41  
  PPW 25-02485     17693     PPW     Clausen (Cedar Springs 2): XFMR T2          WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0 

  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  9999.0 

  0.0 

  9999.0   
  2025-07-07 07:00 

  2025-07-07 17:00 

  2025-07-08 07:00 

  2025-07-08 07:29 

  2025-07-11 23:55   
  2025-07-07 17:00 

  2025-07-08 07:00 

  2025-07-08 07:29 

  2025-07-11 23:55 

  2025-08-07 23:55   
  Completed     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Avian Guarding Project 2025 Moved Clearance boundaries to the low side Feeder discs.: 89F21-2, 89F22-2, 89F23-2 and 89F24-2 per email conversation with Brian Hail:Cedar Springs 2 Wind Farm unavailable.:     2025-02-20 14:34     161564     2025-07-08 07:29  
  PPW 25-12804     18097     PPW     {Mkt Affiliate} Currant Creek Plant: {Mkt Affiliate} Currant Creek Plant Total Plant               0.0      0.0      0.0      2025-07-09 02:20      2025-07-11 23:59      Completed     GENERATION     FORCED      ONPATH     PPW     continuous:Ambient due to temp:     2025-07-09 09:20     171936     2025-07-09 09:20  
  PPW 25-12805     18098     PPW     {Mkt Affiliate} Lake Side Plant: {Mkt Affiliate} Lake Side 1 Total Plant               0.0      0.0      0.0      2025-07-09 02:21      2025-07-11 23:59      Completed     GENERATION     FORCED      ONPATH     PPW     continuous:Ambient due to temp:     2025-07-09 09:21     171937     2025-07-09 09:21  
  PPW 25-12807     18099     PPW     {Mkt Affiliate} Lake Side Plant #2: {Mkt Affiliate} Lake Side Plant #2 Total Plant               0.0      0.0      0.0      2025-07-09 02:21      2025-07-11 23:59      Completed     GENERATION     FORCED      ONPATH     PPW     continuous:Ambient due to temp:     2025-07-09 09:21     171939     2025-07-09 09:21  
  PPW 25-12808     18100     PPW     {Mkt Affiliate} Chehalis Plant: {Mkt Affiliate} Chehalis Plant Total Plant               0.0      0.0      0.0      2025-07-09 02:22      2025-07-11 23:59      Completed     GENERATION     FORCED      ONPATH     PPW     continuous:Ambient due to temp:     2025-07-09 09:22     171940     2025-07-09 09:22  
  PPW 25-12809     18101     PPW     {Mkt Affiliate} Hermiston 3: {Mkt Affiliate} Hermiston 3 Hermiston Unit 3               0.0      0.0      0.0      2025-07-09 02:23      2025-07-11 23:59      Completed     GENERATION     FORCED      ONPATH     PPW     continuous:Ambient due to temp:     2025-07-09 09:23     171941     2025-07-09 09:23  
  PPW 25-12810     18103     PPW     {Mkt Affiliate} Currant Creek Plant: {Mkt Affiliate} Currant Creek Plant Total Plant               0.0      0.0      0.0      2025-07-09 02:25      2025-07-12 23:59      Completed     GENERATION     FORCED      ONPATH     PPW     continuous:Ambient due to temp:     2025-07-09 09:25     171942     2025-07-09 09:25  
  PPW 25-12811     18105     PPW     {Mkt Affiliate} Lake Side Plant: {Mkt Affiliate} Lake Side 1 Total Plant               0.0      0.0      0.0      2025-07-09 02:26      2025-07-12 23:59      Completed     GENERATION     FORCED      ONPATH     PPW     continuous:Ambient due to temp:     2025-07-09 09:26     171943     2025-07-09 09:26  
  PPW 25-12812     18106     PPW     {Mkt Affiliate} Lake Side Plant #2: {Mkt Affiliate} Lake Side Plant #2 Total Plant               0.0      0.0      0.0      2025-07-09 02:26      2025-07-12 23:59      Completed     GENERATION     FORCED      ONPATH     PPW     continuous:Ambient due to temp:     2025-07-09 09:26     171944     2025-07-09 09:26  
  PPW 25-12813     18107     PPW     {Mkt Affiliate} Chehalis Plant: {Mkt Affiliate} Chehalis Plant Total Plant               0.0      0.0      0.0      2025-07-09 02:27      2025-07-12 23:59      Completed     GENERATION     FORCED      ONPATH     PPW     continuous:Ambient due to temp:     2025-07-09 09:27     171945     2025-07-09 09:27  
  PPW 25-12814     18108     PPW     {Mkt Affiliate} Hermiston 3: {Mkt Affiliate} Hermiston 3 Hermiston Unit 3               0.0      0.0      0.0      2025-07-09 02:28      2025-07-12 23:59      Completed     GENERATION     FORCED      ONPATH     PPW     continuous:Ambient due to temp:     2025-07-09 09:28     171946     2025-07-09 09:28  
  PPW 25-12836     18138     PPW     {Mkt Affiliate} Hunter Plant 3: {Mkt Affiliate} Hunter Plant 3 Hunter Unit 3               0.0      0.0      0.0      2025-07-09 04:52      2025-07-12 14:00      Completed     GENERATION     FORCED      ONPATH     PPW     continuous:Mill Service:     2025-07-09 11:52     171968     2025-07-09 11:52  
  PPW 25-12837     18141     PPW     {Mkt Affiliate} Hunter Plant 1: {Mkt Affiliate} Hunter Plant 1 Unit 1               0.0      0.0      0.0      2025-07-09 05:03      2025-07-12 16:00      Completed     GENERATION     FORCED      ONPATH     PPW     continuous:Mill Service:     2025-07-09 12:03     171969     2025-07-09 12:03  
  PPW 25-12785     18069     PPW     Dave Johnston: #1 Main Bank T2127               0.0      0.0      0.0      2025-07-09 07:06      2025-07-11 23:59      Completed     TRANSMISSION     FORCED      ONPATH     PPW     continuous:Investigate steam line blowout. :     2025-07-09 09:10     171917     2025-07-09 09:10  
  PPW 25-12777     18102     PPW     Humbug Creek-Ruch section of the Humbug Creek-Jacksonville-Medford 69 kV line,Humbug Creek: SW 3R348               0.0      0.0      0.0      2025-07-09 09:23      2025-07-25 15:00      ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Change out 27 structures between 1/17 and 5/22 in the Ruch to Humbug Cr section of Line 32.:     2025-07-09 09:23     171909     2025-07-09 09:23  
  PPW 25-12869     18162     PPW     {Mkt Affiliate} Swift Hydro: {Mkt Affiliate} Swift Hydro Total Plants               0.0      0.0      0.0      2025-07-09 09:36      2025-07-11 23:55      Completed     GENERATION     FORCED      ONPATH     PPW     continuous:units 13, 21/22 available, 110MW total:     2025-07-09 16:36     172001     2025-07-09 16:36  
  PPW 25-06213     18120     PPW     Camp Williams: CAP CB C348               0.0      0.0      0.0      2025-07-09 09:58      2025-07-14 14:10      COMPLETED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:BREAKER MINOR MAINTENANCE:     2025-07-09 09:58     165311     2025-07-14 14:10  
  PPW 25-02204     18123     PPW     Warren: XFMR 2,Warren: SW 2A5               0.0      0.0      0.0      2025-07-09 10:31      2025-07-16 15:00      ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:**Commissioning Req**Commission CBs 7B17, 2A10, 2A9, 2A8, 2A6, XFMR #2,, Cap 2, PT 6:     2025-07-09 10:31     161283     2025-07-09 10:31  
  PPW 25-12874     18165     PPW     {Mkt Affiliate} Swift Hydro: {Mkt Affiliate} Swift Hydro UNIT 12               0.0      0.0      0.0      2025-07-09 11:48      2025-07-16 17:59      ACTIVE     GENERATION     FORCED      ONPATH     PPW     continuous:SWIFT12 Offline, Annual Maintenance:     2025-07-09 18:48     172006     2025-07-09 18:48  
  PPW 25-12845     18148     PPW     BPA Malin-Summer Lake 500 kV line          PACW-SMLK(PPW) 
  SMLK-PACW(PPW) 

  PACW-SMLK(PPW) 
  SMLK-PACW(PPW) 

  PACW-SMLK(PPW) 
  SMLK-PACW(PPW) 

  PACW-SMLK(PPW) 
  SMLK-PACW(PPW)   
  550.0 
  1187.0 

  550.0 
  1187.0 

  550.0 
  1187.0 

  550.0 
  1187.0   
  550.0 
  1187.0 

  550.0 
  1187.0 

  550.0 
  1187.0 

  550.0 
  1187.0   
  550.0 
  1187.0 

  0.0 
  0.0 

  550.0 
  1187.0 

  550.0 
  1187.0   
  2025-07-09 13:20 
  2025-07-09 13:20 

  2025-07-09 13:23 
  2025-07-09 13:23 

  2025-07-12 09:29 
  2025-07-12 09:29 

  2025-07-12 09:30 
  2025-07-12 09:30   
  2025-07-09 13:23 
  2025-07-09 13:23 

  2025-07-12 09:29 
  2025-07-12 09:29 

  2025-07-12 09:30 
  2025-07-12 09:30 

  2025-07-12 16:00 
  2025-07-12 16:00   
  COMPLETED     TRANSMISSION     FORCED      ONPATH     PPW     continuous:Line Removed from Service due to approaching Fire:PACW-SMLK & SMLK-PACW = 0. Eliminates ESM Point to Point Service from Troutdale to Summer Lake. Eliminates Ability to Transfer Bridger Generation for Network Load Service to Southern Oregon.:     2025-07-09 13:09     171977     2025-07-12 09:29  
  PPW 25-12844     18149     PPW     Parkway: CB 17,Carlisle: CB 11               0.0      0.0      0.0      2025-07-09 13:23      2025-09-09 15:00      ACTIVE     DISTRIBUTION     URGENT      ONPATH     PPW     continuous:Offload 2 MVA off PKW 17 onto CRL 11:     2025-07-09 13:23     171976     2025-07-09 13:43  
  PPW 25-12875     18166     PPW     DG&T Bonanza: Unit #1 Main Bank               0.0      0.0      0.0      2025-07-09 19:03      2025-07-18 23:00      ACTIVE     TRANSMISSION     FORCED      ONPATH     PPW     continuous:Investigate Unit trip:     2025-07-09 19:03     172007     2025-07-09 19:03  
  PPW 25-11040     18001     PPW     Hinshaw: 138/34.5 kV T-1          WINDGEN-PACE(PPW) 

  WINDGEN-PACE(PPW) 

  WINDGEN-PACE(PPW)   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  0.0 

  0.0   
  2025-07-14 06:00 

  2025-07-15 05:44 

  2025-07-15 06:00   
  2025-07-14 17:00 

  2025-07-15 06:00 

  2025-07-18 17:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Annual substation maintenance.:Hinshaw wind unavailable.:     2025-06-17 13:23     170165     2025-06-17 13:27  
  PPW 25-12652     18050     PPW     Populus: 345 kV Series Capacitor #1,Populus: SERIES CAP BYPASS SW 372A          JBSN-JB345(PPW) 

  JBSN-JB345(PPW)   
  1600.0 

  1600.0   
  1600.0 

  1600.0   
  1600.0 

  1433.0   
  2025-07-09 07:30 

  2025-07-14 07:41   
  2025-07-14 07:41 

  2025-07-18 15:00   
  ACTIVE     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Troubleshoot and replace protective equipment on platforms.:JBSN-JB345 = 2150. PacifiCorp = 1433. IPCo = 717.:     2025-07-08 11:31     171784     2025-07-14 07:41  
  PPW 25-06540     17869     PPW     Dunlap: 230/34 kV Bank #1          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-07-14 08:00      2025-07-17 13:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:WECC maintenance for T1, CB 1H2016 & 230kV Bus:Dunlap Wind restricted to 0 MW and de-energized.:     2025-04-22 13:57     165641     2025-06-16 11:28  
  PPW 25-08481     17938     PPW     Culver-Cove section of the Redmond-Cove 69 kV line,Cove (OR): Ground SW 3D560               0.0      0.0      0.0      2025-07-14 08:43      2025-07-18 12:00      ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace Failed MOAB SW 3D27 At Culver Sub:Crooked River & Culver will be switched over to BPA Redmond via Pacific Power Redmond. Opal Springs Generation will be tie to BPA Redmond. Network Load Service Arrangements may be required.:     2025-05-24 09:43     167587     2025-07-14 08:43  
  PPW 25-07647     17941     PPW     Dunlap: 230/34 kV Bank #1,Dunlap: CB 1H2016          WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2025-07-14 08:00 

  2025-07-14 10:41   
  2025-07-14 10:41 

  2025-07-17 13:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:WECC maintenance for T1, CB 1H2016 & 230kV Bus:Dunlap Wind unavailable.:     2025-05-27 14:21     166753     2025-07-14 10:42  
  PPW 25-13328     18176     PPW     Chiloquin-Klamath Falls 230 kV line               0.0      0.0      0.0      2025-07-14 19:46      2025-07-16 17:00      ACTIVE     TRANSMISSION     FORCED      ONPATH     PPW     continuous:fire:COI & PDCI Restrictions to be determined by BPA.:     2025-07-14 19:46     172463     2025-07-15 16:08  
  PPW 25-12045     18161     PPW     Promontory: CB 11               0.0      0.0      0.0      2025-07-14 21:58      2025-07-15 04:00      Completed     DISTRIBUTION     PLANNED      ONPATH     PPW     continuous:Change 46kv fuses on Trans 1. Change blown arrestor, work on CB11.:     2025-07-09 16:07     171177     2025-07-14 21:58  
  PPW 25-07718     17884     PPW     Sunbeam-Moonshine 230 kV line          WINDGEN-PACE(PPW)      9999.0      9999.0      9999.0      2025-07-15 05:00      2025-07-15 21:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Substation offline maintenance.:Moonshine Generation unavailable (45 mw).:     2025-04-30 10:00     166824     2025-04-30 10:03  
  PPW 25-06448     17825     PPW     Moonshine: 230/34.5 kV Bank T-1          WINDGEN-PACE(PPW) 

  WINDGEN-PACE(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2025-07-15 06:00 

  2025-07-15 06:06   
  2025-07-15 06:06 

  2025-07-15 21:00   
  COMPLETED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Site outage for substation offline maintenance.:Moonshine generation unavailable.:     2025-04-09 13:28     165547     2025-07-15 20:46  
  PPW 25-12161     18038     PPW     BPA Redmond-Redmond 115 kV section of the Houston Lake-BPA Redmond 115 kV line,Redmond: REDMOND2 GND          BPAT.PACW-RDMND115PAC(PPW) 

  BPAT.PACW-RDMND115PAC(PPW) 

  BPAT.PACW-RDMND115PAC(PPW)   
  65.0 

  65.0 

  65.0   
  65.0 

  65.0 

  65.0   
  65.0 

  65.0 

  65.0   
  2025-07-15 09:00 

  2025-07-15 09:23 

  2025-07-15 13:34   
  2025-07-15 09:23 

  2025-07-15 13:34 

  2025-07-15 15:30   
  COMPLETED     TRANSMISSION     URGENT      ONPATH     PPW     continuous:FPI Correction work on SW 35th.:BPAT.PACW-RDMND115PAC=65.:     2025-07-01 15:46     171293     2025-07-15 13:34  
  PPW 25-13402     18180     PPW     Glen Canyon-Sigurd 230 kV line          GLENCANYON2-PACE(PPW) 
  PACE-GLENCANYON2(PPW) 

  GLENCANYON2-PACE(PPW) 
  PACE-GLENCANYON2(PPW)   
  300.0 
  250.0 

  300.0 
  250.0   
  300.0 
  250.0 

  300.0 
  250.0   
  300.0 
  250.0 

  0.0 
  0.0   
  2025-07-15 17:22 
  2025-07-15 17:22 

  2025-07-15 17:41 
  2025-07-15 17:41   
  2025-07-15 17:41 
  2025-07-15 17:41 

  2025-07-16 21:22 
  2025-07-16 21:22   
  ACTIVE     TRANSMISSION     FORCED      ONPATH     PPW     continuous:Removed due to fire:GLENCANYON2-PACE & PACE-GLENCANYON2 (TOT 2B2) = 0.:     2025-07-15 17:27     172538     2025-07-15 17:43  
  PPW 25-09700     17950     PPW     Foote Creek: 34.5 kV Bus #3,Foote Creek: 34.5 kV Bus #4          WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2025-07-15 06:30 

  2025-07-16 06:00   
  2025-07-15 15:00 

  2025-07-16 14:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian guarding.:Foote Creek 1 Wind unavailable.:     2025-05-30 13:42     168809     2025-06-23 14:14  
  PPW 25-11559     18018     PPW     Foote Creek: 34.5 kV Bus #1,Foote Creek: 34.5 kV Bus #2,Foote Creek: 34.5 kV Bus #3,Foote Creek: 34.          WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2025-07-15 06:30 

  2025-07-16 06:30   
  2025-07-15 15:00 

  2025-07-16 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian guarding. Outage Updated at the request of Aron Anderson. Instead of attempting to do each bus one-at-a-time, the entire site will now be taken offline and installation done all-at-once. - Geiger 07/10/25:Foote Creek 2 Wind unavailable.:     2025-06-23 13:54     170687     2025-07-11 12:07  
  PPW 25-09447     17987     PPW     Jim Bridger-Mustang 230 kV line,Mustang-WAPA Spence 230 kV line          JBSN-WYOCENTRAL(PPW) 
  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-JBSN(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  600.0 
  631.0 
  249.0 
  600.0 
  574.0 
  0.0 
  574.0   
  600.0 
  631.0 
  249.0 
  600.0 
  574.0 
  0.0 
  574.0   
  400.0 
  631.0 
  243.0 
  400.0 
  287.0 
  0.0 
  287.0   
  2025-07-16 07:00 
  2025-07-16 07:00 
  2025-07-16 07:00 
  2025-07-16 07:00 
  2025-07-16 07:00 
  2025-07-16 07:00 
  2025-07-16 07:00   
  2025-07-18 14:00 
  2025-07-18 14:00 
  2025-07-18 14:00 
  2025-07-18 14:00 
  2025-07-18 14:00 
  2025-07-18 14:00 
  2025-07-18 14:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install 230 kV shoo fly at Mustang sub:AW/4B Curve 121. WAPAEAST-WAPANORTH = 243. WYOEAST-AEOW (Aeolus West) = 1627. TOT4B-WYONORTH = 631. TOT 4B = 874. JBSN-WYOC & WYOC-JBSN = 400. Potential Real Time Impact to Wyoming Generation Great Divide will be radial from WAPA Spence via Mustang. Network Load Service Arrangements may be required. AW/4B Curve 121. WAPAEAST-WAPANORTH = 243. WYOEAST-AEOW (Aeolus West) = 1627. TOT4B-WYONORTH = 631. TOT 4B = 874. JBSN-WYOC & WYOC-JBSN = 400. Potential Real Time Impact to Wyoming Generation Great Divide will be radial from WAPA Spence via Mustang. Network Load Service Arrangements may be required.:     2025-06-10 11:51     168554     2025-06-10 11:56  
  PPW 25-09822     18021     PPW     Pinto-Westwater69kV line          ANTE-BRDY(PPW) 
  BRDY-ANTE(PPW)   
  90.0 
  90.0   
  90.0 
  90.0   
  90.0 
  90.0   
  2022-01-01 12:00 
  2022-01-01 12:00   
  2022-01-01 16:00 
  2022-01-01 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:REPLACE STR #11 and 94:     2025-06-24 11:16     168933     2025-06-24 11:16  
  PPW 25-13375     18179     PPW     Cold Springs: XFMR 1 T-3169,Cold Springs: CS 1W27,Cold Springs: CB 3W120,Cold Springs-Hermiston 69 k               0.0      0.0      0.0      2025-07-17 09:00      2025-12-19 16:00      SCHEDULED     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Replace T-3169, CB 3W120, SW 3W119:Umatilla, Hermiston & Hinkle will be radial from BPA McNary. Network Load Service Arrangements may be required. With Cold Springs XFMR #1 out of service, Echo Wind Generation will be tied to BPA McNary. Orchard Wind restricted to 8.5MW maximum output. Umatilla, Hermiston & Hinkle will be radial from BPA McNary. Network Load Service Arrangements may be required. With Cold Springs XFMR #1 out of service, Echo Wind Generation will be tied to BPA McNary. Orchard Wind required offline.:     2025-07-15 13:11     172511     2025-07-15 13:11  
  PPW 25-10623     17989     PPW     Merwin: MERWIN GR.UNIT1          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-07-20 07:00      2025-07-25 18:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Unit 1 annual maintenance.:Merwin Unit #1 unavailable.:     2025-06-11 14:28     169748     2025-06-11 14:28  
  PPW 25-06799     18133     PPW     Loafer-Spanish Fork Wind section of the Santaquin-Spanish Fork 46kV line               0.0      0.0      0.0      2025-07-21 08:00      2025-07-25 14:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:A-condition str replacements :     2025-07-09 11:16     165901     2025-07-09 11:16  
  PPW 25-12137     18041     PPW     Black Rock-Pavant 230 kV line          GON.PAV-PAVANT(PPW) 
  PAVANT-GON.PAV(PPW)   
  130.0 
  139.0   
  130.0 
  139.0   
  0.0 
  0.0   
  2025-07-22 07:30 
  2025-07-22 07:30   
  2025-07-22 17:00 
  2025-07-22 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Change Bad Wing Arm structure 313:GON.PAV-PAVANT & PAVANT-GON.PAV = 0. Network Load Service Arrangements are required for Black Rock load.:     2025-07-02 11:57     171269     2025-07-02 12:07  
  PPW 25-12120     18042     PPW     Prosperity: CB 7A5               0.0      0.0      0.0      2025-07-22 08:16      2025-07-23 03:16      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:maintain ckb 7a5:     2025-07-02 12:18     171252     2025-07-02 12:18  
  PPW 25-00791     18071     PPW     River Road: CB 5Y38,River Road: Bypass SW 5Y27,River Road: Bypass SW 5Y43,River Road: CB 5Y43,River               0.0      0.0      0.0      2025-07-22 08:30      2025-07-23 15:30      SCHEDULED     DISTRIBUTION     PLANNED      ONPATH     PPW     continuous:CB 5Y38 minor maintenance :     2025-07-09 09:10     159866     2025-07-09 09:10  
  PPW 25-11803     18156     PPW     Kamas: CB 11               0.0      0.0      0.0      2025-07-23 06:00      2025-07-23 13:00      SCHEDULED     DISTRIBUTION     PLANNED      ONPATH     PPW     continuous:Update settings and possibly firmware for CB11 plus verify SCADA control and visibility:     2025-07-09 15:09     170932     2025-07-09 15:09  
  PPW 25-12855     18171     PPW     Gadsby: CB 47,Gadsby: ABS23A,Gadsby: CB 52,Gadsby: CB 31 (Unit #1)          THERMALGEN-PACE(PPW)      9999.0      9999.0      0.0      2025-07-23 06:30      2025-08-01 13:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace SW 23A at Gadsby Sub:Gadsby Unit #1 unavailable.:     2025-07-11 11:59     171987     2025-07-11 11:59  
  PPW 25-12144     18043     PPW     Glen Canyon-Sigurd 230 kV line          GLENCANYON2-PACE(PPW) 
  PACE-GLENCANYON2(PPW)   
  300.0 
  250.0   
  300.0 
  250.0   
  0.0 
  0.0   
  2025-07-23 07:30 
  2025-07-23 07:30   
  2025-07-24 17:00 
  2025-07-24 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Change bad Wingarms and Bad guys on a deadend:GLENCANYON2-PACE & PACE-GLENCANYON2 (TOT 2B2) = 0.:     2025-07-02 12:29     171276     2025-07-02 12:47  
  PPW 25-12656     18139     PPW     Diamond Hill-Fry 230 kV line,Calapooya: CS 1M24,Sw 1M22,Sw 1M23,Calapooya: T-3240 230/69 kV          PACW-NTLOAD(PPW)      9999.0      9999.0      0.0      2025-07-24 22:00      2025-07-25 06:00      SCHEDULED     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Replace and rewire CCVTs on 230 KV bus needed for Transformer protection scheme on transformer T 3240. This work will allow us to re-energize transformer T-3240 and restore Calapooya Substation to its normal configuration.:Network Load Service must be arranged for Calapooya, Diamond Hill & EWEB McKenzie. Eliminates ability to move Network Load Service from Alvey to Gresham. Eliminates C&T Point to Point Service from Troutdale to Summer Lake.:     2025-07-09 11:55     171788     2025-07-09 11:55  
  PPW 25-11118     18004     PPW     Merwin: MERWIN GR.UNIT2          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-07-27 07:00      2025-08-01 18:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Annual maintenance. TIV closed and scroll case DEWATERED.:Merwin Unit 2 unavailable.:     2025-06-18 11:04     170244     2025-06-18 11:04  
  PPW 25-03490     17720     PPW     Atlantic City: CB 1H120,Atlantic City-Rock Springs 230 kV line          TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW) 

  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  571.0 
  235.0 
  287.0 
  0.0 
  287.0   
  2025-06-02 07:00 
  2025-06-02 07:00 
  2025-06-02 07:00 
  2025-06-02 07:00 
  2025-06-02 07:00 

  2025-07-28 07:00 
  2025-07-28 07:00 
  2025-07-28 07:00 
  2025-07-28 07:00 
  2025-07-28 07:00   
  2025-06-04 10:00 
  2025-06-04 10:00 
  2025-06-04 10:00 
  2025-06-04 10:00 
  2025-06-04 10:00 

  2025-07-30 10:00 
  2025-07-30 10:00 
  2025-07-30 10:00 
  2025-07-30 10:00 
  2025-07-30 10:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Breaker Minor Maintenance:AW/4B Curve 117. WAPAEAST-WAPANORTH = 235. WYOEAST-AEOW (Aeolus West) = 1632. TOT4B-WYONORTH = 571. TOT 4B = 806. Potential Real Time Impact to Wyoming Generation:     2025-02-27 14:05     162572     2025-05-30 14:54  
  PPW 25-12721     18122     PPW     Carr Draw-Wyodak 230 kV line          TOT4B-WYODAK(PPW) 
  WYODAK-TOT4B(PPW)   
  383.0 
  383.0   
  383.0 
  383.0   
  0.0 
  0.0   
  2025-07-30 08:00 
  2025-07-30 08:00   
  2025-08-01 13:00 
  2025-08-01 13:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Investigate partial intermittent failure of PT#3. Isolate & test PT#3 and associated cables.:WYODAK-TOT4B & TOT4B-WYODAK = 0. Alternate Transmission Arrangements may be required for WyoDak Area Generation or to serve PacifiCorp Load.:     2025-07-09 10:11     171853     2025-07-09 10:48  
  PPW 25-12788     18074     PPW     Canyon Compression: CB 137               0.0      0.0      0.0      2025-07-30 08:30      2025-07-30 12:30      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:We need to test trip CB137 at Canyon Compression to verify operation through Trip Coil 1. This can be done locally or through SCADA. If breaker opens successfully, we can immediately reclose and complete the order. I request 4 hours to allow for any troubleshooting that may be required. :     2025-07-09 09:10     171920     2025-07-09 09:11  
  PPW 25-03491     17721     PPW     Atlantic City: LINE CB 1H116,Wyopo-Atlantic City section of the Riverton-Atlantic City 230 kV line          TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW) 

  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  571.0 
  235.0 
  287.0 
  0.0 
  287.0   
  2025-06-04 11:00 
  2025-06-04 11:00 
  2025-06-04 11:00 
  2025-06-04 11:00 
  2025-06-04 11:00 

  2025-07-30 11:00 
  2025-07-30 11:00 
  2025-07-30 11:00 
  2025-07-30 11:00 
  2025-07-30 11:00   
  2025-06-06 16:30 
  2025-06-06 16:30 
  2025-06-06 16:30 
  2025-06-06 16:30 
  2025-06-06 16:30 

  2025-08-01 16:30 
  2025-08-01 16:30 
  2025-08-01 16:30 
  2025-08-01 16:30 
  2025-08-01 16:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Breaker Minor Maintenance 1H116:AW/4B Curve 117. WAPAEAST-WAPANORTH = 235. WYOEAST-AEOW (Aeolus West) = 1632. TOT4B-WYONORTH = 571. TOT 4B = 806. Potential Real Time Impact to Wyoming Generation:     2025-02-27 14:17     162573     2025-05-30 14:59  
  PPW 25-12935     18169     PPW     Spanish Fork: CB 134,Carbon-Spanish Fork #2 138 kV line          OTHERGEN-PACE(PPW) 
  PACE-VNL(PPW) 
  VNL-PACE(PPW)   
  9999.0 
  140.0 
  138.0   
  9999.0 
  140.0 
  138.0   
  0.0 
  75.0 
  75.0   
  2025-07-31 10:11 
  2025-07-31 10:11 
  2025-07-31 10:11   
  2025-07-31 14:11 
  2025-07-31 14:11 
  2025-07-31 14:11   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Perform Major Maintenance on this Relay Package:PACE-VNL & VNL-PACE = 75 Summer, 112 Winter. Graphite Solar limited to 10 MW. If both Carbon - Spanish Fork 138 kV lines are out-of-service, PACE-VNL = 0; VNL-PACE = Carbon area load:     2025-07-11 09:34     172067     2025-07-11 09:35  
  PPW 25-10921     18015     PPW     Sheridan-Yellowtail 230 kV line          TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-AEOW(PPW) 
  WYONORTH-YTP(PPW) 
  YTP-WYONORTH(PPW)   
  631.0 
  249.0 
  0.0 
  400.0 
  400.0   
  631.0 
  249.0 
  0.0 
  400.0 
  400.0   
  490.0 
  189.0 
  0.0 
  241.0 
  241.0   
  2025-08-04 07:00 
  2025-08-04 07:00 
  2025-08-04 07:00 
  2025-08-04 07:00 
  2025-08-04 07:00   
  2025-08-18 16:00 
  2025-08-18 16:00 
  2025-08-18 16:00 
  2025-08-18 16:00 
  2025-08-18 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Pole replacement and modifications:AW/4B Curve 109. WAPAEAST-WAPANORTH = 189. WYOEAST-AEOW (Aeolus West) = 1746. TOT4B-WYONORTH = 490. TOT 4B = 679. Potential Real Time Impact to Wyoming Generation. Yellowtail South limit to be determined by WAPA. YTP-WYONORTH & WYONORTH-YTP = 241. Yellowtail South = 376 total (Series 7).:     2025-06-20 09:48     170046     2025-06-20 09:48  
  PPW 25-03422     17860     PPW     Ekola Flats: 230/34.5 kV T1,Ekola Flats: 34.5kV Bus 1          WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  0.0 

  9999.0   
  2025-08-04 07:30 

  2025-08-06 13:00   
  2025-08-06 13:00 

  2025-08-08 13:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install bird guarding.:Ekola Flats Feeders 11, 12, 13, 14, 15, 21, 22, 23, 24, and 25 unavailable (250MW total).:     2025-04-18 14:29     162504     2025-07-14 08:41  
  PPW 25-12653     18173     PPW     Sigurd-Sevier Tap section of the Sigurd-Sevier-Tushar 138kV line               0.0      0.0      0.0      2025-08-04 07:30      2025-08-07 17:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:change structures 20, 59 and 99:Granite Mountain Solar East and West restricted to a combined 80 MW.:     2025-07-11 13:59     171785     2025-07-11 14:02  
  PPW 25-11020     18170     PPW     Dixonville: 115 kV Bus Differential Relay,Dixonville: CB 2U4          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-08-04 09:00      2025-10-17 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Remove and replace 115 kV Bus Differential Relay Scheme:Umpqua River (Toketee) Hydro Project restricted to 40 MW total generation for the duration of this outage.:     2025-07-11 10:59     170145     2025-07-11 10:59  
  PPW 25-03420     17859     PPW     Ekola Flats: 230/34.5 kV T1,Ekola Flats: 34.5kV Bus 1          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-08-04 09:00      2025-08-04 18:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install bird guarding.:Ekola Flats Feeder 11, 12, 13, 14, and 15 unavailable (125MW).:     2025-04-18 14:26     162502     2025-05-01 10:21  
  PPW 25-03929     17736     PPW     Alturas-Cedarville Tap section of the Alturas-Bullard 115 kV line          OTHERGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-08-05 07:00      2025-08-08 13:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:REPLACE POLES 6/49 8/49 5/50 8/50 :Airport Solar and Garrett Solar restricted to 0 MW during switching.:     2025-03-06 13:59     163011     2025-03-06 13:59  
  PPW 25-13289     18175     PPW     West Cedar: CB 123,West Cedar: ABS 153A,West Cedar: CB B138               0.0      0.0      0.0      2025-08-05 07:30      2025-08-07 15:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Breaker Maintenance:     2025-07-14 14:19     172423     2025-07-14 15:24  
  PPW 25-09483     18048     PPW     Opal Springs Tap-Culver section of the Redmond-Cove 69 kV line,Crooked River-Opal Springs Tap sectio          PACW-NTLOAD(PPW)      9999.0      9999.0      0.0      2025-08-05 08:00      2025-08-06 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:adjust switches 3D87 and 3D89. This work is to be in conjunction with Opal Springs seasonal maintenance shutdown scheduled for the first week of August 2025 :Crooked River will be switched over to BPA Redmond via Pacific Power Redmond. Opal Springs Generation will be tie to BPA Redmond. Network Load Service Arrangements may be required.:     2025-07-04 09:37     168590     2025-07-14 14:37  
  PPW 25-13229     18174     PPW     Ekola Flats: 230/34.5 kV T2,Ekola Flats: 34.5kV Bus 2               0.0      0.0      0.0      2025-08-06 07:30      2025-08-08 14:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install bird guarding.:Ekola Flats Feeders 11, 12, 13, 14, 15, 21, 22, 23, 24, and 25 unavailable (250MW total).:     2025-07-14 08:40     172361     2025-07-14 08:40  
  PPW 25-03423     17861     PPW     Ekola Flats: 230/34.5 kV T2,Ekola Flats: 34.5kV Bus 2          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-08-06 09:00      2025-08-06 18:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install bird guarding.:Ekola Flats Feeders 21, 22, 23, 24, and 25 unavailable (125MW):     2025-04-18 14:35     162505     2025-05-01 10:21  
  PPW 25-03424     17862     PPW     Ekola Flats: 230/34.5 kV T1,Ekola Flats: 34.5kV Bus 1          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-08-07 09:00      2025-08-07 18:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install bird guarding.:Ekola Flats Feeder 11, 12, 13, 14, and 15 unavailable (125MW).:     2025-04-18 14:39     162506     2025-05-01 10:21  
  PPW 25-03426     17863     PPW     Ekola Flats: 230/34.5 kV T2,Ekola Flats: 34.5kV Bus 2          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-08-08 09:00      2025-08-08 18:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install bird guarding.:Ekola Flats Feeders 21, 22, 23, 24, and 25 unavailable (125MW).:     2025-04-18 14:50     162508     2025-05-01 10:21  
  PPW 25-13273     18177     PPW     Walla Walla-AVA Saddle Mountain 230 kV line,Walla Walla: LINE MOAB 1W2          MIDC-WALLAWALLA(PPW) 
  WALLAWALLA-MIDC(PPW)   
  240.0 
  240.0   
  240.0 
  240.0   
  0.0 
  0.0   
  2025-08-11 08:00 
  2025-08-11 08:00   
  2025-08-13 17:00 
  2025-08-13 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace structure 4/014 and reframe structures 2/004 and 4/003:MIDC-WALLAWALLA & WALLAWALLA-MIDC = 0. Affects Stateline Wind deliveries to Wanapum & Avista Dry Creek. Affects Avistas Transfer Rights from Wanapum to Dry Creek. Affects ability to deliver Network Load Service from the Walla Walla Area to the Yakima Area. Affects ability to deliver Network Load Service from Mid-Columbia to the Walla Walla Area.:     2025-07-15 10:16     172407     2025-07-15 10:19  
  PPW 25-11120     18005     PPW     Merwin: MERWIN GR.UNIT3          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-08-18 07:00      2025-08-27 18:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Annual maintenance and runner welding. Headgate lowered and penstock DEWATERED.:Merwin Unit 3 unavailable.:     2025-06-18 11:24     170246     2025-06-18 11:24  
  PPW 25-13277     18178     PPW     Wallula-Walla Walla 230 kV line,Walla Walla: LINE MOAB 1W12          WALLAWALLA-WALLULA(PPW) 
  WALLULA-WALLAWALLA(PPW)   
  402.0 
  480.0   
  402.0 
  480.0   
  0.0 
  0.0   
  2025-08-18 08:00 
  2025-08-18 08:00   
  2025-08-20 17:00 
  2025-08-20 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replacing cross arm on 6/050 and 1 other location. Also replacing lightning arrester on 3/039:WALLAWALLA-WALLULA, WALLULA-WALLAWALLA = 0.:     2025-07-15 11:21     172411     2025-07-15 11:22  
  PPW 25-09891     17969     PPW     Crag View-Weed Junction section of the PG&E Cascade-Weed Junction 115 kV line,Lassen: SW 3G24,Crag V          CRAGVIEW-CRAG(PPW) 
  CRAGVIEW-PACW(PPW) 
  PACW-NTLOAD(PPW) 

  CRAGVIEW-CRAG(PPW) 
  CRAGVIEW-PACW(PPW) 

  CRAGVIEW-CRAG(PPW) 
  CRAGVIEW-PACW(PPW)   
  75.0 
  108.0 
  9999.0 

  75.0 
  108.0 

  75.0 
  108.0   
  75.0 
  108.0 
  9999.0 

  75.0 
  108.0 

  75.0 
  108.0   
  75.0 
  108.0 
  9999.0 

  75.0 
  108.0 

  0.0 
  0.0   
  2025-06-25 06:00 
  2025-06-25 06:00 
  2025-06-25 06:00 

  2025-07-16 06:00 
  2025-07-16 06:00 

  2025-08-19 06:00 
  2025-08-19 06:00   
  2025-06-27 18:30 
  2025-06-27 18:30 
  2025-06-27 18:30 

  2025-07-18 18:30 
  2025-07-18 18:30 

  2025-08-21 18:30 
  2025-08-21 18:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Change structures 2/48-2/55:CRAGVIEW-PACW & PACW-CRAGVIEW = 0; CRAGVIEW-CRAG = 0; CRAG-CRAGVIEW = Crag View Load (Approx 10 mw); Crag View will be radial from Weed Junction.:     2025-06-05 08:53     169003     2025-07-11 11:58  
  PPW 25-11976     18051     PPW     Merwin-Yale 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-09-02 06:00      2025-09-12 17:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace structures and switches:Yale units 1 and 2 unavailable.:     2025-07-08 14:35     171108     2025-07-08 14:35  
  PPW 25-03360     17687     PPW     Dave Johnston-TSGT Laramie River Station 230 kV line          DJ-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-DJ(PPW)   
  790.0 
  0.0 
  790.0   
  790.0 
  0.0 
  790.0   
  442.0 
  0.0 
  442.0   
  2025-09-02 07:00 
  2025-09-02 07:00 
  2025-09-02 07:00   
  2025-09-19 15:00 
  2025-09-19 15:00 
  2025-09-19 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:2025 structure replacements.:DJ-WYOEAST & WYOEAST-DJ = 442 (Dave Johnston-WAPA Stegall 230 kV line rating):     2025-02-17 14:22     162442     2025-02-17 14:28  
  PPW 25-07188     17870     PPW     Fry-Parrish Gap 230 kV line          PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW)   
  325.0 
  325.0 

  325.0 
  325.0 

  325.0 
  325.0   
  325.0 
  325.0 

  325.0 
  325.0 

  325.0 
  325.0   
  325.0 
  325.0 

  325.0 
  325.0 

  159.0 
  159.0   
  2025-08-04 22:00 
  2025-08-04 22:00 

  2025-09-01 22:00 
  2025-09-01 22:00 

  2025-09-02 22:00 
  2025-09-02 22:00   
  2025-08-05 08:00 
  2025-08-05 08:00 

  2025-09-02 08:00 
  2025-09-02 08:00 

  2025-09-03 02:00 
  2025-09-03 02:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace arm at structure 4/1:PACW-PGE.PACW & PACW.PGE-PACW = 159 Summer/149 Winter Network Load Service Arrangements may be required.:     2025-04-22 14:03     166290     2025-06-20 12:07  
  PPW 25-07192     17871     PPW     Fry-Calapooya section of the Diamond Hill-Fry 230 kV line          PACW-NTLOAD(PPW) 

  PACW-NTLOAD(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2025-08-05 22:00 

  2025-09-03 22:00   
  2025-08-06 08:00 

  2025-09-04 08:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace arms at structure 4/14:Network Load Service must be arranged for Calapooya, Diamond Hill & EWEB McKenzie. Eliminates ability to move Network Load Service from Alvey to Gresham. Eliminates C&T Point to Point Service from Troutdale to Summer Lake.:     2025-04-22 14:06     166294     2025-07-02 13:45  
  PPW 25-03417     17688     PPW     Malin-PG&E Round Mountain #1 500 kV line          MALIN500-RDM500(PPW) 
  RDM500-MALIN500(PPW) 

  MALIN500-RDM500(PPW) 
  RDM500-MALIN500(PPW)   
  800.0 
  612.0 

  800.0 
  612.0   
  800.0 
  612.0 

  800.0 
  612.0   
  625.0 
  416.0 

  800.0 
  612.0   
  2025-09-08 06:00 
  2025-09-08 06:00 

  2025-09-29 06:00 
  2025-09-29 06:00   
  2025-09-12 17:00 
  2025-09-12 17:00 

  2025-10-03 17:00 
  2025-10-03 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install lab measurement and fault initiating test equipment on primary conductors (Grounded).:MALIN500-RDM500 = 625. RDM500-MALIN500 = 416.:     2025-02-18 12:23     162499     2025-04-10 08:52  
  PPW 25-05028     17750     PPW     Pryor Mountain Wind: 34.5kV Bus 2,Pryor Mountain Wind: 34.5kV Bus 1          WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2025-07-07 08:00 

  2025-09-08 08:00   
  2025-07-09 11:00 

  2025-09-10 11:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian protection.:Pryor Mountain Wind unavailable.:     2025-03-14 11:07     164124     2025-03-17 12:01  
  PPW 25-05029     17751     PPW     Circuit 1,Circuit 2,Circuit 3,Circuit 4,Circuit 5,Circuit 6,Pryor Mountain Wind: 34.5kV Bus 1          WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  0.0 

  9999.0   
  2025-07-09 11:00 

  2025-09-08 08:00   
  2025-07-11 16:00 

  2025-09-12 16:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian protection.:Pryor Mountain Wind circuits 1-6 (120.6MW) unavailable.:     2025-03-14 11:21     164125     2025-03-17 12:03  
  PPW 25-04835     18040     PPW     Weed Junction: WEEDJUNC CS 2G50,Weed Junction: SW 2G27,Weed Junction: PST T-3726               0.0      0.0      0.0      2025-09-08 08:00      2025-09-19 14:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:TCOH on Phase shifter at weed JCT:     2025-07-02 08:32     163923     2025-07-14 08:57  
  PPW 25-07196     17896     PPW     PGE Bethel-Parrish Gap 230 kV line          PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW)   
  325.0 
  325.0 

  325.0 
  325.0   
  325.0 
  325.0 

  325.0 
  325.0   
  325.0 
  325.0 

  159.0 
  159.0   
  2025-09-02 07:00 
  2025-09-02 07:00 

  2025-09-15 07:00 
  2025-09-15 07:00   
  2025-09-05 18:00 
  2025-09-05 18:00 

  2025-09-18 18:00 
  2025-09-18 18:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace structures, 1/21, 1/23, 1/25.:PACW-PGE.PACW & PACW.PGE-PACW = 159 Summer/149 Winter Network load service arrangements may be required:     2025-05-05 08:36     166298     2025-06-25 13:00  
  PPW 25-03879     17708     PPW     Sweet Home: Main Bus Disc CB 4M94,Sweet Home: Bypass Bus Disc CB 4M94,Sweet Home: Line Disc CB 4M94          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-09-15 08:00      2025-09-19 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Breaker maintenance.:Fall Creek Hydro Units 1, 2, and 3 unavailable.:     2025-02-25 10:20     162961     2025-02-25 10:20  
  PPW 25-06481     17833     PPW     Malin-PG&E Round Mountain #1 500 kV line          MALIN500-RDM500(PPW) 
  RDM500-MALIN500(PPW)   
  800.0 
  612.0   
  800.0 
  612.0   
  625.0 
  416.0   
  2025-09-17 06:00 
  2025-09-17 06:00   
  2025-09-19 17:00 
  2025-09-19 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install lab measurement and fault initiating test equipment on primary conductors (Grounded).:MALIN500-RDM500 = 625. RDM500-MALIN500 = 416.:     2025-04-10 08:55     165580     2025-04-10 08:55  
  PPW 26-00002     17627     PPW     IPC Midpoint-Hemingway 500 kV line,IPCo Midpoint: 500/345 kV Bank T-501          H500-M500(PPW) 
  M500-H500(PPW) 
  PACW-NTLOAD(PPW) 

  H500-M500(PPW) 
  M500-H500(PPW) 
  PACW-NTLOAD(PPW)   
  800.0 
  1090.0 
  9999.0 

  800.0 
  1090.0 
  9999.0   
  800.0 
  1090.0 
  9999.0 

  800.0 
  1090.0 
  9999.0   
  350.0 
  350.0 
  0.0 

  800.0 
  1090.0 
  9999.0   
  2025-09-22 06:00 
  2025-09-22 06:00 
  2025-09-22 06:00 

  2026-02-23 08:00 
  2026-02-23 08:00 
  2026-02-23 08:00   
  2025-11-07 16:00 
  2025-11-07 16:00 
  2025-11-07 16:00 

  2026-05-29 15:00 
  2026-05-29 15:00 
  2026-05-29 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:This outage is for relocating the existing Midpoint T501 345kV/500kV transformer to a new 345kV station bay.:M500-H500 & H500-M500= 350. BORA-M500 = 959. No impact to Bridger West. Jim Bridger Generation may be restricted real time (as determined by Northwest Path Flow). Network Load Service Arrangements may be required for Southern Oregon Load. Note: TTC Schedules on Path 75 East & West are 0. However, the SOL is 350 West / 325 East (Limited by Bowmont Xfmrs). However, there is a potential of up to 300 mw of actual unscheduled inadvertent flow between Hemingway & Summer Lake. JBSN-JB345 = 2200. PacifiCorp = 1467. IPCo = 733. Jim Bridger Generation may be restricted real time (as determined by Northwest Path Flow).:     2025-01-28 09:16     161059     2025-05-05 13:54  
  PPW 25-11740     18044     PPW     Huntington-Spanish Fork 345 kV line               0.0      0.0      0.0      2025-09-25 07:00      2025-09-30 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Spanish Fork-Huntington Pole Replacement:No impact under normal conditions.:     2025-07-02 13:57     170869     2025-07-02 13:57  
  PPW 25-09173     17952     PPW     Hopland-Union Gap section of the BPA Moxee-Union Gap 115 kV line,Hopland: Bank #1,Hopland: CB 5Y440               0.0      0.0      0.0      2025-10-09 12:00      2025-10-31 23:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install Conduit and Panel 4R. Replace SW 2Y52, 2Y531 and MO, 115kV Bus Tie SW and XFMR BK #1 Relay upgrade. :Hopland will be fed from BPA Moxee. Network Load Service Arrangements may be required.:     2025-05-31 21:25     168280     2025-07-08 09:56  
  PPW 25-09054     17933     PPW     Gala Solar: Xfmr T1          OTHERGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-10-14 07:00      2025-10-15 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Three-year substation preventative maintenance.:Gala Solar offline.:     2025-05-21 14:37     168161     2025-05-21 14:37  
  PPW 25-07860     17890     PPW     WAPA Thermopolis-Hilltop-WAPA Lovell 115 kV line          YTP-WYONORTH(PPW)      400.0      400.0      377.0      2025-10-14 07:00      2025-10-20 11:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace Nahne Jensen Line switches NJ-5761 and NJ-5765.:YTP-WYONORTH = 377. YTS = Series #11: TTC of 589 (PACE = 377 & LAPT = 212).:     2025-05-02 13:30     166966     2025-05-02 13:30  
  PPW 25-00010     16953     PPW     Hemingway-Summer Lake 500 kV line          H500-SMLK(PPW) 
  PACW-NTLOAD(PPW) 
  SMLK-H500(PPW) 

  H500-SMLK(PPW) 
  PACW-NTLOAD(PPW) 
  SMLK-H500(PPW)   
  1500.0 
  9999.0 
  100.0 

  1500.0 
  9999.0 
  100.0   
  1500.0 
  9999.0 
  100.0 

  1500.0 
  9999.0 
  100.0   
  1500.0 
  9999.0 
  100.0 

  0.0 
  0.0 
  0.0   
  2025-04-01 08:00 
  2025-04-01 08:00 
  2025-04-01 08:00 

  2025-10-17 08:00 
  2025-10-17 08:00 
  2025-10-17 08:00   
  2025-09-14 18:00 
  2025-09-14 18:00 
  2025-09-14 18:00 

  2025-10-31 18:00 
  2025-10-31 18:00 
  2025-10-31 18:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Spacer Replacements:H500-SMLK & SMLK-H500 = 0; BORA-M500 = 959; Network Load Service Arrangements may be required for Southern Oregon Load.:     2024-04-30 09:25     144659     2024-12-20 09:45  
  PPW 25-08635     17922     PPW     BPA Captain Jack-Grizzly-Ponderosa #1 500 kV line          BPAT.PACW-PONDEROSA230(PPW)      267.0      267.0      267.0      2025-10-21 08:00      2025-10-21 09:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:DE-ENERGIZE LINE FOR DEADLINE SWITCHING AT POND:BPAT.PACW-PONDEROSA230 = 555 Summer/ 700 Winter:     2025-05-15 11:16     167741     2025-05-15 11:16  
  PPW 25-07978     17897     PPW     WAPA Thermopolis-Hilltop-WAPA Lovell 115 kV line          YTP-WYONORTH(PPW) 

  YTP-WYONORTH(PPW) 

  YTP-WYONORTH(PPW)   
  400.0 

  400.0 

  400.0   
  400.0 

  400.0 

  400.0   
  400.0 

  400.0 

  377.0   
  2025-06-25 11:01 

  2025-07-21 07:00 

  2025-10-27 07:00   
  2025-06-27 16:00 

  2025-07-24 15:00 

  2025-10-29 11:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace broken insulators:YTP-WYONORTH = 377. YTS = Series #11: TTC of 589 (PACE = 377 & LAPT = 212).:     2025-05-05 09:53     167084     2025-07-03 09:09  
  PPW 25-08632     17921     PPW     BPA Captain Jack-Grizzly-Ponderosa #1 500 kV line          BPAT.PACW-PONDEROSA230(PPW)      267.0      267.0      267.0      2025-10-31 14:00      2025-10-31 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:DE-ENERGIZE LINE FOR DEADLINE SWITCHING AT POND:BPAT.PACW-PONDEROSA230 = 555 Summer/ 700 Winter:     2025-05-15 11:14     167738     2025-05-15 11:14  
  PPW 25-09174     18000     PPW     Hopland-Union Gap section of the BPA Moxee-Union Gap 115 kV line,Hopland: Bank #1,Hopland: Bank #2               0.0      0.0      0.0      2025-10-31 23:00      2025-11-01 05:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install Bus between SW 2Y51, 2Y61 and 115kV Bus Tie SW:Hopland will be fed from BPA Moxee. Network Load Service Arrangements may be required.:     2025-06-16 08:07     168281     2025-07-08 09:45  
  PPW 25-10042     17988     PPW     Jim Bridger-Mustang 230 kV line,Mustang-WAPA Spence 230 kV line          JBSN-WYOCENTRAL(PPW) 
  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-JBSN(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  600.0 
  631.0 
  249.0 
  600.0 
  574.0 
  0.0 
  574.0   
  600.0 
  631.0 
  249.0 
  600.0 
  574.0 
  0.0 
  574.0   
  400.0 
  631.0 
  243.0 
  400.0 
  287.0 
  0.0 
  287.0   
  2025-11-19 07:15 
  2025-11-19 07:15 
  2025-11-19 07:15 
  2025-11-19 07:15 
  2025-11-19 07:15 
  2025-11-19 07:15 
  2025-11-19 07:15   
  2025-11-21 14:00 
  2025-11-21 14:00 
  2025-11-21 14:00 
  2025-11-21 14:00 
  2025-11-21 14:00 
  2025-11-21 14:00 
  2025-11-21 14:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Mustang: Remove 230 kV Shoo Fly:AW/4B Curve 121. WAPAEAST-WAPANORTH = 243. WYOEAST-AEOW (Aeolus West) = 1627. TOT4B-WYONORTH = 631. TOT 4B = 874. JBSN-WYOC & WYOC-JBSN = 400. Potential Real Time Impact to Wyoming Generation Great Divide will be radial from WAPA Spence via Mustang. Network Load Service Arrangements may be required.:     2025-06-10 12:20     169155     2025-06-10 12:50  
  PPW 26-00007     17980     PPW     Hemingway-Summer Lake 500 kV line          BORA-M500(PPW) 
  H500-SMLK(PPW) 
  PACW-NTLOAD(PPW) 
  SMLK-H500(PPW)   
  1090.0 
  1500.0 
  9999.0 
  100.0   
  1090.0 
  1500.0 
  9999.0 
  100.0   
  959.0 
  0.0 
  0.0 
  0.0   
  2026-05-11 08:00 
  2026-05-11 08:00 
  2026-05-11 08:00 
  2026-05-11 08:00   
  2026-05-22 18:00 
  2026-05-22 18:00 
  2026-05-22 18:00 
  2026-05-22 18:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Spacer Replacements:H500-SMLK & SMLK-H500 = 0; BORA-M500 = 959; Network Load Service Arrangements may be required for Southern Oregon Load.:     2025-06-09 09:44     168591     2025-06-09 09:46  
  PPW 24-04189     16311     PPW     Cove (OR): 230/69 kV Bank #2 (T3398)          COVEPACW-ROUNDBUTTE(PPW) 
  ROUNDBUTTE-COVEPACW(PPW) 

  COVEPACW-ROUNDBUTTE(PPW) 
  ROUNDBUTTE-COVEPACW(PPW) 

  COVEPACW-ROUNDBUTTE(PPW) 
  ROUNDBUTTE-COVEPACW(PPW) 

  COVEPACW-ROUNDBUTTE(PPW) 
  ROUNDBUTTE-COVEPACW(PPW) 

  COVEPACW-ROUNDBUTTE(PPW) 
  ROUNDBUTTE-COVEPACW(PPW)   
  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0   
  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0   
  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0 

  60.0 
  60.0   
  2024-07-01 12:00 
  2024-07-01 12:00 

  2024-10-14 12:00 
  2024-10-14 12:00 

  2025-04-28 12:00 
  2025-04-28 12:00 

  2025-07-07 12:00 
  2025-07-07 12:00 

  2026-07-06 12:00 
  2026-07-06 12:00   
  2024-07-21 12:00 
  2024-07-21 12:00 

  2024-11-01 12:00 
  2024-11-01 12:00 

  2025-05-30 12:00 
  2025-05-30 12:00 

  2025-08-01 12:00 
  2025-08-01 12:00 

  2026-07-31 12:00 
  2026-07-31 12:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:T-3398 LTC Maintenance and Bushing Replacement:COVEPACW-ROUNDBUTTE & ROUNDBUTTE-COVEPACW = 60.:     2024-03-15 09:39     142013     2025-06-18 08:34  