PPW Outages 
Jun 08, 2025 - Jun 12, 2026
Report created on Jun 12, 2025 at 20:25 (PPT)
Outage
Name
Outage
Id
Company Facility Flow
Gate
Segment/
JOTSFacility
Original
TTC In
Original
TTC Out
New
TTC
Start Time (PPT) Stop Time (PPT) Status Outage
Category
Outage
Type
Path
Impact
Report
TPs
Annotation Creation Time (PPT) EventId Last Updated (PPT)
  PPW 171983     10361     PPW     Riverton: 230 kV Cap Bank S/C 472               0.0      0.0      0.0      2021-02-18 09:03      2025-06-30 17:00      ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Riverton: 230 kV Cap Bank S/C 472:     2022-11-14 00:32     75797     2025-06-10 08:55  
  PPW 175805     9275     PPW     Hemingway-Summer Lake 500 kV line (Path 75 Schedule Limitation)          H500-SMLK(PPW) 

  H500-SMLK(PPW)   
  1500.0 

  1500.0   
  1500.0 

  1500.0   
  1386.0 

  1386.0   
  2021-06-02 12:00 

  2024-12-04 12:00   
  2024-12-04 12:00 

  2025-12-31 12:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Hemingway-Summer Lake 500 kV line (Path 75 Schedule Limitation)..:Path Restriction Notes: Path 75 Westbound = 1386.:     2021-12-21 14:06     80760     2024-12-04 08:04  
  PPW 24-00488     15058     PPW     Burns: Series Cap Segment #1 & 2          BORA-M500(PPW) 
  PACW-SMLK(PPW) 
  SMLK-H500(PPW) 

  BORA-M500(PPW) 
  PACW-SMLK(PPW) 
  SMLK-H500(PPW)   
  1090.0 
  550.0 
  100.0 

  1090.0 
  550.0 
  100.0   
  1090.0 
  550.0 
  100.0 

  1090.0 
  550.0 
  100.0   
  1090.0 
  550.0 
  100.0 

  1070.0 
  535.0 
  96.0   
  2024-01-09 03:48 
  2024-01-09 03:48 
  2024-01-09 03:48 

  2024-01-09 03:48 
  2024-01-09 03:48 
  2024-01-09 03:48   
  2024-01-09 03:48 
  2024-01-09 03:48 
  2024-01-09 03:48 

  2025-06-30 23:59 
  2025-06-30 23:59 
  2025-06-30 23:59   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Investigating a possible failure of relay voltage sensing component.:Path 75 limited to 507 (Midpoint Series Caps bypassed for maint). SMLK-H500 = 96; BORA-M500 = 959;:     2024-01-03 10:34     138306     2025-06-10 09:15  
  PPW 24-06062     16750     PPW     Path 25 Schedule Limitation (Cascade 115 kV Tie)          CRAGVIEW-PACW(PPW) 

  CRAGVIEW-PACW(PPW)   
  108.0 

  108.0   
  108.0 

  108.0   
  0.0 

  0.0   
  2024-04-09 00:00 

  2024-04-09 02:35   
  2024-04-09 02:35 

  2026-04-09 00:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:CRAGVIEW-PACW TTC = 0 PER PLANNING.:CRAGVIEW-PACW = 0 INDEFINITELY:     2024-04-09 09:34     143888     2025-04-07 18:15  
  PPW 24-06351     17531     PPW     Threemile Knoll: TIE CB 335               0.0      0.0      0.0      2024-04-12 22:23      2025-06-26 17:00      ACTIVE     TRANSMISSION     FORCED      ONPATH     PPW     continuous:***Commissioning Required*** Investigate failure of CB 335. :     2024-12-02 14:23     144180     2025-05-26 05:25  
  PPW 24-15751     17530     PPW     Threemile Knoll: Series Cap C2,Threemile Knoll: Series Cap C1          JBSN-JB345(PPW) 
  NUT-PATHC(PPW) 
  PATHC-NUT(PPW) 

  NUT-PATHC(PPW) 

  NUT-PATHC(PPW) 

  JBSN-JB345(PPW) 
  PATHC-NUT(PPW)   
  1600.0 
  0.0 
  1600.0 

  1172.0 

  1060.0 

  1600.0 
  1600.0   
  1600.0 
  0.0 
  1600.0 

  1172.0 

  1060.0 

  1600.0 
  1600.0   
  1417.0 
  0.0 
  1600.0 

  1172.0 

  1060.0 

  1433.0 
  1480.0   
  2024-09-18 00:30 
  2024-09-18 00:30 
  2024-09-18 00:30 

  2024-11-01 00:00 

  2025-04-01 00:00 

  2025-06-09 19:09 
  2025-06-09 19:09   
  2025-06-09 19:09 
  2024-11-01 00:00 
  2025-06-09 19:09 

  2025-04-01 00:00 

  2025-06-09 19:09 

  2025-12-31 17:30 
  2025-12-31 17:30   
  ACTIVE     TRANSMISSION     FORCED      ONPATH     PPW     continuous:Computer/controller for Series caps needs to be repaired/replaced. Tech support needed from Hitachi.:JBSN-JB345 = 2150. PacifiCorp = 1433. IPCo = 717 NUT-PATHC = 730 Summer/730 Winter. PATHC-NUT = 1480 Summer/1560 Winter. JBSN-JB345 = 2150. PacifiCorp = 1433. IPCo = 717 NUT-PATHC = 950 Summer/951 Winter. PATHC-NUT = 1480 Summer/1580 Winter.:     2024-11-30 22:07     153619     2025-06-09 19:12  
  PPW 24-16609     17387     PPW     Oquirrh-Terminal #1 345 kV line               0.0      0.0      0.0      2024-10-25 07:52      2025-06-25 14:00      ACTIVE     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Relocate the Oquirrh-Terminal #1 345 kV line:No impact under normal conditions.:     2024-10-10 12:23     154477     2025-03-26 11:43  
  PPW 25-00820     17929     PPW     Calapooya: T-3240 230/69 kV          PACW-NTLOAD(PPW) 

  PACW-NTLOAD(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2025-03-06 06:00 

  2025-03-06 06:21   
  2025-03-06 06:21 

  2025-07-31 15:30   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace wire, jumpers and circuit switcher.:Network Load Service must be arranged for Calapooya, Diamond Hill & EWEB McKenzie. Eliminates ability to move Network Load Service from Alvey to Gresham. Eliminates C&T Point to Point Service from Troutdale to Summer Lake.:     2025-05-20 09:10     159895     2025-05-28 12:50  
  PPW 25-01798     17623     PPW     Klamath Co-Gen: GSU 301          THERMALGEN-PACW(PPW) 

  THERMALGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2025-04-01 10:00 

  2025-04-01 10:42   
  2025-04-01 10:42 

  2025-06-19 10:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:GSU 301 bladder replacement and buckholtz replacement.:Klamath Co-Gen Unit 301 unavailable.:     2025-01-24 14:02     160874     2025-05-30 09:27  
  PPW 25-07871     17907     PPW     Enterprise-Wallowa section of the Enterprise-Elgin 69 kV line               0.0      0.0      0.0      2025-05-20 05:26      2025-06-11 07:00      Completed     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Lambert will be replacing several structures between Enterprise and Wallow subs on the 69kv line. Pat Chase will be working on disconnects on CB 3W106 at Enterprise sub:Network Load Service may be needed. Wallowa and Minam to be served on BPAs system through Oregon Trails Co-op.:     2025-05-11 18:10     166977     2025-06-05 12:48  
  PPW 25-00095     17940     PPW     Bonanza-TSGT Craig 345 kV line               0.0      0.0      0.0      2025-05-27 09:04      2025-06-15 15:00      ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Change out polymer dead ends that are beginning to fail. :     2025-05-27 12:07     158223     2025-05-27 12:07  
  PPW 25-09445     17943     PPW     Cold Springs: XFMR 1 T-3169          PACW-NTLOAD(PPW) 
  WINDGEN-PACW(PPW) 

  PACW-NTLOAD(PPW) 
  WINDGEN-PACW(PPW)   
  9999.0 
  9999.0 

  9999.0 
  9999.0   
  9999.0 
  9999.0 

  9999.0 
  9999.0   
  0.0 
  0.0 

  0.0 
  0.0   
  2025-05-29 09:33 
  2025-05-29 09:33 

  2025-05-29 10:00 
  2025-05-29 10:00   
  2025-05-29 10:00 
  2025-05-29 10:00 

  2025-06-28 14:10 
  2025-06-28 14:10   
  ACTIVE     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Replace T-3169:Umatilla, Hermiston & Hinkle will be radial from BPA McNary. Network Load Service Arrangements may be required. With Cold Springs XFMR #1 out of service, Echo Wind Generation will be tied to BPA McNary. Orchard Wind required offline Umatilla, Hermiston & Hinkle will be radial from BPA McNary. Network Load Service Arrangements may be required. With Cold Springs XFMR #1 out of service, Echo Wind Generation will be tied to BPA McNary. Umatilla, Hermiston & Hinkle will be radial from BPA McNary. Network Load Service Arrangements may be required. With Cold Springs XFMR #1 out of service, Echo Wind Generation will be tied to BPA McNary.:     2025-05-28 14:07     168552     2025-05-29 09:33  
  PPW 25-09798     17953     PPW     {Mkt Affiliate} Gadsby Plant: {Mkt Affiliate} Gadsby Plant Gadsby Unit 3               0.0      0.0      0.0      2025-06-02 01:27      2025-06-10 19:00      Completed     GENERATION     FORCED      ONPATH     PPW     continuous:Must Run:     2025-06-02 08:27     168907     2025-06-02 08:27  
  PPW 25-06418     17868     PPW     Clover: Transformer #3          CLOVER-PACE(PPW) 
  PACE-CLOVER(PPW) 

  CLOVER-PACE(PPW) 
  PACE-CLOVER(PPW) 

  CLOVER-PACE(PPW) 
  PACE-CLOVER(PPW)   
  1700.0 
  1000.0 

  1700.0 
  1000.0 

  1700.0 
  1000.0   
  1700.0 
  1000.0 

  1700.0 
  1000.0 

  1700.0 
  1000.0   
  1700.0 
  1000.0 

  1600.0 
  900.0 

  1600.0 
  900.0   
  2025-06-02 07:00 
  2025-06-02 07:00 

  2025-06-02 07:23 
  2025-06-02 07:23 

  2025-06-10 14:00 
  2025-06-10 14:00   
  2025-06-02 07:23 
  2025-06-02 07:23 

  2025-06-10 14:00 
  2025-06-10 14:00 

  2025-06-10 15:28 
  2025-06-10 15:28   
  COMPLETED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Clover XFMR #3 Outage to Replace Tertiary Bushings:CLOVER-PACE=1600. PACE-CLOVER=900.:     2025-04-22 13:30     165516     2025-06-10 15:31  
  PPW 25-07334     17895     PPW     Goshen-Fish Creek 161 kV line          GSHN-PATHC(PPW) 
  NUT-PATHC(PPW) 
  PATHC-GSHN(PPW) 

  GSHN-PATHC(PPW) 
  NUT-PATHC(PPW) 
  PATHC-GSHN(PPW)   
  348.0 
  1060.0 
  148.0 

  348.0 
  1060.0 
  148.0   
  348.0 
  1060.0 
  148.0 

  348.0 
  1060.0 
  148.0   
  348.0 
  1060.0 
  148.0 

  200.0 
  900.0 
  0.0   
  2025-06-02 08:00 
  2025-06-02 08:00 
  2025-06-02 08:00 

  2025-06-02 08:13 
  2025-06-02 08:13 
  2025-06-02 08:13   
  2025-06-02 08:13 
  2025-06-02 08:13 
  2025-06-02 08:13 

  2025-06-13 16:00 
  2025-06-13 16:00 
  2025-06-13 16:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace 161kv STR 106, 162, 164, 170, 410, 411:NUT-PATHC = 900 GSHN-PATHC = 200. PATHC-GSHN = 0:     2025-05-03 11:45     166439     2025-06-02 08:17  
  PPW 25-09902     17960     PPW     {Mkt Affiliate} Hermiston 3: {Mkt Affiliate} Hermiston 3 Hermiston Unit 3          ANTE-BRDY(PPW) 
  BRDY-ANTE(PPW)   
  90.0 
  90.0   
  90.0 
  90.0   
  90.0 
  90.0   
  2021-11-20 15:31 
  2021-11-20 15:31   
  2021-11-20 19:31 
  2021-11-20 19:31   
  ACTIVE     GENERATION     FORCED      ONPATH     PPW     continuous:Water Outages Pump 2 :     2025-06-03 12:11     169014     2025-06-03 12:11  
  PPW 25-09826     17965     PPW     Clover: 500kV West Bus               0.0      0.0      0.0      2025-06-04 07:07      2025-06-10 09:50      COMPLETED     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Replace gear boxes on 500 kV switches11B110, 11B111, 11B109, 11B107, 11C121 and 11D1290:     2025-06-04 07:08     168938     2025-06-10 09:50  
  PPW 25-07407     17932     PPW     Cherry Lane: T-4970 BK1               0.0      0.0      0.0      2025-06-04 22:55      2025-06-19 21:00      ACTIVE     DISTRIBUTION     PLANNED      ONPATH     PPW     continuous:LTC Maintenance and retrofit with new parts. Line crew to Bird Guard pole outside substation with Raptor Protection.:Adams Solar generation off-line for duration of the outage.:     2025-05-21 12:02     166512     2025-06-04 22:55  
  PPW 25-09961     17966     PPW     Crag View-PG&E Cascade section of the PG&E Cascade-Weed Junction 115 kV line          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW) 

  CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  75.0 

  45.0 
  75.0   
  45.0 
  75.0 

  45.0 
  75.0   
  45.0 
  75.0 

  0.0 
  0.0   
  2025-06-07 07:00 
  2025-06-07 07:00 

  2025-06-07 07:36 
  2025-06-07 07:36   
  2025-06-07 07:36 
  2025-06-07 07:36 

  2025-07-15 11:00 
  2025-07-15 11:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Technicians testing program for Cottonwood 230/115kV transformer #4 and Cottonwood CBs 542 & 192.:CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0.:     2025-06-04 10:36     169073     2025-06-07 07:44  
  PPW 25-10192     17979     PPW     Pomona-BPA Vantage 230 kV line          PACW-NTLOAD(PPW) 

  MIDC-YAKIMA(PPW) 
  PACW-NTLOAD(PPW) 
  YAKIMA-MIDC(PPW) 

  PACW-NTLOAD(PPW)   
  9999.0 

  402.0 
  9999.0 
  402.0 

  9999.0   
  9999.0 

  402.0 
  9999.0 
  402.0 

  9999.0   
  9999.0 

  402.0 
  0.0 
  402.0 

  9999.0   
  2025-06-07 17:37 

  2025-06-07 17:49 
  2025-06-07 17:49 
  2025-06-07 17:49 

  2025-06-09 15:16   
  2025-06-07 17:49 

  2025-06-09 15:16 
  2025-06-09 15:16 
  2025-06-09 15:16 

  2025-06-10 17:00   
  COMPLETED     TRANSMISSION     FORCED      ONPATH     PPW     continuous:Fire in area evaluate.:No impact to Yakima load service with two 230 kV lines in service. Network Load Service Arrangements may be required.:     2025-06-07 17:49     169316     2025-06-09 15:22  
  PPW 25-02330     17643     PPW     Big Charlie (TB Flats 2): 230/34.5 kV XFMR T1,Big Charlie (TB Flats 2): 34.5kV Bus 1          OTHERGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  2025-05-09 06:00 

  2025-06-09 06:00   
  2025-05-09 18:00 

  2025-06-09 18:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian guarding.:TB Flats 2/Big Charlie Circuits 11, 12, 13, and 14 unavailable (106 MW).:     2025-01-31 13:52     161409     2025-05-01 10:12  
  PPW 25-03821     17759     PPW     Glide Tap-Steamboat section of the Dixonville-Toketee Switch Station 115 kV line          HYDROGEN-PACW(PPW) 

  HYDROGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  174.0   
  2025-06-09 06:00 

  2025-06-09 06:02   
  2025-06-09 06:02 

  2025-06-09 18:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace 2 fly structures. 3/23, 6/23:Umpqua River Hydro Project Restriction = 174 Summer/199 Winter.:     2025-03-18 10:30     162903     2025-06-09 06:33  
  PPW 25-02331     17644     PPW     Big Charlie (TB Flats 2): 230/34.5 kV XFMR T1,Big Charlie (TB Flats 2): 230/34.5 kV XFMR T2,Big Char          OTHERGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2025-05-10 06:00 

  2025-06-09 07:00   
  2025-05-10 18:00 

  2025-06-13 13:00   
  COMPLETED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian guarding on all 230kV and 34.5kV equipment below SWs 89-X1 and 89-X2:TB Flats 2/Big Charlie Circuits 11, 12, 13, and 14 unavailable (106 MW). TB Flats 2/Big Charlie Circuits 21, 22, 23, and 24 unavailable (91 MW).:     2025-01-31 14:01     161410     2025-06-12 18:18  
  PPW 25-09573     17945     PPW     Scheduling Limitation: Path 8 Schedule Limitation (MT-NW)          ANTE-MLCK(PPW) 
  COLSTRIP-TOWNSEND(PPW) 
  MLCK-ANTE(PPW)   
  66.0 
  157.0 
  90.0   
  66.0 
  157.0 
  90.0   
  46.0 
  109.0 
  46.0   
  2025-06-09 08:00 
  2025-06-09 08:00 
  2025-06-09 08:00   
  2025-06-26 15:00 
  2025-06-26 15:00 
  2025-06-26 15:00   
  Active     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:CCVT replacement:COLSTRIP-TOWNSEND = 109; ANTE-MLCK = 46:     2025-05-29 13:09     168682     2025-05-29 13:09  
  PPW 25-09577     17946     PPW     Scheduling Limitation: Path 8 Schedule Limitation (MT-NW)          ANTE-MLCK(PPW) 
  COLSTRIP-TOWNSEND(PPW) 
  MLCK-ANTE(PPW)   
  66.0 
  157.0 
  90.0   
  66.0 
  157.0 
  90.0   
  46.0 
  109.0 
  46.0   
  2025-06-09 08:00 
  2025-06-09 08:00 
  2025-06-09 08:00   
  2025-06-13 15:00 
  2025-06-13 15:00 
  2025-06-13 15:00   
  Active     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace traditional glass insulators at towers 55-11 through 55-13 with silicon coated units.:COLSTRIP-TOWNSEND = 109; ANTE-MLCK = 46:     2025-05-29 13:16     168686     2025-05-29 13:17  
  PPW 25-03826     17913     PPW     Dixonville-Soda Springs 115 kV line          HYDROGEN-PACW(PPW) 

  HYDROGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  0.0 

  0.0   
  2025-06-10 05:51 

  2025-06-10 06:00   
  2025-06-10 06:00 

  2025-06-10 18:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Replace multiple structures on this section of line.:Umpqua River Hydro Project Restriction = 112 Summer /154 Winter.:     2025-05-13 15:14     162908     2025-06-10 05:54  
  PPW 25-09922     17962     PPW     Quail Creek: CB 11          BRDY-ANTE(PPW)      90.0      90.0      90.0      2021-12-12 00:00      2021-12-12 01:00      CANCELLED     DISTRIBUTION     PLANNED      ONPATH     PPW     continuous:Time will be needed for new CB11 breaker install. wiring, testing of relays.:     2025-06-03 14:57     169034     2025-06-03 14:57  
  PPW 25-08702     17948     PPW     Gadsby: ABS57A          THERMALGEN-PACE(PPW) 

  THERMALGEN-PACE(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  0.0 

  0.0   
  2025-06-10 08:56 

  2025-06-10 12:00   
  2025-06-10 12:00 

  2025-06-10 22:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace 57A ***Commissioning Required***:Gadsby Unit #1 must-run starting 1000 MST. Gadsby Unit #2 must-run starting 1100 MST. Gadsby Unit #3 must-run starting 1200 MST.:     2025-05-30 09:48     167808     2025-06-10 09:00  
  PPW 25-06373     17867     PPW     Painter-Railroad 138kV line          WINDGEN-PACE(PPW) 

  WINDGEN-PACE(PPW) 

  WINDGEN-PACE(PPW)   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  0.0   
  2025-05-26 07:30 

  2025-06-09 07:30 

  2025-06-10 09:06   
  2025-05-28 15:00 

  2025-06-10 09:06 

  2025-06-11 15:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:NERC relay maintenance.:Longhollow and Mtn Wind are restricted to a total of 232 MW Potential impact to PACE-UINTA & UINTA-PACE.:     2025-04-22 12:31     165471     2025-06-10 09:10  
  PPW 25-10283     17984     PPW     Malin: 500/230 kV Bank #1 T3804,5,6          MALIN230-MALIN500(PPW) 
  MALIN500-MALIN230(PPW) 

  MALIN230-MALIN500(PPW) 
  MALIN500-MALIN230(PPW) 

  MALIN230-MALIN500(PPW) 
  MALIN500-MALIN230(PPW)   
  300.0 
  300.0 

  300.0 
  300.0 

  300.0 
  300.0   
  300.0 
  300.0 

  300.0 
  300.0 

  300.0 
  300.0   
  300.0 
  300.0 

  300.0 
  300.0 

  300.0 
  300.0   
  2025-06-09 10:00 
  2025-06-09 10:00 

  2025-06-10 10:00 
  2025-06-10 10:00 

  2025-06-10 14:00 
  2025-06-10 14:00   
  2025-06-10 10:00 
  2025-06-10 10:00 

  2025-06-10 14:00 
  2025-06-10 14:00 

  2025-06-10 16:00 
  2025-06-10 16:00   
  CANCELLED     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Add oil to XFMR:MALIN230-MALIN500 & MALIN500-MALIN230 = 0.:     2025-06-09 23:43     169407     2025-06-10 08:04  
  PPW 25-08490     17914     PPW     Dixonville-Soda Springs 115 kV line          HYDROGEN-PACW(PPW) 

  HYDROGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  0.0 

  0.0   
  2025-06-11 05:50 

  2025-06-11 06:00   
  2025-06-11 06:00 

  2025-06-11 18:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Replace multiple structures on this section of line.:Umpqua River Hydro Project Restriction = 112 Summer /154 Winter.:     2025-05-13 15:14     167596     2025-06-11 05:51  
  PPW 25-02333     17645     PPW     Big Charlie (TB Flats 2): 230/34.5 kV XFMR T2,Big Charlie (TB Flats 2): 34.5kV Bus 2          OTHERGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  2025-05-11 06:00 

  2025-06-11 06:00   
  2025-05-11 18:00 

  2025-06-11 18:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian guarding.:TB Flats 2/Big Charlie Circuits 21, 22, 23, and 24 unavailable (91 MW).:     2025-01-31 14:04     161412     2025-05-01 10:16  
  PPW 25-08491     17915     PPW     Dixonville-Soda Springs 115 kV line          HYDROGEN-PACW(PPW) 

  HYDROGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  0.0 

  0.0   
  2025-06-12 05:50 

  2025-06-12 06:00   
  2025-06-12 06:00 

  2025-06-12 18:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Replace multiple structures on this section of line.:Umpqua River Hydro Project Restriction = 112 Summer /154 Winter.:     2025-05-13 15:14     167597     2025-06-12 05:52  
  PPW 25-02334     17646     PPW     Big Charlie (TB Flats 2): 230/34.5 kV XFMR T1,Big Charlie (TB Flats 2): 34.5kV Bus 1          OTHERGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  2025-05-12 06:00 

  2025-06-12 06:00   
  2025-05-12 18:00 

  2025-06-12 18:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian guarding.:TB Flats 2/Big Charlie Circuits 11, 12, 13, and 14 unavailable (106 MW).:     2025-01-31 14:08     161413     2025-05-01 10:16  
  PPW 25-09873     17990     PPW     Granite Mountain Solar (East): SCADA / RTU          ANTE-BRDY(PPW) 
  BRDY-ANTE(PPW)   
  90.0 
  90.0   
  90.0 
  90.0   
  90.0 
  90.0   
  2021-12-10 09:03 
  2021-12-10 09:03   
  2021-12-10 13:03 
  2021-12-10 13:03   
  COMPLETED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Test meters:     2025-06-12 08:45     168985     2025-06-12 10:15  
  PPW 25-10679     17991     PPW     Wallula-Nine Mile 230 kV line          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-06-12 08:30      2025-06-13 17:00      ACTIVE     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Line de-energized due to Hatchet Road Fire:Nine Mile and Campbell Wind will be offline.:     2025-06-12 09:15     169804     2025-06-12 09:15  
  PPW 25-02335     17647     PPW     Big Charlie (TB Flats 2): 230/34.5 kV XFMR T2,Big Charlie (TB Flats 2): 34.5kV Bus 2          OTHERGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  2025-05-13 06:00 

  2025-06-13 06:00   
  2025-05-13 18:00 

  2025-06-13 18:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian guarding.:TB Flats 2/Big Charlie Circuits 21, 22, 23, and 24 unavailable (91 MW).:     2025-01-31 14:15     161414     2025-05-01 10:16  
  PPW 25-08492     17916     PPW     Dixonville-Soda Springs 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-06-13 06:00      2025-06-13 18:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Replace multiple structures on this section of line.:Umpqua River Hydro Project Restriction = 112 Summer /154 Winter.:     2025-05-13 15:14     167598     2025-05-13 15:15  
  PPW 25-08493     17917     PPW     Dixonville-Soda Springs 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-06-16 06:00      2025-06-16 18:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Replace multiple structures on this section of line.:Umpqua River Hydro Project Restriction = 112 Summer /154 Winter.:     2025-05-13 15:14     167599     2025-05-13 15:15  
  PPW 25-10259     17983     PPW     Pomona-BPA Vantage 230 kV line          MIDC-YAKIMA(PPW) 
  PACW-NTLOAD(PPW) 
  YAKIMA-MIDC(PPW)   
  402.0 
  9999.0 
  402.0   
  402.0 
  9999.0 
  402.0   
  402.0 
  0.0 
  402.0   
  2025-06-16 07:00 
  2025-06-16 07:00 
  2025-06-16 07:00   
  2025-06-19 17:00 
  2025-06-19 17:00 
  2025-06-19 17:00   
  SCHEDULED     TRANSMISSION     URGENT      ONPATH     PPW     continuous:replacing poles at 5/40, 3B/41, 3A/41:No impact to Yakima load service with two 230 kV lines in service. Network Load Service Arrangements may be required.:     2025-06-09 14:02     169383     2025-06-09 14:02  
  PPW 25-10132     17975     PPW     Scheduling Limitation: Path 8 Schedule Limitation (MT-NW)          ANTE-MLCK(PPW) 
  COLSTRIP-TOWNSEND(PPW) 
  MLCK-ANTE(PPW)   
  66.0 
  157.0 
  90.0   
  66.0 
  157.0 
  90.0   
  46.0 
  109.0 
  46.0   
  2025-06-16 07:00 
  2025-06-16 07:00 
  2025-06-16 07:00   
  2025-06-19 17:00 
  2025-06-19 17:00 
  2025-06-19 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:TBD:COLSTRIP-TOWNSEND = 109; ANTE-MLCK = 46:     2025-06-06 10:17     169246     2025-06-06 10:17  
  PPW 25-08494     17918     PPW     Dixonville-Soda Springs 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-06-17 06:00      2025-06-17 18:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Replace multiple structures on this section of line.:Umpqua River Hydro Project Restriction = 112 Summer /154 Winter.:     2025-05-13 15:14     167600     2025-05-13 15:15  
  PPW 25-09057     17955     PPW     Naughton: 9745 Tone Relaying Equipment,Canyon Compression-Muddy Creek-Naughton 138 kV line          THERMALGEN-PACE(PPW)      9999.0      9999.0      0.0      2025-06-17 14:30      2025-06-19 18:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Tone testing:Naughton site generation limited to 330MW maximum.:     2025-06-02 10:24     168164     2025-06-02 10:24  
  PPW 25-08495     17919     PPW     Dixonville-Soda Springs 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-06-18 06:00      2025-06-18 18:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Replace multiple structures on this section of line.:Umpqua River Hydro Project Restriction = 112 Summer /154 Winter.:     2025-05-13 15:15     167601     2025-05-13 15:15  
  PPW 25-09474     17993     PPW     Glenrock Wind Collector: 34 kV Circuit #3          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-06-18 07:00      2025-06-18 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:GR1-302 pad mount transformer vault replacement:Glenrock Wind feeder #3 unavailable (19.5MW).:     2025-06-12 11:09     168581     2025-06-12 11:10  
  PPW 25-08675     17926     PPW     Pinto: CIRCUIT SWITCHER 332I,Pinto: PST #4,Pinto: 345 kV PST East Bus,Pinto: PST #5,Pinto: PST #6          FOURCORNE345-PINTO(PPW) 
  PINTO-FOURCORNE345(PPW) 

  FOURCORNE345-PINTO(PPW) 
  PINTO-FOURCORNE345(PPW)   
  660.0 
  625.0 

  660.0 
  625.0   
  660.0 
  625.0 

  660.0 
  625.0   
  660.0 
  625.0 

  578.0 
  578.0   
  2025-06-09 08:59 
  2025-06-09 08:59 

  2025-06-18 08:59 
  2025-06-18 08:59   
  2025-06-12 17:59 
  2025-06-12 17:59 

  2025-06-21 17:59 
  2025-06-21 17:59   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Circuit switcher 332I maintenance.:PINTO-FOURCORNE345 = 625. FOURCORNE345-PINTO (TOT 2B1) = 650. PINTO-FOURCORNE345 = 625. FOURCORNE345-PINTO (TOT 2B1) = 650. PINTO-FOURCORNE345 and FOURCORNE345-PINTO (TOT 2B1) = 578.:     2025-05-16 11:14     167781     2025-06-06 09:32  
  PPW 25-06525     17985     PPW     Mounds: ABS 114A,Mounds: ABS 115A,Mounds: ABS 116A,Mathington-Mounds section of the Mathington-Tamar          THERMALGEN-PACE(PPW)      9999.0      9999.0      0.0      2025-06-19 07:00      2025-06-19 13:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Reattach Jumpers off of new CB 115A to T Line:Sunnyside Co-Gen unavailable during switching only. Sunnyside Co-Gen limited to 30MW maximum during the work.:     2025-06-10 09:20     165625     2025-06-12 12:40  
  PPW 25-09662     17956     PPW     Millican Solar-Stearns Butte 115 kV line               0.0      0.0      0.0      2025-06-20 10:00      2025-06-20 14:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:AGC Meter Testing; AGC will need to be put on backup while the primary meter is under test.:Millican Solar restricted to 0 MW with site de-energized.:     2025-06-02 13:48     168771     2025-06-02 13:48  
  PPW 25-09570     17957     PPW     Carbon-Spanish Fork #2 138 kV line          OTHERGEN-PACE(PPW) 
  PACE-VNL(PPW) 
  VNL-PACE(PPW)   
  9999.0 
  140.0 
  138.0   
  9999.0 
  140.0 
  138.0   
  0.0 
  75.0 
  75.0   
  2025-06-23 08:00 
  2025-06-23 08:00 
  2025-06-23 08:00   
  2025-07-02 14:00 
  2025-07-02 14:00 
  2025-07-02 14:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:A-condition str replacements:PACE-VNL & VNL-PACE = 75 Summer, 112 Winter. Graphite Solar limited to 10 MW. If both Carbon - Spanish Fork 138 kV lines are out-of-service, PACE-VNL = 0; VNL-PACE = Carbon area load:     2025-06-02 14:29     168679     2025-06-02 14:33  
  PPW 25-09785     17972     PPW     Gala Solar-Ponderosa 115 kV line               0.0      0.0      0.0      2025-06-23 10:00      2025-06-23 14:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:AGC Meter Testing; AGC will need to be put on backup while the primary meter is under test.:     2025-06-05 10:46     168894     2025-06-05 10:46  
  PPW 25-10028     17970     PPW     Ariel-Lewis River section of the Merwin-Cowlitz PUD Lewis River 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-06-24 07:00      2025-06-27 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Fire mitigation monitoring system installation.:Possible real time restriction of Merwin and Yale generation.:     2025-06-05 09:41     169140     2025-06-05 09:41  
  PPW 25-04514     17747     PPW     Crag View-PG&E Cascade section of the PG&E Cascade-Weed Junction 115 kV line          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW) 

  CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW) 

  CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW) 

  CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  80.0 

  45.0 
  80.0 

  45.0 
  80.0 

  45.0 
  80.0   
  45.0 
  80.0 

  45.0 
  80.0 

  45.0 
  80.0 

  45.0 
  80.0   
  45.0 
  80.0 

  45.0 
  80.0 

  0.0 
  0.0 

  45.0 
  80.0   
  2025-04-10 07:00 
  2025-04-10 07:00 

  2025-06-23 07:00 
  2025-06-23 07:00 

  2025-06-24 07:00 
  2025-06-24 07:00 

  2025-06-24 18:30 
  2025-06-24 18:30   
  2025-04-11 16:30 
  2025-04-11 16:30 

  2025-06-24 07:00 
  2025-06-24 07:00 

  2025-06-24 18:30 
  2025-06-24 18:30 

  2025-06-27 16:30 
  2025-06-27 16:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:change b/o bells 2/58,1/63:CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0.:     2025-03-11 11:13     163602     2025-06-03 10:11  
  PPW 25-09789     17973     PPW     Goshen (Idaho): 345/161 kV Bank #5          JBSN-JB345(PPW)      1600.0      1600.0      1600.0      2025-06-25 08:30      2025-06-25 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Switch out XFMR #5 to gain access to Sudden Pressure Device for testing. Personal grounds will be installed if needed:No Path 19 de-rate for one Goshen 345 kV/161 kV transformer out of service. If two transformers are out of service, JBSN-JB345 = 2170. PacifiCorp = 1447. IPCo = 723.:     2025-06-05 11:10     168898     2025-06-05 11:13  
  PPW 25-09173     17952     PPW     Hopland-Union Gap section of the BPA Moxee-Union Gap 115 kV line,Hopland: Bank #1,Hopland: CB 5Y440               0.0      0.0      0.0      2025-06-25 12:00      2025-07-15 23:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install Conduit and Panel 4R. Replace SW 2Y52, 2Y531 and MO, 115kV Bus Tie SW and XFMR BK #1 Relay upgrade. :Hopland will be fed from BPA Moxee. Network Load Service Arrangements may be required.:     2025-05-31 21:25     168280     2025-05-31 21:25  
  PPW 25-09353     17981     PPW     Foote Creek-Rock Creek I Collector 230kV Line          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-06-26 05:00      2025-06-26 19:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Punch list work at the Rock Creek I Collector sub .:Rock Creek 1 wind unavailable:     2025-06-09 12:54     168460     2025-06-09 12:54  
  PPW 25-09791     17974     PPW     Goshen (Idaho): 345/161 kV Bank #6          JBSN-JB345(PPW)      1600.0      1600.0      1600.0      2025-06-26 08:30      2025-06-26 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Sudden pressure relay testing.:No Path 19 de-rate for one Goshen 345 kV/161 kV transformer out of service. If two transformers are out of service, JBSN-JB345 = 2170. PacifiCorp = 1447. IPCo = 723.:     2025-06-05 11:16     168900     2025-06-05 11:33  
  PPW 25-10117     17982     PPW     Aeolus-Freezeout #2 230 kV line               0.0      0.0      0.0      2025-06-27 07:00      2025-06-27 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install spacers on the line side jumpers of SW 9D83:     2025-06-09 13:32     169230     2025-06-09 13:32  
  PPW 25-02017     17629     PPW     Crag View-PG&E Cascade section of the PG&E Cascade-Weed Junction 115 kV line          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  75.0   
  45.0 
  75.0   
  45.0 
  75.0   
  2025-06-30 06:00 
  2025-06-30 06:00   
  2025-10-31 17:00 
  2025-10-31 17:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Line reconductoring. Replacing structures.:CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0. CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0.:     2025-01-28 13:43     161094     2025-06-09 11:17  
  PPW 25-07147     17872     PPW     BPA Salem-Dallas section of the BPA Salem-Monpac 115 kV line               0.0      0.0      0.0      2025-06-30 07:00      2025-06-30 17:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:POLE REPLACEMENT, STRUCTURE 17/11:Network Load Service may need to arranged for Dallas & Independence via Monpac. (Monpac Sw 2M88 will be closed & Dallas Sw 2M150 will be open) BPA to Stay Normal at Salem on CB B52 & Albany CB B518.:     2025-04-23 09:54     166249     2025-04-23 09:54  
  PPW 25-07861     17889     PPW     WAPA Thermopolis-Hilltop-WAPA Lovell 115 kV line          YTP-WYONORTH(PPW) 

  YTP-WYONORTH(PPW)   
  400.0 

  400.0   
  400.0 

  400.0   
  400.0 

  377.0   
  2025-06-24 08:30 

  2025-06-30 07:00   
  2025-06-25 11:00 

  2025-07-03 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace broken insulators.:YTP-WYONORTH = 377. YTS = Series #11: TTC of 589 (PACE = 377 & LAPT = 212).:     2025-05-02 13:19     166967     2025-05-14 13:18  
  PPW 25-08522     17928     PPW     Aeolus: XFMR2 525-230 kV               0.0      0.0      0.0      2025-06-30 07:00      2025-07-02 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace gearings in motor operators for switches; 11G52, 11G53, 11G51 at Aeolus. :     2025-05-19 10:16     167628     2025-05-19 10:16  
  PPW 25-03418     17689     PPW     Crag View-PG&E Cascade section of the PG&E Cascade-Weed Junction 115 kV line          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  80.0   
  45.0 
  80.0   
  45.0 
  80.0   
  2025-06-30 07:00 
  2025-06-30 07:00   
  2025-10-31 17:00 
  2025-10-31 17:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Reconductor between structures.:CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0.:     2025-02-18 12:38     162500     2025-05-27 09:55  
  PPW 25-10324     17986     PPW     Crag View-PG&E Cascade section of the PG&E Cascade-Weed Junction 115 kV line          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  75.0   
  45.0 
  75.0   
  0.0 
  0.0   
  2025-06-30 07:00 
  2025-06-30 07:00   
  2025-10-31 17:00 
  2025-10-31 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Line reconductoring. Replacing structures.:CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0. CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0.:     2025-06-10 10:10     169449     2025-06-10 10:15  
  PPW 24-09589     17009     PPW     PG&E Cascade: CB 122          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW) 
  PACW-CRAGVIEW(PPW) 

  CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW) 
  PACW-CRAGVIEW(PPW) 

  CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW) 
  PACW-CRAGVIEW(PPW)   
  45.0 
  80.0 
  115.0 

  45.0 
  80.0 
  150.0 

  45.0 
  80.0 
  115.0   
  45.0 
  80.0 
  115.0 

  45.0 
  80.0 
  150.0 

  45.0 
  80.0 
  115.0   
  45.0 
  80.0 
  115.0 

  45.0 
  80.0 
  150.0 

  0.0 
  0.0 
  0.0   
  2024-08-05 07:00 
  2024-08-05 07:00 
  2024-08-05 07:00 

  2024-12-25 07:00 
  2024-12-25 07:00 
  2024-12-25 07:00 

  2025-07-04 07:00 
  2025-07-04 07:00 
  2025-07-04 07:00   
  2024-08-09 16:00 
  2024-08-09 16:00 
  2024-08-09 16:00 

  2024-12-25 16:00 
  2024-12-25 16:00 
  2024-12-25 16:00 

  2025-07-04 16:00 
  2025-07-04 16:00 
  2025-07-04 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install pott relaying to the Crag View - Cascade 115kV line.:CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0.:     2024-06-06 13:30     147422     2024-12-02 07:13  
  PPW 25-02485     17693     PPW     Clausen (Cedar Springs 2): XFMR T2          WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  0.0 

  9999.0   
  2025-07-07 07:00 

  2025-07-11 23:55   
  2025-07-11 23:55 

  2025-08-07 23:55   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Avian Guarding Project 2025:Cedar Springs 2 Wind Farm unavailable.:     2025-02-20 14:34     161564     2025-02-25 12:58  
  PPW 25-10030     17971     PPW     Swift #2: Unit #22 Main Transformer - T2103,Swift #2: Unit #21 Main Transformer - T2102          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-07-07 07:00      2025-07-17 17:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Bushing replacement.:Swift 2 Unit 21 and 22 unavailable.:     2025-06-05 10:03     169142     2025-06-05 10:05  
  PPW 24-04189     16311     PPW     Cove (OR): 230/69 kV Bank #2 (T3398)          COVEPACW-ROUNDBUTTE(PPW) 
  ROUNDBUTTE-COVEPACW(PPW) 

  COVEPACW-ROUNDBUTTE(PPW) 
  ROUNDBUTTE-COVEPACW(PPW) 

  COVEPACW-ROUNDBUTTE(PPW) 
  ROUNDBUTTE-COVEPACW(PPW) 

  COVEPACW-ROUNDBUTTE(PPW) 
  ROUNDBUTTE-COVEPACW(PPW)   
  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0   
  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0   
  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0 

  60.0 
  60.0   
  2024-07-01 12:00 
  2024-07-01 12:00 

  2024-10-14 12:00 
  2024-10-14 12:00 

  2025-04-28 12:00 
  2025-04-28 12:00 

  2025-07-07 12:00 
  2025-07-07 12:00   
  2024-07-21 12:00 
  2024-07-21 12:00 

  2024-11-01 12:00 
  2024-11-01 12:00 

  2025-05-30 12:00 
  2025-05-30 12:00 

  2025-08-01 12:00 
  2025-08-01 12:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:T-3398 LTC Maintenance and Bushing Replacement:COVEPACW-ROUNDBUTTE & ROUNDBUTTE-COVEPACW = 60.:     2024-03-15 09:39     142013     2025-06-11 12:33  
  PPW 25-10712     17994     PPW     Pearson collector (Milford Solar): MOAB 345-1,Pearson collector (Milford Solar): XFMR 1 345/34.5kV 1          OTHERGEN-PACE(PPW) 

  OTHERGEN-PACE(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  0.0 

  9999.0   
  2025-07-07 21:30 

  2025-07-08 04:00   
  2025-07-08 04:00 

  2025-07-09 04:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Maintenance on high-side switch.:Pearson (Milford Solar) unavailable.:     2025-06-12 13:51     169837     2025-06-12 13:54  
  PPW 25-06480     17832     PPW     WAPA Flaming Gorge: 230/138 kV XFMR KY2A          FGE-WYOCENTRAL(PPW) 
  WYOCENTRAL-FGE(PPW)   
  200.0 
  200.0   
  200.0 
  200.0   
  0.0 
  200.0   
  2025-07-08 06:30 
  2025-07-08 06:30   
  2025-07-10 11:00 
  2025-07-10 11:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Transformer maintenance.:FGE-WYOCENTRAL = 0. WYOCENTRAL-FGE = Little Mtn load.:     2025-04-10 08:41     165579     2025-04-10 08:41  
  PPW 25-10714     17995     PPW     Pearson collector (Milford Solar): MOAB 345-1,Pearson collector (Milford Solar): XFMR 1 345/34.5kV 1          OTHERGEN-PACE(PPW)      9999.0      9999.0      0.0      2025-07-08 21:30      2025-07-09 04:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     1234567 Daily:Maintenance on high-side switch.:Pearson (Milford Solar) unavailable.:     2025-06-12 13:54     169839     2025-06-12 13:54  
  PPW 25-07647     17941     PPW     Dunlap: 230/34 kV Bank #1          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-07-14 08:00      2025-07-17 13:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:WECC maintenance for T1, CB 1H2016 & 230kV Bus:Dunlap Wind unavailable.:     2025-05-27 14:21     166753     2025-05-27 14:21  
  PPW 25-06540     17869     PPW     Dunlap: 230/34 kV Bank #1          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-07-14 08:00      2025-07-17 13:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:WECC maintenance for T1, CB 1H2016 & 230kV Bus:Dunlap Wind restricted to 0 MW and de-energized.:     2025-04-22 13:57     165641     2025-04-22 13:57  
  PPW 25-08481     17938     PPW     Culver-Cove section of the Redmond-Cove 69 kV line               0.0      0.0      0.0      2025-07-14 10:00      2025-07-18 12:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace Failed MOAB SW 3D27 At Culver Sub:Crooked River & Culver will be switched over to BPA Redmond via Pacific Power Redmond. Opal Springs Generation will be tie to BPA Redmond. Network Load Service Arrangements may be required.:     2025-05-24 09:43     167587     2025-05-24 09:43  
  PPW 25-07718     17884     PPW     Sunbeam-Moonshine 230 kV line          WINDGEN-PACE(PPW)      9999.0      9999.0      9999.0      2025-07-15 05:00      2025-07-15 21:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Substation offline maintenance.:Moonshine Generation unavailable (45 mw).:     2025-04-30 10:00     166824     2025-04-30 10:03  
  PPW 25-06448     17825     PPW     Moonshine: 230/34.5 kV Bank T-1          WINDGEN-PACE(PPW)      9999.0      9999.0      0.0      2025-07-15 06:00      2025-07-15 21:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Site outage for substation offline maintenance.:Moonshine generation unavailable.:     2025-04-09 13:28     165547     2025-04-09 13:31  
  PPW 25-09700     17950     PPW     Foote Creek: 34.5 kV Bus #1,Foote Creek: 34.5 kV Bus #2,Foote Creek: 34.5 kV Bus #3,Foote Creek: 34.          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-07-15 06:30      2025-07-15 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian guarding.:Foote Creek Wind unavailable.:     2025-05-30 13:42     168809     2025-06-02 08:52  
  PPW 25-09891     17969     PPW     Crag View-Weed Junction section of the PG&E Cascade-Weed Junction 115 kV line          CRAGVIEW-CRAG(PPW) 
  CRAGVIEW-PACW(PPW) 
  PACW-NTLOAD(PPW) 

  CRAGVIEW-CRAG(PPW) 
  CRAGVIEW-PACW(PPW) 
  PACW-NTLOAD(PPW)   
  75.0 
  108.0 
  9999.0 

  75.0 
  108.0 
  9999.0   
  75.0 
  108.0 
  9999.0 

  75.0 
  108.0 
  9999.0   
  75.0 
  108.0 
  9999.0 

  75.0 
  108.0 
  9999.0   
  2025-06-25 06:00 
  2025-06-25 06:00 
  2025-06-25 06:00 

  2025-07-16 06:00 
  2025-07-16 06:00 
  2025-07-16 06:00   
  2025-06-27 18:30 
  2025-06-27 18:30 
  2025-06-27 18:30 

  2025-07-18 18:30 
  2025-07-18 18:30 
  2025-07-18 18:30   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Change structures 2/48-2/55:CRAGVIEW-PACW & PACW-CRAGVIEW = 0; CRAGVIEW-CRAG = 0; CRAG-CRAGVIEW = Crag View Load (Approx 10 mw); Crag View will be radial from Cascade. Network Load Service Arrangements may be required.:     2025-06-05 08:53     169003     2025-06-06 12:55  
  PPW 25-09447     17987     PPW     Jim Bridger-Mustang 230 kV line,Mustang-WAPA Spence 230 kV line          JBSN-WYOCENTRAL(PPW) 
  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-JBSN(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  600.0 
  631.0 
  249.0 
  600.0 
  574.0 
  0.0 
  574.0   
  600.0 
  631.0 
  249.0 
  600.0 
  574.0 
  0.0 
  574.0   
  400.0 
  631.0 
  243.0 
  400.0 
  287.0 
  0.0 
  287.0   
  2025-07-16 07:00 
  2025-07-16 07:00 
  2025-07-16 07:00 
  2025-07-16 07:00 
  2025-07-16 07:00 
  2025-07-16 07:00 
  2025-07-16 07:00   
  2025-07-18 14:00 
  2025-07-18 14:00 
  2025-07-18 14:00 
  2025-07-18 14:00 
  2025-07-18 14:00 
  2025-07-18 14:00 
  2025-07-18 14:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install 230 kV shoo fly at Mustang sub:AW/4B Curve 121. WAPAEAST-WAPANORTH = 243. WYOEAST-AEOW (Aeolus West) = 1627. TOT4B-WYONORTH = 631. TOT 4B = 874. JBSN-WYOC & WYOC-JBSN = 400. Potential Real Time Impact to Wyoming Generation Great Divide will be radial from WAPA Spence via Mustang. Network Load Service Arrangements may be required. AW/4B Curve 121. WAPAEAST-WAPANORTH = 243. WYOEAST-AEOW (Aeolus West) = 1627. TOT4B-WYONORTH = 631. TOT 4B = 874. JBSN-WYOC & WYOC-JBSN = 400. Potential Real Time Impact to Wyoming Generation Great Divide will be radial from WAPA Spence via Mustang. Network Load Service Arrangements may be required.:     2025-06-10 11:51     168554     2025-06-10 11:56  
  PPW 25-10623     17989     PPW     Merwin: MERWIN GR.UNIT1          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-07-20 07:00      2025-07-25 18:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Unit 1 annual maintenance.:Merwin Unit #1 unavailable.:     2025-06-11 14:28     169748     2025-06-11 14:28  
  PPW 25-07978     17897     PPW     WAPA Thermopolis-Hilltop-WAPA Lovell 115 kV line          YTP-WYONORTH(PPW) 

  YTP-WYONORTH(PPW) 

  YTP-WYONORTH(PPW) 

  YTP-WYONORTH(PPW)   
  400.0 

  400.0 

  400.0 

  400.0   
  400.0 

  400.0 

  400.0 

  400.0   
  400.0 

  377.0 

  377.0 

  400.0   
  2025-06-25 11:01 

  2025-07-21 07:00 

  2025-07-21 11:01 

  2025-07-24 15:00   
  2025-06-27 16:00 

  2025-07-21 11:01 

  2025-07-24 15:00 

  2025-07-24 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace broken insulators:YTP-WYONORTH = 377. YTS = Series #11: TTC of 589 (PACE = 377 & LAPT = 212).:     2025-05-05 09:53     167084     2025-05-14 13:59  
  PPW 25-03490     17720     PPW     Atlantic City: CB 1H120,Atlantic City-Rock Springs 230 kV line          TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW) 

  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  571.0 
  235.0 
  287.0 
  0.0 
  287.0   
  2025-06-02 07:00 
  2025-06-02 07:00 
  2025-06-02 07:00 
  2025-06-02 07:00 
  2025-06-02 07:00 

  2025-07-28 07:00 
  2025-07-28 07:00 
  2025-07-28 07:00 
  2025-07-28 07:00 
  2025-07-28 07:00   
  2025-06-04 10:00 
  2025-06-04 10:00 
  2025-06-04 10:00 
  2025-06-04 10:00 
  2025-06-04 10:00 

  2025-07-30 10:00 
  2025-07-30 10:00 
  2025-07-30 10:00 
  2025-07-30 10:00 
  2025-07-30 10:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Breaker Minor Maintenance:AW/4B Curve 117. WAPAEAST-WAPANORTH = 235. WYOEAST-AEOW (Aeolus West) = 1632. TOT4B-WYONORTH = 571. TOT 4B = 806. Potential Real Time Impact to Wyoming Generation:     2025-02-27 14:05     162572     2025-05-30 14:54  
  PPW 25-03491     17721     PPW     Atlantic City: LINE CB 1H116,Wyopo-Atlantic City section of the Riverton-Atlantic City 230 kV line          TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW) 

  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  571.0 
  235.0 
  287.0 
  0.0 
  287.0   
  2025-06-04 11:00 
  2025-06-04 11:00 
  2025-06-04 11:00 
  2025-06-04 11:00 
  2025-06-04 11:00 

  2025-07-30 11:00 
  2025-07-30 11:00 
  2025-07-30 11:00 
  2025-07-30 11:00 
  2025-07-30 11:00   
  2025-06-06 16:30 
  2025-06-06 16:30 
  2025-06-06 16:30 
  2025-06-06 16:30 
  2025-06-06 16:30 

  2025-08-01 16:30 
  2025-08-01 16:30 
  2025-08-01 16:30 
  2025-08-01 16:30 
  2025-08-01 16:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Breaker Minor Maintenance 1H116:AW/4B Curve 117. WAPAEAST-WAPANORTH = 235. WYOEAST-AEOW (Aeolus West) = 1632. TOT4B-WYONORTH = 571. TOT 4B = 806. Potential Real Time Impact to Wyoming Generation:     2025-02-27 14:17     162573     2025-05-30 14:59  
  PPW 25-03422     17860     PPW     Ekola Flats: 230/34.5 kV T1,Ekola Flats: 230/34.5 kV T2,Ekola Flats: 34.5kV Bus 1,Ekola Flats: 34.5k          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-08-04 07:30      2025-08-08 13:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install bird guarding.:Ekola Flats Feeders 11, 12, 13, 14, 15, 21, 22, 23, 24, and 25 unavailable (250MW total).:     2025-04-18 14:29     162504     2025-05-01 10:21  
  PPW 25-03420     17859     PPW     Ekola Flats: 230/34.5 kV T1,Ekola Flats: 34.5kV Bus 1          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-08-04 09:00      2025-08-04 18:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install bird guarding.:Ekola Flats Feeder 11, 12, 13, 14, and 15 unavailable (125MW).:     2025-04-18 14:26     162502     2025-05-01 10:21  
  PPW 25-07188     17870     PPW     Fry-Parrish Gap 230 kV line          PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW)   
  325.0 
  325.0   
  325.0 
  325.0   
  159.0 
  159.0   
  2025-08-04 22:00 
  2025-08-04 22:00   
  2025-08-05 08:00 
  2025-08-05 08:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace arm at structure 4/1:PACW-PGE.PACW & PACW.PGE-PACW = 159 Summer/149 Winter Network Load Service Arrangements may be required.:     2025-04-22 14:03     166290     2025-04-22 14:06  
  PPW 25-03929     17736     PPW     Alturas-Cedarville Tap section of the Alturas-Bullard 115 kV line          OTHERGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-08-05 07:00      2025-08-08 13:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:REPLACE POLES 6/49 8/49 5/50 8/50 :Airport Solar and Garrett Solar restricted to 0 MW during switching.:     2025-03-06 13:59     163011     2025-03-06 13:59  
  PPW 25-07192     17871     PPW     Fry-Calapooya section of the Diamond Hill-Fry 230 kV line          PACW-NTLOAD(PPW)      9999.0      9999.0      0.0      2025-08-05 22:00      2025-08-06 08:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace arms at structure 4/14:Network Load Service must be arranged for Calapooya, Diamond Hill & EWEB McKenzie. Eliminates ability to move Network Load Service from Alvey to Gresham. Eliminates C&T Point to Point Service from Troutdale to Summer Lake.:     2025-04-22 14:06     166294     2025-04-22 14:11  
  PPW 25-03423     17861     PPW     Ekola Flats: 230/34.5 kV T2,Ekola Flats: 34.5kV Bus 2          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-08-06 09:00      2025-08-06 18:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install bird guarding.:Ekola Flats Feeders 21, 22, 23, 24, and 25 unavailable (125MW):     2025-04-18 14:35     162505     2025-05-01 10:21  
  PPW 25-03424     17862     PPW     Ekola Flats: 230/34.5 kV T1,Ekola Flats: 34.5kV Bus 1          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-08-07 09:00      2025-08-07 18:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install bird guarding.:Ekola Flats Feeder 11, 12, 13, 14, and 15 unavailable (125MW).:     2025-04-18 14:39     162506     2025-05-01 10:21  
  PPW 25-03426     17863     PPW     Ekola Flats: 230/34.5 kV T2,Ekola Flats: 34.5kV Bus 2          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-08-08 09:00      2025-08-08 18:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install bird guarding.:Ekola Flats Feeders 21, 22, 23, 24, and 25 unavailable (125MW).:     2025-04-18 14:50     162508     2025-05-01 10:21  
  PPW 25-03360     17687     PPW     Dave Johnston-TSGT Laramie River Station 230 kV line          DJ-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-DJ(PPW)   
  790.0 
  0.0 
  790.0   
  790.0 
  0.0 
  790.0   
  442.0 
  0.0 
  442.0   
  2025-09-02 07:00 
  2025-09-02 07:00 
  2025-09-02 07:00   
  2025-09-19 15:00 
  2025-09-19 15:00 
  2025-09-19 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:2025 structure replacements.:DJ-WYOEAST & WYOEAST-DJ = 442 (Dave Johnston-WAPA Stegall 230 kV line rating):     2025-02-17 14:22     162442     2025-02-17 14:28  
  PPW 25-07196     17896     PPW     PGE Bethel-Parrish Gap 230 kV line          PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW)   
  325.0 
  325.0   
  325.0 
  325.0   
  159.0 
  159.0   
  2025-09-02 07:00 
  2025-09-02 07:00   
  2025-09-05 18:00 
  2025-09-05 18:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace structures, 1/21, 1/23, 1/25.:PACW-PGE.PACW & PACW.PGE-PACW = 159 Summer/149 Winter Network load service arrangements may be required:     2025-05-05 08:36     166298     2025-05-05 08:37  
  PPW 25-03417     17688     PPW     Malin-PG&E Round Mountain #1 500 kV line          MALIN500-RDM500(PPW) 
  RDM500-MALIN500(PPW) 

  MALIN500-RDM500(PPW) 
  RDM500-MALIN500(PPW)   
  800.0 
  612.0 

  800.0 
  612.0   
  800.0 
  612.0 

  800.0 
  612.0   
  625.0 
  416.0 

  800.0 
  612.0   
  2025-09-08 06:00 
  2025-09-08 06:00 

  2025-09-29 06:00 
  2025-09-29 06:00   
  2025-09-12 17:00 
  2025-09-12 17:00 

  2025-10-03 17:00 
  2025-10-03 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install lab measurement and fault initiating test equipment on primary conductors (Grounded).:MALIN500-RDM500 = 625. RDM500-MALIN500 = 416.:     2025-02-18 12:23     162499     2025-04-10 08:52  
  PPW 25-05028     17750     PPW     Pryor Mountain Wind: 34.5kV Bus 2,Pryor Mountain Wind: 34.5kV Bus 1          WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2025-07-07 08:00 

  2025-09-08 08:00   
  2025-07-09 11:00 

  2025-09-10 11:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian protection.:Pryor Mountain Wind unavailable.:     2025-03-14 11:07     164124     2025-03-17 12:01  
  PPW 25-05029     17751     PPW     Circuit 1,Circuit 2,Circuit 3,Circuit 4,Circuit 5,Circuit 6,Pryor Mountain Wind: 34.5kV Bus 1          WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  0.0 

  9999.0   
  2025-07-09 11:00 

  2025-09-08 08:00   
  2025-07-11 16:00 

  2025-09-12 16:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian protection.:Pryor Mountain Wind circuits 1-6 (120.6MW) unavailable.:     2025-03-14 11:21     164125     2025-03-17 12:03  
  PPW 25-03879     17708     PPW     Sweet Home: Main Bus Disc CB 4M94,Sweet Home: Bypass Bus Disc CB 4M94,Sweet Home: Line Disc CB 4M94          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-09-15 08:00      2025-09-19 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Breaker maintenance.:Fall Creek Hydro Units 1, 2, and 3 unavailable.:     2025-02-25 10:20     162961     2025-02-25 10:20  
  PPW 25-06481     17833     PPW     Malin-PG&E Round Mountain #1 500 kV line          MALIN500-RDM500(PPW) 
  RDM500-MALIN500(PPW)   
  800.0 
  612.0   
  800.0 
  612.0   
  625.0 
  416.0   
  2025-09-17 06:00 
  2025-09-17 06:00   
  2025-09-19 17:00 
  2025-09-19 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install lab measurement and fault initiating test equipment on primary conductors (Grounded).:MALIN500-RDM500 = 625. RDM500-MALIN500 = 416.:     2025-04-10 08:55     165580     2025-04-10 08:55  
  PPW 26-00002     17627     PPW     IPC Midpoint-Hemingway 500 kV line,IPCo Midpoint: 500/345 kV Bank T-501          H500-M500(PPW) 
  M500-H500(PPW) 
  PACW-NTLOAD(PPW) 

  H500-M500(PPW) 
  M500-H500(PPW) 
  PACW-NTLOAD(PPW)   
  800.0 
  1090.0 
  9999.0 

  800.0 
  1090.0 
  9999.0   
  800.0 
  1090.0 
  9999.0 

  800.0 
  1090.0 
  9999.0   
  350.0 
  350.0 
  0.0 

  800.0 
  1090.0 
  9999.0   
  2025-09-22 06:00 
  2025-09-22 06:00 
  2025-09-22 06:00 

  2026-02-23 08:00 
  2026-02-23 08:00 
  2026-02-23 08:00   
  2025-11-07 16:00 
  2025-11-07 16:00 
  2025-11-07 16:00 

  2026-05-29 15:00 
  2026-05-29 15:00 
  2026-05-29 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:This outage is for relocating the existing Midpoint T501 345kV/500kV transformer to a new 345kV station bay.:M500-H500 & H500-M500= 350. BORA-M500 = 959. No impact to Bridger West. Jim Bridger Generation may be restricted real time (as determined by Northwest Path Flow). Network Load Service Arrangements may be required for Southern Oregon Load. Note: TTC Schedules on Path 75 East & West are 0. However, the SOL is 350 West / 325 East (Limited by Bowmont Xfmrs). However, there is a potential of up to 300 mw of actual unscheduled inadvertent flow between Hemingway & Summer Lake. JBSN-JB345 = 2200. PacifiCorp = 1467. IPCo = 733. Jim Bridger Generation may be restricted real time (as determined by Northwest Path Flow).:     2025-01-28 09:16     161059     2025-05-05 13:54  
  PPW 25-07860     17890     PPW     WAPA Thermopolis-Hilltop-WAPA Lovell 115 kV line          YTP-WYONORTH(PPW)      400.0      400.0      377.0      2025-10-14 07:00      2025-10-20 11:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace Nahne Jensen Line switches NJ-5761 and NJ-5765.:YTP-WYONORTH = 377. YTS = Series #11: TTC of 589 (PACE = 377 & LAPT = 212).:     2025-05-02 13:30     166966     2025-05-02 13:30  
  PPW 25-09054     17933     PPW     Gala Solar: Xfmr T1          OTHERGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-10-14 07:00      2025-10-15 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Three-year substation preventative maintenance.:Gala Solar offline.:     2025-05-21 14:37     168161     2025-05-21 14:37  
  PPW 25-00010     16953     PPW     Hemingway-Summer Lake 500 kV line          H500-SMLK(PPW) 
  PACW-NTLOAD(PPW) 
  SMLK-H500(PPW) 

  H500-SMLK(PPW) 
  PACW-NTLOAD(PPW) 
  SMLK-H500(PPW)   
  1500.0 
  9999.0 
  100.0 

  1500.0 
  9999.0 
  100.0   
  1500.0 
  9999.0 
  100.0 

  1500.0 
  9999.0 
  100.0   
  1500.0 
  9999.0 
  100.0 

  0.0 
  0.0 
  0.0   
  2025-04-01 08:00 
  2025-04-01 08:00 
  2025-04-01 08:00 

  2025-10-17 08:00 
  2025-10-17 08:00 
  2025-10-17 08:00   
  2025-09-14 18:00 
  2025-09-14 18:00 
  2025-09-14 18:00 

  2025-10-31 18:00 
  2025-10-31 18:00 
  2025-10-31 18:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Spacer Replacements:H500-SMLK & SMLK-H500 = 0; BORA-M500 = 959; Network Load Service Arrangements may be required for Southern Oregon Load.:     2024-04-30 09:25     144659     2024-12-20 09:45  
  PPW 25-08635     17922     PPW     BPA Captain Jack-Grizzly-Ponderosa #1 500 kV line          BPAT.PACW-PONDEROSA230(PPW)      267.0      267.0      267.0      2025-10-21 08:00      2025-10-21 09:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:DE-ENERGIZE LINE FOR DEADLINE SWITCHING AT POND:BPAT.PACW-PONDEROSA230 = 555 Summer/ 700 Winter:     2025-05-15 11:16     167741     2025-05-15 11:16  
  PPW 25-08632     17921     PPW     BPA Captain Jack-Grizzly-Ponderosa #1 500 kV line          BPAT.PACW-PONDEROSA230(PPW)      267.0      267.0      267.0      2025-10-31 14:00      2025-10-31 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:DE-ENERGIZE LINE FOR DEADLINE SWITCHING AT POND:BPAT.PACW-PONDEROSA230 = 555 Summer/ 700 Winter:     2025-05-15 11:14     167738     2025-05-15 11:14  
  PPW 25-10042     17988     PPW     Jim Bridger-Mustang 230 kV line,Mustang-WAPA Spence 230 kV line          JBSN-WYOCENTRAL(PPW) 
  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-JBSN(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  600.0 
  631.0 
  249.0 
  600.0 
  574.0 
  0.0 
  574.0   
  600.0 
  631.0 
  249.0 
  600.0 
  574.0 
  0.0 
  574.0   
  400.0 
  631.0 
  243.0 
  400.0 
  287.0 
  0.0 
  287.0   
  2025-11-19 07:15 
  2025-11-19 07:15 
  2025-11-19 07:15 
  2025-11-19 07:15 
  2025-11-19 07:15 
  2025-11-19 07:15 
  2025-11-19 07:15   
  2025-11-21 14:00 
  2025-11-21 14:00 
  2025-11-21 14:00 
  2025-11-21 14:00 
  2025-11-21 14:00 
  2025-11-21 14:00 
  2025-11-21 14:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Mustang: Remove 230 kV Shoo Fly:AW/4B Curve 121. WAPAEAST-WAPANORTH = 243. WYOEAST-AEOW (Aeolus West) = 1627. TOT4B-WYONORTH = 631. TOT 4B = 874. JBSN-WYOC & WYOC-JBSN = 400. Potential Real Time Impact to Wyoming Generation Great Divide will be radial from WAPA Spence via Mustang. Network Load Service Arrangements may be required.:     2025-06-10 12:20     169155     2025-06-10 12:50  
  PPW 26-00007     17980     PPW     Hemingway-Summer Lake 500 kV line          BORA-M500(PPW) 
  H500-SMLK(PPW) 
  PACW-NTLOAD(PPW) 
  SMLK-H500(PPW)   
  1090.0 
  1500.0 
  9999.0 
  100.0   
  1090.0 
  1500.0 
  9999.0 
  100.0   
  959.0 
  0.0 
  0.0 
  0.0   
  2026-05-11 08:00 
  2026-05-11 08:00 
  2026-05-11 08:00 
  2026-05-11 08:00   
  2026-05-22 18:00 
  2026-05-22 18:00 
  2026-05-22 18:00 
  2026-05-22 18:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Spacer Replacements:H500-SMLK & SMLK-H500 = 0; BORA-M500 = 959; Network Load Service Arrangements may be required for Southern Oregon Load.:     2025-06-09 09:44     168591     2025-06-09 09:46  