PPW Outages 
Aug 06, 2025 - Aug 10, 2026
Report created on Aug 10, 2025 at 21:20 (PPT)
Outage
Name
Outage
Id
Company Facility Flow
Gate
Segment/
JOTSFacility
Original
TTC In
Original
TTC Out
New
TTC
Start Time (PPT) Stop Time (PPT) Status Outage
Category
Outage
Type
Path
Impact
Report
TPs
Annotation Creation Time (PPT) EventId Last Updated (PPT)
  PPW 171983     10361     PPW     Riverton: 230 kV Cap Bank S/C 472               0.0      0.0      0.0      2021-02-18 09:03      2025-12-23 17:00      ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Riverton: 230 kV Cap Bank S/C 472:     2022-11-14 00:32     75797     2025-06-30 15:01  
  PPW 175805     9275     PPW     Hemingway-Summer Lake 500 kV line (Path 75 Schedule Limitation)          H500-SMLK(PPW) 

  H500-SMLK(PPW)   
  1500.0 

  1500.0   
  1500.0 

  1500.0   
  1386.0 

  1386.0   
  2021-06-02 12:00 

  2024-12-04 12:00   
  2024-12-04 12:00 

  2025-12-31 12:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Hemingway-Summer Lake 500 kV line (Path 75 Schedule Limitation)..:Path Restriction Notes: Path 75 Westbound = 1386.:     2021-12-21 14:06     80760     2024-12-04 08:04  
  PPW 24-00488     15058     PPW     Burns: Series Cap Segment #1 & 2          BORA-M500(PPW) 
  PACW-SMLK(PPW) 
  SMLK-H500(PPW) 

  BORA-M500(PPW) 
  PACW-SMLK(PPW) 
  SMLK-H500(PPW)   
  1090.0 
  550.0 
  100.0 

  1090.0 
  550.0 
  100.0   
  1090.0 
  550.0 
  100.0 

  1090.0 
  550.0 
  100.0   
  1090.0 
  550.0 
  100.0 

  1070.0 
  535.0 
  96.0   
  2024-01-09 03:48 
  2024-01-09 03:48 
  2024-01-09 03:48 

  2024-01-09 12:00 
  2024-01-09 12:00 
  2024-01-09 12:00   
  2024-01-09 12:00 
  2024-01-09 12:00 
  2024-01-09 12:00 

  2025-10-31 23:59 
  2025-10-31 23:59 
  2025-10-31 23:59   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Investigating a possible failure of relay voltage sensing component.:Path 75 limited to 507 (Midpoint Series Caps bypassed for maint). SMLK-H500 = 96; BORA-M500 = 959;:     2024-01-03 10:34     138306     2025-06-25 08:49  
  PPW 24-06062     16750     PPW     Path 25 Schedule Limitation (Cascade 115 kV Tie)          CRAGVIEW-PACW(PPW) 

  CRAGVIEW-PACW(PPW)   
  108.0 

  108.0   
  108.0 

  108.0   
  0.0 

  0.0   
  2024-04-09 00:00 

  2024-04-09 02:35   
  2024-04-09 02:35 

  2026-04-09 00:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:CRAGVIEW-PACW TTC = 0 PER PLANNING.:CRAGVIEW-PACW = 0 INDEFINITELY:     2024-04-09 09:34     143888     2025-04-07 18:15  
  PPW 24-10840     18116     PPW     Mercer: 345 kV Customer Tie-Line #6               0.0      0.0      0.0      2024-08-19 10:45      2025-08-20 17:00      ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous: **Commissioning required** Charging Authorization on relay package, Switch 10C5, Tie Line #6 Primary Metering, and Meta tie-line #6. Mercer: Add jumpers to load side of MOAB 10B86:     2025-07-09 09:54     148673     2025-08-07 08:50  
  PPW 24-15751     17530     PPW     Threemile Knoll: Series Cap C2,Threemile Knoll: Series Cap C1          JBSN-JB345(PPW) 
  NUT-PATHC(PPW) 
  PATHC-NUT(PPW) 

  NUT-PATHC(PPW) 

  NUT-PATHC(PPW) 

  JBSN-JB345(PPW) 
  PATHC-NUT(PPW)   
  1600.0 
  0.0 
  1600.0 

  1172.0 

  1060.0 

  1600.0 
  1600.0   
  1600.0 
  0.0 
  1600.0 

  1172.0 

  1060.0 

  1600.0 
  1600.0   
  1417.0 
  0.0 
  1600.0 

  1172.0 

  1060.0 

  1433.0 
  1480.0   
  2024-09-18 00:30 
  2024-09-18 00:30 
  2024-09-18 00:30 

  2024-11-01 00:00 

  2025-04-01 00:00 

  2025-06-09 19:09 
  2025-06-09 19:09   
  2025-06-09 19:09 
  2024-11-01 00:00 
  2025-06-09 19:09 

  2025-04-01 00:00 

  2025-06-09 19:09 

  2025-12-31 17:30 
  2025-12-31 17:30   
  ACTIVE     TRANSMISSION     FORCED      ONPATH     PPW     continuous:Computer/controller for Series caps needs to be repaired/replaced. Tech support needed from Hitachi.:JBSN-JB345 = 2150. PacifiCorp = 1433. IPCo = 717 NUT-PATHC = 730 Summer/730 Winter. PATHC-NUT = 1480 Summer/1560 Winter. JBSN-JB345 = 2150. PacifiCorp = 1433. IPCo = 717 NUT-PATHC = 950 Summer/951 Winter. PATHC-NUT = 1480 Summer/1580 Winter.:     2024-11-30 22:07     153619     2025-06-09 19:12  
  PPW 24-16609     17387     PPW     Oquirrh-Terminal #1 345 kV line               0.0      0.0      0.0      2024-10-25 07:52      2025-08-28 14:00      ACTIVE     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Relocate the Oquirrh-Terminal #1 345 kV line:No impact under normal conditions.:     2024-10-10 12:23     154477     2025-07-21 11:23  
  PPW 25-09144     18144     PPW     Fern Hill-Knappa Svensen section of the Astoria-BPA Driscoll 115 kV line,Knappa Svensen: KNAPPASV B1               0.0      0.0      0.0      2025-05-30 07:41      2025-08-11 15:00      ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Rebuild line section.:     2025-07-09 12:21     168251     2025-07-09 12:21  
  PPW 25-02017     17629     PPW     Crag View-PG&E Cascade section of the PG&E Cascade-Weed Junction 115 kV line          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  75.0   
  45.0 
  75.0   
  45.0 
  75.0   
  2025-06-30 06:00 
  2025-06-30 06:00   
  2025-10-31 17:00 
  2025-10-31 17:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Line reconductoring. Replacing structures.:CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0. CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0.:     2025-01-28 13:43     161094     2025-06-09 11:17  
  PPW 25-03418     17689     PPW     Crag View-PG&E Cascade section of the PG&E Cascade-Weed Junction 115 kV line          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  80.0   
  45.0 
  80.0   
  45.0 
  80.0   
  2025-06-30 07:00 
  2025-06-30 07:00   
  2025-10-31 17:00 
  2025-10-31 17:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Reconductor between structures.:CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0.:     2025-02-18 12:38     162500     2025-05-27 09:55  
  PPW 25-10324     17986     PPW     Crag View-PG&E Cascade section of the PG&E Cascade-Weed Junction 115 kV line          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW) 

  CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  75.0 

  45.0 
  75.0   
  45.0 
  75.0 

  45.0 
  75.0   
  45.0 
  75.0 

  0.0 
  0.0   
  2025-06-30 07:00 
  2025-06-30 07:00 

  2025-06-30 07:17 
  2025-06-30 07:17   
  2025-06-30 07:17 
  2025-06-30 07:17 

  2025-10-31 17:00 
  2025-10-31 17:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Line reconductoring. Replacing structures.:CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0. CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0.:     2025-06-10 10:10     169449     2025-06-30 07:18  
  PPW 25-12777     18102     PPW     Humbug Creek-Ruch section of the Humbug Creek-Jacksonville-Medford 69 kV line,Humbug Creek: SW 3R348               0.0      0.0      0.0      2025-07-09 09:23      2025-08-15 15:00      ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Change out 27 structures between 1/17 and 5/22 in the Ruch to Humbug Cr section of Line 32.:     2025-07-09 09:23     171909     2025-07-23 15:17  
  PPW 25-12844     18149     PPW     Parkway: CB 17,Carlisle: CB 11               0.0      0.0      0.0      2025-07-09 13:23      2025-09-09 15:00      ACTIVE     DISTRIBUTION     URGENT      ONPATH     PPW     continuous:Offload 2 MVA off PKW 17 onto CRL 11:     2025-07-09 13:23     171976     2025-07-09 13:43  
  PPW 25-12875     18166     PPW     DG&T Bonanza: Unit #1 Main Bank               0.0      0.0      0.0      2025-07-09 19:03      2025-08-22 23:00      ACTIVE     TRANSMISSION     FORCED      ONPATH     PPW     continuous:Investigate Unit trip:     2025-07-09 19:03     172007     2025-07-19 01:18  
  PPW 25-13375     18179     PPW     Cold Springs: XFMR 1 T-3169,Cold Springs: CS 1W27,Cold Springs: CB 3W120,Cold Springs-Hermiston 69 k               0.0      0.0      0.0      2025-07-17 07:44      2025-12-19 16:00      ACTIVE     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Replace T-3169, CB 3W120, SW 3W119:Umatilla, Hermiston & Hinkle will be radial from BPA McNary. Network Load Service Arrangements may be required. With Cold Springs XFMR #1 out of service, Echo Wind Generation will be tied to BPA McNary. Orchard Wind restricted to 8.5MW maximum output. Umatilla, Hermiston & Hinkle will be radial from BPA McNary. Network Load Service Arrangements may be required. With Cold Springs XFMR #1 out of service, Echo Wind Generation will be tied to BPA McNary. Orchard Wind required offline.:     2025-07-15 13:11     172511     2025-07-17 07:44  
  PPW 25-13805     18193     PPW     Jim Bridger-Mustang 230 kV line,Mustang-WAPA Spence 230 kV line,Jim Bridger: SWITCH 1H744          JBSN-WYOCENTRAL(PPW) 
  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-JBSN(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW) 

  JBSN-WYOCENTRAL(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-JBSN(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  600.0 
  631.0 
  249.0 
  600.0 
  574.0 
  0.0 
  574.0 

  600.0 
  249.0 
  600.0 
  574.0 
  0.0 
  574.0   
  600.0 
  631.0 
  249.0 
  600.0 
  574.0 
  0.0 
  574.0 

  600.0 
  249.0 
  600.0 
  574.0 
  0.0 
  574.0   
  400.0 
  631.0 
  243.0 
  400.0 
  287.0 
  0.0 
  287.0 

  400.0 
  243.0 
  400.0 
  287.0 
  0.0 
  287.0   
  2025-07-18 13:20 
  2025-07-18 13:20 
  2025-07-18 13:20 
  2025-07-18 13:20 
  2025-07-18 13:20 
  2025-07-18 13:20 
  2025-07-18 13:20 

  2025-08-08 15:00 
  2025-08-08 15:00 
  2025-08-08 15:00 
  2025-08-08 15:00 
  2025-08-08 15:00 
  2025-08-08 15:00   
  2025-08-08 15:00 
  2025-08-15 15:00 
  2025-08-08 15:00 
  2025-08-08 15:00 
  2025-08-08 15:00 
  2025-08-08 15:00 
  2025-08-08 15:00 

  2025-08-15 15:00 
  2025-08-15 15:00 
  2025-08-15 15:00 
  2025-08-15 15:00 
  2025-08-15 15:00 
  2025-08-15 15:00   
  ACTIVE     TRANSMISSION     FORCED      ONPATH     PPW     continuous:Fix Jim Bridger SW 1H744 Broken Blade :AW/4B Curve 121. WAPAEAST-WAPANORTH = 243. WYOCENTRAL-WYOEAST=287. TOT4B-WYONORTH = 631. TOT 4B = 874. JBSN-WYOC & WYOC-JBSN = 400. Potential Real Time Impact to Wyoming Generation Great Divide will be radial from WAPA Spence via Mustang. Network Load Service Arrangements may be required. AW/4B Curve 121. WAPAEAST-WAPANORTH = 243. WYOCENTRAL-WYOEAST=287. TOT4B-WYONORTH = 631. TOT 4B = 874. JBSN-WYOC & WYOC-JBSN = 400. Potential Real Time Impact to Wyoming Generation Great Divide will be radial from WAPA Spence via Mustang. Network Load Service Arrangements may be required.:     2025-07-18 13:26     172941     2025-08-02 03:44  
  PPW 25-14685     18209     PPW     Glen Canyon-Sigurd 230 kV line          GLENCANYON2-PACE(PPW) 
  PACE-GLENCANYON2(PPW) 

  GLENCANYON2-PACE(PPW) 
  PACE-GLENCANYON2(PPW)   
  300.0 
  250.0 

  300.0 
  250.0   
  300.0 
  250.0 

  300.0 
  250.0   
  0.0 
  0.0 

  0.0 
  0.0   
  2025-07-29 14:09 
  2025-07-29 14:09 

  2025-08-04 17:00 
  2025-08-04 17:00   
  2025-08-04 17:00 
  2025-08-04 17:00 

  2025-08-12 17:00 
  2025-08-12 17:00   
  ACTIVE     TRANSMISSION     FORCED      ONPATH     PPW     continuous:Fire approching line:GLENCANYON2-PACE & PACE-GLENCANYON2 (TOT 2B2) = 0.:     2025-07-29 14:10     173823     2025-08-04 10:44  
  PPW 25-10921     18015     PPW     Sheridan-Yellowtail 230 kV line          TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-AEOW(PPW) 
  WYONORTH-YTP(PPW) 
  YTP-WYONORTH(PPW) 

  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-AEOW(PPW) 
  WYONORTH-YTP(PPW) 
  YTP-WYONORTH(PPW)   
  631.0 
  249.0 
  0.0 
  400.0 
  400.0 

  631.0 
  249.0 
  0.0 
  400.0 
  400.0   
  631.0 
  249.0 
  0.0 
  400.0 
  400.0 

  631.0 
  249.0 
  0.0 
  400.0 
  400.0   
  490.0 
  189.0 
  0.0 
  241.0 
  241.0 

  631.0 
  249.0 
  0.0 
  400.0 
  400.0   
  2025-08-04 06:51 
  2025-08-04 06:51 
  2025-08-04 06:51 
  2025-08-04 06:51 
  2025-08-04 06:51 

  2025-08-08 10:28 
  2025-08-08 10:28 
  2025-08-08 10:28 
  2025-08-08 10:28 
  2025-08-08 10:28   
  2025-08-08 10:28 
  2025-08-08 10:28 
  2025-08-08 10:28 
  2025-08-08 10:28 
  2025-08-08 10:28 

  2025-08-18 16:00 
  2025-08-18 16:00 
  2025-08-18 16:00 
  2025-08-18 16:00 
  2025-08-18 16:00   
  Active     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Pole replacement and modifications:AW/4B Curve 109. WAPAEAST-WAPANORTH = 189. WYOEAST-AEOW (Aeolus West) = 1746. TOT4B-WYONORTH = 490. TOT 4B = 679. Potential Real Time Impact to Wyoming Generation. Yellowtail South limit to be determined by WAPA. YTP-WYONORTH & WYONORTH-YTP = 241. Yellowtail South = 376 total (Series 7).:     2025-06-20 09:48     170046     2025-06-20 09:48  
  PPW 25-15252     18237     PPW     Scheduling Limitation: Path 8 Schedule Limitation (MT-NW)          ANTE-MLCK(PPW) 
  COLSTRIP-TOWNSEND(PPW) 
  MLCK-ANTE(PPW)   
  66.0 
  157.0 
  90.0   
  66.0 
  157.0 
  90.0   
  66.0 
  157.0 
  90.0   
  2025-08-04 07:00 
  2025-08-04 07:00 
  2025-08-04 07:00   
  2025-08-08 15:00 
  2025-08-08 15:00 
  2025-08-08 15:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:TBD:COLSTRIP-TOWNSEND = 115; ANTE-MLCK = 49.:     2025-08-04 11:39     174391     2025-08-04 11:44  
  PPW 25-15022     18238     PPW     Scheduling Limitation: Path 8 Schedule Limitation (MT-NW)          ANTE-MLCK(PPW) 
  COLSTRIP-TOWNSEND(PPW) 
  MLCK-ANTE(PPW)   
  66.0 
  157.0 
  90.0   
  66.0 
  157.0 
  90.0   
  49.0 
  115.0 
  49.0   
  2025-08-04 07:00 
  2025-08-04 07:00 
  2025-08-04 07:00   
  2025-08-08 15:00 
  2025-08-08 15:00 
  2025-08-08 15:00   
  Completed     TRANSMISSION     URGENT      ONPATH     PPW     continuous:Replace insulators at various locations between 29-47 miles.:COLSTRIP-TOWNSEND = 115; ANTE-MLCK = 49:     2025-08-04 11:44     174161     2025-08-04 11:44  
  PPW 25-12653     18173     PPW     Sigurd-Sevier Tap section of the Sigurd-Sevier-Tushar 138kV line               0.0      0.0      0.0      2025-08-04 07:30      2025-08-07 17:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:change structures 20, 59 and 99:Granite Mountain Solar East and West restricted to a combined 80 MW.:     2025-07-11 13:59     171785     2025-07-31 15:23  
  PPW 25-11020     18170     PPW     Dixonville: 115 kV Bus Differential Relay,Dixonville: CB 2U4          HYDROGEN-PACW(PPW) 

  HYDROGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2025-08-04 09:00 

  2025-08-12 12:00   
  2025-08-12 12:00 

  2025-10-17 16:00   
  ACTIVE     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Remove and replace 115 kV Bus Differential Relay Scheme:Umpqua River (Toketee) Hydro Project restricted to 40 MW total generation.:     2025-07-11 10:59     170145     2025-08-08 12:06  
  PPW 25-03929     17736     PPW     Alturas-Cedarville Tap section of the Alturas-Bullard 115 kV line,Alturas: CB 2L22          OTHERGEN-PACW(PPW) 

  OTHERGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  0.0 

  0.0   
  2025-08-05 06:55 

  2025-08-05 07:00   
  2025-08-05 07:00 

  2025-08-08 13:30   
  Completed     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:REPLACE POLES 6/49 8/49 5/50 8/50 :Airport Solar and Garrett Solar restricted to 0 MW during switching.:     2025-03-06 13:59     163011     2025-08-05 06:55  
  PPW 25-13289     18175     PPW     West Cedar: CB 123,West Cedar: ABS 153A,West Cedar: CB B138               0.0      0.0      0.0      2025-08-05 07:30      2025-08-07 15:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Breaker Maintenance:     2025-07-14 14:19     172423     2025-07-14 15:24  
  PPW 25-13229     18174     PPW     Ekola Flats: 230/34.5 kV T2,Ekola Flats: 34.5kV Bus 2          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-08-06 07:30      2025-08-08 14:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install bird guarding.:Ekola Flats Feeders 11, 12, 13, 14, 15, 21, 22, 23, 24, and 25 unavailable (250MW total).:     2025-07-14 08:40     172361     2025-08-06 14:55  
  PPW 25-15453     18244     PPW     Ekola Flats: 230/34.5 kV T2,Ekola Flats: 230/34.5 kV T1          WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  0.0 

  9999.0   
  2025-08-06 09:11 

  2025-08-08 13:04   
  2025-08-08 13:04 

  2025-08-08 16:00   
  COMPLETED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install bird guarding.:Ekola Flats Feeders 21, 22, 23, 24, and 25 unavailable (125MW) Ekola Flats Feeder 11, 12, 13, 14, and 15 unavailable.:     2025-08-06 09:04     174592     2025-08-08 13:05  
  PPW 25-15507     18246     PPW     Aeolus-Clover 500 kV line          AEOLUS-CLOVER(PPW) 
  CLOVER-AEOLUS(PPW) 

  AEOLUS-CLOVER(PPW) 
  CLOVER-AEOLUS(PPW) 

  AEOLUS-CLOVER(PPW) 
  CLOVER-AEOLUS(PPW)   
  1394.0 
  1000.0 

  1394.0 
  1000.0 

  1394.0 
  1000.0   
  1394.0 
  1000.0 

  1394.0 
  1000.0 

  1394.0 
  1000.0   
  1394.0 
  1000.0 

  0.0 
  0.0 

  1394.0 
  1000.0   
  2025-08-06 15:30 
  2025-08-06 15:30 

  2025-08-06 15:35 
  2025-08-06 15:35 

  2025-08-07 12:57 
  2025-08-07 12:57   
  2025-08-06 15:35 
  2025-08-06 15:35 

  2025-08-07 12:57 
  2025-08-07 12:57 

  2025-08-07 18:00 
  2025-08-07 18:00   
  COMPLETED     TRANSMISSION     FORCED      ONPATH     PPW     continuous:Removed for SOP-203:AEOLUS-CLOVER=0; CLOVER-AEOLUS=0.:     2025-08-06 15:21     174646     2025-08-07 12:59  
  PPW 25-13479     18222     PPW     Brooklawn-Cameron section of the Cameron-Milford 46kV line          OTHERGEN-PACE(PPW) 
  THERMALGEN-PACE(PPW)   
  9999.0 
  9999.0   
  9999.0 
  9999.0   
  0.0 
  0.0   
  2025-08-06 19:50 
  2025-08-06 19:50   
  2025-08-07 04:30 
  2025-08-07 04:30   
  Completed     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace broken insulators "A" condition:Generation Offline: South Milford (Intermountain Geothermal), Blue Knoll Gas (Blue Mountain Energy), Smithfield Farms (Murphy Brown) Solar, Milford Flat Solar, Laho Solar (Brookville), Milford 1 Solar, Milford 12 Solar, Granite Peak Solar (Brookville), Milford 2 (MaxGen Services). Blundell Units 1 and 2: Total generation output limited to 30MW maximum.:     2025-07-31 10:44     172615     2025-08-06 19:51  
  PPW 25-15518     18247     PPW     Wallula-Walla Walla 230 kV line          WALLAWALLA-WALLULA(PPW) 
  WALLULA-WALLAWALLA(PPW)   
  402.0 
  480.0   
  402.0 
  480.0   
  402.0 
  480.0   
  2025-08-06 23:44 
  2025-08-06 23:44   
  2025-08-09 17:00 
  2025-08-09 17:00   
  COMPLETED     TRANSMISSION     FORCED      ONPATH     PPW     continuous:tripped and failed test:WALLAWALLA-WALLULA, WALLULA-WALLAWALLA = 0.:     2025-08-06 23:44     174659     2025-08-07 20:43  
  PPW 25-13480     18207     PPW     Cameron-Milford 138kV line          OTHERGEN-PACE(PPW) 
  THERMALGEN-PACE(PPW)   
  9999.0 
  9999.0   
  9999.0 
  9999.0   
  30.0 
  0.0   
  2025-08-07 00:00 
  2025-08-07 00:00   
  2025-08-07 04:30 
  2025-08-07 04:30   
  Completed     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace broken insulators "A" condition:Generation Offline: South Milford (Intermountain Geothermal), Blue Knoll Gas (Blue Mountain Energy), Smithfield Farms (Murphy Brown) Solar, Milford Flat Solar, Laho Solar (Brookville), Milford 1 Solar, Milford 12 Solar, Granite Peak Solar (Brookville), Milford 2 (MaxGen Services). Blundell Units 1 and 2: Total generation output limited to 30MW maximum.:     2025-07-28 07:49     172616     2025-07-31 10:48  
  PPW 25-15519     18248     PPW     Jim Bridger-Threemile Knoll 345 kV line          JB345-TMK(PPW) 
  JBSN-JB345(PPW) 
  NUT-PATHC(PPW) 
  PATHC-NUT(PPW) 
  TMK-JB345(PPW) 

  JB345-TMK(PPW) 
  JBSN-JB345(PPW) 
  NUT-PATHC(PPW) 
  PATHC-NUT(PPW) 
  TMK-JB345(PPW)   
  533.0 
  1600.0 
  1060.0 
  1600.0 
  317.0 

  533.0 
  1600.0 
  1060.0 
  1600.0 
  317.0   
  533.0 
  1600.0 
  1060.0 
  1600.0 
  317.0 

  533.0 
  1600.0 
  1060.0 
  1600.0 
  317.0   
  0.0 
  1033.0 
  400.0 
  1100.0 
  0.0 

  533.0 
  1600.0 
  1060.0 
  1600.0 
  317.0   
  2025-08-07 01:34 
  2025-08-07 01:34 
  2025-08-07 01:34 
  2025-08-07 01:34 
  2025-08-07 01:34 

  2025-08-07 08:12 
  2025-08-07 08:12 
  2025-08-07 08:12 
  2025-08-07 08:12 
  2025-08-07 08:12   
  2025-08-07 08:12 
  2025-08-07 08:12 
  2025-08-07 08:12 
  2025-08-07 08:12 
  2025-08-07 08:12 

  2025-08-08 17:00 
  2025-08-08 17:00 
  2025-08-08 17:00 
  2025-08-08 17:00 
  2025-08-08 17:00   
  COMPLETED     TRANSMISSION     FORCED      ONPATH     PPW     continuous:Line tripped. :JBSN-JB345 = 1600. PacifiCorp = 1067. IPCo = 533. Potential Real Time Impact to Jim Bridger Generation. JB345-TMK & TMK-JB345= 0 NUT-PATHC = 800 Summer/900 Winter. PATHC-NUT = 1025 Summer/1275 Winter.:     2025-08-07 01:36     174660     2025-08-07 08:12  
  PPW 25-15521     18249     PPW     Fish Creek - Grace 161 kV line,Goshen-Fish Creek 161 kV line          GSHN-PATHC(PPW) 
  NUT-PATHC(PPW) 
  PATHC-GSHN(PPW) 

  GSHN-PATHC(PPW) 
  NUT-PATHC(PPW) 
  PATHC-GSHN(PPW)   
  348.0 
  1060.0 
  148.0 

  348.0 
  1060.0 
  148.0   
  348.0 
  1060.0 
  148.0 

  348.0 
  1060.0 
  148.0   
  200.0 
  400.0 
  0.0 

  348.0 
  1060.0 
  148.0   
  2025-08-07 04:42 
  2025-08-07 04:42 
  2025-08-07 04:42 

  2025-08-07 06:12 
  2025-08-07 06:12 
  2025-08-07 06:12   
  2025-08-07 06:12 
  2025-08-07 06:12 
  2025-08-07 06:12 

  2025-08-07 17:00 
  2025-08-07 17:00 
  2025-08-07 17:00   
  COMPLETED     TRANSMISSION     FORCED      ONPATH     PPW     continuous:line tripped OOS:NUT-PATHC = 900 GSHN-PATHC = 200. PATHC-GSHN = 0 NUT-PATHC = 900 GSHN-PATHC = 200. PATHC-GSHN = 0:     2025-08-07 04:43     174662     2025-08-07 12:42  
  PPW 25-15483     18245     PPW     BPA, Chehalis: Chehalis Gen Dropping Scheme          THERMALGEN-PACW(PPW) 

  THERMALGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  0.0 

  9999.0   
  2025-08-07 07:00 

  2025-10-04 21:00   
  2025-08-07 09:00 

  2025-10-05 06:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Trip-testing unit with circuit.:Chehalis Unit 3 unavailable.:     2025-08-06 13:00     174622     2025-08-06 13:38  
  PPW 25-14920     18223     PPW     Jim Bridger-Mustang 230 kV line          JBSN-WYOCENTRAL(PPW) 
  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-JBSN(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  600.0 
  631.0 
  249.0 
  600.0 
  574.0 
  0.0 
  574.0   
  600.0 
  631.0 
  249.0 
  600.0 
  574.0 
  0.0 
  574.0   
  600.0 
  631.0 
  249.0 
  600.0 
  574.0 
  0.0 
  574.0   
  2025-08-07 07:00 
  2025-08-07 07:00 
  2025-08-07 07:00 
  2025-08-07 07:00 
  2025-08-07 07:00 
  2025-08-07 07:00 
  2025-08-07 07:00   
  2025-08-14 14:00 
  2025-08-14 14:00 
  2025-08-14 14:00 
  2025-08-14 14:00 
  2025-08-14 14:00 
  2025-08-14 14:00 
  2025-08-14 14:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Repair Sw 1H744 at Jim Bridger:AW/4B Curve 121. WAPAEAST-WAPANORTH = 243. WYOCENTRAL-WYOEAST=287. TOT4B-WYONORTH = 631. TOT 4B = 874. JBSN-WYOC & WYOC-JBSN = 400. Potential Real Time Impact to Wyoming Generation Great Divide will be radial from WAPA Spence via Mustang. Network Load Service Arrangements may be required.:     2025-07-31 10:53     174059     2025-08-02 03:44  
  PPW 25-03424     17862     PPW     Ekola Flats: 230/34.5 kV T1,Ekola Flats: 34.5kV Bus 1          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-08-07 09:00      2025-08-07 18:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install bird guarding.:Ekola Flats Feeder 11, 12, 13, 14, and 15 unavailable (125MW).:     2025-04-18 14:39     162506     2025-05-01 10:21  
  PPW 25-15029     18228     PPW     NWMT Broadview-Garrison #2 500 kV line          ANTE-MLCK(PPW) 
  COLSTRIP-TOWNSEND(PPW) 
  NW-MT-BPAT.NWMT(PPW)   
  66.0 
  157.0 
  45.0   
  66.0 
  157.0 
  45.0   
  56.0 
  133.0 
  46.0   
  2025-08-07 13:00 
  2025-08-07 13:00 
  2025-08-07 13:00   
  2025-08-07 14:00 
  2025-08-07 14:00 
  2025-08-07 14:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Pacificorp limited to 46 MW transmission on NW-MT to BPAT.NWMT and the NWMT.SYSTEM-TOWNSEND:COLSTRIP-TOWNSEND = 133. ANTE-MLCK = 56:     2025-08-01 10:31     174168     2025-08-01 10:31  
  PPW 25-15685     18250     PPW     Populus: 345 kV Series Capacitor #1          JBSN-JB345(PPW) 

  JBSN-JB345(PPW)   
  1600.0 

  1600.0   
  1600.0 

  1600.0   
  1433.0 

  1433.0   
  2025-08-08 08:35 

  2025-08-08 12:33   
  2025-08-08 12:33 

  2025-08-11 17:00   
  ACTIVE     TRANSMISSION     FORCED      ONPATH     PPW     continuous:investigate SERIES CAP 1 CRIT alarm at Populus:JBSN-JB345 = 2150. PacifiCorp = 1433. IPCo = 717.:     2025-08-08 08:35     174826     2025-08-08 12:02  
  PPW 25-03426     17863     PPW     Ekola Flats: 230/34.5 kV T2,Ekola Flats: 34.5kV Bus 2          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2025-08-08 09:00      2025-08-08 18:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install bird guarding.:Ekola Flats Feeders 21, 22, 23, 24, and 25 unavailable (125MW).:     2025-04-18 14:50     162508     2025-05-01 10:21  
  PPW 25-15764     18257     PPW     Craven Creek: SCADA/RTU,Chappel Creek-Craven Creek 230 kV line,Craven Creek-Monument 230 kV line,Cra               0.0      0.0      0.0      2025-08-09 00:13      2025-08-10 18:00      Completed     TRANSMISSION     FORCED      ONPATH     PPW     continuous:Fiber system has suffered material failure - resulting in a loss of relay communication in the area.:     2025-08-09 00:13     174905     2025-08-09 00:13  
  PPW 25-13273     18177     PPW     Walla Walla-AVA Saddle Mountain 230 kV line,Walla Walla: LINE MOAB 1W2          MIDC-WALLAWALLA(PPW) 
  WALLAWALLA-MIDC(PPW)   
  240.0 
  240.0   
  240.0 
  240.0   
  0.0 
  0.0   
  2025-08-11 08:00 
  2025-08-11 08:00   
  2025-08-13 17:00 
  2025-08-13 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace structure 4/014 and reframe structures 2/004 and 4/003:MIDC-WALLAWALLA & WALLAWALLA-MIDC = 0. Affects Stateline Wind deliveries to Wanapum & Avista Dry Creek. Affects Avistas Transfer Rights from Wanapum to Dry Creek. Affects ability to deliver Network Load Service from the Walla Walla Area to the Yakima Area. Affects ability to deliver Network Load Service from Mid-Columbia to the Walla Walla Area.:     2025-07-15 10:16     172407     2025-07-15 10:19  
  PPW 25-15397     18243     PPW     Gadsby: Gadsby Unit 1 GSU XFMR 1,Gadsby: Gadsby Unit 1 GSU XFMR 2          THERMALGEN-PACE(PPW)      9999.0      9999.0      0.0      2025-08-12 06:00      2025-09-12 17:00      SCHEDULED     TRANSMISSION     OPPORTUNITY      ONPATH     PPW     continuous:Fire system scaffold setup and work.:Gadsby Unit #1 unavailable.:     2025-08-05 14:27     174536     2025-08-06 09:19  
  PPW 25-07023     18201     PPW     Naughton-Treasureton 230 kV line          NUT-PATHC(PPW)      1060.0      1060.0      850.0      2025-08-13 08:00      2025-08-15 14:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:A-condition str replacement :NUT-PATHC = 850 Summer/ 900 Winter.:     2025-07-24 13:37     166125     2025-07-24 13:41  
  PPW 25-13276     18198     PPW     Athena-Weston section of the Pendleton-Walla Walla 69 kV line,Weston (OR): SW 3W31          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-08-14 09:00      2025-08-14 16:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Reframing structure due to car vs. pole damage:Combine Hills Generation is restricted to 20 MW only during the line switching process (at the beginning and end of the line outage). Chopin Wind is restricted to 0 MW for the whole duration while tied to Central.:     2025-07-23 08:55     172410     2025-07-23 08:57  
  PPW 25-14300     18255     PPW     Riverton-Atlantic City 230 kV line               0.0      0.0      0.0      2025-08-15 07:00      2025-08-15 14:00      SCHEDULED     TELECOM     PLANNED      ONPATH     PPW     continuous:Perform WECC Critical maintenance on Powerline Carrier between Atlantic City Sub and Riverton Sub. Zone 1 protection will in service during maintenance.:     2025-08-08 14:29     173436     2025-08-08 14:29  
  PPW 25-15691     18252     PPW     Scheduling Limitation: Path 8 Schedule Limitation (MT-NW)          ANTE-MLCK(PPW) 
  COLSTRIP-TOWNSEND(PPW) 
  MLCK-ANTE(PPW)   
  66.0 
  157.0 
  90.0   
  66.0 
  157.0 
  90.0   
  46.0 
  109.0 
  46.0   
  2025-08-18 07:00 
  2025-08-18 07:00 
  2025-08-18 07:00   
  2025-08-21 17:00 
  2025-08-21 17:00 
  2025-08-21 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Connect new ABSW #30L.:COLSTRIP-TOWNSEND = 109; ANTE-MLCK = 46:     2025-08-08 09:05     174832     2025-08-08 09:05  
  PPW 25-14552     18219     PPW     Firehole-WAPA Flaming Gorge 230 kV line,WAPA Flaming Gorge: FLAMINGG TD.173...138,Little Mtn-Flaming          FGE-WYOCENTRAL(PPW) 
  OTHERGEN-PACE(PPW) 
  WYOCENTRAL-FGE(PPW)   
  200.0 
  9999.0 
  200.0   
  200.0 
  9999.0 
  200.0   
  0.0 
  9999.0 
  0.0   
  2025-08-18 07:00 
  2025-08-18 07:00 
  2025-08-18 07:00   
  2025-08-18 14:00 
  2025-08-18 14:00 
  2025-08-18 14:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Perform WECC Critical maintenance on Powerline Carrier between Firehole Substation and WAPA Flaming Gorge Sub. Zone 1 protection will in service during maintenance.:Flaming Gorge aggregate generation limited below 90MW. FGE-WYOC = 0. WYOC-FGE = 0:     2025-07-31 08:53     173688     2025-08-06 11:04  
  PPW 25-11120     18005     PPW     Merwin: MERWIN GR.UNIT3          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-08-18 07:00      2025-08-27 18:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Annual maintenance and runner welding. Headgate lowered and penstock DEWATERED.:Merwin Unit 3 unavailable.:     2025-06-18 11:24     170246     2025-06-18 11:24  
  PPW 25-13277     18178     PPW     Wallula-Walla Walla 230 kV line,Walla Walla: LINE MOAB 1W12          WALLAWALLA-WALLULA(PPW) 
  WALLULA-WALLAWALLA(PPW)   
  402.0 
  480.0   
  402.0 
  480.0   
  0.0 
  0.0   
  2025-08-18 08:00 
  2025-08-18 08:00   
  2025-08-20 17:00 
  2025-08-20 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replacing cross arm on 6/050 and 1 other location. Also replacing lightning arrester on 3/039:WALLAWALLA-WALLULA, WALLULA-WALLAWALLA = 0.:     2025-07-15 11:21     172411     2025-07-15 11:22  
  PPW 25-03627     18235     PPW     Prospect Central: T-3069,70,71,Prospect Central: Sw 2R264,Prospect Central: SW 3R105,Prospect Centra          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-08-18 09:00      2025-09-12 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Remove existing XFMR relays and add new SEL-387E relay panel.:Prospect Hydro Project generation restricted to 14 MW.:     2025-08-04 09:39     162709     2025-08-04 09:39  
  PPW 25-09891     17969     PPW     Crag View-Weed Junction section of the PG&E Cascade-Weed Junction 115 kV line,Lassen: SW 3G24,Crag V          CRAGVIEW-CRAG(PPW) 
  CRAGVIEW-PACW(PPW) 
  PACW-NTLOAD(PPW) 

  CRAGVIEW-CRAG(PPW) 
  CRAGVIEW-PACW(PPW) 

  CRAGVIEW-CRAG(PPW) 
  CRAGVIEW-PACW(PPW)   
  75.0 
  108.0 
  9999.0 

  75.0 
  108.0 

  75.0 
  108.0   
  75.0 
  108.0 
  9999.0 

  75.0 
  108.0 

  75.0 
  108.0   
  75.0 
  108.0 
  9999.0 

  75.0 
  108.0 

  0.0 
  0.0   
  2025-06-25 06:00 
  2025-06-25 06:00 
  2025-06-25 06:00 

  2025-07-16 06:00 
  2025-07-16 06:00 

  2025-08-19 06:00 
  2025-08-19 06:00   
  2025-06-27 18:30 
  2025-06-27 18:30 
  2025-06-27 18:30 

  2025-07-18 18:30 
  2025-07-18 18:30 

  2025-08-21 18:30 
  2025-08-21 18:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Change structures 2/48-2/55:CRAGVIEW-PACW & PACW-CRAGVIEW = 0; CRAGVIEW-CRAG = 0; CRAG-CRAGVIEW = Crag View Load (Approx 10 mw); Crag View will be radial from Weed Junction.:     2025-06-05 08:53     169003     2025-07-11 11:58  
  PPW 25-13278     18217     PPW     Umapine-Pine Creek Tap 69kV Line,Weston (OR): SW 3W31          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-08-21 08:30      2025-08-21 17:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replacing structure 9/034 near HWY 11 and Sunny Side Rd, MF.:Combine Hills and Chopin Wind Generation is restricted to 20 MW for the whole duration while tied to Pendleton. Chopin Wind is restricted to 0 MW only during the line switching process (at the beginning and end of the line outage).:     2025-07-31 07:30     172412     2025-07-31 07:30  
  PPW 25-14771     18211     PPW     Carr Draw-Wyodak 230 kV line          TOT4B-WYODAK(PPW) 
  WYODAK-TOT4B(PPW)   
  383.0 
  383.0   
  383.0 
  383.0   
  0.0 
  0.0   
  2025-08-23 06:00 
  2025-08-23 06:00   
  2025-08-31 16:00 
  2025-08-31 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:"A" condition Work:WYODAK-TOT4B & TOT4B-WYODAK = 0. Alternate Transmission Arrangements may be required for WyoDak Area Generation or to serve PacifiCorp Load.:     2025-07-30 11:32     173909     2025-07-30 11:32  
  PPW 25-13951     18196     PPW     Buffalo-Carr Draw 230 kV line          TOT4B-WYODAK(PPW) 
  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYODAK-TOT4B(PPW)   
  383.0 
  631.0 
  249.0 
  383.0   
  383.0 
  631.0 
  249.0 
  383.0   
  383.0 
  631.0 
  249.0 
  383.0   
  2025-08-23 06:00 
  2025-08-23 06:00 
  2025-08-23 06:00 
  2025-08-23 06:00   
  2025-08-31 16:00 
  2025-08-31 16:00 
  2025-08-31 16:00 
  2025-08-31 16:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:"A" condition Work:Path Restriction Notes: WYODAK-TOT4B =0 WAPAEAST-WAPANORTH = 239:     2025-07-21 15:20     173087     2025-07-30 11:25  
  PPW 25-03490     17720     PPW     Atlantic City: CB 1H120,Atlantic City: SW 1H118,Atlantic City-Rock Springs 230 kV line,Rock Springs:          TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW) 

  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW) 

  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  571.0 
  235.0 
  287.0 
  0.0 
  287.0   
  2025-06-02 07:00 
  2025-06-02 07:00 
  2025-06-02 07:00 
  2025-06-02 07:00 
  2025-06-02 07:00 

  2025-07-28 07:00 
  2025-07-28 07:00 
  2025-07-28 07:00 
  2025-07-28 07:00 
  2025-07-28 07:00 

  2025-08-25 07:00 
  2025-08-25 07:00 
  2025-08-25 07:00 
  2025-08-25 07:00 
  2025-08-25 07:00   
  2025-06-04 10:00 
  2025-06-04 10:00 
  2025-06-04 10:00 
  2025-06-04 10:00 
  2025-06-04 10:00 

  2025-07-30 10:00 
  2025-07-30 10:00 
  2025-07-30 10:00 
  2025-07-30 10:00 
  2025-07-30 10:00 

  2025-08-27 10:00 
  2025-08-27 10:00 
  2025-08-27 10:00 
  2025-08-27 10:00 
  2025-08-27 10:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Breaker Minor Maintenance:AW/4B Curve 117. WAPAEAST-WAPANORTH = 235. WYOEAST-AEOW (Aeolus West) = 1632. TOT4B-WYONORTH = 571. TOT 4B = 806. Potential Real Time Impact to Wyoming Generation:     2025-02-27 14:05     162572     2025-07-28 13:46  
  PPW 25-13622     18208     PPW     Craven Creek-Naughton 230 kV line          NUT-TRONA(PPW) 
  TRONA-NUT(PPW)   
  407.0 
  475.0   
  407.0 
  475.0   
  401.0 
  401.0   
  2025-08-25 08:00 
  2025-08-25 08:00   
  2025-08-29 11:00 
  2025-08-29 11:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:B-condition insulator replacement:NUT-TRONA & TRONA-NUT = 401 Summer/475 Winter:     2025-07-29 11:55     172758     2025-07-29 11:55  
  PPW 25-13407     18188     PPW     Yale Runback RAS          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-08-25 08:00      2025-10-02 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Upgrade the Yale Runback RAS to comply with FERC Order881 Mandated Upgrades:Yale and Merwin total output limited to 175MW maximum.:     2025-07-18 09:19     172543     2025-07-18 09:19  
  PPW 25-13049     18189     PPW     Merwin-BPA Cardwell 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-08-25 08:00      2025-08-29 17:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace RAS Relays for BPA Cardwell Bay.:Possible real time restriction of Merwin and Yale generation.:     2025-07-18 09:56     172181     2025-07-18 09:59  
  PPW 25-15743     18254     PPW     Pickett-Stonebridge 230 kV line,Pickett: SW 1L204          OTHERGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-08-25 20:00      2025-08-26 05:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:We would like to test and operate our 89L1 and to do that. We need the incoming line deenergized:     2025-08-08 14:29     174884     2025-08-08 14:29  
  PPW 25-15744     18256     PPW     Pickett-Stonebridge 230 kV line,Pickett: SW 1L204          OTHERGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-08-26 08:00      2025-08-27 05:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:We would like to test and operate our 89L1 and to do that. We need the incoming line deenergized:     2025-08-08 14:31     174885     2025-08-08 14:31  
  PPW 25-15674     18258     PPW     Mile Hi: CB 5L104               0.0      0.0      0.0      2025-08-26 08:00      2025-08-26 16:00      SCHEDULED     DISTRIBUTION     PLANNED      ONPATH     PPW     continuous:Relay setting change and test.:Metzger Solar reduced to 0 MW for the duration.:     2025-08-09 12:00     174815     2025-08-09 12:00  
  PPW 25-15692     18259     PPW     Mile Hi: CB 5L105               0.0      0.0      0.0      2025-08-27 08:00      2025-08-27 16:00      SCHEDULED     DISTRIBUTION     PLANNED      ONPATH     PPW     continuous:Relay setting change and testing.:Black Cap Solar reduced to 0 MW for the duration.:     2025-08-09 12:00     174833     2025-08-09 12:00  
  PPW 25-03491     17721     PPW     Atlantic City: LINE CB 1H116,Atlantic City: SW 1H118,Wyopo: LINERUPTOR 1H99,Wyopo-Atlantic City sect          TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW) 

  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW) 

  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0   
  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  631.0 
  249.0 
  574.0 
  0.0 
  574.0 

  571.0 
  235.0 
  287.0 
  0.0 
  287.0   
  2025-06-04 11:00 
  2025-06-04 11:00 
  2025-06-04 11:00 
  2025-06-04 11:00 
  2025-06-04 11:00 

  2025-07-30 11:00 
  2025-07-30 11:00 
  2025-07-30 11:00 
  2025-07-30 11:00 
  2025-07-30 11:00 

  2025-08-27 11:00 
  2025-08-27 11:00 
  2025-08-27 11:00 
  2025-08-27 11:00 
  2025-08-27 11:00   
  2025-06-06 16:30 
  2025-06-06 16:30 
  2025-06-06 16:30 
  2025-06-06 16:30 
  2025-06-06 16:30 

  2025-08-01 16:30 
  2025-08-01 16:30 
  2025-08-01 16:30 
  2025-08-01 16:30 
  2025-08-01 16:30 

  2025-08-29 16:30 
  2025-08-29 16:30 
  2025-08-29 16:30 
  2025-08-29 16:30 
  2025-08-29 16:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Breaker Minor Maintenance 1H116:AW/4B Curve 117. WAPAEAST-WAPANORTH = 235. WYOEAST-AEOW (Aeolus West) = 1632. TOT4B-WYONORTH = 571. TOT 4B = 806. Potential Real Time Impact to Wyoming Generation:     2025-02-27 14:17     162573     2025-07-28 13:44  
  PPW 25-03360     17687     PPW     Dave Johnston-TSGT Laramie River Station 230 kV line          DJ-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-DJ(PPW)   
  790.0 
  0.0 
  790.0   
  790.0 
  0.0 
  790.0   
  442.0 
  0.0 
  442.0   
  2025-09-02 07:00 
  2025-09-02 07:00 
  2025-09-02 07:00   
  2025-09-19 15:00 
  2025-09-19 15:00 
  2025-09-19 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:2025 structure replacements.:DJ-WYOEAST & WYOEAST-DJ = 442 (Dave Johnston-WAPA Stegall 230 kV line rating):     2025-02-17 14:22     162442     2025-02-17 14:28  
  PPW 25-13051     18190     PPW     Merwin-View Tap section of the Merwin-CCPD Cherry Grove 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-09-02 08:00      2025-09-05 17:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace the RAS Relays in Cherry Grove (Battleground) Line Bay:May be Slight Impact on South of Allston Path. Eliminates Merwin/Yale Generation Delivery to the Portland Load Area.:     2025-07-18 10:13     172183     2025-07-18 10:24  
  PPW 25-15533     18253     PPW     Ben Lomond-Terminal #1 345 kV line          NUT-PACE(PPW) 
  PACE-NUT(PPW)   
  2563.0 
  2563.0   
  2563.0 
  2563.0   
  1331.0 
  1331.0   
  2025-09-02 08:00 
  2025-09-02 08:00   
  2025-09-02 11:47 
  2025-09-02 11:47   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:A-condition insulator replacement:NUT-PACE & PACE-NUT = 1331.:     2025-08-08 11:16     174674     2025-08-08 11:35  
  PPW 25-07188     17870     PPW     Fry-Parrish Gap 230 kV line          PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW)   
  325.0 
  325.0 

  325.0 
  325.0 

  325.0 
  325.0   
  325.0 
  325.0 

  325.0 
  325.0 

  325.0 
  325.0   
  325.0 
  325.0 

  325.0 
  325.0 

  159.0 
  159.0   
  2025-08-04 22:00 
  2025-08-04 22:00 

  2025-09-01 22:00 
  2025-09-01 22:00 

  2025-09-02 22:00 
  2025-09-02 22:00   
  2025-08-05 08:00 
  2025-08-05 08:00 

  2025-09-02 08:00 
  2025-09-02 08:00 

  2025-09-03 02:00 
  2025-09-03 02:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace arm at structure 4/1:PACW-PGE.PACW & PACW.PGE-PACW = 159 Summer/149 Winter Network Load Service Arrangements may be required.:     2025-04-22 14:03     166290     2025-06-20 12:07  
  PPW 25-13366     18195     PPW     Aeolus-Clover 500 kV line,Aeolus: 11G59,Clover: SW 11B117,Little Snake: SW 11B5,Coyote: SW 11B5,Coyo          AEOLUS-CLOVER(PPW) 
  CLOVER-AEOLUS(PPW) 

  AEOLUS-CLOVER(PPW) 
  CLOVER-AEOLUS(PPW)   
  1394.0 
  1000.0 

  1394.0 
  1000.0   
  1394.0 
  1000.0 

  1394.0 
  1000.0   
  0.0 
  0.0 

  0.0 
  0.0   
  2025-09-03 06:30 
  2025-09-03 06:30 

  2025-09-03 10:30 
  2025-09-03 10:30   
  2025-09-03 07:30 
  2025-09-03 07:30 

  2025-09-03 11:30 
  2025-09-03 11:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Switch work on Aeolus 11G59, Little Snake 11B5, Coyote SW's 11B5 and 11B10, Clover SW 1B117 in prep for 25-08524:CLOVER-AEOLUS and AEOLUS-CLOVER=0 DURING SWITCHING ONLY.:     2025-07-21 10:56     172502     2025-07-31 10:48  
  PPW 25-09785     18184     PPW     Gala Solar-Ponderosa 115 kV line               0.0      0.0      0.0      2025-09-03 10:00      2025-09-03 14:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:AGC Meter Testing; AGC will need to be put on backup while the primary meter is under test.:     2025-07-17 10:45     168894     2025-07-17 10:45  
  PPW 25-07192     17871     PPW     Fry-Calapooya section of the Diamond Hill-Fry 230 kV line          PACW-NTLOAD(PPW) 

  PACW-NTLOAD(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2025-08-05 22:00 

  2025-09-03 22:00   
  2025-08-06 08:00 

  2025-09-04 08:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace arms at structure 4/14:Network Load Service must be arranged for Calapooya, Diamond Hill & EWEB McKenzie. Eliminates ability to move Network Load Service from Alvey to Gresham. Eliminates C&T Point to Point Service from Troutdale to Summer Lake.:     2025-04-22 14:06     166294     2025-07-02 13:45  
  PPW 25-13284     18242     PPW     Pendleton-Athena section of the Pendleton-Walla Walla 69 kV line,Weston (OR): SW 3W31          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-09-04 09:00      2025-09-04 17:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replacing structure:Combine Hills Generation is restricted to 20 MW only during the line switching process (at the beginning and end of the line outage). Chopin Wind is restricted to 0 MW for the whole duration while tied to Central:     2025-08-05 09:30     172418     2025-08-05 09:30  
  PPW 25-04835     18040     PPW     Weed Junction: WEEDJUNC CS 2G50,Weed Junction: SW 2G27,Weed Junction: PST T-3726               0.0      0.0      0.0      2025-09-07 08:00      2025-09-19 14:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:TCOH on Phase shifter at weed JCT:     2025-07-02 08:32     163923     2025-08-09 10:08  
  PPW 25-03417     17688     PPW     Malin-PG&E Round Mountain #1 500 kV line          MALIN500-RDM500(PPW) 
  RDM500-MALIN500(PPW) 

  MALIN500-RDM500(PPW) 
  RDM500-MALIN500(PPW)   
  800.0 
  612.0 

  800.0 
  612.0   
  800.0 
  612.0 

  800.0 
  612.0   
  625.0 
  416.0 

  800.0 
  612.0   
  2025-09-08 06:00 
  2025-09-08 06:00 

  2025-09-29 06:00 
  2025-09-29 06:00   
  2025-09-12 17:00 
  2025-09-12 17:00 

  2025-10-03 17:00 
  2025-10-03 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install lab measurement and fault initiating test equipment on primary conductors (Grounded).:MALIN500-RDM500 = 625. RDM500-MALIN500 = 416.:     2025-02-18 12:23     162499     2025-04-10 08:52  
  PPW 25-05028     17750     PPW     Pryor Mountain Wind: 34.5kV Bus 2,Pryor Mountain Wind: 34.5kV Bus 1          WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2025-07-07 08:00 

  2025-09-08 08:00   
  2025-07-09 11:00 

  2025-09-10 11:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian protection.:Pryor Mountain Wind unavailable.:     2025-03-14 11:07     164124     2025-03-17 12:01  
  PPW 25-05029     17751     PPW     Circuit 1,Circuit 2,Circuit 3,Circuit 4,Circuit 5,Circuit 6,Pryor Mountain Wind: 34.5kV Bus 1          WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  0.0 

  9999.0   
  2025-07-09 11:00 

  2025-09-08 08:00   
  2025-07-11 16:00 

  2025-09-12 16:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install avian protection.:Pryor Mountain Wind circuits 1-6 (120.6MW) unavailable.:     2025-03-14 11:21     164125     2025-03-17 12:03  
  PPW 25-13052     18191     PPW     Ariel-Merwin section of the Merwin-Cowlitz PUD Lewis River 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-09-08 08:00      2025-09-12 17:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace the RAS Relays in Lewis River Bay at Merwin.:May be Slight Impact on South of Allston Path. Eliminates Merwin/Yale Generation Delivery to the Portland Load Area. Possible real time restriction of Merwin and Yale generation.:     2025-07-18 10:57     172184     2025-07-18 10:59  
  PPW 25-15687     18251     PPW     Yale: 115/13 kV Bank #1 - T365880, 1, 2               0.0      0.0      0.0      2025-09-15 05:00      2025-09-25 18:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Annual maintenance and runner welding. Penstock and scroll case DEWATERED.:     2025-08-08 08:54     174828     2025-08-08 08:54  
  PPW 25-11976     18051     PPW     Merwin-Yale 115 kV line,Merwin: CB 2P26,Merwin: CB 2P27,Merwin: 2P500 GND SW,Yale: SW 2P508          HYDROGEN-PACW(PPW) 

  HYDROGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2025-09-02 06:00 

  2025-09-15 06:00   
  2025-09-12 17:30 

  2025-09-26 17:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace structures and switches:Yale units 1 and 2 unavailable.:     2025-07-08 14:35     171108     2025-07-30 13:41  
  PPW 25-08524     18212     PPW     Aeolus-Clover 500 kV line,Aeolus: 500 kV South Bus          AEOLUS-CLOVER(PPW) 
  CLOVER-AEOLUS(PPW)   
  1394.0 
  1000.0   
  1394.0 
  1000.0   
  0.0 
  0.0   
  2025-09-15 07:00 
  2025-09-15 07:00   
  2025-09-23 07:00 
  2025-09-23 07:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Switch work/reactor work/Station service/Remove shoo fly at Aeolus, Little Snake, Coyote, Clover:AEOLUS-CLOVER=0; CLOVER-AEOLUS=0.:     2025-07-30 11:41     167630     2025-07-31 10:49  
  PPW 25-07196     17896     PPW     PGE Bethel-Parrish Gap 230 kV line          PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW)   
  325.0 
  325.0 

  325.0 
  325.0   
  325.0 
  325.0 

  325.0 
  325.0   
  325.0 
  325.0 

  159.0 
  159.0   
  2025-09-02 07:00 
  2025-09-02 07:00 

  2025-09-15 07:00 
  2025-09-15 07:00   
  2025-09-05 18:00 
  2025-09-05 18:00 

  2025-09-18 18:00 
  2025-09-18 18:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace structures, 1/21, 1/23, 1/25.:PACW-PGE.PACW & PACW.PGE-PACW = 159 Summer/149 Winter Network load service arrangements may be required:     2025-05-05 08:36     166298     2025-06-25 13:00  
  PPW 25-03879     17708     PPW     Sweet Home: Main Bus Disc CB 4M94,Sweet Home: Bypass Bus Disc CB 4M94,Sweet Home: Line Disc CB 4M94          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-09-15 08:00      2025-09-19 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Breaker maintenance.:Fall Creek Hydro Units 1, 2, and 3 unavailable.:     2025-02-25 10:20     162961     2025-02-25 10:20  
  PPW 25-13053     18192     PPW     Merwin-Chelatchie Tap section of the Merwin-Yale 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2025-09-15 08:00      2025-09-19 17:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace the RAS Relays in Yale Lakes Line Bay.:May be Slight Impact on South of Allston Path. Eliminates Merwin/Yale Generation Delivery to the Portland Load Area. Yale units 1 and 2 unavailable.:     2025-07-18 11:09     172185     2025-07-18 11:12  
  PPW 25-06481     17833     PPW     Malin-PG&E Round Mountain #1 500 kV line          MALIN500-RDM500(PPW) 
  RDM500-MALIN500(PPW)   
  800.0 
  612.0   
  800.0 
  612.0   
  625.0 
  416.0   
  2025-09-17 06:00 
  2025-09-17 06:00   
  2025-09-19 17:00 
  2025-09-19 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install lab measurement and fault initiating test equipment on primary conductors (Grounded).:MALIN500-RDM500 = 625. RDM500-MALIN500 = 416.:     2025-04-10 08:55     165580     2025-04-10 08:55  
  PPW 26-00002     17627     PPW     IPC Midpoint-Hemingway 500 kV line,IPCo Midpoint: 500/345 kV Bank T-501          H500-M500(PPW) 
  M500-H500(PPW) 
  PACW-NTLOAD(PPW) 

  H500-M500(PPW) 
  M500-H500(PPW) 
  PACW-NTLOAD(PPW)   
  800.0 
  1090.0 
  9999.0 

  800.0 
  1090.0 
  9999.0   
  800.0 
  1090.0 
  9999.0 

  800.0 
  1090.0 
  9999.0   
  350.0 
  350.0 
  0.0 

  800.0 
  1090.0 
  9999.0   
  2025-09-22 06:00 
  2025-09-22 06:00 
  2025-09-22 06:00 

  2026-02-23 08:00 
  2026-02-23 08:00 
  2026-02-23 08:00   
  2025-11-07 16:00 
  2025-11-07 16:00 
  2025-11-07 16:00 

  2026-05-29 15:00 
  2026-05-29 15:00 
  2026-05-29 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:This outage is for relocating the existing Midpoint T501 345kV/500kV transformer to a new 345kV station bay.:M500-H500 & H500-M500= 350. BORA-M500 = 959. No impact to Bridger West. Jim Bridger Generation may be restricted real time (as determined by Northwest Path Flow). Network Load Service Arrangements may be required for Southern Oregon Load. Note: TTC Schedules on Path 75 East & West are 0. However, the SOL is 350 West / 325 East (Limited by Bowmont Xfmrs). However, there is a potential of up to 300 mw of actual unscheduled inadvertent flow between Hemingway & Summer Lake. JBSN-JB345 = 2200. PacifiCorp = 1467. IPCo = 733. Jim Bridger Generation may be restricted real time (as determined by Northwest Path Flow).:     2025-01-28 09:16     161059     2025-05-05 13:54  
  PPW 25-14736     18229     PPW     Black Rock-Osceola 230 kV line          GON.PAV-PAVANT(PPW) 
  PAVANT-GON.PAV(PPW)   
  130.0 
  139.0   
  130.0 
  139.0   
  0.0 
  0.0   
  2025-09-22 08:30 
  2025-09-22 08:30   
  2025-09-23 17:00 
  2025-09-23 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Changing Wingarms between Blackrock and State Line:PAVANT-GON.PAV = 0. GON.PAV-PAVANT = 0.:     2025-08-01 11:11     173874     2025-08-01 11:11  
  PPW 25-14736     18230     PPW     Black Rock-Osceola 230 kV line               0.0      0.0      0.0      2025-09-22 08:30      2025-09-23 17:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Changing Wingarms between Blackrock and State Line:PAVANT-GON.PAV = 0. GON.PAV-PAVANT = 0.:     2025-08-01 11:11     173874     2025-08-01 11:11  
  PPW 25-13898     18213     PPW     Little Snake: SW 11B4,Little Snake: Reactor #1 116.1 MVAR,Aeolus-Clover 500 kV line,Clover: SW 11B11          AEOLUS-CLOVER(PPW) 
  CLOVER-AEOLUS(PPW) 

  AEOLUS-CLOVER(PPW) 
  CLOVER-AEOLUS(PPW) 

  AEOLUS-CLOVER(PPW) 
  CLOVER-AEOLUS(PPW)   
  1394.0 
  1000.0 

  1394.0 
  1000.0 

  1394.0 
  1000.0   
  1394.0 
  1000.0 

  1394.0 
  1000.0 

  1394.0 
  1000.0   
  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0   
  2025-09-23 06:30 
  2025-09-23 06:30 

  2025-09-23 08:30 
  2025-09-23 08:30 

  2025-10-02 07:30 
  2025-10-02 07:30   
  2025-09-23 08:30 
  2025-09-23 08:30 

  2025-10-02 07:30 
  2025-10-02 07:30 

  2025-10-02 09:30 
  2025-10-02 09:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Warranty work to replace oil valve on Little Snake reactor #1:CLOVER-AEOLUS and AEOLUS-CLOVER=0 DURING SWITCHING ONLY.:     2025-07-30 14:31     173034     2025-07-30 14:34  
  PPW 25-14749     18231     PPW     Pavant-Sigurd 230 kV line          PACE-PAVANT(PPW) 
  PAVANT-GON.PAV(PPW) 
  PAVANT-PACE(PPW)   
  150.0 
  139.0 
  150.0   
  150.0 
  139.0 
  150.0   
  0.0 
  0.0 
  0.0   
  2025-09-24 07:30 
  2025-09-24 07:30 
  2025-09-24 07:30   
  2025-09-26 17:00 
  2025-09-26 17:00 
  2025-09-26 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Change Wingarm and Insulator Changeouts:PACE-PAVANT, PAVANT-PACE & PAVANT-GON.PAV = 0. GON.PAV-PAVANT = Black Rock & Pavant load.:     2025-08-01 11:17     173887     2025-08-01 11:18  
  PPW 25-11740     18044     PPW     Huntington-Spanish Fork 345 kV line               0.0      0.0      0.0      2025-09-25 07:00      2025-09-30 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Spanish Fork-Huntington Pole Replacement:No impact under normal conditions.:     2025-07-02 13:57     170869     2025-07-02 13:57  
  PPW 25-13899     18220     PPW     Coyote: Reactor #1 116.1 MVAR,Coyote: SW 11B4,Aeolus-Clover 500 kV line,Aeolus: SW 11G56,Clover: SW          AEOLUS-CLOVER(PPW) 
  CLOVER-AEOLUS(PPW) 

  AEOLUS-CLOVER(PPW) 
  CLOVER-AEOLUS(PPW)   
  1394.0 
  1000.0 

  1394.0 
  1000.0   
  1394.0 
  1000.0 

  1394.0 
  1000.0   
  0.0 
  0.0 

  0.0 
  0.0   
  2025-10-02 08:30 
  2025-10-02 08:30 

  2025-10-10 08:30 
  2025-10-10 08:30   
  2025-10-02 09:30 
  2025-10-02 09:30 

  2025-10-10 09:30 
  2025-10-10 09:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Warranty work to replace oil valve on Coyote reactor #1:CLOVER-AEOLUS and AEOLUS-CLOVER=0 DURING SWITCHING ONLY.:     2025-07-31 10:35     173035     2025-07-31 10:41  
  PPW 25-09173     17952     PPW     Hopland-Union Gap section of the BPA Moxee-Union Gap 115 kV line,Hopland: Bank #1,Hopland: CB 5Y440               0.0      0.0      0.0      2025-10-09 12:00      2025-10-31 23:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install Conduit and Panel 4R. Replace SW 2Y52, 2Y531 and MO, 115kV Bus Tie SW and XFMR BK #1 Relay upgrade. :Hopland will be fed from BPA Moxee. Network Load Service Arrangements may be required.:     2025-05-31 21:25     168280     2025-07-08 09:56  
  PPW 25-13902     18221     PPW     Coyote: Reactor #2 116.1 MVAR,Coyote: SW 11B9,Aeolus: SW 11G56,Clover: SW 11B114,Aeolus-Clover 500 k          AEOLUS-CLOVER(PPW) 
  CLOVER-AEOLUS(PPW) 

  AEOLUS-CLOVER(PPW) 
  CLOVER-AEOLUS(PPW)   
  1394.0 
  1000.0 

  1394.0 
  1000.0   
  1394.0 
  1000.0 

  1394.0 
  1000.0   
  0.0 
  0.0 

  0.0 
  0.0   
  2025-10-10 08:30 
  2025-10-10 08:30 

  2025-10-20 08:30 
  2025-10-20 08:30   
  2025-10-10 09:30 
  2025-10-10 09:30 

  2025-10-20 09:30 
  2025-10-20 09:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Warranty work to replace oil valve on Coyote reactor #2:CLOVER-AEOLUS and AEOLUS-CLOVER=0 DURING SWITCHING ONLY.:     2025-07-31 10:43     173038     2025-07-31 10:43  
  PPW 25-09054     17933     PPW     Gala Solar: Xfmr T1          OTHERGEN-PACW(PPW) 

  OTHERGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  0.0 

  9999.0   
  2025-09-30 07:00 

  2025-10-14 07:00   
  2025-10-01 16:00 

  2025-10-15 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Three-year substation preventative maintenance.:Gala Solar offline.:     2025-05-21 14:37     168161     2025-05-21 14:37  
  PPW 25-07860     17890     PPW     WAPA Thermopolis-Hilltop-WAPA Lovell 115 kV line          YTP-WYONORTH(PPW)      400.0      400.0      377.0      2025-10-14 07:00      2025-10-20 11:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace Nahne Jensen Line switches NJ-5761 and NJ-5765.:YTP-WYONORTH = 377. YTS = Series #11: TTC of 589 (PACE = 377 & LAPT = 212).:     2025-05-02 13:30     166966     2025-05-02 13:30  
  PPW 25-00010     16953     PPW     Hemingway-Summer Lake 500 kV line          H500-SMLK(PPW) 
  PACW-NTLOAD(PPW) 
  SMLK-H500(PPW) 

  H500-SMLK(PPW) 
  PACW-NTLOAD(PPW) 
  SMLK-H500(PPW)   
  1500.0 
  9999.0 
  100.0 

  1500.0 
  9999.0 
  100.0   
  1500.0 
  9999.0 
  100.0 

  1500.0 
  9999.0 
  100.0   
  1500.0 
  9999.0 
  100.0 

  0.0 
  0.0 
  0.0   
  2025-04-01 08:00 
  2025-04-01 08:00 
  2025-04-01 08:00 

  2025-10-17 08:00 
  2025-10-17 08:00 
  2025-10-17 08:00   
  2025-09-14 18:00 
  2025-09-14 18:00 
  2025-09-14 18:00 

  2025-10-31 18:00 
  2025-10-31 18:00 
  2025-10-31 18:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Spacer Replacements:H500-SMLK & SMLK-H500 = 0; BORA-M500 = 959; Network Load Service Arrangements may be required for Southern Oregon Load.:     2024-04-30 09:25     144659     2024-12-20 09:45  
  PPW 25-08635     17922     PPW     BPA Captain Jack-Grizzly-Ponderosa #1 500 kV line          BPAT.PACW-PONDEROSA230(PPW)      267.0      267.0      267.0      2025-10-21 08:00      2025-10-21 09:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:DE-ENERGIZE LINE FOR DEADLINE SWITCHING AT POND:BPAT.PACW-PONDEROSA230 = 555 Summer/ 700 Winter:     2025-05-15 11:16     167741     2025-05-15 11:16  
  PPW 25-07978     17897     PPW     WAPA Thermopolis-Hilltop-WAPA Lovell 115 kV line          YTP-WYONORTH(PPW) 

  YTP-WYONORTH(PPW) 

  YTP-WYONORTH(PPW)   
  400.0 

  400.0 

  400.0   
  400.0 

  400.0 

  400.0   
  400.0 

  400.0 

  377.0   
  2025-06-25 11:01 

  2025-07-21 07:00 

  2025-10-27 07:00   
  2025-06-27 16:00 

  2025-07-24 15:00 

  2025-10-29 11:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Replace broken insulators:YTP-WYONORTH = 377. YTS = Series #11: TTC of 589 (PACE = 377 & LAPT = 212).:     2025-05-05 09:53     167084     2025-07-03 09:09  
  PPW 25-08632     17921     PPW     BPA Captain Jack-Grizzly-Ponderosa #1 500 kV line          BPAT.PACW-PONDEROSA230(PPW)      267.0      267.0      267.0      2025-10-31 14:00      2025-10-31 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:DE-ENERGIZE LINE FOR DEADLINE SWITCHING AT POND:BPAT.PACW-PONDEROSA230 = 555 Summer/ 700 Winter:     2025-05-15 11:14     167738     2025-05-15 11:14  
  PPW 25-09174     18000     PPW     Hopland-Union Gap section of the BPA Moxee-Union Gap 115 kV line,Hopland: Bank #1,Hopland: Bank #2               0.0      0.0      0.0      2025-10-31 23:00      2025-11-01 05:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Install Bus between SW 2Y51, 2Y61 and 115kV Bus Tie SW:Hopland will be fed from BPA Moxee. Network Load Service Arrangements may be required.:     2025-06-16 08:07     168281     2025-07-08 09:45  
  PPW 25-10042     17988     PPW     Jim Bridger-Mustang 230 kV line,Mustang-WAPA Spence 230 kV line          JBSN-WYOCENTRAL(PPW) 
  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-JBSN(PPW) 
  WYOCENTRAL-WYOEAST(PPW) 
  WYOEAST-AEOW(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  600.0 
  631.0 
  249.0 
  600.0 
  574.0 
  0.0 
  574.0   
  600.0 
  631.0 
  249.0 
  600.0 
  574.0 
  0.0 
  574.0   
  400.0 
  631.0 
  243.0 
  400.0 
  287.0 
  0.0 
  287.0   
  2025-11-19 07:15 
  2025-11-19 07:15 
  2025-11-19 07:15 
  2025-11-19 07:15 
  2025-11-19 07:15 
  2025-11-19 07:15 
  2025-11-19 07:15   
  2025-11-21 14:00 
  2025-11-21 14:00 
  2025-11-21 14:00 
  2025-11-21 14:00 
  2025-11-21 14:00 
  2025-11-21 14:00 
  2025-11-21 14:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Mustang: Remove 230 kV Shoo Fly:AW/4B Curve 121. WAPAEAST-WAPANORTH = 243. WYOEAST-AEOW (Aeolus West) = 1627. TOT4B-WYONORTH = 631. TOT 4B = 874. JBSN-WYOC & WYOC-JBSN = 400. Potential Real Time Impact to Wyoming Generation Great Divide will be radial from WAPA Spence via Mustang. Network Load Service Arrangements may be required.:     2025-06-10 12:20     169155     2025-06-10 12:50  
  PPW 26-00007     17980     PPW     Hemingway-Summer Lake 500 kV line          BORA-M500(PPW) 
  H500-SMLK(PPW) 
  PACW-NTLOAD(PPW) 
  SMLK-H500(PPW)   
  1090.0 
  1500.0 
  9999.0 
  100.0   
  1090.0 
  1500.0 
  9999.0 
  100.0   
  959.0 
  0.0 
  0.0 
  0.0   
  2026-05-11 08:00 
  2026-05-11 08:00 
  2026-05-11 08:00 
  2026-05-11 08:00   
  2026-05-22 18:00 
  2026-05-22 18:00 
  2026-05-22 18:00 
  2026-05-22 18:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:Spacer Replacements:H500-SMLK & SMLK-H500 = 0; BORA-M500 = 959; Network Load Service Arrangements may be required for Southern Oregon Load.:     2025-06-09 09:44     168591     2025-06-09 09:46  
  PPW 24-04189     16311     PPW     Cove (OR): 230/69 kV Bank #2 (T3398)          COVEPACW-ROUNDBUTTE(PPW) 
  ROUNDBUTTE-COVEPACW(PPW) 

  COVEPACW-ROUNDBUTTE(PPW) 
  ROUNDBUTTE-COVEPACW(PPW) 

  COVEPACW-ROUNDBUTTE(PPW) 
  ROUNDBUTTE-COVEPACW(PPW) 

  COVEPACW-ROUNDBUTTE(PPW) 
  ROUNDBUTTE-COVEPACW(PPW) 

  COVEPACW-ROUNDBUTTE(PPW) 
  ROUNDBUTTE-COVEPACW(PPW)   
  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0   
  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0   
  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0 

  123.0 
  123.0 

  60.0 
  60.0   
  2024-07-01 12:00 
  2024-07-01 12:00 

  2024-10-14 12:00 
  2024-10-14 12:00 

  2025-04-28 12:00 
  2025-04-28 12:00 

  2025-07-07 12:00 
  2025-07-07 12:00 

  2026-07-06 12:00 
  2026-07-06 12:00   
  2024-07-21 12:00 
  2024-07-21 12:00 

  2024-11-01 12:00 
  2024-11-01 12:00 

  2025-05-30 12:00 
  2025-05-30 12:00 

  2025-08-01 12:00 
  2025-08-01 12:00 

  2026-07-31 12:00 
  2026-07-31 12:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     continuous:T-3398 LTC Maintenance and Bushing Replacement:COVEPACW-ROUNDBUTTE & ROUNDBUTTE-COVEPACW = 60.:     2024-03-15 09:39     142013     2025-06-18 08:34  








©2000 webTrans Version 7.4.09.0™ - Open Access Technology International, Inc. All Rights Reserved.