RGIA Phase 2 Power Flow Model
RGIA Phase 2 Final Report
RGIA Phase 1A Final Report
December 11, 2006: SPP ICT posts its report on the classification of previously incurred generation interconnection costs per Attachment T, meeting its goal of completing the study within 90 days. Potentially confidential data has been redacted from the report.
These interconnection studies have been posted upon request of the customer.
· Warren Power - Baxter Wilson Scope Document
· System Interconnection Study
· Final Report on Short Circuit and Stability Analysis
Power Flow Model