Western Area Power
Administration (WAPA)
Upper Great Plains Region (UGP)
Rate Order No. WAPA-217
Last Update: 12/23/2024:
Notice of Extension of UGP Transmission/Ancillary Formula Rates
(Rate Order No. WAPA-217) - Federal Register notice on December
20, 2024 (89 FR 104143)
12/23/2024:
(UGP
Transmission/Ancillary Rates for
SPP)
Notice of Extension of UGP Transmission/Ancillary
Formula Rates (Rate Order No. WAPA-217) - Federal
Register notice on December 20, 2024 (89 FR
104143)
As
described in the December 20, 2024,
Federal Register notice (89 FR
104143) (FRN-Provisional-UGP-Trans-Anc-Service-Rates-2024-1220.pdf),
the
extension of the Upper Great Plains (UGP) region’s
existing Pick-Sloan Missouri Basin Program— Eastern
Division (P–SMBP—ED) transmission and ancillary
services formula rates in Rate Order No. WAPA-217
(described below), as proposed and published in the
Federal Register notice (Proposed FRN) on August 26,
2024 (89 FR 68432), has been confirmed,
approved, and placed into effect on an interim
basis.
The existing formula rates under Rate Schedules
WAUGP–ATRR (Annual Transmission Revenue
Requirement), WAUGP–AS1 (Scheduling, System Control,
and Dispatch Service), WAUW–AS3 (Regulation and
Frequency Response Service), WAUW–AS4 (Energy
Imbalance Service), WAUW–AS5 (Operating
Reserve—Spinning Reserve Service), WAUW–AS6
(Operating Reserve—Supplemental Reserve Service),
and WAUW–AS7 (Generator Imbalance Service) are set
to expire on September 30, 2025. This rate
extension makes no changes to the existing formula
rates and extends them through September 30, 2030.
The extended formula rates under Rate Schedules
WAUGP–ATRR, WAUGP–AS1, WAUW–AS3, WAUW– AS4,
WAUW–AS5, WAUW–AS6 and WAUW–AS7 will be placed
into effect on an interim basis on October 1, 2025.
In accordance with 10 CFR 903.23(a), UGP filed a
notice in the Federal Register on August 26, 2024,
proposing to extend, without adjustment, Rate
Schedules WAUGP–ATRR, WAUGP– AS1, WAUW–AS3,
WAUW–AS4, WAUW–AS5, WAUW–AS6, and WAUW–AS7 under
Rate Order No. WAPA–217. UGP determined it was not
necessary to hold public information or public
comment forums on the proposed formula rate
extension, but provided a 30-day consultation and
comment period to give the public an opportunity to
comment on the proposed extension. The consultation
and comment period ended on September 25, 2024, and
UGP received no comments on the proposed
formula rate extension.
WAPA provided
notification and posted information by email on
December 22, 2024 about the provisional formula
rates to the SPP ‘‘Formula Rate Posting
Information Notification’’ Exploder List: frpin@
spplist.spp.org
Information on this rate process is, or will be,
posted on: 1) UGP's OASIS at http://www.oasis.oati.com/wapa/index.html;
2) the UGP's Rates Web Page at: https://www.wapa.gov/regions/UGP/rates/Pages/rates.aspx;
and 3) the "Western Area Power Administration UGP
Information" link on SPP's Member
Related Postings website.
The existing UGP
Transmission and Ancillary Service
Formula Rates developed under Rate
Order No. WAPA-188 are available
at the information sites above.
Next Steps:
1. WAPA will
submit Rate Order No. WAPA–217 and
the extended rate schedules to
FERC for confirmation and approval
on a final basis.
08/26/2024:
(UGP Transmission/Ancillary
Rates for SPP)
Notice of Proposed Extension of UGP Transmission/Ancillary
Formula Rates - Federal Register notice, Announcement of
Consultation and Comment Period
As described in the August 26, 2024, Federal Register notice (FRN-Proposed-Extension-UGP-Trans-Anc-Service-Rates-2024-0826.pdf),
the Upper Great Plains (UGP) region of the Western Area Power
Administration (WAPA or Western) proposes to extend existing
formula rates (without any changes) for the Pick- Sloan Missouri
Basin Program—Eastern Division (P–SMBP—ED) through September 30,
2030. The existing rates UGP proposes to extend are: WAUGP– ATRR
(Annual Transmission Revenue Requirement), WAUGP–AS1 (Scheduling,
System Control, and Dispatch Service), WAUW–AS3 (Regulation and
Frequency Response Service), WAUW–AS4 (Energy Imbalance Service),
WAUW–AS5 (Operating Reserve-Spinning Reserve Service), WAUW–AS6
(Operating Reserve-Supplemental Reserve Service), and WAUW–AS7
(Generator Imbalance Service). The existing rates expire on
September 30, 2025.
These rates will be used by UGP to provide
rate data to the Southwest Power Pool, Inc. (SPP), the Regional
Transmission Organization of which UGP is a member. UGP’s
planned expanded participation in the SPP RTO extension into the
Western Interconnection will have impacts on the above rate
methodologies. Extending the existing formula rates for five
years allows UGP time to evaluate rate methodologies to conduct
a major rate adjustment process to put new formula rates in
place that would become effective upon UGP’s expanded
participation in the SPP RTO (currently planned on April 1,
2026).
Publication of the August 26, 2024, Federal
Register notice begins the formal process for the proposed
formula rates. The consultation and comment period begins
August 26, 2024, and ends September 25,
2024. UGP will accept written
comments at any time during the consultation and comment
period.
In accordance with 10 CFR 903.23(a), UGP has
determined that it is not necessary to hold public information or
public comment forums for this rate action but is initiating a
30-day consultation and comment period to give the public an
opportunity to comment on the proposed extension. UGP will review
and consider all timely public comments at the conclusion of the
consultation and comment period and adjust the proposal as
appropriate.
WAPA provided notification and posted information by email on
August 26, 2024 about the proposed formula rates to the SPP
‘‘Formula Rate Posting Information Notification’’ Exploder List:
frpin@ spplist.spp.org
Information on this rate process is, or will be, posted on: 1)
UGP's OASIS at http://www.oasis.oati.com/wapa/index.html;
2) the UGP's Rates Web Page at: https://www.wapa.gov/regions/UGP/rates/Pages/rates.aspx;
and 3) the "Western Area Power Administration UGP Information"
link on SPP's Member
Related Postings website.
The existing UGP Transmission and Ancillary Service Formula Rates
developed under Rate-Order-No-WAPA-188 are available at the
information sites above.
WAPA UGP
Transmission & Ancillary Services Rates
contact(s):
- Ms. Linda Cady-Hoffman, Rates Manager, UGP, WAPA, 2900 4th
Avenue North, Billings, MT 59101–1266;
telephone: (406) 255–2920; email: cady@wapa.gov
- Mr. Steve Sanders, Strategic Advisor, UGP, WAPA, 2900 4th Avenue
North, Billings, MT 59101-1266;
telephone: (406) 670-7436; email sanders@wapa.gov
- Ms. Sara Baker,
Public Utilities Specialist, UGP, WAPA, 2900 4th Avenue North,
Billings, MT 59101-1266;
telephone: (406) 255-2924; email SBaker@wapa.gov
Any other questions can be directed to: Steve Sanders
(WAPA-UGP) at 406-670-7436 (sanders@wapa.gov).
Previous Updates:
12/23/2024:
Notice of Extension of UGP Transmission/Ancillary Formula Rates
(Rate Order No. WAPA-217) - Federal Register notice on December
20, 2024 (89 FR 104143)
08/26/24: Notice of Proposed Extension of UGP
Transmission/Ancillary Formula Rates - Federal Register notice,
Announcement of Consultation and Comment Period