Western Area Power Administration (WAPA)
Draft
Business Practices (BPs) Common to all of WAPA's Regions
(Posted for 10 business day
comment period)
(Last
Update: 04/06/2024, Updated NDA Draft posting)
The following are the currently
proposed draft versions (posted for the 10 business day comment
period) of the Business Practices (BPs) that
are common and identical across all of WAPA's Regional
Offices, which includes (DSW, RMR, SNR, and UGP - See
Note 1 for UGP). The BPs apply to the NERC
identified TSPs: CRCM, LAPT, WALC, WAPA, WASN. Additional draft BPs specific
only to an individual Region/TSP are also posted on
that TSP's OASIS under the "Business Practices"
folder.
->Proposed UPDATED
BP
Non-Disclosure Agreement (NDA) Form
(CLEAN) (REDLINE) (Posted
04/06/2024, Comments due by 04/22/2024)
Please submit
any comments or questions on the proposed draft BP(s) by the due
date shown above to your specific WAPA Regional Contacts:
Note 1. The UGP
Region joined the Southwest Power Pool, Inc. (SPP) as a
transmission owner and transferred functional control of all
of its eligible transmission facilities to SPP on October 1,
2015. Transmission service and certain other services
over those UGP Regional transmission facilities are available
solely under the SPP Open Access Transmission Tariff (SPP
Tariff). Ancillary services offered by the UGP Region as
a Balancing Authority operator are also solely available under
the SPP Tariff. Therefore, certain WAPA BPs may not be
currently applicable, or have limited applicability, in the
UGP Region.
Previous Draft Postings
Archive (No longer posted for comment)