PacifiCorp Generation Interconnection Requests       As of: 5/15/2025                    
Interconnect Request Information     Max MW Output Location of
Generating Facility
Location of Interconnection In-Service Date
(Commercial
Operations)
       
Generation Interconnection Cluster Number Cluster Cluster Area Request Date Request Status Company Name Service        Type Application Rules Qualifying Facility Summer Winter County ST Region Point of Interconnection Customer Requested Commercial Operations Date Agreed to Commercial Operations Date Type Facilities   Study Schedule Deviation Request Status Explanation
C1-01 Cluster 1 CA08 11/6/2020 Withdrawn   NR SGI QF 20 20 Morrow OR PACW Circuit 4K16 out of Dalreed substation 12/31/2023   Solar     WITHDRAWN
C1-02 Cluster 1 CA01 4/1/2021 Withdrawn   NR SGI QF 20 20 Park WY PACE Circuit 9H182 out of Frannie substation 12/31/2025   Solar     WITHDRAWN
C1-03 Cluster 1 CA01 4/1/2021 Withdrawn   NR SGI QF 9 9 Park WY PACE Circuit 9H184 out of Frannie substation 12/31/2025   Solar     WITHDRAWN
C1-04 Cluster 1 CA04A 4/1/2021 In Progress   ER UGI 1/0/1900 6 6 Salt Lake UT  PACE Circuit RKW17 out of Porter Rockwell substation 1/31/2023 TBD Wind & Battery Storage Available   0
C1-05 Cluster 1 NA 4/6/2021 Withdrawn   NR LGI   115 115 Millard UT  PACE Blackrock substation 12/31/2026   Geothermal     WITHDRAWN
C1-06 Cluster 1 CA06 4/15/2021 Withdrawn   NR/ER LGI   199.9 199.9 San Juan UT PACE Pinto substation 5/1/2024   Solar & Battery Storage     WITHDRAWN
C1-07 Cluster 1 CA06 4/15/2021 Withdrawn   NR/ER LGI   199.9 199.9 San Juan UT PACE Pinto substation 5/1/2024   Solar & Battery Storage     WITHDRAWN
C1-08 Cluster 1 CA05 4/15/2021 Withdrawn   NR/ER LGI   199.9 199.9 Juab UT PACE Clover substation 5/1/2024   Solar & Battery Storage     WITHDRAWN
C1-09 Cluster 1 CA05 4/15/2021 Withdrawn   NR/ER LGI   199.9 199.9 Juab UT PACE Clover substation 5/1/2024   Solar & Battery Storage     WITHDRAWN
C1-10 Cluster 1 CA06 4/21/2021 In Progress   ER LGI 1/0/1900 45 45 Emery UT  PACE Moore substation 11/30/2024 TBD Solar & Battery Storage Available   0
C1-11 Cluster 1 CA06 4/21/2021 In Progress   ER LGI 1/0/1900 450 450 Emery UT  PACE Huntington-Spanish Fork transmission line 11/30/2024 TBD Solar & Battery Storage Available   0
C1-12 Cluster 1 CA06 4/21/2021 Withdrawn   NR LGI   25 25 Carbon UT PACE Helper-National SW Rack transmission line 11/30/2024   Solar & Battery Storage Available   WITHDRAWN
C1-13 Cluster 1 CA06 4/21/2021 Withdrawn   NR LGI   35 35 Carbon UT PACE Columbia Junction substation 11/30/2024   Solar & Battery Storage Available   WITHDRAWN
C1-14 Cluster 1 CA06 4/21/2021 In Progress   ER LGI 1/0/1900 120 120 Emery UT PACE Emery-Sigurd #2 transmission line 11/30/2024 TBD Solar & Battery Storage Available   0
C1-15 Cluster 1 CA13 5/5/2021 In Progress PacifiCorp ER OGI 1/0/1900 2.3 2.3 Klamath OR PACW Circuit 5L49 out of Lakeport substation 2/1/2023 7/26/2024 Battery Storage Available   SGIA executed 3/31/22
C1-16 Cluster 1 CA05 5/7/2021 Suspended Neptune Solar Energy Park LLC NR LGI   199 199 Millard UT PACE Blackrock substation 12/31/2025 TBD Solar & Battery Storage Available   LGIA executed 4/6/23, suspended 2/13/2025
C1-17 Cluster 1 CA02 5/7/2021 Withdrawn   NR LGI   199 199 Box Elder UT PACE Bridgerland substation 12/31/2025   Solar & Battery Storage     WITHDRAWN
C1-18 Cluster 1 CA08 5/7/2021 Withdrawn   NR/ER LGI   160 160 Tooele UT PACE Craner Flat substation 12/31/2025   Solar & Battery Storage     WITHDRAWN
C1-19 Cluster 1 CA11 5/7/2021 Withdrawn   NR LGI   199 199 Marion OR PACW Parrish Gap substation 12/31/2025   Solar & Battery Storage     WITHDRAWN
C1-20 Cluster 1 CA11 5/7/2021 Suspended Muddy Creek Energy Park LLC NR LGI   199 199 Linn OR PACW Diamond Hill substation 12/31/2025 TBD Solar & Battery Storage Available   LGIA executed 11/4/22, suspended 10/18/23
C1-21 Cluster 1 CA03 5/7/2021 Withdrawn   NR LGI   199 199 Caribou ID PACE Threemile Knoll substation 12/31/2025   Solar & Battery Storage     WITHDRAWN
C1-22 Cluster 1 CA07 5/7/2021 Withdrawn   NR/ER LGI   400 400 Iron UT PACE Sigurd-Three Peaks transmission line 12/1/2025   Solar & Battery Storage     WITHDRAWN
C1-23 Cluster 1 CA12 5/7/2021 Withdrawn Sugar Pine Solar Project LLC ER LGI   300 300 Klamath OR PACW Chiloquin-LaPine transmission line 12/1/2025 12/20/2030 Solar & Battery Storage Available   LGIA executed 12/21/23, LGIA terminated 3/28/25
C1-24 Cluster 1 CA12 5/7/2021 Withdrawn   NR/ER LGI   400 400 Klamath OR PACW JC Boyle-Klamath Falls transmission line 12/1/2025   Solar & Battery Storage     WITHDRAWN
C1-25 Cluster 1 CA01 5/7/2021 Withdrawn   NR/ER LGI   900 900 Carbon WY PACE Aeolus substation 5/1/2028   Pump Storage     WITHDRAWN
C1-26 Cluster 1 CA06 5/10/2021 Withdrawn   NR LGI   100 100 Carbon UT PACE Columbia Junction substation 12/31/2024 TBD Solar & Battery Storage Available   WITHDRAWN
C1-27 Cluster 1 CA10 5/7/2021 Suspended Solway Solar Energy LLC NR LGI   100 100 Benton WA PACW Grandview substation 12/31/2023 TBD Solar & Battery Storage Available   LGIA executed 10/12/2022, suspended 3/27/23
C1-28 Cluster 1 CA07 5/7/2021 Withdrawn   NR/ER LGI   199 199 Iron UT PACE Three Peaks substation 10/15/2024   Solar     WITHDRAWN
C1-29 Cluster 1 CA07 5/10/2021 Withdrawn   NR/ER LGI   40 40 Beaver UT PACE Blundell-Milford transmission line 1/1/2025   Geothermal     WITHDRAWN
C1-30 Cluster 1 CA07 5/10/2021 Withdrawn   NR/ER LGI   100 100 Beaver UT PACE Blundell-Milford transmission line 1/1/2025   Solar & Battery Storage     WITHDRAWN
C1-31 Cluster 1 CA12 5/10/2021 Withdrawn   NR/ER LGI   35 35 Klamath OR PACE Chiloquin-Mile Hi transmission line 1/1/2025   Solar & Battery Storage     WITHDRAWN
C1-32 Cluster 1 CA07 5/10/2021 Withdrawn   NR/ER LGI   456 456 Millard UT PACE Red Butte-Sigurd #2 transmission line 12/31/2024   Wind     WITHDRAWN
C1-33 Cluster 1 CA06 5/12/2021 Withdrawn   NR LGI   100 100 San Juan UT PACE Pinto substation 10/15/2024   Solar     WITHDRAWN
C1-34 Cluster 1 CA05 5/12/2021 In Progress Quicksilver Solar, LLC NR LGI   200 200 Utah UT PACE Mercer substation 12/31/2024 12/31/2027 Solar & Battery Storage Available   LGIA executed 1/30/23
C1-35 Cluster 1 CA01 5/13/2021 In Progress Lucky Star Wind, LLC ER LGI   500 500 Carbon WY PACE Aeolus substation 12/31/2024 7/11/2028 Wind Available   LGIA executed 6/1/23
C1-36 Cluster 1 CA09 5/14/2021 Withdrawn   NR/ER LGI   199.99 199.99 Franklin WA PACW Walla Walla-Wanapum transmission line 12/31/2024   Solar & Battery Storage     WITHDRAWN
C1-37 Cluster 1 CA10 5/14/2021 Suspended Badger Gap PV I, LLC NR LGI   199 199 Kittitas WA PACW Pomona-Vantage transmission line 12/31/2024 TBD Solar & Battery Storage Available   LGIA executed 10/12/22, suspended 1/30/24
C1-38 Cluster 1 CA02 5/14/2021 Withdrawn   NR/ER LGI   199.99 199.99 Uinta WY PACE Muddy Creek substation 12/31/2024   Solar & Battery Storage     WITHDRAWN
C1-39 Cluster 1 CA07 5/14/2021 In Progress REBU BN, LLC ER LGI No 300 300 Washington UT PACE Red Butte – Three Peaks – Sigurd transmission line 6/15/2023 12/31/2027 Solar & Battery Storage Available   LGIA executed 3/6/2024
C1-40 Cluster 1 CA10 5/14/2021 Suspended CG Yakima County Solar I LLC NR LGI   150 150 Yakima WA PACW Midway-Union Gap transmission line 10/1/2025 TBD Solar & Battery Storage Available   LGIA executed 10/5/22, suspended 1/31/24
C1-41 Cluster 1 CA12 5/14/2021 Withdrawn   NR LGI   60 60 Modoc CA PACW Clearlake Substation 12/31/2023   Solar & Battery Storage     WITHDRAWN
C1-42 Cluster 1 CA10 5/14/2021 Withdrawn   NR LGI   200 200 Yakima WA PACW Midway-Union Gap transmission line 12/31/2023   Solar & Battery Storage     WITHDRAWN
C1-43 Cluster 1 CA03 5/14/2021 Withdrawn Jugu Bn, LLC ER LGI   200 200 Clark ID PACE Amps substation 12/1/2023 12/20/2030 Solar & Battery Storage Available   LGIA executed 1/27/23, LGIA terminated 2/7/25
C1-44 Cluster 1 CA14 5/14/2021 Suspended Archway Solar Energy LLC ER LGI   400 400 Lake OR PACW Burns-Summer Lake transmission line 10/1/2025 TBD Solar & Battery Storage Available   LGIA executed 10/9/23, suspended 1/26/24
C1-45 Cluster 1 CA09 5/14/2021 Withdrawn   ER LGI   100 100 Morrow OR PACW Dalreed substation 10/1/2024   Solar & Battery Storage     WITHDRAWN
C1-46 Cluster 1 CA12 5/14/2021 Suspended Diamond Solar Energy LLC ER LGI   198.75 198.75 Klamath OR PACW Chiloquin-LaPine transmission line 10/1/2024 TBD Solar & Battery Storage Available   LGIA executed 9/11/2023, suspended 12/22/23
C1-47 Cluster 1 CA07 5/14/2021 Withdrawn   NR/ER LGI   300 300 Iron UT PACE Three Peaks substation 12/1/2025   Solar & Battery Storage     WITHDRAWN
C1-48 Cluster 1 CA01 5/14/2021 Withdrawn   NR/ER LGI   600 600 Sweetwater WY PACE Jim Bridger substation 12/1/2025   Wind     WITHDRAWN
C1-49 Cluster 1 CA03 5/14/2021 Withdrawn   NR/ER LGI   308 308 Bonneville ID PACE Goshen-Bonneville transmission line 9/30/2024   Wind     WITHDRAWN
C1-50 Cluster 1 CA05 5/14/2021 Suspended Mosida Solar, LLC ER LGI   400 400 Utah UT PACE Mercer-Mona #1 transmission line 12/15/2024 TBD Solar & Battery Storage Available   LGIA executed 11/16/2023, suspended 1/10/2025
C1-51 Cluster 1 CA05 5/14/2021 Suspended Thirsty Valley Solar Energy LLC NR LGI   300 300 Juab UT PACE Clover substation 10/1/2024 TBD Solar & Battery Storage Available   LGIA executed 5/25/23, suspended 10/26/23
C1-52 Cluster 1 CA05 5/14/2021 Withdrawn   NR/ER LGI   250 250 Tooele UT PACE Limber substation 10/1/2024   Solar & Battery Storage     WITHDRAWN
C1-53 Cluster 1 CA01 5/14/2021 Withdrawn   ER LGI   190 190 Albany WY PACE Aeolus substation 12/31/2024   Wind     WITHDRAWN
C1-54 Cluster 1 CA05 5/14/2021 Suspended Pinyon Creek Solar LLC NR LGI   199 199 Utah UT PACE Mercer-Mona #1 transmission line 10/31/2024 TBD Solar & Battery Storage Available   LGIA executed 11/16/2023, suspended 1/27/2025
C1-55 Cluster 1 CA01 5/14/2021 Withdrawn   ER LGI   199 199 Carbon WY PACE Platte substation 12/31/2025   Solar & Battery Storage     WITHDRAWN
C1-56 Cluster 1 CA04B 5/14/2021 Withdrawn   ER LGI   49 49 Salt Lake UT PACE Oquirrh substation 12/1/2024   Battery Storage     WITHDRAWN
C1-57 Cluster 1 CA01 5/14/2021 Withdrawn   ER LGI   100 100 Carbon WY PACE Shirley Basin substation 12/31/2025   Wind     WITHDRAWN
C1-58 Cluster 1 CA04A 5/14/2021 In Progress   ER UGI   2 2 Salt Lake UT  PACE Circuit RKW17 out of Porter Rockwell substation 1/31/2023 TBD Wind Available   0
C1-59 Cluster 1 CA01 5/14/2021 Withdrawn   NR/ER LGI   300 300 Converse WY PACE Windstar substation 6/1/2024   Solar & Battery Storage     WITHDRAWN
Company Name: Only displayed after Interconnection Agreement has been signed or is an affiliate of PacifiCorp.
Affiliate Initial Scoping Meeting Notification: It is PacifiCorp's intention to hold initial scoping meetings for all projects listed that are associated with an affiliate per the relevant timing requirements.
Study Reports: If displayed, click "Available" link to view PDF files.
Study Schedule Deviation: If displayed, click "More Info" link to view PDF files.