ICT Planning Studies and Related Documents
2010 Base Plan & Construction Plan
ICT Base Plan
ICT 2010 BasePlan Update 6(11102010)(pdf)
ICT 2010 Base Plan Update 5(082010)(pdf)
ICT 2010 Base Plan Update 4(062010)(pdf)
ICT 2010 Base Plan Update 3(042010)(pdf)
ICT 2010 Base Plan Update 2
ICT 2010 Base Plan 2010 Update 1
ICT 2010 Base Plan (Final - posted 1/12/2010)
ICT 2010 Draft Base Plan
ICT 2009 Reliability Assessment Final Report
ICT DRAFT 2009 Reliability Assessment Report
ICT Reliability Assessment Contingency Scan Spreadsheet (updated for Revision 2)
ICT 2009 Reliability Assessment Modeling Files
ICT Reliability Assessment Scope
Entergy Construction Plan
2010-2012 Entergy FinalConstruction Plan Update 5 (110810)(pdf)
2010-2012 Entergy Final Construction Plan Update 4 (072810)(pdf)
2010-2012 Entergy Final Construction Plan Update 3 (062010)(pdf)
2010-2012 Entergy Final Construction Plan Monthly Status Reports
2010-2012 Entergy Final Construction Plan Update 2 (042010)(pdf)
2010-2012 Entergy Final Construction Plan Update 1
2010-2012 Entergy Final Construction Plan
2010-2012 Entergy DRAFT Construction Plan Revision 2(pdf)
2010-2012 Entergy DRAFT Construction Plan Update 1(pdf)
2010-2012 Entergy DRAFT Construction Plan(pdf)
2010-2012 Entergy Construction Plan Idev Files
Operation Guides used in the development of Base Plan and Construction Plan
2009 Transmission Summit Presentations Transmission Summit Notes and Received Comments
YOU CAN DOWNLOAD STUDY REPORTS FROM ABOVE LINKS OR SEND YOUR REQUEST TO:
Laura Rauch
317-249-5853
lrauch@misoenergy.org