Western Area
Power Administration (Western)
Upper Great Plains Region (UGPR)
This listing shows older News items for the WAPA-UGP OASIS
page and the older Western / Basin Electric Power Cooperative /
Heartland Consumers Power District integrated transmission
system called the Integrated System (IS) in the MAPP and WECC
Regions.
Older News, Last
Updated: 12/23/2024 (See Main OASIS Page for recent
News)
10/16/2023
(UGP Trans.
& Anc. Service Rates Posting): Notice - Revised Annual
Update (REV 1)
-- UGP Rates Effective 01/01/2024 Posted
UGP
provided notification by email on
October 16, 2023 (Customer-Email-2023-1016)
of posting revisions (Rev
1) to
its Annual Update to its existing
formula rates to the SPP Exploder List:
Formula Rate Posting Information
Notification (frpin@spplist.spp.org).
UGP is updating
its rates for transmission and ancillary
services for the Pick-Sloan Missouri Basin
Program-Eastern Division (P-SMBP--ED) that
are utilized in the SPP Zone 19 pricing zone
(also referred to as the Upper Missouri Zone
or UMZ) and also in its WAUW Balancing
Authority Area. UGP also posted Responses
to the Information Requests
received.
The details of the REVISED
(Rev 1) 2024
UGP rate calculations (Effective 1/1/2024)
are posted under the 2024 "Rates Calculation" sub-folder
in the "Rates" folder, or directly at:
WAPA-UGP-Trans-Anc-Service-Rates-ESTIMATE-Templates-2024-0101-Rev1.pdf
(Excel version)
UGP
has also posted the REVISED
(Rev 1) UGP
2022 True-Up calculation under the "Rates Calculation"
sub-folder in the "Rates" folder, or directly at:
WAPA-UGP-Trans-Anc-Service-Rates-2022-TrueUp-Templates-Rev1.pdf (Excel version)
UGP will also post these 2023 Rates updates to the SPP Member Related Postings
page on the SPP OASIS.
The REVISED
(Rev 1)
WAPA-UGP Rates
Summary/Notices is here: UGP-Rates-2024-0101.pdf
If you
have any questions, please contact
Steve Sanders at (406) 255-2807
(sanders@wapa.gov) or Sara
Baker at (406) 255-2924
(sbaker@wapa.gov).
--------
09/01/2023 (UGP
Trans. & Anc. Service Rates Posting): Notice
- Annual
Update
-- UGP Rates Effective 01/01/2024 Posted
UGP
provided email
notification
of
its Annual Update to its existing formula rates to the
SPP Exploder List: Formula Rate Posting Information
Notification (frpin@spplist.spp.org). UGP is
updating its rates for transmission and ancillary services
for the Pick-Sloan Missouri Basin Program-Eastern Division
(P-SMBP--ED) that are utilized in the SPP Zone 19 pricing
zone (also referred to as the Upper Missouri Zone or UMZ)
and also in its WAUW Balancing Authority Area.
The
UGP 2024 Estimated rate templates calculations (Effective
1/1/2024) are posted under the Rates
Calculation sub-folder in the Rates folder, or directly
at: (PDF version) (Excel version)
The UGP
2022 True-Up templates calculations are posted under the
Rates Calculation sub-folder in the Rates folder, or
directly at:
(PDF Version) (Excel version)
The 2024
Rates Summary/Notices is
posted in the Rates folder. UGP
will also post its 2024 Rates updates to the SPP Member Related Postings.
Annual Update Meeting: UGP will host a
meeting to provide Customers and other interested parties
an opportunity to discuss and comment on these
recalculated revenue requirements on September 15,
2023, at 9:00 a.m. MDT (10:00 a.m. CDT) via Net
Conference (Microsoft Teams): Net
Conference Info
Presentation:
Annual-Update-Mtg-Presentation (Will
be posted when
available)
05/16/2023
(Western Area
Power Administration Notice):
Standards of Conduct (SOC) Chief Compliance
Officer and Procedures updates
Please note that the Vice President of
Enterprise Portfolio Management, Chrystal Dean, has
been designated as the WAPA Standards of Conduct
(SOC) Chief Compliance Officer effective May 9,
2023. Info: Chief
Compliance Officer
WAPA has also posted an updated Standards
of
Conduct
Procedures
05/12/2023
(Western Area
Power Administration Notice): Emergency Assistance Update
The ability
of WAPA Regions to provide Emergency Assistance
during extreme weather and ongoing drought
conditions may be limited. Additional detail and
contact information is available at:
WAPA-2023-Summer-Preparedness-Letter.pdf
10/28/2022 (UGP Trans. & Anc. Service Rates
Posting): Notice - REVISED (Rev
1) UGP Rates
Effective 01/01/2023 Posted
UGP
provided notification by email on
October 28, 2022 (Customer-Email-2022-1028)
of posting revisions (Rev
1) to
its Annual Update to its existing
formula rates to the SPP Exploder List:
Formula Rate Posting Information
Notification (frpin@spplist.spp.org).
UGP is updating
its rates for transmission and ancillary
services for the Pick-Sloan Missouri Basin
Program-Eastern Division (P-SMBP--ED) that
are utilized in the SPP Zone 19 pricing zone
(also referred to as the Upper Missouri Zone
or UMZ) and also in its WAUW Balancing
Authority Area. UGP also posted Responses to
the Information Requests
received.
The details of the REVISED
(Rev 1) 2023
UGP rate calculations (Effective 1/1/2023)
are posted under the "Rates Calculation" sub-folder in
the "Rates" folder, or directly at:
WAPA-UGP-Trans-Anc-Service-Rates-ESTIMATE-Templates-2023-0101-Rev1.pdf
(Excel version)
UGP
has also posted the REVISED
(Rev 1) UGP
2021 True-Up calculation under the "Rates Calculation"
sub-folder in the "Rates" folder, or directly at:
WAPA-UGP-Trans-Anc-Service-Rates-2021-TrueUp-Templates-Rev1.pdf (Excel version)
UGP will also post these 2023 Rates updates to the SPP Member Related Postings
page on the SPP OASIS.
The REVISED
(Rev 1)
WAPA-UGP Rates
Summary/Notices document for 2023 is located at: UGP-Rates-2023-0101.pdf
If you have any questions,
please contact Steve Sanders at (406) 255-2807
(sanders@wapa.gov) or Sara Baker at
(406) 255-2924 (sbaker@wapa.gov).
--------
09/09/2022 (Updated
09/19/2022) (New
UGP Trans. & Anc. Service Rates Posting): Notice
- Annual Update -- New
UGP Rates Effective 01/01/2023 Posted
UGP
provided notification by email on September 9, 2022 (Customer-Email-WAPA-UGP-2023-Trans-Anc-Service-Rates.pdf)
of its Annual Update to its existing formula rates to
the SPP Exploder List: Formula Rate Posting
Information Notification (frpin@spplist.spp.org).
UGP
is updating its rates for transmission and ancillary
services for the Pick-Sloan Missouri Basin Program-Eastern
Division (P-SMBP--ED) that are utilized in the SPP Zone 19
pricing zone (also referred to as the Upper Missouri Zone
or UMZ) and also in its WAUW Balancing Authority Area.
The
details of the 2023 UGP rate calculations (Effective
1/1/2023) are posted under the Rates
Calculation sub-folder in the Rates folder, or directly
at:
WAPA-UGP-Trans-Anc-Service-Rates-ESTIMATE-Templates-2023-0101.pdf
(Excel version)
UGP has
also posted the UGP 2021 True-Up calculation under the
Rates Calculation sub-folder in the Rates folder, or
directly at:
WAPA-UGP-Trans-Anc-Service-Rates-2021-TrueUp-Templates.pdf (Excel version)
UGP will also post its 2023 Rates updates to the SPP Member Related Postings page on
the SPP OASIS.
Customer Meeting: UGP will host a meeting to
provide Customers and other interested parties an
opportunity to discuss and comment on these recalculated
revenue requirements on September 21, 2022, at 12:00
p.m. MDT (1:00 p.m. CDT) via Net Conference
(Microsoft Teams). Net Conference
information is here: WAPA-UGP-Rates-Annual-Update-Customer-Meeting-2022-0921-NetConf-Info.pdf.
Presentation:
Customer-Mtg-Presentation-WAPA-UGP-2023-Trans-Anc-Service-Rates.pdf (POSTED
09/19/2022)
The WAPA-UGP Rates Summary/Notices document for 2023 is
located at: UGP-Rates-2023-0101.pdf
06/15/2022 (Western
Area Power Administration Notice): Emergency
Assistance Update
The
ability of WAPA Regions to provide Emergency
Assistance during extreme weather and ongoing drought
conditions may be limited. Additional detail and
contact information is available at: WAPA-2022-Summer-Preparedness-Letter-2022-0610.pdf
09/23/2021 (Updated 09/29/2021) (New
UGP Trans. & Anc. Service Rates Posting):
Notice - Annual Update --
New UGP Rates Effective 01/01/2022 Posted
UGP
provided notification by email on September 23, 2021 (Customer-Email-WAPA-UGP-2022-Trans-Anc-Service-Rates.pdf)
of its Annual Update to its existing formula rates to
the SPP Exploder List: Formula Rate Posting Information
Notification (frpin@spplist.spp.org). UGP is
updating its rates for transmission and ancillary services
for the Pick-Sloan Missouri Basin Program-Eastern Division
(P-SMBP--ED) that are utilized in the SPP Zone 19 pricing
zone (also referred to as the Upper Missouri Zone or UMZ)
and also in its WAUW Balancing Authority Area.
The
details of the 2022 UGP rate calculations (Effective
1/1/2022) are posted under the Rates Calculation
sub-folder in the Rates folder, or directly at:
WAPA-UGP-Trans-Anc-Service-Rates-ESTIMATE-Templates-2022-0101.pdf
(Excel version)
UGP has
also posted the UGP 2020 True-Up calculation under the
Rates Calculation sub-folder in the Rates folder, or
directly at:
WAPA-UGP-Trans-Anc-Service-Rates-2020-TrueUp-Templates.pdf (Excel version)
UGP will also post its 2022 Rates updates to the SPP Member Related Postings page on
the SPP OASIS.
Customer Meeting: UGP will host a meeting to
provide Customers and other interested parties an
opportunity to discuss and comment on these recalculated
revenue requirements on October 1, 2021, at 1:00 p.m.
MDT (2:00 p.m. CDT) via WebEx. WebEx information
is here: WAPA-UGP-Rates-Annual-Update-Customer-Meeting-2021-1001-Webex-Info.pdf.
Presentation:
Customer-Mtg-Presentation-WAPA-UGP-2022-Trans-Anc-Service-Rates.pdf (POSTED 09/29/2021)
The WAPA-UGP Rates Summary/Notices document for 2022 is
located at: UGP-Rates-2022-0101.pdf
12/31/2020
(UGP Trans. & Anc.
Service Rates Posting):
Notice - REVISED
(Rev 2) UGP Rates
Effective 02/01/2021 Posted
UGP
provided notification by email on December 31,
2021 of its 30-day advance Notice of its
participation in the Western Energy Imbalance Service
Market (WEIS Market) administered by SPP, which is
scheduled to "go-live" on February 1, 2021. At that
time, WAPA-UGP will apply Energy Imbalance Service and
Generator Imbalance Service charges under its Rate
Schedules in its WAUW BAA based upon the WEIS Market
providing such services effective February 1, 2021 (or
the actual “go-live” date of the WEIS Market, if
later). All load and resources within the WAPA-UGP
WAUW BAA will be subject to settlement under the WEIS
Market pursuant to the provisions of the WEIS Tariff,
and charges to customers for these ancillary services
will be based upon the WEIS Market rates, terms, and
conditions.
The updated WAPA-UGP Rates
Summary/Notices document for 2021 (Rev
2) is located at: http://www.oasis.oati.com/WAPA/WAPAdocs/WAPA-UGP-Rates-2021-0101.pdf
If you have any questions,
please contact Steve Sanders at (406) 255-2840
(sanders@wapa.gov)
11/04/2020 (UGP
Trans. & Anc. Service Rates Posting):
Notice - REVISED
(Rev 1) UGP Rates
Effective 01/01/2021 Posted
UGP
provided notification by email on October 30,
2020 of the posting of its Responses to the Information Requests
received under its 2021 Annual Update to its existing
formula rates
for transmission and ancillary services for the
Pick-Sloan Missouri Basin Program-Eastern Division
(P-SMBP--ED) that are utilized in the SPP Zone 19
pricing zone (also referred to as the Upper
Missouri Zone or UMZ) and also in its WAUW
Balancing Authority Area to
the SPP Exploder List ‘‘Formula Rate Posting Information
Notification’’ (frpin@spplist.spp.org).
UGP also provided notification by email on
November 1, 2020 of the posting
of its REVISED
(Rev 1) rates.
The
details of the REVISED
(Rev 1) 2021
UGP rate calculations (Effective 1/1/2021)
are posted under the "Rates Calculation" sub-folder in the
"Rates" folder, or directly at the following URLs:
WAPA-UGP-Trans-Anc-Service-Rates-ESTIMATE-Templates-2021-0101-Rev1.pdf
(Excel version)
UGP has
also posted the REVISED
(Rev 1) UGP
2019 True-Up calculation under the "Rates Calculation"
sub-folder in the "Rates" folder, or directly at the
following URLs:
WAPA-UGP-Trans-Anc-Service-Rates-2019-TrueUp-Templates-Rev1.pdf (Excel version)
UGP will also post these 2021 Rates updates to the SPP
Member Related Postings page on the SPP OASIS at the
following URL:
http://opsportal.spp.org/OASIS/Directory/Member%20Related%20Postings
The WAPA-UGP Rates
Summary/Notices document for 2021 is located at: http://www.oasis.oati.com/WAPA/WAPAdocs/WAPA-UGP-Rates-2021-0101.pdf
If you have any questions,
please contact Steve Sanders at (406) 255-2840
(sanders@wapa.gov) or Sara Baker at (406)
255-2924 (sbaker@wapa.gov).
09/15/2020
(New UGP Trans. & Anc.
Service Rates Posting): Notice
- Annual Update -- New UGP
Rates Effective 01/01/2021 Posted
UGP
provided notification by email on September 15, 2020 (Customer-Email-WAPA-UGP-2021-Trans-Anc-Service-Rates.pdf)
of its Annual Update to its existing formula rates to the
SPP Exploder List ‘‘Formula Rate Posting Information
Notification’’ (frpin@spplist.spp.org). UGP is
updating its rates for transmission and ancillary services for
the Pick-Sloan Missouri Basin Program-Eastern Division
(P-SMBP--ED) that are utilized in the SPP Zone 19 pricing zone
(also referred to as the Upper Missouri Zone or UMZ) and also
in its WAUW Balancing Authority Area.
The
details of the 2021 UGP rate calculations (Effective
1/1/2021) are posted under the "Rates Calculation"
sub-folder in the "Rates" folder, or directly at the following
URLs:
WAPA-UGP-Trans-Anc-Service-Rates-ESTIMATE-Templates-2021-0101.pdf
(Excel version)
UGP has also
posted the UGP 2019 True-Up calculation under the "Rates
Calculation" sub-folder in the "Rates" folder, or directly
at the following URLs:
WAPA-UGP-Trans-Anc-Service-Rates-2019-TrueUp-Templates.pdf (Excel version)
UGP will also post its 2021 Rates updates to the SPP Member
Related Postings page on the SPP OASIS at the following URL:
http://opsportal.spp.org/OASIS/Directory/Member%20Related%20Postings
Customer Meeting: UGP will host a meeting to
provide Customers and other interested parties an opportunity
to discuss and comment on these recalculated revenue
requirements on September 24, 2020, at 1:00 p.m. MDT (2:00
p.m. CDT) via WebEx. WebEx
information is here: WAPA-UGP-Rates-Annual-Update-Customer-Meeting-2020-0924-Webex-Info.pdf.
Presentation:
Customer-Mtg-Presentation-WAPA-UGP-2021-Trans-Anc-Service-Rates.pdf (TO
BE POSTED -
WHEN AVAILABLE)
The WAPA-UGP Rates Summary/Notices document for 2021 is
located at: http://www.oasis.oati.com/WAPA/WAPAdocs/WAPA-UGP-Rates-2021-0101.pdf
If you have any questions, please
contact Steve Sanders at (406) 255-2840 (sanders@wapa.gov) or
Sara Baker at (406) 255-2924 (sbaker@wapa.gov).
02/08/2020:
(Proposed NEW Business Practice) WAPA has
posted a PROPOSED "Implementation Requirements
under Order 842"
Business
Practice (BP),
under its "Business Practices" folder; "Draft BPs
- 10 Day Comment" sub-folder; and "Business
Practices Common to all Western Regions" link, or directly
via the following URL: www.oasis.oati.com/woa/docs/WAPA/WAPAdocs/Western-Common-Business-Practices-Draft.html
Comments
regarding the proposed BP must be submitted within 10 business
days of the posting date noted at the location above
to:
Steve Sanders at 406-255-2840 (email:
sanders@wapa.gov) and Kass Portra at 406-255-2842 (email:
portra@wapa.gov), OR to your applicable WAPA Regional
Representative(s) as noted in the posting above.
01/26/2020:
(Proposed NEW Business Practice) WAPA has
posted a PROPOSED "Effective Date of Gen Power
Factor Requirements
under Order 827" Business
Practice (BP),
under its "Business Practices" folder; "Draft BPs
- 10 Day Comment" sub-folder; and "Business
Practices Common to all Western Regions" link, or directly
via the following URL: www.oasis.oati.com/woa/docs/WAPA/WAPAdocs/Western-Common-Business-Practices-Draft.html
Comments
regarding the proposed BP must be submitted within 10 business
days of the posting date noted at the location above
to:
Steve Sanders at 406-255-2840 (email:
sanders@wapa.gov) and Kass Portra at 406-255-2842 (email:
portra@wapa.gov), OR to your applicable WAPA Regional
Representative(s) as noted in the posting above.
10/21/2019:
(UGP
Transmission/Ancillary Rates for SPP) Notice
of Posting of Formula Rate Templates (FRTs) for the
Proposed UGP Transmission/Ancillary Rates (Rate Order No. WAPA-188)
As a follow-up to the 9/18/19 postings, in addition to the
information previously provided, UGP has provided
notification by email on October 21, 2019 to the SPP Exploder List ‘‘Formula Rate
Posting Information Notification’’ (frpin@spplist.spp.org)
and posted the following proposed UGP
Transmission/Ancillary Rates Formula Rate Templates (FRTs) (Effective 10/1/20) for
review and comment. The FRTs
are located in
the “Rate Order No. WAPA-188” page under the “Rates” folder,
and at the direct URLs:
WAPA-UGP-Trans-Anc-Service-Rates-ESTIMATE-Templates--Rate-Order-No-WAPA-188-DRAFT.xlsx (PDF Version)
WAPA-UGP-Trans-Anc-Service-Rates-TRUEUP-Templates--Rate-Order-No-WAPA-188-DRAFT.xlsx
(PDF Version)
If you have any questions,
please contact Steve Sanders at (406) 255-2840
(sanders@wapa.gov) or Sara Baker at
(406) 255-2924 (sbaker@wapa.gov).
Please send written
comments by email to UGPTrates@wapa.gov
or to the address below:
Rates Manager
Upper Great Plains Region
Western Area Power Administration
2900 4th Ave North
Billings, MT 59101-1266
Fax: (406) 255-2900
Comments must be received by November
20, 2019.
10/16/2019
(New UGP Trans. & Anc.
Service Rates Posting): Notice -
Annual Update -- New UGP Rates
Effective 01/01/2020 Posted
UGP
provided notification by email on October 16, 2019 (Customer-Email-WAPA-UGP-2020-Trans-Anc-Service-Rates.pdf)
of its Annual Update to its existing formula rates to the
SPP Exploder List ‘‘Formula Rate Posting Information
Notification’’ (frpin@spplist.spp.org). UGP is updating
its rates for transmission and ancillary services for the
Pick-Sloan Missouri Basin Program-Eastern Division (P-SMBP--ED)
that are utilized in the SPP Zone 19 pricing zone (also referred
to as the Upper Missouri Zone or UMZ) and also in its WAUW
Balancing Authority Area. The details of the 2020 UGP rate
calculations (Effective 1/1/2020) are posted
under the "Rates Calculation" subfolder in the "Rates" folder,
or directly at the following URLs:
WAPA-UGP-Trans-Anc-Service-Rates-ESTIMATE-2020-0101.pdf
(Excel version)
UGP has also
posted the UGP 2018 True-Up calculation under the "Rates
Calculation" subfolder in the "Rates" folder, or directly at
the following URLs:
WAPA-UGP-Trans-Anc-Service-Rates-2018-TrueUp.pdf (Excel version)
UGP will also post its 2020 Rates updates to the SPP Member
Related Postings page on the SPP OASIS at the following URL:
http://opsportal.spp.org/OASIS/Directory/Member%20Related%20Postings
Customer Meeting: UGP will host a meeting to
provide Customers and other interested parties an opportunity to
discuss and comment on these recalculated revenue requirements
on October 29, 2019, at 9:00 a.m. MDT (10:00 a.m. CDT)
at the UGP offices located at 2900 4th Avenue North, 6th Floor,
Billings, MT. The meeting will also be available via WebEx. WebEx
information is here: WAPA-UGP-Rates-Annual-Update-Customer-Meeting-2019-1029-Webex-Info.pdf.
Presentation:
Customer-Mtg-Presentation-WAPA-UGP-2020-Trans-Anc-Service-Rates.pdf (TO
BE POSTED -
WHEN AVAILABLE)
The WAPA-UGP Rates Summary/Notices document for 2020 is located
at: http://www.oasis.oati.com/WAPA/WAPAdocs/WAPA-UGP-Rates-2020-0101.pdf
If
you have any questions, please contact Steve Sanders at (406)
255-2840 (sanders@wapa.gov) or Sara Baker at (406)
255-2924 (sbaker@wapa.gov).
09/18/2019:
(UGP
Transmission/Ancillary Rates for SPP) Notice
of Posting of Information/Presentations for the Proposed
UGP Transmission/Ancillary Rates (Rate
Order No. WAPA-188)
The following Information/Presentations has (or will be posted
in the near future) for the Proposed UGP Transmission/Ancillary
Service Rates:
1. Rates Customer Brochure; describing proposed Transmission and
Ancillary Service Rates:
WAPA-UGP-Trans-Ancillary-Rates-Customer-Brochure--Rate-Order-No-WAPA-188.pdf
(Posted 9/18/19)
2. Public Information Forum Presentation: Rate-Order-No-WAPA-188-Public-Information-Forum-Presentation.pdf
(Posted 9/18/19)
3.
Public Comment Forum Presentation: Rate-Order-No-WAPA-188-Public-Comment-Forum-Presentation.pdf
(Posted 9/18/19)
4. Proposed Rate Schedules (Redlines): WAPA-UGP-Rate-Schedules--Rate-Order-No-WAPA-188-DRAFT(Redlines).pdf
(Posted 9/18/19)
5. Proposed
Rate Schedules (Clean): WAPA-UGP-Rate-Schedules--Rate-Order-No-WAPA-188-DRAFT(Clean).pdf
(Posted 9/18/19)
6. Proposed Formula Rate Implementation
Protocols: WAPA-UGP-Formula-Rate-Implementation-Protocols--Rate-Order-No-WAPA-188-DRAFT.pdf
(Posted 9/18/19)
7. Proposed Rate Templates for Transmission
and Ancillary Service:
WAPA-UGP-Trans-Anc-Service-Rate-Templates--Rate-Order-No-WAPA-188-DRAFT.xlsx
(TO BE POSTED - WHEN AVAILABLE)
WAPA-UGP-Trans-Anc-Service-Rate-Templates--Rate-Order-No-WAPA-188-DRAFT.pdf
(TO BE POSTED - WHEN
AVAILABLE)
08/23/2019: (UGP Transmission/Ancillary Rates
for SPP) Notice of Proposed UGP
Transmission/Ancillary Rates - Federal Register notice,
Announcement of Public Information and Public Comment Forums (Rate
Order No. WAPA-188)
As described in the August 22, 2019, Federal Register notice (FRN-Proposed-UGP-Trans-Anc-Service-Rates-2019-0822.pdf),
Western
Area Power
Administration (WAPA) proposes new formula rates for the
Pick-Sloan Missouri Basin Program—Eastern Division (P–SMBP—ED)
transmission and ancillary services. These rates will be used by
the WAPA Upper Great Plains Region (UGP) to provide rate data to
the Southwest Power Pool, Inc. (SPP), the Regional Transmission
Organization of which UGP is a member. The existing rates for
services expire on September 30, 2020. The proposed rates should
not result in increased overall costs to customers compared to
the current formula rates because the increase to the Operating
Reserves rate is expected to be offset by a similar reduction in
the transmission rate. The proposed rates continue the
formula-based methodology that includes an annual update to the
financial data in the rate formulas with only limited changes
to: (1) The Rate Formula Templates to increase transparency; (2)
the Rate Formula Implementation Protocols to clarify the UGP
rate implementation and annual update procedures; (3) the
Operating Reserves formula rates to incorporate costs associated
with the UGP current reserve sharing group membership; and (4)
the Rate Schedules for Energy Imbalance and Generator Imbalance
to accommodate possible participation in a Western
Interconnection energy imbalance service market. WAPA intends
the proposed formula-based rates, if adopted, to go into effect
on October 1, 2020. The charges under the rates would be updated
on January 1 of each year thereafter. The proposed formula rates
would remain in effect until September 30, 2025, or until WAPA
changes the formula rates through another public rate process
pursuant to 10 CFR part 903, whichever occurs first.
Transmission and ancillary
services are provided by SPP over UGP facilities transferred
to the functional control of SPP under the SPP Open Access
Transmission Tariff (SPP Tariff). UGP needs to adopt new
formula rates for these transmission and ancillary services so
the UGP costs can continued to be recovered under the SPP
Tariff. The proposed formula rates provide UGP sufficient
revenue to pay all annual costs, including interest expenses,
and repay investment. The UGP membership in SPP and the
functional control of its facilities is in accordance with the
SPP
Membership Agreement, Bylaws, and Tariff (SPP Governing
Documents) and other contractual
arrangements with SPP.
WAPA provided notification and posted information by email on
August 23, 2019 about the proposed formula rates to the SPP
‘‘Formula Rate Posting Information Notification’’ Exploder
List: frpin@ spplist.spp.org
Publication of the August 22, 2019, Federal Register notice
begins the formal process for the proposed formula rates.
The consultation and comment period begins with the Federal
Register notice publication and will end November 20,
2019. WAPA will accept written comments any time
during the 90-day consultation and comment period. WAPA will
present a detailed explanation of the proposed formula rates and
other modifications at the following public information forums:
September 24, 2019, from 9
a.m. to 10:30 a.m. CDT -- Holiday Inn Downtown Omaha,
1420 Cuming St. Omaha, NE
September 25,
2019, from 9
a.m. to 10:30 a.m.
CDT -- Radisson Hotel Bismarck,
605 East Broadway, Bismarck, ND
WAPA will
accept oral and written comments at the following public comment
forums:
September
24, 2019, from 11 a.m. to no
later than 12 p.m. CDT -- Holiday Inn Downtown
Omaha, 1420 Cuming St. Omaha, NE
September 25,
2019, from
11 a.m. to
no later than 12
p.m. CDT
-- Radisson Hotel
Bismarck, 605 East Broadway, Bismarck, ND
Information on this rate process is, or will be,
posted on: 1) the UGP OASIS at http://www.oasis.oati.com/wapa/index.html;
2) the UGP Rates Web Page at: https://www.wapa.gov/regions/UGP/rates/Pages/rates.aspx;
and 3) the "Western Area Power Administration UGP
Information" link on the SPP Member Related Postings website at:
http://opsportal.spp.org/OASIS/Directory/Member%20Related%20Postings
The proposed Transmission and Ancillary Rates are described in
the Rate Brochure:
WAPA-UGP-Trans-Ancillary-Rates-Customer-Brochure--Rate-Order-No-WAPA-188.pdf (TO BE POSTED - WHEN AVAILABLE)
The presentations given at the public meetings
and any future information, will be available in the "Rates"
Folder on the WAPA OASIS and other links noted above.
Rate-Order-No-WAPA-188-Public-Information-Forum-Presentation.pdf
Rate-Order-No-WAPA-188-Public-Comment-Forum-Presentation.pdf
(TO BE POSTED
- WHEN
AVAILABLE)
12/29/2018
(New UGP Trans. & Anc.
Service Rates Posting): Notice -
REVISED UGP Rates
Effective 01/01/2019 Posted
As described in the December 28,
2018, letter to Customers ( Customer-Letter-WAPA-UGP-2019-Trans-Anc-Service-Rates-REVISED.pdf),
UGP has REVISED its updated rates for transmission and ancillary
services for the Pick-Sloan Missouri Basin Program-Eastern
Division (P-SMBP--ED) that are utilized in the SPP Zone 19
pricing zone (also referred to as the Upper Missouri Zone or
UMZ) and also in its WAUW Balancing Authority Area. The letter to
Customers and details of the REVISED 2019 UGP rate
calculations are posted under the "Rates Calculation" subfolder
in the "Rates" folder, or directly at the following URL: WAPA-UGP-Trans-Anc-Service-Rates-Calc-2019-0101(Rev1).pdf
UGP has also
posted the REVISED UGP 2017 True-Up calculation
under the "Rates Calculation" subfolder in the "Rates" folder,
or directly at the following URL: WAPA-UGP-Trans-Anc-Service-Rates-2017-TrueUp(Rev1).pdf
UGP will also post its REVISED 2019 Rates updates to the
SPP Member Related Postings page on the SPP OASIS at the
following URL:
http://opsportal.spp.org/OASIS/Directory/Member%20Related%20Postings
If
you have any questions, please contact Steve Sanders at (406)
255-2840 (sanders@wapa.gov).
09/25/2018
(New UGP Trans. & Anc.
Service Rates Posting): Notice -
New UGP Rates Effective 01/01/2019 Posted
10/30/18 Customer
Meeting Presentation: Customer-Mtg-Presentation-WAPA-UGP-2019-Trans-Anc-Service-Rates.pdf
As described in the September 25,
2018, letter to Customers ( Customer-Letter-WAPA-UGP-2019-Trans-Anc-Service-Rates.pdf),
UGP is updating its rates for transmission and ancillary
services for the Pick-Sloan Missouri Basin Program-Eastern
Division (P-SMBP--ED) that are utilized in the SPP Zone 19
pricing zone (also referred to as the Upper Missouri Zone or
UMZ) and also in its WAUW Balancing Authority Area. The letter to
Customers and details of the 2019 UGP rate calculations are
posted under the "Rates Calculation" subfolder in the "Rates"
folder, or directly at the following URL: WAPA-UGP-Trans-Anc-Service-Rates-Calc-2019-0101.pdf
UGP has also
posted the UGP 2017 True-Up calculation under the "Rates
Calculation" subfolder in the "Rates" folder, or directly at
the following URL: WAPA-UGP-Trans-Anc-Service-Rates-2017-TrueUp.pdf
UGP will also post its 2019 Rates updates to the SPP Member
Related Postings page on the SPP OASIS at the following URL:
http://opsportal.spp.org/OASIS/Directory/Member%20Related%20Postings
UGP will host a meeting to provide Customers and other
interested parties an opportunity to discuss and comment on
these recalculated revenue requirements on October 30, 2018, at
1:00 p.m. MDT (2:00 p.m. CDT) at the UGP offices located at 2900
4th Avenue North, 6th Floor, Billings, MT. The meeting will also
be available via WebEx. For those desiring to attend the meeting
in person or via WebEx, please contact Sara Baker at (406)
255-2924 or sbaker@wapa.gov before October 30, 2018, for meeting
or WebEx access information.
If
you have any questions, please contact Steve Sanders at (406)
255-2840 (sanders@wapa.gov).
06/05/2018:
(Proposed
Business Practice REVISION) WAPA has posted
a PROPOSED
REVISION to its Meter Policy Business Practice (BP), under its "Business
Practices" folder; "Draft BPs - 10 Day Comment"
sub-folder; and "Business Practices Common to all
Western Regions" link, or directly via the following URL: www.oasis.oati.com/woa/docs/WAPA/WAPAdocs/Western-Common-Business-Practices-Draft.html
Comments
regarding the proposed BP revision must be submitted within 10 business days of
the posting date noted at the location above to:
Steve
Sanders at 406-255-2840 (email: sanders@wapa.gov) and Kass
Portra at 406-255-2842 (email: portra@wapa.gov), OR to your
applicable WAPA Regional Representative(s) as noted in the
posting above.
01/19/2018:
(Proposed
Business Practice REVISION) WAPA has posted
a PROPOSED
REVISION to its Network Upgrades Policy Business
Practice (BP), under its
"Business Practices" folder; "Draft BPs - 10 Day Comment"
sub-folder; and "Business Practices Common to all
Western Regions" link, or directly via the following URL: www.oasis.oati.com/woa/docs/WAPA/WAPAdocs/Western-Common-Business-Practices-Draft.html
The WAPA
"Transmission System Network Upgrades Policy Document" has
limited applicability to Western-UGP and will not be applicable
to transmission service on the transmission facilities that
Western-UGP has transferred functional control of to SPP, and
for which transmission service is offered under the SPP
Tariff. Comments regarding the proposed BP revision must
be submitted within
10 business days of the posting date noted at the location
above to:
Steve
Sanders at 406-255-2840 (email: sanders@wapa.gov) and Kass
Portra at 406-255-2842 (email: portra@wapa.gov), OR to your
applicable WAPA Regional Representative(s) as noted in the
posting above.
(10/30/2017 - Presentation Posted)
09/27/2017 (New
UGP Trans. & Anc. Service Rates Posting): Notice -
New UGP Rates Effective 01/01/2018 Posted
10/31/17 Customer Meeting
Presentation: Customer-Mtg-Presentation-WAPA-UGP-2018-Trans-Anc-Service-Rates.pdf
As described in the September 26,
2017, letter to Customers ( Customer-Letter-WAPA-UGP-2018-Trans-Anc-Service-Rates.pdf),
Western-UGP is updating its rates for transmission and ancillary
services for the Pick-Sloan Missouri Basin Program-Eastern
Division (P-SMBP--ED) that are utilized in the SPP Zone 19
pricing zone (also referred to as the Upper Missouri Zone or
UMZ) and also in its WAUW Balancing Authority Area. The letter to
Customers and details of the 2018 UGP rate calculations are
posted under the "Rates Calculation" subfolder in the "Rates"
folder, or directly at the following URL: WAPA-UGP-Trans-Anc-Service-Rates-Calc-2018-0101.pdf
Western-UGP
has also posted the UGP 2016 True-Up calculation under the
"Rates Calculation" subfolder in the "Rates" folder, or
directly at the following URL: WAPA-UGP-Trans-Anc-Service-Rates-2016-TrueUp.pdf
Western-UGP will also post its 2018 Rates updates to the SPP
Member Related Postings page on the SPP OASIS at the following
URL:
http://sppoasis.spp.org/documents/SWPP/MemberRelatedPostings/MemberRelatedPostings.asp
Western-UGP will host a meeting to provide customers and
other interested parties an opportunity to discuss and comment
on these recalculated revenue requirements on October 31, 2017,
at 9:00a.m. MDT at the Western offices located at 2900 4th
Avenue North, 6th Floor, Billings, MT. The meeting will also be
available via WebEx. For those desiring to attend the meeting in
person or via WebEx, please contact Sara Baker at (406) 255-2924
or sbaker@wapa.gov before October 31, 2017, for meeting or WebEx
access information.
If
you have any questions, please contact Steve Sanders at (406)
255-2840 (sanders@wapa.gov).
06/27/2017: (Proposed
Business Practice) WAPA has posted two (2) PROPOSED
WAPA-wide Business Practices (BPs) related to Behind the
Meter Generation under its OATT and to its General
Requirements for Interconnection (GRI), under its "Business
Practices" folder; "Draft BPs - 10 Day Comment"
sub-folder; and "Business Practices Common to all
Western Regions" link, or directly via the following URL: www.oasis.oati.com/woa/docs/WAPA/WAPAdocs/Western-Common-Business-Practices-Draft.html
The WAPA Behind
the Meter Generation BP will not be applicable to transmission
service on the transmission facilities that Western-UGP has
transferred functional control of to SPP, and for which
transmission service is offered under the SPP Tariff.
Comments regarding the proposed BP(s) should be submitted within 10 business days of
the posting date noted at the location above to:
Steve
Sanders at 406-255-2840 (email: sanders@wapa.gov) and Kass
Portra at 406-255-2842 (email: portra@wapa.gov)
10/21/2016 (New
UGP Trans. & Anc. Service Rates Posting): Notice -
New UGP Rates Effective 01/01/2017 Posted (10/31/16 - Presentation Posted)
10/31/16 Customer Meeting
Presentation: Customer-Mtg-Presentation-UGP-Trans-Anc-Service-Rates-2017.pdf
As described in
the October 21, 2016, letter to Customers ( Customer-Letter-UGP-Trans-Anc-Service-Rates-2016-1021.pdf),
Western-UGP is updating its rates for transmission and ancillary
services for the Pick-Sloan Missouri Basin Program-Eastern
Division (P-SMBP--ED) that are utilized in the SPP Zone 19
pricing zone (also referred to as the Upper Missouri Zone or
UMZ) and also in its WAUW Balancing Authority Area. The letter to
Customers and details of the 2017 UGP rate calculations are
posted under the "Rates Calculation" subfolder in the "Rates"
folder, or directly at the following URL: UGP-Trans-Anc-Service-Rates-Calc-2017-0101.pdf
Western-UGP
has also posted the UGP 2015 True-Up calculation under the
"Rates Calculation" subfolder in the "Rates" folder, or
directly at the following URL: UGP-Trans-Anc-Service-Rates-2015-TrueUp.pdf
Western-UGP will host a meeting to provide customers and
other interested parties an opportunity to discuss and comment
on these recalculated revenue requirements on October 31, 2016,
at 9:00a.m. MDT at the Western offices located at 2900 4th
Avenue North, 6th Floor, Billings, MT. The meeting will also be
available via WebEx. For those desiring to attend the meeting in
person or via WebEx, please contact Sara Baker at (406) 255-2924
or sbaker@wapa.gov before October 31, 2016, for meeting or WebEx
access information.
Western-UGP
has also posted the IS 2015 True-Up calculation under the
"Historic IS Rates Calculations" subfolder in the "Historic IS
Info - Rates" folder, or directly at the following URL: IS-Trans-Anc-Service-Rates-2015-TrueUp.pdf
If
you have any questions, please contact Steve Sanders at (406)
255-2840 (sanders@wapa.gov).
03/03/2016:
(UGP Trans. & Anc.
Service Rates Posting) On February
18, 2016, a Federal Register Notice
(FRN) was published providing notice (ACTION) of transfer of
functional control of eligible Western-Upper Great Plains
Region transmission facilities to Southwest Power Pool, Inc.
on October 1, 2015, and Rate Schedules WAUGP-ATRR,
WAUGP-AS1, WAUW-AS3, WAUW-AS4, WAUW-AS5, WAUW-AS6 and
WAUW-AS7 made effective on that date. The Federal
Register Notice summary follows:
SUMMARY:
Western Area Power Administration (Western) transferred
functional control of eligible Western-Upper Great Plains Region
(Western-UGP) transmission facilities to Southwest Power Pool,
Inc. (SPP) on October 1, 2015. Transmission service is being
provided over the Western-UGP eligible facilities under the SPP
Open Access Transmission Tariff. Western-UGP costs are included
in Western-UGP Formula rates for Transmission and Ancillary
Services under Rate Schedules WAUGP-ATRR, WAUGP-AS1, WAUW-AS3,
WAUW-AS4, WAUW-AS5, WAUW-AS6 and WAUW-AS7, which became
effective on October 1, 2015.
-----------------------------------------------------------------------
SUPPLEMENTARY INFORMATION: On July 27, 2015,
Western published a Federal Register Notice (80 FR 44339)
providing a Notice of Final Transmission and Ancillary Services
Formula Rates for the Western Pick-Sloan Missouri Basin
Program-Eastern Division (P-SMBP--ED). Western explained that
Western-UGP intended to transfer functional control of the
Western-UGP PSMBP--ED eligible transmission facilities located
in the Upper Missouri Zone (UMZ or Zone 19) to SPP on October 1,
2015. Western announced the final transmission and ancillary
services formula rates and the P-SMBP--ED transmission and
ancillary services formula rates would go into effect when
functional control was transferred to SPP. The purpose of this
notice is to announce that Western-UGP successfully transferred
functional control of eligible transmission facilities on
October 1, 2015, and Rate Schedules WAUGP-ATRR, WAUGP-AS1,
WAUW-AS3, WAUW-AS4, WAUW-AS5, WAUW-AS6 and WAUW-AS7 were made
effective on that date.
The Federal
Register Notice is available at the following
link: FRN-UGP-Trans-Anc-Service-Rates-Notice-2016-0218.pdf.
If you have any questions, please
contact Steve Sanders at (406) 255-2840 (sanders@wapa.gov).
12/03/2015 :
(Proposed
Business Practice) Western-UGP has posted a PROPOSED
WAUW Balancing Authority Area related Business Practice (BP) for
Miles City DC Tie Tag Curtailments due to Deadband, under its "Business
Practices" folder; "Draft BPs - 10 Day Comment"
sub-folder; and "UGPR Draft Business Practices"
link, or directly via the following URL: http://www.oasis.oati.com/WAPA/WAPAdocs/Western-UGPR-Business-Practices-Draft.html
This
Western-UGP BP will be provided to SPP, and also posted by SPP
on its OASIS page upon reaching Effective BP status given its
potential impacts on transmission service provided by SPP under
the SPP Tariff. Comments regarding the proposed BP(s)
should be submitted within
10 business days of the posting date noted at the location
above to:
Steve
Sanders at 406-255-2840 (email: sanders@wapa.gov) and Kass
Portra at 406-255-2842 (email: portra@wapa.gov)
11/29/2015 :
(Proposed
Business Practice) Western has posted a PROPOSED
Western-wide Business Practice (BP) related to Curtailments
under its OATT, under
its "Business Practices" folder; "Draft BPs - 10
Day Comment" sub-folder; and "Business Practices Common to all
Western Regions" link, or directly via the following URL: www.oasis.oati.com/woa/docs/WAPA/WAPAdocs/Western-Common-Business-Practices-Draft.html
This Western BP
will not be applicable to the transmission facilities that
Western-UGP has transferred functional control of to SPP, and
for which transmission service is offered under the SPP
Tariff. Comments regarding the proposed BP(s) should be
submitted within 10
business days of the posting date noted at the location above
to:
Steve
Sanders at 406-255-2840 (email: sanders@wapa.gov) and Kass
Portra at 406-255-2842 (email: portra@wapa.gov)
10/07/2015
(Updated) (New UGP Trans. & Anc.
Service Rates Posting): Notice -
New UGP Rates Effective 01/01/2016 Posted
10/29/2015 Update
-- 10/29/15 Customer Meeting Presentation: Customer-Mtg-Presentation-UGP-Trans-Anc-Service-Rates-2016.pdf
As described in
the October 6, 2015, letter to Customers ( Customer-Letter-UGP-Trans-Anc-Service-Rates-2015-1006.pdf
), Western-UGP is updating its rates for transmission
and ancillary services for the Pick-Sloan Missouri Basin
Program-Eastern Division (P-SMBP--ED) that are utilized in the
SPP Zone 19 pricing zone (also referred to as the Upper Missouri
Zone or UMZ) and also in its WAUW Balancing Authority Area. The letter to
Customers and details of the 2016 UGP rate calculations are
posted under the "Rates Calculation" subfolder in the "Rates"
folder, or directly at the following URL: UGP-Trans-Anc-Service-Rates-Calc-2016-0101.pdf
Western-UGP will host a meeting to provide customers and other
interested parties an opportunity to discuss and comment on
these recalculated revenue requirements on October 29, 2015, at
9:00a.m. MDT at the Western offices located at 2900 4th Avenue
North, 6th Floor, Billings, MT. The meeting will also be
available via WebEx. For those desiring to attend the meeting in
person or via WebEx, please contact Sara Baker at (406) 255-2924
or sbaker@wapa.gov before October 29, 2015, for meeting or WebEx
access information.
Western-UGP
has also posted the IS 2014 True-Up calculation under the
"Historic IS Rates Calculations" subfolder in the "Historic IS
Info - Rates" folder, or directly at the following URL: IS-Trans-Anc-Service-Rates-2014-TrueUp.pdf
If
you have any questions, please contact Steve Sanders at (406)
255-2840 (sanders@wapa.gov).
10/01/15
: Status of Western-UGP Membership
in SPP, Impacts to Existing IS Customers
Western-UGP transferred functional control of its eligible
transmission facilities to SPP on midnight September 30,
2015. Therefore, as of October 1, 2015, all IS
transmission service was terminated. The Western-UGP
OASIS home page was transitioned and is now hosted on the SPP
OASIS. All of the TSRs on the Western-UGP OASIS home
page that represent the previous IS transmission service have
been recalled effective October 1, 2015 and beyond.
Western-UGP is currently updating its OASIS home page to
maintain the necessary IS historical information and to post
relevant information related to its membership in SPP.
If you have any questions, please contact Steve Sanders at
(406) 255-2840 (sanders@wapa.gov).
------
07/29/2015 (Updated 08/04/2015) : (Western UGP
Transmission and Ancillary Rates for SPP Integration):
Notice - New Western UGP Transmission and Ancillary Rates
Effective 10/01/2015 for SPP Integration
08/04/2015 Update - Western-UGP
Transmission Facilities Eligible for SPP Inclusion (2015) - Direct link to document
already posted in the "SPP Integration" Folder added here for
convenience. This document shows the Western-UGP
Transmission Facilities included (and also excluded) in its 2015
transmission rates.
Western-UGP-Trans-Facilities-Eligible-for-SPP-Inclusion-2015.pdf
In addition, with Western's recent
Web Site updates, the old URL
http://www.wapa.gov/ugp/rates/default.htm may not
work. Information regarding this rate process is
also posted on the Upper Great Plains Region's Rates
Web Page at the new URL: https://www.wapa.gov/regions/UGP/rates/Pages/rates.aspx
The July 27, 2015, Federal
Register notice placing formula transmission and ancillary
services rates for Western Area Power Administration's (Western)
Pick-Sloan Missouri Basin Program--Eastern Division (P-SMBP--ED)
into effect on an interim basis effective October 1, 2015, upon
transfer of functional control of eligible Western-Upper Great
Plains Region (Western-UGP) transmission facilities to Southwest
Power Pool, Inc. (SPP) is available at the following link: FRN-UGP-Trans-Anc-Service-Rates-2015-0727.pdf.
These formula rates will remain in effect until September 30,
2020, pending approval by the Federal Energy Regulatory
Commission (FERC) on a final basis or until superseded.
Notification of the transfer of functional control and the
effective date of the formula rates will be published in the Federal
Register. These formula rates will be recalculated
annually using updated financial information from Western-UGP
and submitted to SPP to provide and bill for services under the
SPP Tariff The Federal Register Notice summary
follows:
ACTION:
Notice of Final Transmission and Ancillary Services Formula
Rates.
-----------------------------------------------------------------------
SUMMARY: The
Deputy Secretary of Energy confirmed and approved Rate Order No.
WAPA-170 and Rate Schedules WAUGP-ATRR, WAUGP-AS1, WAUW-AS3,
WAUW-AS4, WAUW- AS5, WAUW-AS6 and WAUW-AS7. Through this notice,
the Western Area Power Administration (Western), places formula
transmission and ancillary services rates for Western's
Pick-Sloan Missouri Basin Program-Eastern Division (P-SMBP--ED)
into effect on an interim basis. The provisional rates will be
in effect until the Federal Energy Regulatory Commission (FERC)
confirms, approves, and places them into effect on a final
basis, or until they are superseded. The provisional formula
rates will provide sufficient revenue to pay all associated
annual costs, including interest expense, and repay required
investment within the allowable periods.
DATES: Formula rates for Transmission and Ancillary
Services under Rate Schedules WAUGP-ATRR; WAUGP-AS1, WAUW-AS3,
WAUW-AS4, WAUW-AS5, WAUW-AS6 and WAUW-AS7 are effective on the
first day of the first full billing period beginning on or after
October 1, 2015, upon transfer of functional control of eligible
Western-Upper Great Plains Region (Western-UGP) transmission
facilities to Southwest Power Pool, Inc. (SPP) and will remain
in effect until September 30, 2020, pending approval by FERC on
a final basis or until superseded. Notification of the transfer
of functional control and the effective date of the formula
rates will be published in the Federal Register.
Western sent the following letter, dated
July 28, 2015, to its Transmission Customers and Other
Interested Parties: Customer-Letter-UGP-Trans-Anc-Service-Rates-2015-0728.pdf
12/16/2014 : (Western
UGP Transmission and Ancillary Rates for SPP
Integration) Notice of Posted
12/16/14 Updates to Proposed Western UGP Transmission and
Ancillary Rates Brochure and Public Comment Forum Presentation
The proposed
Transmission and Ancillary Rates are described in the Rate
Brochure:
UGP-Trans-Anc-Service-Rate-Brochure-Nov-2014-UPDATED-2014-1216.pdf (Posted
12/16/14)
The presentations given at the public meetings
and any future information, will be available in the "SPP
Integration" Folder on Western's OASIS.
Public-Comment-Forum-Presentation-2014-1217-18.pdf
(Posted
12/16/14)
11/04/2014 (Updated 11/21/2014) : (Western
UGP Transmission and Ancillary Rates for SPP
Integration) Notice of Proposed
Western UGP Transmission and Ancillary Rates - Announcement of
Public Information and Public Comment Forums
As described in the November 3, 2014, Federal Register notice (FRN-Proposed-UGP-Trans-Anc-Service-Rates-2014-1103.pdf),
the Western Area Power
Administration (Western), a power marketing administration
within the Department of Energy (DOE), is proposing new
formula transmission and ancillary services rates for the
Pick-Sloan Missouri Basin Program-Eastern Division
(P-SMBP--ED). The proposed formula rates would become
effective October 1, 2015, and remain in effect until
September 30, 2020, or until Western changes the formula rates
through another public rate process pursuant to 10 CFR part
903, whichever is sooner. Western's Upper Great Plains Region
(Western-UGP) has joined the Southwest Power Pool (SPP)
Regional Transmission Organization (RTO) contingent upon
Federal Energy Regulatory Commission (FERC) approval of the
Western-UGP negotiated provisions in the SPP Membership
Agreement, Bylaws, and Tariff (SPP Governing Documents).
Transmission and ancillary services will be provided over
Western-UGP facilities under the SPP Open Access Transmission
Tariff (Tariff) by SPP as the transmission service provider
upon Western-UGP transferring functional control to SPP.
Western-UGP needs to adopt new formula rates for these
transmission and ancillary services so the Western-UGP costs
can be recovered under the SPP Tariff. These formula rates
will provide Western sufficient revenue to pay all annual
costs, including interest expenses, and repay required
investments within the allowable periods. The Western-UGP
membership in SPP and the functional control of its facilities
will be in accordance with the SPP Governing Documents and
other contractual arrangements with SPP. Publication of this
Federal Register notice begins the formal process for the
proposed rates.
Western sent the following letter, dated 11/3/14, to its
Transmission Customers and Other Interested Parties: Customer-Letter-2014-1103-FRN-Announcement.pdf
Publication of the November 3, 2014, FRN begins the formal
process for the proposed formula rates. The consultation
and comment period begins with the Federal Register notice
publication and will end February 2, 2015. Western will
accept written comments any time during the 90-day consultation
and comment period. Western will present a detailed explanation
of the proposed formula rates at the following public
information forums:
November 19, 2014, from 9
a.m. to 12 p.m. CST -- Holiday Inn Downtown Omaha, 1420
Cuming St. Omaha, NE
November 20, 2014, from 9 a.m. to 12 p.m. CST -- Ramada Plaza
& Suites and Conf. Center, 1635 42nd St. South, Fargo, ND
Western will accept oral and written comments at the following
public comment forums:
December 17, 2014, from 9 a.m. to 12 p.m. CST --
Holiday Inn Downtown Omaha, 1420 Cuming St. Omaha, NE
December 18, 2014, from 9 a.m. to 12 p.m. CST -- Ramada Plaza
& Suites and Conf. Center, 1635 42nd St. South, Fargo, ND
Information on this rate process is posted on
Western's OASIS and at the Upper Great Plains Region's Rates Web
Page at: https://www.wapa.gov/regions/UGP/rates/Pages/rates.aspx
The proposed Transmission and Ancillary Rates are described in
the Rate Brochure:
UGP-Trans-Anc-Service-Rate-Brochure-Nov-2014.pdf (Posted
11/21/14)
The presentations given at the public meetings
and any future information, will be available in the "SPP
Integration" Folder on Western's OASIS.
Public-Information-Forum-Presentation-2014-1119-20.pdf
(Posted
11/21/14)
09/11/14
: SPP FERC Filing of proposed changes
to the SPP Tariff, Membership Agreement, and Bylaws for
Western (and other IS members) Integration into SPP SPP-FERC-Filing-ER14-2850-IS-Tariff-Changes-2014-0911.pdf
SPP-FERC-Filing-ER14-2851-IS-Bylaws-MA-Changes-2014-0911.pdf
(09/05/2014 Update - Customer
Letter Posted) 08/31/14 : Status
of Western UGPR (and other IS Parties) Efforts to Pursue
Membership in SPP, Impacts to Existing IS Customers, Proposed
Kick-off Informational Webinar on 9/12/14 @ 1pm CDT (Update)
Customer
Letter Dated 9/3/14
Western (UGPR) and the other IS Parties have completed formal
negotiations with the Southwest Power Pool (SPP) concerning
membership and have received SPP Board of Director's approval of
the requested changes to the SPP Membership Agreement, SPP
Bylaws, and SPP Tariff to accommodate the integration of the IS
Parties into SPP, planned for October 1, 2015.
All of the IS Parties have received the necessary internal
approvals and authorizations to proceed with joining SPP.
On July 8, 2014, the Heartland Consumers Power District Board of
Directors approved a resolution authorizing execution of a
membership agreement with SPP. On July 9, 2014, Western's
Administrator Mark Gabriel approved and directed Western's Upper
Great Plains Region to take the necessary actions to accomplish
full membership with SPP (contingent upon FERC approval of the
Western negotiated provisions). Western
Press Release. On July 16, 2014, the Basin Electric
Power Cooperative Board of Directors authorized joining of SPP
subject to FERC approval of necessary documents.
SPP plans to file the proposed IS Parties' Member Agreements,
Bylaws changes, and SPP Tariff changes early September 2014 to
FERC for approval.
IMPACTS to EXISTING IS CUSTOMERS:
Subject to obtaining the required approvals from FERC that
maintain the negotiated provisions with SPP, the IS Parties plan
to integrate as full members of SPP effective October 1,
2015. At that time, no transmission service on the IS will
be offered under Western's Tariff and under the IS Rates, and
Transmission Customers will need to obtain all transmission and
ancillary services from SPP under the SPP Tariff and under the
applicable SPP Rates. Western intends to exercise the
provision in Western's Tariff and Transmission and Network
Service Agreements allowing Western to terminate such Service
Agreements to allow it to join an Independent System Operator by
providing a one-year written termination notice.
Therefore, existing IS Customers will need to make arrangements
to become eligible Transmission Customers of SPP, document their
existing transmission service with SPP to be included in the
Transmission Congestion Rights (TCR) market, and transition
their existing IS service to SPP service. Information
regarding SPP registration procedures, schedules, and contact
information for SPP staff, can be found at the following
link: SPP
Registration Information for IS Customers
KICK-OFF INFORMATIONAL WEBINAR:
Western (UGPR), as the IS Administrator, will be hosting a
kick-off Informational Webinar on Friday, September 12, 2014, at
1pm CDT to provide additional details on the upcoming SPP
integration and answer IS Customer questions. Those
parties desiring to attend the Webinar will need to contact Ms.
Kass Portra at (406) 255-2842 (or by email at portra@wapa.gov) for access
information.
Western will be posting detailed information and status updates
regarding the SPP integration in the "SPP Integration" folder on
Western's WAPA OASIS page as it becomes available.
11/05/2013 : Alternative Operations Study (AOS),
Letter to Customers, Announcement of Public Meetings
Western
Area Power Administration, Upper Great Plains Region, a
power marketing administration of the Department of Energy,
is publishing a recommendation to pursue formal negotiations
with the Southwest Power Pool, a Regional Transmission
Organization, concerning membership. Western is
seeking public comment from Western’s customers, Tribes,
stakeholders, and the public at large. A decision to
pursue implementation of the recommendation is expected
mid-December and will be posted on Western's AOS website: https://www.wapa.gov/regions/UGP/PowerMarketing/Pages/spp-membership.aspx
.
The
Federal Register Notice
was published on 11/01/13. The 45-day public comment
period is open from 11/1/13 through 12/16/13.
Documentation related to the AOS is available at the Western
website above.
Western
plans several meetings where it will present a detailed
explanation of the AOS Team's findings and recommendation.
Public comment forums will be held on the following dates (see
the website above for meeting locations and other details
regarding submission of comments).
November 13, 2013 (9 am to no later than 1 pm MST) - Webinar
November 19, 2013 (8:30 am to no later than 1 pm CST) - Meeting
in Lincoln, NE
November 20, 2013 (8:30 am to no later than 1 pm CST) - Meeting
in Sioux Falls, SD
November 21, 2013 (8:30 am to no later than 1 pm CST) - Meeting
in Fargo, ND
For further information, please contact:
Jody
S. Sundsted, UGP Power Marketing Manager
Western Area Power Administration
Upper Great Plains Region
2900 4th Avenue North, Suite 600
Billings, MT 59101-1266
Telephone (406) 255-2910, email sundsted@wapa.gov
09/13/13 : (New
Rates Postings): IS 2014 Rates Update Letter to
Customers, Announcement of Public Meeting, Posting of IS Rates
2012 True-up Calculation
Western
will
host a meeting to provide customers an opportunity to discuss
and comment on the Integrated System (IS) 2014 recalculated
rates on October 15, 2013, at 1:30 p.m. MDT at Western's
offices located at 2900 4th Avenue North, 6th Floor, Billings,
Montana, as described in the 09/13/2013 letter to
customers. The meeting will also be available via WebEx,
and those desiring to attend the meeting via WebEx will need
to contact Ms. Sara Baker at (406) 255-2924 (or by email at sbaker@wapa.gov) before
September 27, 2013 for access information. If you will attend
in person, please e-mail your intention to do so to UGPISRate@wapa.gov prior to
September 27,2013
Presentation:
Customer-Information-Meeting-Presentation-2013-1015.pdf
(TO BE POSTED,
when available)
The details
of the 2014 IS rate calculations, and 2012 IS rate true-up
calculation are posted under the "Rates/Losses Calculation"
subfolder in the "Rates/Losses" folder on Western's WAPA OASIS
page, or directly at the following URLs:
IS-Rate-Calculation-2014-0101.pdf
IS-Rate-TrueUp-Calculation-2012.pdf
08/13/2013 :
(Proposed
Environmental Clause Templates Update) Western has
posted PROPOSED updates to its existing Environmental Clause Templates (EA
and EIS Review Agreements) under its "Business
Practices" folder; "Draft BP's - 10 Day Comment"
sub-folder; and "Business Practices Common to all
Western Regions" link, or directly via the following URL: www.oasis.oati.com/woa/docs/WAPA/WAPAdocs/Western-Common-Business-Practices-Draft.html
Comments
regarding the proposed updates should be submitted within 10 business days of
the posting date noted at the location above to:
Steve
Sanders at 406-255-2840 (email: sanders@wapa.gov) and Kass
Portra at 406-255-2842 (email: portra@wapa.gov)
-------------------------------
04/16/2013 :
(Proposed
Business Practice Update) Western has
posted a PROPOSED update to its existing business
practice for TSR Annulments
under its "Business Practices" folder; "Draft BP's -
10 Day Comment" sub-folder; and "Business
Practices Common to all Western Regions" link, or directly via
the following URL: www.oasis.oati.com/woa/docs/WAPA/WAPAdocs/Western-Common-Business-Practices-Draft.html
Comments
regarding the proposed business practice should be submitted within 10 business days of
the posting date noted at the location above to:
Steve
Sanders at 406-255-2840 (email: sanders@wapa.gov) and Kass
Portra at 406-255-2842 (email: portra@wapa.gov)
04/15/2013: OATT Revision Filed with FERC,
Effective Date of May 13, 2013: Western has filed revisions to its OATT
on April 12, 2013, to clarify certain provisions and
correct errors in Western's prior filings.
Western has requested an effective date of May 13,
2013. A copy of Western's filing letter WAPA
OATT
Revision Filing (April 12, 2013) is available
under the "Tariff" Documents Folder on the WAPA OASIS at the
following URL: WAPA-Tariff-Docs.
Updated
OATT documents reflecting the revisions will be made available
on the OASIS in the near future.
If you have
any questions, please contact Steve Sanders (Western) at
406-255-2840, or by email at sanders@wapa.gov.
03/25/2013: (Emergency Business Practice) Western has posted a new emergency business
practice for Temporary
Limit on Multiple Transmission Service Requests
under its "Business Practice" folder, or directly via the
following URL: www.oasis.oati.com/woa/docs/WAPA/WAPAdocs/WAPA_UPGR_BP_Multiple_TSR_v1_2013-03-26.pdf
This
Business Practice is EFFECTIVE
at 09:00 CPT on 3/26/2013
If you have any questions, please contact Kass Portra (Western)
at 406-255-2842, or by email at portra@wapa.gov.
01/07/2013 :
(Proposed
Business Practice) Western has posted a PROPOSED
business practice for LGIA
Option to Build under its "Business Practices" folder;
"Draft
BP's - 10 Day Comment" sub-folder; and "Business
Practices Common to all Western Regions" link, or directly via
the following URL: www.oasis.oati.com/woa/docs/WAPA/WAPAdocs/Western-Common-Business-Practices-Draft.html
Comments
regarding the proposed business practice should be submitted within 10 business days of
the posting date noted at the location above to:
Steve
Sanders at 406-255-2840 (email: sanders@wapa.gov) and Kass
Portra at 406-255-2842 (email: portra@wapa.gov)
10/31/2012 :
(Proposed
Business Practice) Western has posted a PROPOSED
business practice for TSR
Annulments under its "Business Practices" folder; "Draft BP's -
10 Day Comment" sub-folder; and "Business
Practices Common to all Western Regions" link, or directly via
the following URL: www.oasis.oati.com/woa/docs/WAPA/WAPAdocs/Western-Common-Business-Practices-Draft.html
Comments
regarding the proposed business practice should be submitted within 10 business days of
the posting date noted at the location above to:
Steve
Sanders at 406-255-2840 (email: sanders@wapa.gov) and Kass
Portra at 406-255-2842 (email: portra@wapa.gov)
10/15/2012 (Update to
09/17/2012 posting to include presentation) : (New Rates Postings): IS 2013 Rates Update Letter to
Customers, Announcement of Public Meeting, Posting of IS
Rates 2011 True-up Calculation
Western will host a meeting to provide customers an
opportunity to discuss and comment on the Integrated System (IS)
2013 recalculated rates on October 15, 2012, at 1:30 p.m. MDT at
Western's offices located at 2900 4th Avenue North, 6th Floor,
Billings, Montana, as described in the 09/07/2012 letter to
customers. The meeting will also be available via WebEx,
and those desiring to attend the meeting via WebEx will need to
contact Mr. Stan Bayley at (406) 255-2923 (or by email at bayley@wapa.gov) before
September 28, 2012 for access information.
(UPDATE)
Presentation: Customer-Information-Meeting-Presentation-2012-1015.pdf
The details
of the 2013 IS rate calculations, and 2011 IS rate true-up
calculation are posted under the "Rates/Losses Calculation"
subfolder in the "Rates/Losses" folder on Western's WAPA OASIS
page, or directly at the following URLs:
IS-Rate-Calculation-2013-0101.pdf
IS-Rate-TrueUp-Calculation-2011.pdf
02/02/2012 : (Proposed
Business Practice) Western has posted a PROPOSED
business practice for Resales
of Transmission Rights under its "Business Practices"
folder; "Draft BP's - 10 Day Comment"
sub-folder; and "Business Practices Common to all
Western Regions" link, or directly via the following URL: www.oasis.oati.com/woa/docs/WAPA/WAPAdocs/Western-Common-Business-Practices-Draft.html
Comments
regarding the proposed business practice should be submitted within 10 business days
of the posting date noted at the location above to:
Steve
Sanders at 406-255-2840 (email: sanders@wapa.gov) and
Kass Portra at 406-255-2842 (email: portra@wapa.gov)
01/01/2012 : (New Rates Postings): IS 2012 Recalculated Rates,
Update Letter to Customers
As a follow-up to the September 29,
2011 public meeting, Western notified customers of the
Integrated System (IS) 2012 recalculated rates in the 12/27/2011
letter to customers: Customer-Letter-2012-IS-Recalculated-Rates.pdf.
The
details of the 2012 IS rate calculations are posted under the
"Rates/Losses Calculation" subfolder in the "Rates/Losses"
folder on Western's WAPA OASIS page, or directly at the
following URLs:
IS-Rate-Calculation-2012-0101.pdf
If you
have any questions, please contact Steve Sanders at (406)
255-2840, or Mr. Stan Bayley in Rates at (406) 255-2923.
11/18/2011 : (Business Practice Clarification) Scheduling Requirements:
Western
has posted a clarification effective today of its Scheduling
Requirements specifically related to quarter hour and
intra-hour scheduling, which is available under its "Business
Practices" folder (in the "Effective Business Practices"
sub-folder) and also available at the
following URL: www.oasis.oati.com/WAPA/WAPAdocs/WAPA-UGPR-BP-Quarter-Intra-Hour-Scheduling-Version-2011-1118.pdf
If you
have any questions, please contact Steve Sanders at
406-255-2840 (sanders@wapa.gov), or Scott Byer (Watertown
Dispatch) at 605-882-7551 (byer@wapa.gov).
09/29/2011 : (New Rates Public Meeting Presentation): IS 2012 Rates Public Meeting
Presentation
Western hosted a meeting to provide customers an
opportunity to discuss and comment on the Integrated System (IS)
2012 recalculated rates on September 29, 2011, at 9:00 a.m.
MDT. The meeting presentation is available at the
following URL:
IS-2012-Rates-Customer-Meeting-Presentation-2011-0929.pdf
Please
provide written comments or questions via email or letter, by
October 14, 2011 to Mr. Stan Bayley at bayley@wapa.gov and Ms. Linda
Cady-Hoffman (Rates Manager) at cady@wapa.gov
.
09/07/2011 : (New Rates Postings): IS 2012 Rates Update Letter to
Customers, Announcement of Public Meeting, Posting of IS
Rates 2010 True-up Calculation
Western will host a meeting to provide customers an
opportunity to discuss and comment on the Integrated System (IS)
2012 recalculated rates on September 29, 2011, at 9:00 a.m. MDT
at Western's offices located at 2900 4th Avenue North, 6th
Floor, Billings, Montana, as described in the 09/02/2011 letter
to customers. The meeting will also be available via
WebEx, and those desiring to attend the meeting via WebEx will
need to contact Mr. Stan Bayley at (406) 255-2923 (or by email
at bayley@wapa.gov) before
September 22, 2011 for access information.
The details
of the 2012 IS rate calculations, and 2010 IS rate true-up
calculation are posted under the "Rates/Losses Calculation"
subfolder in the "Rates/Losses" folder on Western's WAPA OASIS
page, or directly at the following URLs:
IS-Rate-Calculation-2012-0101.pdf
IS-Rate-TrueUp-Calculation-2010.pdf
If you
have any questions, please contact Steve Sanders at (406)
255-2840, or Mr. Stan Bayley in Rates at (406) 255-2923.
08/11/2011 :
(Notice
- Replaces previous 07/10/11 and 04/16/11 posting) Daily Non-Firm (DNF) Evaluation:
Effective
August
11,
2011 the MAPP MTA system implemented a software update
concerning ATC/AFC decrementing when Non-Firm Daily TSRs are
evaluated in the Operating Horizon. Due to the FERC Order
No. 729 implementation, the Operating Horizon was increased from
36 hours to 48 hours. Under the old definition, Non-Firm
Daily TSRs were validated completely outside the Operating
Horizon. Once the Operating Horizon was expanded to 48
hours, Non-Firm Daily TSRs could now fall within the Operating
Horizon, yet their impacts were not included in the AFC/ATC
calculation. This software change allowed the validation
to treat daily non-firm impacts as hourly non-firm impacts in
the AFCcalc engine to correctly decrement ATC/AFC in the
Operating Horizon. Announcement of this software update
was also posted on the MAPP OASIS site on the MAPP Home
page. OATI has indicated that with the software update the
posting and evaluation Daily Non-Firm against the posted ATC/AFC
in the Operating Horizon is consistent with other WebTrans
systems.
If you have any
questions, please contact Steve Sanders (Western) at
406-255-2840 or Kass Portra (Western) at 406-255-2842.
07/22/2011 (Updated 08/11/2011) : (Business
Practice
Update) Western has posted the FINAL
revised Creditworthiness Business Practice under its "Business
Practices" folder (in the "Effective Business Practices"
sub-folder). The revised BP was posted for review as noted
in the original 07/22/11 posting, and those versions are now
available in the Draft and Pending sub-folders "archives".
07/18/2011 :
(Business
Practice Reposting) Queue
Flooding Restrictions: Western has added a
clarification effective today to its reposted a business
practice that was EFFECTIVE at 00:00 CPT on
7/8/2011 to address queue flooding issues, which is
available under its "Business Practices" folder (in the
"Effective Business Practices" sub-folder) and also
available at the following URL: www.oasis.oati.com/WAPA/WAPAdocs/WAPA-UGPR-BP-Queue-Flooding-Version-2011-0718.pdf
If you
have any questions, please contact Kass Portra (Western) at
406-255-2842, or by email at portra@wapa.gov.
05/05/2011 (Updated 08/11/2011) : (Business
Practice
Update) Western has posted the FINAL revised
to its General Requirements for Interconnection document under
its "Business Practices" folder (in the "Effective Business
Practices" sub-folder). The revised BP was posted for
review as noted in the original 05/05/2011 posting, and those
versions are posted in the "archives" in the Draft and Pending
sub-folders.
The
currently effective version of the General Requirements for
Interconnection (Sept 1999), for comparison, is posted under the
"Interconnection Requests" folder, and available at the
following URL: www.oasis.oati.com/WAPA/WAPAdocs/WAPA-General-Req-for-Interconnection-FINAL-CLEAN-Issued-2011-0714.pdf.
If
you have any questions, please contact Steve Sanders at 406-255-2840 (email:
sanders@wapa.gov)
05/05/2011: Posting
of
Western's Planning Criteria Document: Western has posted its Planning
Criteria Document under its "Transmission Planning
Process" folder and
available
at the following URL: www.oasis.oati.com/WAPA/WAPAdocs/WAPA-Planning-Criteria-Document-2011-0504.pdf.
03/10/2011: Transmission
Planning
Stakeholder Meeting on March 30, 2011
The Upper Great
Plains Region of Western (UGPR) invites you to a
Western UGPR Transmission Planning Stakeholder
Meeting from 8:00 a.m. to 12:00 p.m. MDT on
Wednesday, March 30th, 2011, at the Western UGP
Regional office located at 2900 4th Avenue North
in Billings, Montana.
At the meeting, we will review the
UGPR FERC Order 890 planning process as
implemented in 2010 and present the plan for
the coming year. We will also review the
results of the 2010 Integrated System
Evaluation and introduce the planned studies
for 2011. The meeting is being held to meet
the local transmission planning process
requirements outlined in Western's OATT. Your
comments on the Draft Agenda are
welcome.
If you plan
to attend the meeting, please
print and fill out the
registration form indicating that
you plan to attend the meeting and
indicate whether you plan to
attend in person or via WebEx. A
limited number of WebEx
participants are available.
Therefore, WebEx participation
will be limited to one per company
and available only on a first-come
first-served basis.
Western
UGPR looks forward to meeting
with you during the meeting in
Billings and receiving your
input on the UGPR 2011 local
transmission planning studies. Please
send your comments on the
draft agenda and/or your Registration Form by
email to ugpplanningmanager@wapa.gov or by
fax at (406) 255-2900 by March 21,
2011.
If you have
questions, please contact Ms.
Gayle R. Nansel, UGPR Transmission
System Planning Manager at
406-255-2830.
03/03/2011 :
(Business
Practice Update) Rollover
Provision Changes: Western UGPR has posted its Modified Rollover
Rights Administration Business Practice to reflect and explain
the changes to rollover provisions under Section 2.2 of its
OATT, issued on 03/02/2011. The modified business practice
is available at the following URL: Modified
Rollover
Rights Administration Business Practice, and under its
"Business Practices" folder (in the "Effective Business
Practices" sub-folder).
If you
have any questions, please contact Steve Sanders (Western) at
406-255-2840, or by email at sanders@wapa.gov.
03/02/2011: OATT
Revision
Filed with FERC, Effective Date of April 3, 2011 (Revised
Section 2.2 effective March 2, 2011): Western Area Power Administration
submitted revisions to its non-jurisdictional Open
Access Transmission Tariff in compliance with the
Federal Energy Regulatory Commission's (Commission)
Order dated December 2, 2010. This compliance
filing ( Filing
Letter
for revised OATT (March 2, 2011) ) revises the new
baseline eTariff, which is substantially the
same tariff originally submitted in Docket No.
NJ10-1-000. Western
requested the Commission deem the revisions to its OATT proposed
in the compliance filing become effective April 3, 2011, with
the exception of the revisions to Section 2.2, which Western
requested become effective on March 2, 2011. The revised
OATT is available under the "Tariff" Documents Folder on the
WAPA OASIS and at the following: WAPA-Tariff-Docs
02/23/2011 : Updated Notice Posting clarifying
Valid POR/PODs for Transmission Service Requests across
Miles City DC Tie, other DC Ties, West-Side Only, and
WAUE-SaskPower paths
Western (UGPR) has posted an updated Notice (replacing
the version previously posted on MAPP's OASIS Information
Page) showing the valid POR/PODs that must be utilized by
Transmission Customers when submitting Transmission Service
Requests 1) from/to/across the East/West DC Ties that
interconnect with the IS; 2) for service on the West-Side
system only, and 3) from/to the WAUE/SaskPower interface
(WAUE-SPC and SPC-WAUE paths). The Notice is
posted in the Effective Business Practices folder and at the
following URL: UGPR DC
Tie & Other TSR POR/POD Reqm'ts.
Any questions should be directed to Ms. Kass Portra (406)
255-2842 or Steve Sanders at (406) 255-2840.
12/31/2010 : (New
Rates Posting): IS 2011 Rates - Letter to Customers
As a follow-up to the September 21, 2010 public meeting,
Western notified customers of the Integrated System (IS) 2011
recalculated rates in the 12/20/2010 letter to customers: Customer-Letter-20101220-IS-2011-Rates.pdf
The details
of the rate calculatons are included in the following posting: IS-Rate-Calculation-2011-0101.pdf
09/30/2010 : Western
submitted the baseline eTariff version of its OATT
Western submitted the baseline eTariff version of its
non-jurisdictional Open Access Transmission Tariff
(OATT), which was previously filed with the Federal
Energy Regulatory Commission in Docket No.
NJ10-1-000. A copy of Western's 9/30/2010 filing
is available at: Western-OATT-Etariff-Filing-2010-0930.pdf.
09/30/2010 : Western
filed comments on FERC's "Transmission Planning & Cost
Allocation" NOPR
Western submitted the
following comments to the Federal Energy Regulatory Commission
(FERC) on its Notice of Proposed Rulemaking for Transmission
Planning and Cost Allocation by Transmission Owning and
Operating Public Utilities (NOPR) issued on June 17, 2010 in
Docket No. RM10-23-000. Western's comments were submitted
on September 29, 2010, as a Federal Power Marketing
Administration (PMA), and not on behalf of the Department of
Energy as a whole: Western-RM10-23-NOPR-Response.pdf
09/14/2010 : (New Rates Posting): IS 2011 Rates Update Letter to
Customers, Announcement of Public Meeting
Western will host a meeting to provide customers an
opportunity to discuss and comment on the Integrated System (IS)
2011 recalculated rates on September 21, 2010, at 8:00 a.m. CDT
at the Holiday Inn City Center, 100 W 8th Street, Sioux Falls,
South Dakota, as described in the 09/03/2010 letter to
customers: IS-Rate-Calculation-2011-0101-Cover-Letter.pdf
The details
of the rate calculatons are included in the following posting: IS-Rate-Calculation-2011-0101.pdf
08/04/2010:
Announcement
of
Informal Public Meeting on 8/5/2010 to discuss FERC
"Transmission Planning & Cost Allocation" NOPR (Original
08/02/2010 Posting)
Western will
hold an informal public meeting at our Corporate Services
Office at 12155 W. Alameda Parkway in Lakewood, Colorado on
August 5, 2010, at 10:30 a.m. MDT. The meeting will
conclude by 12:00 p.m. MDT. The purpose of the meeting
is to discuss the Transmission Planning and Cost Allocation By
Transmission Owning and Operating Public Utilities (NOPR) that
was released by the Federal Energy Regulatory Commission on
June 17, 2010 in Docket No. RM10-23.
Western
will provide a high level synopsis of the NOPR and outline
the areas it is considering for comment. Customers
will have an opportunity to provide input on these issues
after a brief presentation. A copy of the presentation
Western will use at the meeting will be available at http://www.wapa.gov
prior
to 9 a.m. MDT, August 5th.
07/01/2010 :
(Proposed Business Practice Update) Western
UGPR has posted PROPOSED revisions to its CEII
Policy Business Practice and NDA under its "Business
Practices" folder (in the "Draft BP's - 10 Day Comment"
sub-folder).
Comments/concerns
with
the proposed revisions should be submitted within 10
business days of this posting to:
Steve Sanders at 406-255-2840 (email:
sanders@wapa.gov)
05/27/2010:
Announcement
that
WAUE.AECI.CM Service Point has been Disabled
Western has disabled the WAUE.AECI.CM Service Point on its
OASIS effective 5/27/2010. Western also requested that
TranServ (acting on behalf of MAPP) disable the same Service
Point on the MAPP Schedule F OASIS page, and received
notification that it was also disabled on that page effective
5/27/2010.
Transmission Customers can continue to utilize the WAUE.AECI
Service Point on UGPR's WAPA OASIS page when requesting
transmission service from UGPR, which is the same interface
point between WAUE and AECI at the Maryville 161-kV
substation.
The WAUE.AECI.CM point was setup to allow for reservations
across Western's Creston-Maryville 161-kV transmission line
(WAUE-AECI-CM contract path) under the MAPP Schedule F tariff
or UGPR's OATT. However, requests utilizing the
WAUE.AECI.CM Service Point are not being properly evaluated
across the entire Sioux City - Denison - Exira - Creston -
Maryville contract path (WAUE-AECI contract path) when the
source Service Point on the reservation is located upstream of
the WAUE-AECI contract path. Therefore, until such time
as that can be resolved in the MAPP OASIS backend, the
WAUE.AECI.CM Service Point will be disabled. If, in the
interim, a Transmission Customer needs to submit a
transmission service request for only the path from
Creston-Maryville (WAUE-AECI-CM contract path) using the
available source Service Points of WAUE.ALTW or WAUE.MEC at
Creston, such requests will be handled on a manual basis by
contacting Western or TranServ (as Western's TSC).
If you have any
questions, please contact Steve Sanders (Western) at
406-255-2840, or by email at sanders@wapa.gov.
12/29/2009 (New Rates Posting):
Notice - New IS Transmission Rates Effective 01/01/2010
Posted
As described in the December
29, 2009, Federal Register notice ( FRN-IS-Trans-Anc-Service-Rates-2010-0101.pdf
), the Western Area Power Administration (Western) is
updating its rates for transmission and ancillary services
for the Pick-Sloan Missouri Basin Program-Eastern Division
(P-SMBP-ED) that are utilized for the Integrated System
(IS). The Federal Register Notice summary follows:
ACTION:
Notice of Order Concerning Transmission and Ancillary
Services Rates and Transmission Service Penalty Rate for
Unreserved Use.
-----------------------------------------------------------------------
SUMMARY:
The Deputy Secretary of Energy confirmed and approved Rate
Order Nos. WAPA-144 and WAPA-148 and Rate Schedules UGP-NT1,
UGP-FPT1, UGP-NFPT1, UGP-AS1, UGP-AS2, UGP-AS3, UGP-AS4,
UGP-AS5, UGP-AS6, UGP-AS7 and UGP-TSP1 on an interim basis.
The provisional rates will be in effect until the Federal
Energy Regulatory Commission (FERC) confirms, approves, and
places them into effect on a final basis or until they are
superseded. The provisional rates will provide sufficient
revenue to pay all annual costs,
including interest expenses, and repay required
investments within the allowable periods.
DATES:
Rate Schedules UGP-NT1, UGP-FPT1, UGP-NFPT1, UGP-AS1,
UGP-AS2, UGP-AS3, UGP-AS4, UGP-AS5, and UGP-AS6 and will be
placed into effect on an interim basis on January 1, 2010,
and will be in effect until FERC confirms, approves, and
places the rate schedules in effect on a final basis through
December 31, 2014, or until the rate schedules are
superseded. The revised Rate Schedules UGP-NT1, UGP-FPT1,
UGP-NFPT1, UGP-AS1, UGP-AS2, UGP-AS3, UGP-AS4, UGP-AS5 and
UGP-AS6 dated January 1, 2010, supersede the similarly
titled rate schedules dated October 1, 2005. Rate Schedule
UGP-AS7 will be placed into effect on an interim basis on
January 1, 2010; however, Rate Schedule UGP-AS7 will not be
charged until such time as Western's OATT is revised to
provide for Generator Imbalance Service. Rate Schedule
UGP-AS7 will remain in effect through December 31, 2014, or
until superseded, to coincide with the other ancillary
service rates in this rate order. Rate Schedule UGP-TSP1
will be placed into effect on an interim basis on January 1,
2010; however, Rate Schedule UGP-TSP1 will not be charged
until such time as Western's Open Access Transmission Tariff
(OATT) is revised to provide for unreserved use of
transmission service penalties. Rate schedule UGP-TSP1 will
also remain in effect through December 31, 2014, or until
superseded, to coincide with the other rates in this rate
order. Western will post notice on its Open Access Same-Time
Information System (OASIS) Web site of its intent to
initiate charging
for
Rate Schedule UGP-AS7 or UGP-TSP1.
Western
submitted the following letter to its customers on
12/29/2010 advising them of the implementation of the
revised rates: IS-Rate-Calculation-2010-0101-Cover-Letter.pdf.
The updated rates are shown in the "Current
Rates/Losses" folder. If you have
any questions, please contact Steve Sanders.
12/28/2009 (Rate
Update Status): Notice – Rate
Orders Signed (Rates to be effective 01/01/2010)
The Deputy Secretary of
Energy has signed Rate Orders 144 and 148, Orders
Confirming, Approving, and Placing the Pick-Sloan Missouri
Basin Program – Eastern Division Transmission and Ancillary
Services and Transmission Service Penalty for Unreserved Use
Formula Rates into effect on an interim basis on January 1,
2010.
The Federal Register
notice announcing these rates is expected to be published
during the week of December 28-31. Once the Federal
Register notice is published, a letter will be sent to our
transmission customers and other interested parties
providing rate information and a copy of the Federal
Register notice.
The rate announcement
letter and Federal Register notice will also be posted to
this web site and the Upper Great Plains Region Open Access
Same-Time Information System (OASIS) web site.
10/07/2009:
OATT
Revision
Filed with FERC, Effective Date of December 1, 2009:
Western Area Power
Administration submitted its revised Open Access
Transmission Service Tariff with the Federal Energy Regulatory
Commission on September 30, 2009. The new tariff becomes
effective on December 1, 2009. The new revised tariff was
developed to comply with FERC Order No. 890 and to be consistent
with Western’s statutory and regulatory requirements. It
addresses changes in transmission services and planning. The updated
OATT (both clean and redline versions) and FERC generated PDF
documents for this filing are included in the "Tariff" folder.
08/25/2009 : MAPP Schedule F service no longer
available effective 9/1/2009
07/22/2009
(Updated
06/10/2010) : Corn
Belt Power Cooperative (CBPC) move into Western's east-side
"WAUE" Balancing Authority Area (Control Area) and addition
of CBPC transmission facilities to Integrated System
(IS) effective September 1, 2009
06/10/2010
Update: Western has posted an Informational
Posting providing guidance for Customers on submitting
Generation Interconnections or Transmission Service Requests
on facilities owned by CBPC under its "Generation
Interconnections" sub-folder or at the following link:
CBPC
Facilities
- GI/TSR Submission Reqmts
08/25/2009 Update:
Western will be including eligible portions of the Corn Belt Power
Cooperativce (CBPC) transmission facilities
located in western Iowa in the Western/Basin Electric Power
Cooperative/Heartland Consumers Power District Integrated System
(IS), and the change will be effective on September 1,
2009. The following CBPC transmission facilities will be
included in the IS as Basin Electric Power Cooperative leased
facilities:
Wisdom to Osgood 161 kV transmission line – 30.64 miles
Osgood to Burt 161 kV transmission line – 29.79 miles
Burt to Hancock 161 kV transmission line – 33.70 miles
Wisdom to Buena Vista 161 kV transmission line – 32.77 miles
Buena Vista to Sac County 161 kV transmission line – 9.66 miles
Hope to Webster 161 kV transmission line – 12.39 miles
Burt to Hope 161 kV transmission line – 34.61 miles
Hope substation (161 kV portion only)
Wisdom substation (161 kV portion only)
Burt substation (161 kV portion only)
Osgood substation (161 kV portion only)
Webster substation (161 kV portion only)
Hancock substation (161 kV portion only)
Interconnection and transmission service requests utilizing
these facilities will need to be submitted to Western, as the IS
administrator, pursuant to Western's OATT and LGIP/SGIP,
starting on September 1, 2009 at 0000 (CDT). Western and
CBPC will work with existing interconnection and
transmission service customers on the CBPC facilities listed
above to address any transition issues. The IS
transmission rates will apply to service across the facilities
above, and preliminary analysis shows no expected increase to
the IS rate as the result of inclusion of the CBPC facilities
and associated new network load into the IS. CBPC will
continue to adminster its own tariff on the remaining CBPC
facilities that are moving into Western's WAUE Balancing
Authority Area on September 1, 2009, and therefore
interconnection and transmission service requests on those other
CBPC facilities will continue to be submitted to CBPC.
===========================
07/22/2009 Posting: Corn Belt Power Cooperativce (CBPC)
intends to move its transmission system located presently in the
MidAmerican Energy Company (MEC) Balancing Authority
Area/Control Area (BAA) into Western's east-side "WAUE" BAA by
September 1, 2009, as a result of MEC's plan to join the Midwest
ISO on September 1, 2009 and move its facilities into the
Midwest ISO BAA. CBPC and the Integrated System are also
exploring the possibility of eligible portions of the CBPC
transmission facilities becoming part of the Integrated System
(IS) as a result of this BAA change, and that change would also
occur on September 1, 2009. Western will post additional
details in near future regarding the potential inclusion of CBPC
transmission facilities into the IS, and the impacts upon such a
change on interconnection and transmission service requests
located on those CBPC transmission facilities, and preliminary
information regarding potential IS rate impacts. This
information will be located on Western's OASIS page under
"Recent News" and also under a documents folder named "CBPC BAA
Move Information", if necessary. More information
concerning CBPC and its members is available on their company
web page at: http://www.cbpower.coop/aspx/CBPower/default.aspx
04/24/2009 : (Business
Practice Update) Western UGPR has posted a
Western-wide Policy Statement regarding crediting transmission
service for transmission system outages that will become
effective on May 1, 2009. The policy
document is posted under the "Business Practices" folder and
available at the following URL: WAPA-Crediting-for-Outages-Business-Practice.
04/22/2009 :
(Business
Practice Update) Western UGPR has posted a
Western-wide Policy Statement regarding Attachment K of
Western's OATT dated 04/16/2009. The policy
document is posted under the "Business Practices" folder and
available at the following URL: WAPA-OATT-AttachK-Policy-Statement-2009-0416.
06/18/2008
(Business Practice
Update) : Western Area Power Administration
(Western) Upper Great Plains Region (UGPR) made minor changes to
its posted "Business Practice for Adjustment Criteria for Open
Access Transmission Tariff Charges" to clarify the 18 month
adjustment period. The
updated business practice is effective
immediately (6/18/2008). The updated
document is posted under the "Business Practices" folder and
URL: WAPA
UGPR
Adjustment Criteria for OATT Charges
01/26/2010 (Storm Damage Update
- Updated 01/26/2010 @16:00 CST):
Summary of January 21-xx, 2010 Winter Storm Damage to IS
Transmission System
Update:
1/26/2010 @ 16:00 CST: The
Heskett-Dickinson 230kV line was removed from service
today due to storm damage, again restricting the Miles City
AC - DC - AC Converter station to only west to east
operation (east to west limited to zero). The updated
listing (which doesn't yet include this latest loss of the
Heskett-Dickinson 230kV line) of the related outages and other
system restrictions: Summary-UGPR-Jan21st-Winter-Storm-Trans-Issues-Rev1.pdf
Update:
1/25/2010 @ 21:00 CST: The
Bowman-Hettinger 230kV line was restored to service today at
19:19, allowing the limitations on the Miles City AC - DC -
AC Converter station to be partially released and allowing
limited east to west operation (75 MW). The Charlie
Creek - Rough Rider 115-kV line was restored to service at
17:42. At 18:19 Eagle Butte Substation was energized
allowing the 69-kV deliveries to begin to be restored.
At 18:11 Faith Substation was energized (with the
restoration of hte Maurine-Faith-Eagle Butte 115-kV line at
18:11), and at 18:13 the City of Faith service was restored.
01/25/2010 (Initial Posting):
UGPR experienced a severe winter storm that started the evening
of January 21, 2010. The storm started with conditions
that resulted in ice formation; freezing rain, drizzle, and
heavy fog. The storm then transitioned into snow with
heavy winds. UGPR experienced several transmission line
outages due to ice loading and high winds. The snow and
high winds have lasted for several days and are expected to
diminish tonight. This has limited our ability to respond
to the outages. Although there were 17 transmission lines
out of service, we only experienced long term outages to Western
customers at two substations. However, the coops,
municipalities, and others taking service from our facilities
had issues on their facilities that resulted in over 10,000
customers without power at various times during the storm.
The Western long term outages were at Eagle Butte and Faith
115-kV substations. The Eagle Butte substation was
de-energized at 0115 on January 22, 2010. Service was
temporarily restored at 1529 on the 23, 2010. However,
Eagle Butte and Faith substations were de-energized at 0432 on
January 24, 2010 and are still out of service. UGPR
personnel have been working on restoring the lines to these
substations and they have been tested multiple times without
success. Due to conditions the lines needed to be
patrolled from the ground and access to all of the lines was not
possible. Also conditions were such that problems
developed as the line was being patrolled. It appears that
we will be able to do an aerial patrol on January 25, 2010.
A listing of
the related outages and other system restrictions: Summary-UGPR-Jan21st-Winter-Storm-Trans-Issues.pdf
If you have any questions, please
contact Steve Sanders at 406-247-7436.
12/29/2009 (New Rates Posting):
Notice - New IS Transmission Rates Effective 01/01/2010
Posted
As
described in the December 29, 2009, Federal Register notice ( FRN-IS-Trans-Anc-Service-Rates-2010-0101.pdf
), the Western Area Power Administration (Western) is updating
its rates for transmission and ancillary services for the
Pick-Sloan Missouri Basin Program-Eastern Division (P-SMBP-ED)
that are utilized for the Integrated System (IS). The
Federal Register Notice summary follows:
ACTION:
Notice of Order Concerning Transmission and Ancillary Services
Rates and Transmission Service Penalty Rate for Unreserved Use.
-----------------------------------------------------------------------
SUMMARY:
The Deputy Secretary of Energy confirmed and approved Rate Order
Nos. WAPA-144 and WAPA-148 and Rate Schedules UGP-NT1, UGP-FPT1,
UGP-NFPT1, UGP-AS1, UGP-AS2, UGP-AS3, UGP-AS4, UGP-AS5, UGP-AS6,
UGP-AS7 and UGP-TSP1 on an interim basis. The provisional rates
will be in effect until the Federal Energy Regulatory Commission
(FERC) confirms, approves, and places them into effect on a
final basis or until they are superseded. The provisional rates
will provide sufficient revenue to pay all
annual costs, including interest expenses, and repay
required investments within the allowable periods.
DATES: Rate
Schedules UGP-NT1, UGP-FPT1, UGP-NFPT1, UGP-AS1, UGP-AS2,
UGP-AS3, UGP-AS4, UGP-AS5, and UGP-AS6 and will be placed into
effect on an interim basis on January 1, 2010, and will be in
effect until FERC confirms, approves, and places the rate
schedules in effect on a final basis through December 31, 2014,
or until the rate schedules are superseded. The revised Rate
Schedules UGP-NT1, UGP-FPT1, UGP-NFPT1, UGP-AS1, UGP-AS2,
UGP-AS3, UGP-AS4, UGP-AS5 and UGP-AS6 dated January 1, 2010,
supersede the similarly titled rate schedules dated October 1,
2005. Rate Schedule UGP-AS7 will be placed into effect on an
interim basis on January 1, 2010; however, Rate Schedule UGP-AS7
will not be charged until such time as Western's OATT is revised
to provide for Generator Imbalance Service. Rate Schedule
UGP-AS7 will remain in effect through December 31, 2014, or
until superseded, to coincide with the other ancillary service
rates in this rate order. Rate Schedule UGP-TSP1 will be placed
into effect on an interim basis on January 1, 2010; however,
Rate Schedule UGP-TSP1 will not be charged until such time as
Western's Open Access Transmission Tariff (OATT) is revised to
provide for unreserved use of transmission service penalties.
Rate schedule UGP-TSP1 will also remain in effect through
December 31, 2014, or until superseded, to coincide with the
other rates in this rate order. Western will post notice on its
Open Access Same-Time Information System (OASIS) Web site of its
intent to initiate charging
for Rate
Schedule UGP-AS7 or UGP-TSP1.
Western
submitted the following letter to its customers on 12/29/2010
advising them of the implementation of the revised rates: IS-Rate-Calculation-2010-0101-Cover-Letter.pdf.
The
updated rates are shown in the "Current Rates/Losses" folder.
If you have any
questions, please contact Steve Sanders at 406-247-7436.
12/28/2009 (Rate Update Status):
Notice – Rate
Orders Signed (Rates to be effective 01/01/2010)
The Deputy
Secretary of Energy has signed Rate Orders 144 and 148,
Orders Confirming, Approving, and Placing the Pick-Sloan
Missouri Basin Program – Eastern Division Transmission and
Ancillary Services and Transmission Service Penalty for
Unreserved Use Formula Rates into effect on an interim
basis on January 1, 2010.
The Federal Register notice
announcing these rates is expected to be published during
the week of December 28-31. Once the Federal
Register notice is published, a letter will be sent to our
transmission customers and other interested parties
providing rate information and a copy of the Federal
Register notice.
The rate
announcement letter and Federal Register notice will also
be posted to this web site and the Upper Great Plains
Region Open Access Same-Time Information System (OASIS)
web site.
If you have any
questions, please contact Steve Sanders at 406-247-7436.
10/07/2009: OATT
Revision
Filed with FERC, Effective Date of December 1, 2009:
Western Area
Power Administration submitted its revised Open Access
Transmission Service Tariff with the Federal Energy Regulatory
Commission on September 30, 2009. The new tariff becomes
effective on December 1, 2009. The new revised tariff
was developed to comply with FERC Order No. 890 and to be
consistent with Western’s statutory and regulatory
requirements. It addresses changes in transmission
services and planning.
The
updated OATT (both clean and redline versions) and FERC
generated PDF documents for this filing are included in the
"Tariff" folder.
If you have any
questions, please contact Steve Sanders at 406-247-7436.
08/25/2009 : MAPP Schedule F service no longer
available effective 9/1/2009; TranServ beginning operations
as Western's Transmission Service Contractor (TSC) effective
0000 CDT on 9/1/2009 to assist in the processing of
Transmission Service Requests on the WAPA OASIS; Corn Belt
Power Cooperative changes effective 9/1/2009.
Western has obtained the
services of TranServ International, Inc. (TranServ) to perform
as its Transmission Service Coordinator (TSC) starting
effective September 1, 2009 at 0000 (CDT). Based upon
the departure of MidAmerican Energy Company from MAPP on
September 1, 2009, the regional MAPP Schedule F tariff will no
longer be available to customers to take transmission service
across Western's Integrated System. Therefore, effective
September 1, 2009 all service on Western's transmission system
will need to be obtained under Western's Open Access
Transmission Tariff (OATT) and requested on Western's OASIS
(WAPA TP OASIS). TranServ will assist Western in
the processing of the majorify of short-term transmission
service requests (TSRs). Western personnel will continue
to process Monthly Firm and Long-Term TSRs. The
delineation of responsibilities for processing TSRs starting
September 1, 2009 is outlined in the following document:
WAPA-Customer-Notification-TranServ-as-TSC.pdf
To assist
Western's customer with the transition associated with the end
of MAPP Schedule F and the introduction of TranServ as TSC in
processing TSRs Western and TranServ will host conference
calls starting on August 31, 2009 at 1500 (CDT) to answer
customer questions and explain the changes being
implemented. In addition, Western will answer questions
regarding the changes associated with the move of Corn Belt
Power Cooperative (CBPC) into Western's WAUE Balancing
Authority Area and inclusion of a portion of CBPC transmission
facilities into the Integrated System. More information
regarding the CBPC changes is noted in the updated 07/22/2009
news item below. The announcement of the conference
calls is outlined in the following letter:
Western-TranServ-Daily-Call-Announcement-Letter-2009-0825.pdf
(Business Practice Update) Western has
updated its TSR Timing Requirements and business practice
related to bumping of TSRs, to address the termination of any
new MAPP Schedule F service, as outlined in the following
Timing Requirement document that will be effective on
September 1, 2009 at 0000 (CDT).
WAPA
UGPR
Timing Requirements-Effective-2009-0901.pdf
If you
have any questions, please contact Steve Sanders at (406)
247-7436.
07/22/2009 (Updated
08/25/2009) : Corn
Belt Power Cooperative (CBPC) move into Western's east-side
"WAUE" Balancing Authority Area (Control Area) and addition of
CBPC transmission facilities to Integrated System (IS)
effective September 1, 2009
08/25/2009
Update: Western will be including eligible
portions of the Corn Belt Power Cooperativce (CBPC)
transmission facilities located in western Iowa in the
Western/Basin Electric Power Cooperative/Heartland Consumers
Power District Integrated System (IS), and the change will be
effective on September 1, 2009. The following CBPC
transmission facilities will be included in the IS as Basin
Electric Power Cooperative leased facilities:
Wisdom to
Osgood 161 kV transmission line – 30.64 miles
Osgood to
Burt 161 kV transmission line – 29.79 miles
Burt to
Hancock 161 kV transmission line – 33.70 miles
Wisdom to
Buena Vista 161 kV transmission line – 32.77 miles
Buena
Vista to Sac County 161 kV transmission line – 9.66 miles
Hope to
Webster 161 kV transmission line – 12.39 miles
Burt to
Hope 161 kV transmission line – 34.61 miles
Hope
substation (161 kV portion only)
Wisdom
substation (161 kV portion only)
Burt
substation (161 kV portion only)
Osgood
substation (161 kV portion only)
Webster
substation (161 kV portion only)
Hancock
substation (161 kV portion only)
Interconnection
and
transmission service requests utilizing these facilities will
need to be submitted to Western, as the IS administrator,
pursuant to Western's OATT and LGIP/SGIP, starting on
September 1, 2009 at 0000 (CDT). Western and CBPC will
work with existing interconnection and transmission
service customers on the CBPC facilities listed above to
address any transition issues. The IS transmission rates
will apply to service across the facilities above, and
preliminary analysis shows no expected increase to the IS rate
as the result of inclusion of the CBPC facilities and
associated new network load into the IS. CBPC will
continue to adminster its own tariff on the remaining CBPC
facilities that are moving into Western's WAUE Balancing
Authority Area on September 1, 2009, and therefore
interconnection and transmission service requests on those
other CBPC facilities will continue to be submitted to CBPC.
===========================
07/22/2009
Posting:
Corn Belt Power Cooperativce (CBPC) intends to move its
transmission system located presently in the MidAmerican
Energy Company (MEC) Balancing Authority Area/Control Area
(BAA) into Western's east-side "WAUE" BAA by September 1,
2009, as a result of MEC's plan to join the Midwest ISO on
September 1, 2009 and move its facilities into the Midwest ISO
BAA. CBPC and the Integrated System are also exploring
the possibility of eligible portions of the CBPC transmission
facilities becoming part of the Integrated System (IS) as a
result of this BAA change, and that change would also occur on
September 1, 2009. Western will post additional details
in near future regarding the potential inclusion of CBPC
transmission facilities into the IS, and the impacts upon such
a change on interconnection and transmission service requests
located on those CBPC transmission facilities, and preliminary
information regarding potential IS rate impacts. This
information will be located on Western's OASIS page under
"Recent News" and also under a documents folder named "CBPC
BAA Move Information", if necessary. More information
concerning CBPC and its members is available on their company
web page at: http://www.cbpower.coop/aspx/CBPower/default.aspx
If you have any questions, please
contact Steve Sanders at (406) 247-7436.
06/26/2009 : Announcement of Public Information
and Public Comment Forums - Proposed Penalty Rate for
Unreserved Use of Transmission Service
As described in the June
26, 2009, Federal Register notice ( FRN-Proposed-IS-Unreserved-Use-Penalty-Rate-2009-0626.pdf
), The Western Area Power
Administration
(Western)
proposes to add a penalty rate for Unreserved Use of
Transmission Service for the Pick-Sloan Missouri Basin
Program—Eastern Division (P–SMBP—ED) in a new rate schedule,
Rate Schedule UGP–TSP1. The new rate schedule for Unreserved
Use of Transmission System Penalties, Rate Schedule UGP–TSP1,
is proposed to go into effect on the later of January 1, 2010,
or when Western’s Open Access Transmission Tariff (OATT) is
revised to provide for Unreserved Use Penalties. Prior to
implementing the penalty rate, Western will post notice on its
OASIS site. If Rate Schedule UGP–TSP1 is implemented, it will
remain in
effect through December 31, 2014, or until superseded. Western
will prepare a brochure that provides detailed information on
the proposed rate to all interested parties. Publication of
this Federal Register notice begins the formal process for the
proposed penalty rate.
Publication
of the June 26, 2009, Federal Register notice begins the
formal process for the proposed Unreserved Use of Transmission
Service rate. The consultation and comment period begins
with the Federal Register notice publication and will end
September 24, 2009. Western will present a detailed
explanation of the proposed rate at a public information
forum. The public information forum date is July 28, 2009, 8
a.m. to 8:45 a.m. CDT, Sioux Falls, South Dakota.Western will
accept oral and written comments at a public comment forum.
The public comment forum date is July 28, 2009, and will be
held in conjunction with the public comment forum for the
adjustment of Western’s transmission and ancillary services
rates (as announced in 74 FR 26682 on June 3, 2009) from 9
a.m. to 12 p.m. CDT, Sioux Falls, South Dakota. Western will
accept written comments any time during the consultation and
comment period. Information on this rate process
is posted on Western's OASIS and at the Upper Great Plains
Region's Rates Web Page at: http://www.wapa.gov/ugp/rates/default.htm
.
The June
26, 2009, letter to Western's Transmission Customers
announcing the Federal Register notice: IS-Customer-Letter-Announcing-FRN-WAPA-148.pdf
.
The presentations given at
the public meetings and any future information, are available
in the "UGPR 2009 Rate Adjustment" Folder on Western's OASIS.
The public
meetings will be held at:
Holiday
Inn—City Centre
100 West
8th Street
Sioux
Falls, South Dakota
If you have any questions, please
contact Steve Sanders at (406) 247-7436.
06/17/2009 : Announcement of Public Information
and Public Comment Forums - Proposed Updates to IS
Transmission and Ancillary Service Rates
As described in the June
3, 2009, Federal Register notice ( FRN-Proposed-IS-Trans-Anc-Service-Rates-2009-0603.pdf
), the Western Area Power Administration (Western) is
proposing to update its rates for transmission and ancillary
services for the Pick-Sloan Missouri Basin Program-Eastern
Division (P-SMBP-ED) that are utilized for the Integrated
System (IS). Current formula rates, under Rate Schedules
UGP–NT1, UGP–FPT1, UGP–NFPT1, UGP–AS1, UGP–AS2, UGP–AS3, UGP–
AS4, UGP–AS5, and UGP–AS6 will expire on September 30, 2010.
Western is also proposing to add a new rate schedule, Rate
Schedule UGP–AS7, for Generator Imbalance Service. Western is
proposing these rates to meet evolving and expanding
transmission system and ancillary services requirements.
Publication
of the June 3, 2009, Federal Register notice begins the formal
process for the proposed formula rates. The consultation
and comment period begins with the Federal Register notice
publication and will end October 1, 2009. Western will present
a detailed explanation of the proposed formula rates at a
public information forum. The public information forum date is
June 24, 2009, 9 a.m. to 12 p.m. CDT, Sioux Falls, South
Dakota. Western will accept oral and written comments at a
public comment forum. The public comment forum date is July
28, 2009, 9 a.m. to 12 p.m. CDT, Sioux Falls, South Dakota.
Western will accept written comments any time during the
consultation and comment period. Information on this
rate process is posted on Western's OASIS and at the Upper
Great Plains Region's Rates Web Page at: http://www.wapa.gov/ugp/rates/default.htm
.
The
proposed Transmission and Ancillary Rates Adjustment is
described in the Rate Brochure: IS-Trans-Anc-Service-Rate-Brochure-June-2009.pdf
.
The presentations given at
the public meetings and any future information, are available
in the "UGPR 2009 Rate Adjustment" Folder on Western's OASIS.
The public
meetings will be held at:
Holiday
Inn—City Centre
100 West
8th Street
Sioux
Falls, South Dakota
If you have any questions, please
contact Steve Sanders at (406) 247-7436.
04/24/2009 :
(Business Practice Update) Western UGPR
has posted a Western-wide Policy Statement regarding crediting
transmission service for transmission system outages that will
become effective on May 1, 2009. The policy
document is posted under the "Business Practices" folder and
available at the following URL: WAPA-Crediting-for-Outages-Business-Practice.
If you
have any questions, please contact Steve Sanders at
406-247-7436.
04/22/2009 :
(Business Practice Update) Western UGPR
has posted a Western-wide Policy Statement regarding
Attachment K of Western's OATT dated 04/16/2009. The policy
document is posted under the "Business Practices" folder and
available at the following URL: WAPA-OATT-AttachK-Policy-Statement-2009-0416.
If you
have any questions, please contact Steve Sanders at
406-247-7436.
04/14/2009 :
Western UGPR
has posted its updated Integrated System (IS)
Transmission and Ancillary Services Rate Calculation, which
will be effective May 1, 2009. The updated documents are
posted under the "Current Rates/Losses" folder. The
following documents were mailed to UGPR's Transmission
Customers and Other Interested Parties on 04/14/2009: IS
Rate
Calculation - May 1, 2009
If you
have any questions, please contact Steve Sanders at
406-247-7436.
01/12/2009: Status Update on
Integrated System (IS) Transmission Rate Adjustment
Change of Scope in Transmission Rate Adjustment
Western's Upper Great Plains Region (UGPR) provided
an Advance Announcement of Rate Adjustment at a public
meeting held June 10, 2008. The announcement
included potential rate adjustments that would be required
for IS participation in the proposed Midwest Independent
System Operator's (Midwest ISO) Tariff Module F, Part III
(Market Integration Service) as described in their Western
Markets filing with the Federal Energy Regulatory
Commission (FERC). UGPR also described potential
rate adjustments for implementation regardless of Midwest
ISO's Market Integration Service
participation.
The FERC’s action on the Midwest ISO Western Markets
filing has changed the scope of Western’s Upper Great
Plains Region’s anticipated transmission rate adjustment.
Our original intent was to incorporate rate changes
necessitated by the Western Markets filing. However, with
the FERC action and the uncertainty of the outcome of the
Western Markets filing, Western will proceed with this
transmission rate adjustment process for required
adjustments unassociated with the Western Markets filing.
Western intends to publish a Federal Register Notice to
initiate the public rate process early in 2009.
Western's UGPR will initiate a future, additional
rate adjustment process if and as required, to incorporate
IS transmission rate changes made necessary by the final
FERC Order accepting or modifying the Midwest ISO filing
and Western's decision regarding Market Integration
Service.
Related information can be found at: http://www.oatioasis.com/WAPA/WAPAdocs/IS-OATT-Revision-2008-0610-Mtg.ppt,
http://www.wapa.gov.ugp/PowerMarketing/MISOSeams/Default.htm,
and http://www.oatioasis.com/WAPA/WAPAdocs/IS-Rate-Adjustment-2008-0610-Mtg.ppt
If you have any questions, please contact Stan Bayley
at (406) 247-7432.
12/03/2008 : Status Update on Potential
Transmission Tariff Revision (See original 05/19/08 News
Item below)
Western's Upper Great
Plains Region (UGPR) Transmission initiated a review and
potential revision to its Open Access Transmission Tariff
(OATT) at the informal public information meeting on June 10,
2008. The information presented at that meeting is
posted on UGPR's OASIS site under the "UGPR 2008 OATT
Revision/Rate Adjustment" folder and "OATT Revision"
sub-folder. The direct link is: http://www.oatioasis.com/WAPA/WAPAdocs/IS-OATT-Revision-2008-0610-Mtg.ppt
. The necessary OATT changes would address potential IS
participation in the proposed Midwest ISO's Module F, Part III
(Market Integration Service), as filed with the FERC.
Based upon the intervention filings against the proposed
Module F, Part III, FERC has not yet accepted Midwest ISO's
tariff filing or issued an Order rejecting or modifying the
proposal. FERC recently held a technical conference on
November 12, 2008, to review the proposal. It is unclear
at this time when FERC will be prepared to make a final ruling
on Module F, Part III.
UGPR's
Merchant Function, who is evaluating MISO's proposal, has put
its evaluation of the Midwest ISO proposal on hold, pending a
final Order from the FERC. The status of the Western
Merchant review can be found at: http://www.wapa.gov/ugp/PowerMarketing/MISOSeams/Default.htm
UGPR
Transmission has also delayed the process for
changing/updating the OATT to allow for potential
participation in Module F, Part III until the FERC issues a
final Order. The necessary changes to UGPR's OATT are
unknown until FERC accepts or modifies the Midwest ISO
filing. Western will notify all potential Transmission
Customer's when and/if it re-initiates the OATT revision
process related to Midwest ISO's Module F, Part III.
06/27/2008 (Rate Corrections effective 05/1/2008)
: On June 27, 2008, Western sent a
letter to Customers notifying them of a correction to the
transmission service rates effective May 1, 2008.
Excerpted from that letter: "On
April 30, 2008, Western Area Power Administration sent the
Integrated System (IS) Transmission and Ancillary Services Rate Calculation
to be effective May 1,2008. Since then Western has received
revised revenue requirement data and has updated and changed
the annual revenue requirement and transmission rates. The
revenue requirement and transmission rates were changed prior
to the calculation of the bills for May service. Therefore,
the bill you received for May service included these
adjustments and no future adjustment will be required based on these changes."
A copy of
the letter is available under the "Current Rates" folder and
at the following URL: Letter
to
Customers 06/27/2008
06/18/2008 (Business Practice
Update) : Western Area Power Administration
(Western) Upper Great Plains Region (UGPR) made minor changes
to its posted "Business Practice for Adjustment Criteria for
Open Access Transmission Tariff Charges" to clarify the 18
month adjustment period. The updated business practice is effective
immediately (6/18/2008). The updated
document is posted under the "Business Practices" folder and
URL: WAPA
UGPR
Adjustment Criteria for OATT Charges
05/19/2008 (Updated
06/18/08) : Announcement of Potential
Transmission Tariff Revision and Advance Announcement of Rate
Adjustment
6/18/08 Update - The
presentations given at the informal public meeting on June 10,
2008, and any future information, are available in the "UGPR
2008 OATT Revision/Rate Adjustment" Folder.
5/19/2008 Posting:
Western Area Power Administration (Western) is initiating a
review and potential revision to its Open Access Transmission
Tariff (OATT). The OATT applies to transmission service
provided over the Integrated System (IS) owned by Western,
Basin Electric Power Cooperative and Heartland Consumers Power
District, and administered by Western. Western is also
beginning the development of potential new and the revision of
existing transmission and ancillary service rates for services
under the OATT that are currently under consideration.
An
informal public information meeting pertaining to potential
OATT changes and an Advance Announcement of Rate Adjustment
meeting will be held on Tuesday, June 10, 2008, in Sioux
Falls, South Dakota.
Potential
revisions to the OATT, and IS transmission and ancillary
service rate adjustments for services provided under the
provisions of the OATT, will be presented. Interested
persons will be able to provide input and ask questions at the
meeting. A court reporter will be present to record
discussions. The meeting time and place are:
9:00
(CDT), Tuesday, June 10, 2008
Holiday
Inn—City Centre
100 West
8th Street
Sioux
Falls, South Dakota
02/16/2008 (Business Practice Update) : Notice
of upcoming change in UGPR's Business Practice (Deadline for
submission of written transmission service application,
application fee, and deposit): Effective upon 03/01/2008 @ 00:00
CST, the
written Application, Deposit, and non-refundable application
processing fee for Firm Point-to-Point and Network
transmission service requests of one (1) year or longer (as required per Tariff Sections
17.1-17.3 for Firm Point-to-Point transmission service and
Sections 29.1-29.2 for Network service) must be received by
close of business within five
(5) business days of the OASIS Request Queued Date at the following
address, or via wire transfer to Western:
Western Area Power Administration
Upper Great Plains Region
Operations and Transmission
Advisor
2900 4th Ave. N, Room 600
Billings, MT 59101
(or P.O. Box 35800,
Billings, MT 59107-5800)
Wire transfer instructions will be
provided, upon request. If the written Application,
Deposit, and application processing fee are not received
within five (5) business days of the OASIS Request Queued Date,
the OASIS Request status will be changed to "Refused".
This minor change to the UGPR
business practice (which previously has been seven (7)
calendar days) will make this timing requirement consistent
across each of Western's Regional Offices
01/17/2008 (Updated) : Notice of Pre-Decisional
Information Meetings (2/12/08 and 2/14/08) - Potential
Consolidation of Western Balancing Authorities, including
Upper Great Plains Region West Side "WAUW" Balancing
Authority (BA): A letter sent to Western's
customers announcing the subject Information meetings is
available at the following URL:
Notice
Letter
- Potential BA Consolidation Information Meetings - January
16, 2008
The
agenda and presentation for the subject meetings are
available:
Potential
BA
Consolidation Information Meetings (2/12 and 2/14/08) - Agenda
Potential
BA
Consolidation Information Meetings (2/12 and 2/14/08) -
Presentation
The status of the process and
subsequent meeting agenda/presentations are available on
Western's main corporate web site at: Strategic
Planning
- Operations Consolidation Proposal
12/26/2007 (Updated
05/30/08, to reflect extension of testing period to
August 29, 2008) : White Substation 345 kV
Interconnection Project Update (December 26, 2007):
Northern States Power Company (NSP) and the Western Area Power
Administration (Western) have entered into a letter agreement
that facilitates the temporary closure of the NSP-Western 345
kV transmission to transmission interconnection at Western’s
White Substation (White Interconnection) on an interim basis
for operational testing purposes through August 29,
2008. During this time, Western and NSP will
work to complete outstanding transmission study analysis, and
negotiate and execute required transmission service and
replacement interconnection agreements. Western will
open the interconnection in the event of adverse reliability
impacts to the Integrated System during this interim timeframe
or at the conclusion of this interim testing period unless
successor contractual arrangements are completed. The
White Interconnection will not be closed on a permanent basis
until Western and NSP have executed long term transmission
service arrangements and a replacement interconnection
agreement.
For
information, please contact Steve Sanders (Western) at (406)
247-7436 or John Lockhart (NSP) at (612) 330-7921.
11/17/2007 : Based upon the upcoming
expiration of the MAPP/MISO Seams Agreement, which addresses
coordination between the MAPP Transmission Providers and the
MidWest ISO (MISO), the parties in the Mid-Continent Area
Power Pool (MAPP), including Western UGPR, have been reviewing
and providing comments to the MidWest ISO regarding its recent
preliminary proposals to replace the MAPP/MISO Seams
Agreement; to continue Reliability Coordination (RC) Services,
to coordinate with MAPP Transmission Providers with manual
redispatch options ("MISO Option 1"), and to also allow
generation and load outside of the MidWest ISO Tariff Module B
footprint to participate in the MidWest ISO Energy Market
while still taking transmission service under the invidivual
MAPP OATT's ("MISO Option 2"). The MidWest ISO has
posted various documents and information describing these
proposals, notes on the meetings with MAPP and other
interested parties, the latest Draft agreements, on its web
site at the following URL:
MISO
Seams
Proposal - 2007, Web Page
The basic
description of "MISO Option 2", which has garnered the most
interest within the MAPP footprint (as set forth by MidWest
ISO in its initial proposal offering) is as follows:
Option
2 – “Join the MISO Market” while continuing to provide
transmission service under individual OATT
- Modules A, C, D, E (see note B) of MISO Energy MarketTariff
will apply
- Pay transmission tariff drive-in and drive-out rates to
obtain full participation in the market
- May select Independent Entity tariff administration services
- May select Transmission Planning: Economic Studies
The Integrated System (IS) owners
are reviewing these MidWest ISO proposals. A new folder
in the Documents section of Western UGPR's OASIS page entitled
"MISO Seams Proposals" has been created to post various
documents related to the potential impacts to the Transmission
Customers of the IS. The IS owners recently provided the
MidWest ISO with comments regarding the necessary transmission
service that would be required to allow for this market
integration across various transmission tariff seams.
The preliminary version of that document is posted under this
new folder, and is as follows:
Principles
of
Market Integration Transmission Service (PRELIMINARY) - November 26, 2007. (Updated 12/3/07)
11/05/2007: On November
1, 2007, Western Area Power Administration (Western) filed
revisions to its Open Access Transmission Tariff (Tariff) with
the Federal Energy Regulatory Commission (FERC).
Specifically, Western is modifying the Section 7 billing and
payment provisions in its Tariff to create the flexibility to
require Transmission Customers to pay for transmission service
in advance. However, advance payment will only be
required if it is included in a rate schedule adopted in a
public process. Western requested that FERC
deem this modification effective as of December 1, 2007.
The FERC generated PDF document for this informational filing
is as follows:
WAPA
Tariff
Revision NJ08-1-000, November 1, 2007
If you have any questions, please
contact Steve Sanders at 406-247-7436.
07/06/2007: On July 6,
2007, Western Area Power Administration (Western) filed
revisions to its Open Access Transmission Tariff (Tariff) with
the Federal Energy Regulatory Commission (FERC).
Specifically, in response to an order issued by FERC on June
28, 2007 (June 28 Order), Western modified its pro forma Small
Generator Interconnection Agreement to remove the small wind
generator technical requirements proposed in Western’s filing
dated March 1, 2007, in Docket No. NJ07-2-000.
Western requested that FERC deem these modifications
effective as of May 1, 2007, the date originally
accepted by FERC in its June 28 Order. The FERC
generated PDF document for this filing is as follows:
WAPA
Tariff
Revision NJ07-2-001, July 6, 2007
06/21/2007: On June 21, 2007, Western Area
Power Administration (Western) filed revisions to its Open
Access Transmission Tariff (Tariff) with the Federal Energy
Regulatory Commission (FERC). Specifically, in response
to an order issued by FERC on May 21, 2007, Western defined in
its OATT the terms “New Rate,” “Rate,” “Rate Adjustment,” and
“Rate Formula Adjustment,” all of which are currently used or
defined under 10 CFR Part 903. Western
requested
that FERC deem these definitions effective as of January 25,
2005, the date originally accepted by FERC in its
July 6, 2005 order applicable to Western’s applicable OATT
revision filing in Docket No. NJ05-1-000. The FERC
generated PDF document for this filing is as follows:
WAPA
Tariff
Revision NJ05-1-002, June 21, 2007
05/24/07 :
Western UGPR sent a letter to all of its Network Customers
clarifying the restrictions on the use of Network Integration
Transmission Service for Third-Party Sales, and notifying the
Network Customers of Western plans to develop the necessary
monitoring tools tool ensure that Network Service is not
used inappropriately. A copy of the letter mailed to
UGPR's Network Customers on 05/24/2007 is as
follows: Restrictions
on
use of Network Service - May 24, 2007.
05/01/07 : Western UGPR has posted
its updated Open Access Transmission Tariff (OATT) documents
(filed with FERC on March 2, 2007) that became effective on
May 1, 2007, under the "Tariff" folder links. The
generation interconnection procedures summary document was
updated to reflect the inclusion of the SGIP under the
"Generator Interconnections" folder.
04/26/07 (This
news item obsolete with posting of rates effective May
1, 2008) : Western UGPR has posted
an update to its Integrated System (IS) Transmission and
Ancillary Services Rate Calculation, which will be effective
May 1, 2007. The updated documents are posted under the
"Current Rates/Losses" folder. The following documents
were mailed to UGPR's Transmission Customers and Other
Interested Parties on 04/26/2007: IS
Rate
Calculation Update - May 1, 2007
04/02/07 (This news
item obsolete with posting of rates effective May 1,
2008) : Western UGPR
has posted its updated Integrated System (IS) Transmission and
Ancillary Services Rate Calculation, which will be effective
May 1, 2007. The updated documents are posted under the
"Current Rates/Losses" folder. The following documents
were mailed to UGPR's Transmission Customers and Other
Interested Parties on 04/02/2007: IS
Rate
Calculation - May 1, 2007
04/02/07 : On March 2, 2007, Western
Area Power Administration (Western) filed non-jurisdictional
modifications to its Open Access Transmission Tariff (OATT),
Large Generator Interconnection Procedures and Large Generator
Interconnection Agreement, and to incorporate its Small
Generator Interconnection Procedures and Small Generator
Interconnection Agreement in the OATT, pursuant to the
Commission’s Order Nos. 2003-C, 676, 676-A, 661, 661-A, 2006,
2006-A, 2006-B. Western also requests that the Commission
issue a declaratory order determining that its Tariff
maintains a “safe harbor” tariff and that it may not be denied
transmission access by any FERC-jurisdictional public entity
pursuant to sections 35.28(e) and (f) of the rules and
regulations. (FERC Docket No. NJ07-2-000). The
FERC generated PDF documents for this filing are as follows:
WAPA
Tariff
Revision NJ07-2-000, March 2, 2007 (Part 1 of 4)
WAPA
Tariff
Revision NJ07-2-000, March 2, 2007 (Part 2 of 4)
WAPA
Tariff
Revision NJ07-2-000, March 2, 2007 (Part 3 of 4)
WAPA
Tariff
Revision NJ07-2-000, March 2, 2007 (Part 4 of 4)
Western has requested that the
revised Tariff become effective on May 1, 2007.
Information
related to Western's OATT Revisions is available at the
following URL: http://www.wapa.gov/transmission/oatt.htm
03/29/07 (Business
Practice Update) : Western UGPR has
posted an updated Business Practice for its Behind the Meter
Generator Policy. The updated
document is posted under the "Business Practices" folder, or
can be accessed directly at the following URL: UGPR
Behind
the Meter Gen Policy
10/02/06 (Replaced on 06/18/08 with posting
above) : Western UGPR has posted an updated
Business Practice for Adjustment Criteria for Open Access
Transmission Service Tariff (OATT) Charges that will be effective
on 12/01/2006. The updated document is posted under
the "Business Practices" folder, or can be accessed directly
at the following URL: WAPA
UGPR
Adjustment Criteria for OATT Charges
12/05/2005 -- Removal of Netting on
WAUE-SPC/SPC-WAUE paths due to ATC manipulation on
SPC-WAUE path
On 12/05/2005,
the Western Area Power Administration (UGPR) requested
the MAPP Transaction Coordinator to remove the netting
of reservations on the WAUE-SPC and SPC-WAUE paths in
the calculation of ATC's on either path, to eliminate
the recent manipulation of ATC's in one direction by the
repeated submission of reservations in the opposite
direction which were never scheduled on.
06/09/2005 -- WAPA
Filing to FERC in response to FERC's Order 2006 (Small
Generator Interconnections)
On 06/09/2005,
the Western Area Power Administration submitted the
following filing to the Federal Energy Regulatory
Commission (FERC) in response to the FERC's
Standardization of Small Generator Interconnection
Agreements (SGIA) and Small Generator Interconnection
Procedures (SGIP) Final Order (Order 2006), issued May
12, 2005.
WAPA
SGI
Filing to FERC, 06/09/2005 (PDF document)
<>
11/19/2004
-- Notice
of termination of MAPP Loss Repayment Policies,
Effective 00:00 CST on Nov 1, 2004
Effective, 00:00 CST on November 1, 2004, the
Western Area Power Administration - Upper Great Plains
Region (WAPA) will terminate implementation of MAPP Loss
Repayment Policies that became effective on February 1,
2001, and will no longer require collection of 3rd party
losses by WAPA when WAPA is identified as the Source
Scheduling Participant (SSP) by the Transmission
Customer. This change to policy does not preclude
MAPP members who were responsible for providing MAPP
losses prior to February 1, 2001 from continuing to
provide those losses.
With 30 day prior notification to change of policy, WAPA
reserves the right to reinstate MAPP LRP 3rd party loss
collection procedure.
If you have any scheduling/tagging questions, please
contact:
Current Scheduling Day: Generation Dispatcher
at 605-882-7584
Next Scheduling Day:
Generation Dispatcher at 605-882-7542
02/14/2005 Update
-- OATT Revision
& Large Generator Interconnection
Procedures/Agreement
<>
11/01/2004 The
Western Area Power Administration (Western) is revising
its Open Access Transmission Service Tariff
(Tariff). Western’s existing Tariff was approved by
the Federal Energy Regulatory Commission (Commission) on
April 12, 2002. Western intends to update certain
Tariff provisions, adopt the principal features of the
Commission’s Standard Large Generator Interconnection
Procedures (LGIP) and Standard Large Generator
Interconnection Agreement (LGIA) consistent with
applicable law, and to make additional changes to further
Western’s mission and transmission marketing
efforts. Western has published a Federal Register
notice available at http://www.wapa.gov/media/fedreg.htm
announcing a public meeting and an opportunity for
informal comments on Western’s revised Tariff prior to
filing with the Commission.
The revised Tariff, a summary of changes Western intends
to make to its existing Tariff, and information about the
tariff revision process is posted on Western’s Web site at
http://www.wapa.gov/oatt.htm.
<>
02/09/2004 -- Standards of
Conduct - WAPA Informational Filing to FERC 2/9/04
Western submitted the following Standards
of Conduct (SOC) Informational Filing to FERC on
02/09/04.
<>
WAPA SOC
Informational Filing, 02/09/2004 (Word document)
<>
03/04/2003
-- Notice of Proposed Extension of the
Transmission Service Rate Schedules
<>
Western posted a Federal Register Notice on 03/04/2003
regarding extension of the Transmission Service Rate Schedules
through September 30, 2005. Federal
Register Notice, 03/04/2003 (PDF document)
<>
11/20/2002 -- Notice of
Initiation of Process to Extend Tariff Rate Schedules
Western is beginning the process to extend the
Tariff Rate Schedules, through September 30, 2005.
<>
07/30/2002 -- Update to
Timing Requirements regarding E-tags (Updated: 10/07/2002)
Future
Day
Scheduling: (New: 10/07/2002)
Effective
October
14, 2002, for future day scheduling into, out of, or
through the WAUE/WAUW Control areas, WAPA will no longer
require a separate schedule be faxed to the Operations Office.
WAPA will use the E-tag as the schedule to meet this
requirement.
Current
Day
Scheduling: (Updated
10/07/2002)
Effective August 1, 2002, for current
day scheduling into, out of, or through the WAUE/WAUW
Control areas, WAPA will no longer require a separate
schedule be faxed to the Operations Office. WAPA will
use the E-tag as the schedule to meet this
requirement. The E-tag must be available for viewing
by 20 minutes prior to the start of the schedule.
<>
<>
04/23/2002
-- Posting
of
A/WAPA/YTW-YTP// and A/WAPA/YTP/YTW// Paths and Associated
ATC's
Effective
at 00:00 (Central Time) on 05/01/2002 (concurrent with the
rate changes), the boundary of the Integrated System will
extend to the Yellowtail (PacifiCorp) substation (New POR/POD
of "YTP"). Western has posted the new "YTP" POR/POD and
included this new point in the valid POR/POD combinations of
the appropriate existing transmission paths. In
addition, Western has posted two new transmission paths on its
OASIS page : A/WAPA/YTW-YTP// and A/WAPA/YTP-YTW//.
These paths represent the 230kV tie line between the
Yellowtail (WAPA) substation and the Yellowtail (PacifiCorp)
substation. Western, in its latest coordinated review of
the Yellowtail substation cost allocations between the Western
Upper Great Plains Region and the Western Rocky Mountain
Region, has agreed that approximately 25% of the capacity of
the 230kV tie line will be included in the Integrated System
(IS) based upon the annual Yellowtail substation costs
included in the IS rate. Therefore, the Upper Great
Plains Region's share of the tie line is equal to a 120 MW TTC
limit in either direction. Available Transmission
Capacity (ATC) values will be posted on the two new paths.
<>
WACM Control Area
Scheduling Requirements:
Transmission service from/to the new
POR/POD of "YTP" will still cross Western's Rocky Mountain
Region control area (WACM), and therefore, scheduling and
tagging arrangments will still need to be made with the WACM
control area, in addition to the WAUW and PACE control areas.
<>
02/04/2002
-- Posting of Additional WAPA Scheduled
Outages
Note:
Since
the conversion of the Mid-Continent Area Power Pool (MAPP)
Security Center to the Mid-West Independent System Operator
(MISO) St Paul Security Center, Western’s submitted
transmission outage schedules for the back-to-back DC Ties
between MAPP and WSCC and Western’s facilities in the WSCC
region have been omitted from the Transmission Outage
Schedules posted on the MAPP OASIS. Therefore, until such time
as these additional outage schedules are restored to the
standard MAPP/MISO outage lists, Western will post these
additional outage schedules on the WAPA OASIS page under the
INFORMATION page, and at the following URL:
<>
http://www.wapa.gov/ugp/oasis/WAPA-Additional-Outages.htm